CN101119029A - 一种电力系统自动发电控制的超前控制方法 - Google Patents

一种电力系统自动发电控制的超前控制方法 Download PDF

Info

Publication number
CN101119029A
CN101119029A CNA2007101752513A CN200710175251A CN101119029A CN 101119029 A CN101119029 A CN 101119029A CN A2007101752513 A CNA2007101752513 A CN A2007101752513A CN 200710175251 A CN200710175251 A CN 200710175251A CN 101119029 A CN101119029 A CN 101119029A
Authority
CN
China
Prior art keywords
power
power system
ideal
electric power
local control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007101752513A
Other languages
English (en)
Other versions
CN100499310C (zh
Inventor
张伯明
吴文传
李予州
孙宏斌
江木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CNB2007101752513A priority Critical patent/CN100499310C/zh
Publication of CN101119029A publication Critical patent/CN101119029A/zh
Application granted granted Critical
Publication of CN100499310C publication Critical patent/CN100499310C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/14District level solutions, i.e. local energy networks

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种电力系统自动发电控制的超前控制方法,属于电力系统调度自动化技术领域。首先设定电力系统本地控制区域的理想运行状态的发电功率PG *,PG *=PD-ΔfKL+Ploss+PT S,设PD+Ploss=PG-PT,则PG *=PG-ΔfKL+PT+PT S;设PG′=PG-ΔfKL-PT,则PG *=PG′+PT S;设当前时刻为tn,对tn+1时刻的理想发电功率PG *进行预测,得到理想发电功率的预测值:PG *F (tn+1)=PGF(tn+1)+PT S(tn+1);根据理想发电功率的预测值,调节相应自动发电控制机组。本发明方法符合电力系统自动发电控制过程的物理实际和运行现状,可以有效提高电力系统频率和联络线功率质量,提高现有AGC系统利用效率,合理安排水火电资源,利于节能降排。

Description

一种电力系统自动发电控制的超前控制方法
技术领域
本发明涉及一种电力系统自动发电控制的超前控制方法,属于电力系统调度自动化技术领域。
背景技术
电力系统自动发电控制(以下简称AGC)是通过调节电力系统中本地控制区域内的发电机有功功率,使本地控制区与其它控制区的联络线功率偏差和系统频率偏差满足运行要求,从而保证电网安全、优质运行。参与自动发电控制的机组大多是响应较快的优质的水电机组,响应方式为滞后校正。目前,大多数控制区域,比如省级或大区电网都有相当数量的AGC机组,但是能够满足电力系统自动发电控制要求的快速响应的优质水电AGC机组在缺水地区比较稀缺,而且,即使是多水电省份,频繁地把大量的优质水电机组用于校正控制,也不利于电网安全、优质运行,还会浪费水利资源,增加火电机组的资源消耗和环境污染。
发明内容
本发明的目的是提出一种电力系统自动发电控制的超前控制方法,该方法以满足下一时刻电力系统频率和本地控制区域联络线功率交换要求的机组理想发电功率为超前自动发电控制的目标,考虑电力系统内本地控制区域的网损因素、负荷的一次调频因素、本控制区与其它控制区间的联络线计划因素以及量测采集的便利性因素,以准确预测出未来时刻本地控制区域的理想的发电总功率,并以此指导自动发电控制的超前控制。
本发明提出的电力系统自动发电控制的超前控制方法,包括以下步骤:
(1)设定电力系统本地控制区域的理想运行状态的发电功率PG * P G * = P D - Δf K L + P loss + P T S , 其中PD为电力系统中本地控制区域的负荷,KL为电力系统中本地控制区域的负荷单位调节功率,Δf为电力系统频率变化量,Ploss为电力系统中本地控制区域的网损,PT S为电力系统中本地控制区域与其它控制区域之间联络线计划功率;该理想运行状态为:系统频率f=50HZ,电力系统中本地控制区域与其它控制区域之间联络线的交换功率PT等于联络线的计划功率PT S
(2)设PD+Ploss=PG-PT,则 P G * = P G - Δf K L - P T + P T S ; 设PG′=PG-ΔfKL-PT,则
P G * = P G ′ + P T S ;
(3)设当前时刻为tn,对tn+1时刻的理想发电功率PG *进行预测,得到理想发电功率的预测值: P G * F ( t n + 1 ) = · P G ′ F ( t n + 1 ) + P T S ( t n + 1 ) , 其中P′G F(tn+1)为tn时刻对PG′的预测值,PT S(tn+1)为从调度部门直接得到的tn+1时刻的本地控制区与其它控制区之间的联络线计划功率;
(4)根据上述理想发电功率的预测值,调节相应自动发电控制机组。
本发明提出的电力系统自动发电控制的超前控制方法,其特点如下:
1、不同于传统的电力系统超前自动发电控制的目标,提出了超前自动发电控制的新目标:满足下一时刻电力系统频率和本地控制区域联络线功率交换要求的机组理想发电功率;
2、不同于传统的负荷预测对采集的负荷数据进行预测,本发明针对超前自动发电控制的新目标进行预测;
3、不同于传统的负荷预测仅把采集的电力系统本控制区的负荷数据作为预测数据,本发明的预测数据中考虑电力系统本控制区的网损因素、负荷的一次调频因素、本控制区与其它控制区间的联络线计划因素、以及量测采集的便利性因素。
以上特点使得本发明的方法符合电力系统自动发电控制过程的物理实际和运行现状,通过预测未来时刻满足电力系统频率和本控制区与其它控制区之间联络线控制要求的理想的本控制区有功发电,对本控制区进行超前自动发电控制,这样,可以有效提高电力系统频率和联络线功率质量,提高现有AGC系统利用效率,合理安排水火电资源,利于节能降排。
附图说明
图1为电力系统中本地控制区与其它控制区互联示意图,图中,PT为本地控制区与其它控制区的联络线功率;PG为本地控制区总发电功率;Ploss为本地控制区网损功率;PD为本地控制区负荷功率;A为本地控制区域;B为等效的其它控制区域。
具体实施方式
本发明提出的电力系统自动发电控制的超前控制方法,包括以下步骤:
(1)设定电力系统本地控制区域的理想运行状态的发电功率PG * P G * = P D - Δf K L + P loss + P T S , 其中PD为电力系统中本地控制区域的负荷,KL为电力系统中本地控制区域的负荷单位调节功率,Δf为电力系统频率变化量,Ploss为电力系统中本地控制区域的网损,PT S为电力系统中本地控制区域与其它控制区域之间联络线计划功率;该理想运行状态为:系统频率f=50HZ,电力系统中本地控制区域与其它控制区域之间联络线的交换功率PT等于联络线的计划功率PT S
(2)设PD+Ploss=PG-PT,则 P G * = P G - Δf K L - P T + P T S ; 设PG′=PG-ΔfKL-PT,则
P G * = P G ′ + P T S ;
(3)设当前时刻为tn,对tn+1时刻的理想发电功率PG *进行预测,得到理想发电功率的预测值: P G * F ( t n + 1 ) = P G ′ F ( t n + 1 ) + P T S ( t n + 1 ) , 其中P′G F(tn+1)为tn时刻对PG′的预测值,PT S(tn+1)为从调度部门直接得到的tn+1时刻的本地控制区与其它控制区之间的联络线计划功率;
(4)根据上述理想发电功率的预测值,调节相应自动发电控制机组,即取tn+1时刻PG *的预测值PG *F(tn+1)为tn+1时刻电力系统自动发电控制的超前控制目标,调节相应自动发电控制机组。
以下结合图1所示的电力系统中本地控制区与其它控制区互联示意图,详细介绍本发明方法内容:
1)确定电力系统内本地控制区的理想发电功率PG *。电力系统稳态运行条件下,本地控制区域的理想运行状态为:系统频率为额定频率f=50HZ、本地联络线交换功率PT等于联络线计划功率PT S。该理想运行状态下的有功发电功率为本地理想有功发电,参照图1,该发电包括3部分:
a)额定频率下本地控制区域的负荷。传统意义下采集的负荷都没有考虑频率因素,考虑负荷频率效应后,实际负荷PD R为: P D R = P D - Δf K L , 其中,PD为本地控制区负荷;Δf为电力系统频率变化量;KL为本地控制区负荷单位调节功率;
b)本地控制区与其它控制区的联络线功率PT,理想状态下其值等于PT S
c)本地控制区网损Ploss
参照图1,电力系统中本地控制区域A的理想发电功率PG *为上述3部分功率的和:
P G * = P D - Δf K L + P loss + P T S - - - ( 1 )
2)将PG *中不易采集的数据进行替换。式(1)中,由于获得Ploss所需测点太多,不易有效准确地获得其值,而图1所示本地控制区A内实测的发电等于实测负荷、网损和联络线功率的和:PG=PD+Ploss+PT,由于PG、PT比Ploss易于获取,所以用PG-PT代替PD+Ploss,PG *的计算公式由式(1)变为:
P G * = P G - Δf K L - P T + P T S - - - ( 2 )
3)将PD *进一步分解。令
PG′=PG-ΔfKL-PT      (3)
(2)式变为:
P G * = P G ′ + P T S - - - ( 4 )
假设当前时刻为tn,利用式(4)对tn+1时刻的PG *作预测时,tn+1时刻的联络线计划PT S(tn+1)可由调度运行部门获得,因此可以先不考虑PT S,而是预测PG′在tn+1时刻的预测值P′G F(tn+1),由调度运行部门获得联络线计划PT S(tn+1),这样,到tn+1时刻,PG *的预测值PG *F(tn+1)为:
P G * F ( t n + 1 ) = P G ′ F ( t n + 1 ) + P T S ( t n + 1 ) - - - ( 5 )
4)预测P′G F(tn+1)。预测的典型方法为以PG′为预测数据,使用日周期多点外推法预测P′G F(tn+1):
a)数据准备
由SCADA系统获得电力系统当前频率与额定频率的差Δf:Δf=f-50以及PT、PG;由电力调度中心的运行方式部门得到KL;按(3)式计算PG′;以适当间隔(如1分钟、5分钟)将PG′存入数据库;
b)从数据库得到当天最近的m个时刻点的PG′历史数据序列PG′(t0,n-i)(i=0,1,2,...,m-1)作为预测未来tn+1时刻P′G F(tn+1)的基础数据;
当天最近的m个时刻点的PG′为:
PG′(t0,n),PG′(t0,n-1),…,PG′(t0,n-m+2),PG′(t0,n-m+1)
从数据库取与之对应的前一日数据:
PG′(t-1,n),PG′(t-1,n-1),…,PG′(t-1,n-m+2),PG′(t-1,n-m+1),多取一个对应于tn+1时刻的昨日数据:PG′(t-1,n+1)
使用前一日和今日同一点的每对数据,都可得出一个预测值:
P G ′ F ( t n + 1 ) = P G ′ ( t 0 , n - i ) + [ P G ′ ( t - 1 , n + 1 ) - P G ′ ( t - 1 , n - i ) ]
从数据库取与当天点对应的前第d日数据:
PG′(t-d,n),PG′(t-d,n-1),…,PG′(t-d,n-m+2),PG′(t-d,n-m+1),多取一个对应于tn+1时刻的前第d日数据:PG′(t-d,n+1),
使用前第d日和今日同一点的每对数据,也可得出一个预测值:
P G ′ F ( t n + 1 ) = P G ′ ( t 0 , n - i ) + [ P G ′ ( t - d , n + 1 ) - P G ′ ( t - d , n - i ) ]
以上各式中,i=0,1,…,m-1。
使用前D天的历史负荷数据,每天都可以得到m个预测值,共有D×m个预测值,求平均值即为预测结果:
P G ′ F ( t n + 1 ) = 1 D · m Σ d = 1 D Σ i = 1 m [ P G ′ ( t 0 , n - 1 ) + P G ′ ( t - d , n + 1 ) - P G ′ ( t - d , n - i ) ] - - - ( 7 )
根据近大远小的原则考虑权重: w ( d , i ) = D * m - ( d * ( i + 1 ) + ( d - 1 ) * ( m ) ) + 1 Σ j = 1 D * m j
P G ′ F ( t n + 1 ) = Σ d = 1 D Σ i = 1 m [ P G ′ ( t 0 , n - i ) + P G ′ ( t - d , n + 1 ) - P G ′ ( t - d , n - i ) ] · w ( d , i ) - - - ( 8 )
5)预测tn+1时刻的PG *F(tn+1)。第4)步已经获得PG′预测值P′G F(tn+1),再由调度部门得到PT S(tn+1),参照(5)式,这2个数的和就是PG *F(tn+1), P G * F ( t n + 1 ) = P G ′ F ( t n + 1 ) + P T S ( t n + 1 ) .
6)根据第5)步的预测结果PG *F(tn+1)调节相应AGC机组。
a)机组分类
将电力系统本地控制区的AGC机组分类,传统的参与滞后校正的AGC机组为滞后AGC机组:L_AGC(Lag-AGC)机组;参与本发明超前控制的AGC机组为超前AGC机组:A_AGC(Advanced-AGC)机组,这样,包括原来的非AGC机组(N_AGC),机组划分如下表:
表1机组分类
  机组分类   L_AGC机组   A_AGC机组   N_AGC机组
  机组要求   秒级调节能力,一般为优质的水电机组   分钟级调节能力,一般为火电AGC机组或   普通的机组
 慢速的水电AGC机组
  主要功能   校正控制  超前控制   按计划发电
  调节周期   秒级  分钟级   15分钟-1天
本发明主要调节A_AGC机组。
b)确定A_AGC机组总调节功率
PG *F(tn+1)由N_AGC机组、L_AGC机组和A_AGC机组的发电功率组成。到tn+1时刻:N_AGC机组执行预先设定的机组计划,其发出功率为:PS N_AGC(tn+1);L_AGC机组到tn+1时刻运行于调度部门预先设定的运行值PB L_AGC(tn+1);这样A_AGC机组到tn+1时刻计划总发功率PS A_AGC(tn+1)为:
P A _ AGC S ( t n + 1 ) = P G * F ( t n + 1 ) - P N _ AGC S ( t n + 1 ) - P L _ AGC B ( t n + 1 ) - - - ( 9 )
A_AGC机组发电总调节功率ΔPS A_AGC(tn+1)为其下点计划总发电功率PS A_AGC(tn+1)与当前发电功率PA_AGC(tn)的差:
Δ P A _ AGC S ( t n + 1 ) = P A _ AGC S ( t n + 1 ) - P A _ AGC ( t n ) - - - ( 10 )
c)ΔPS A_AGC(tn+1)按剩余可调容量大小分配给各个A_AGC机组具体分配算法如下:
①根据ΔPS A_AGC(tn+1)正负确定调节方向,正为上调,负为下调;
②根据调节方向,把A_AGC机组按剩余容量比排序;
③上调时,把上调剩余容量最多的机组的出力上调一个步长的功率 Δ P A _ AGC S ( t n + 1 ) = Δ P A _ AGC S ( t n + 1 ) - Δ P ‾ , 若该机组上调剩余容量小于
Figure A20071017525100075
则转④;下调时,把下调剩余容量最多的机组的出力下调一个步长的功率ΔP &Delta; P A _ AGC S ( t n + 1 ) = &Delta; P A _ AGC S ( t n + 1 ) - &Delta; P &OverBar; , 若该机组下调剩余容量小于|ΔP|则转④;如果调完总调节量, | &Delta; P A _ AGC S ( t n + 1 ) | < &xi; (ξ是一小的正数),转④否则转②;
④结束。

Claims (1)

1.一种电力系统自动发电控制的超前控制方法,其特征在于该方法包括以下步骤:
(1)设定电力系统本地控制区域的理想运行状态的发电功率PG * P G * = P D - &Delta; fK L + P loss + P T S , 其中PD为电力系统中本地控制区域的负荷,KL为电力系统中本地控制区域的负荷单位调节功率,Δf为电力系统频率变化量,Ploss为电力系统中本地控制区域的网损,PT S为电力系统中本地控制区域与其它控制区域之间联络线计划功率;该理想运行状态为:系统频率f=50HZ,电力系统中本地控制区域与其它控制区域之间联络线的交换功率PT等于联络线的计划功率PT S
(2)设PD+Ploss=PG-PT,则 P G * = P G - &Delta; fK L - P T + P T S ; 设PG′=PG-ΔfKL-PT,则 P G * = P G &prime; + P T S ;
(3)设当前时刻为tn,对tn+1时刻的理想发电功率PG *进行预测,得到理想发电功率的预测值: P G * F ( t n + 1 ) = P G &prime; F ( t n + 1 ) + P T S ( t n + 1 ) , 其中PGF(tn+1)为tn时刻对PG′的预测值,PT S(tn+1)为从调度部门直接得到的tn+1时刻的本地控制区与其它控制区之间的联络线计划功率;
(4)根据上述理想发电功率的预测值,调节相应自动发电控制机组。
CNB2007101752513A 2007-09-28 2007-09-28 一种电力系统自动发电控制的超前控制方法 Expired - Fee Related CN100499310C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007101752513A CN100499310C (zh) 2007-09-28 2007-09-28 一种电力系统自动发电控制的超前控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007101752513A CN100499310C (zh) 2007-09-28 2007-09-28 一种电力系统自动发电控制的超前控制方法

Publications (2)

Publication Number Publication Date
CN101119029A true CN101119029A (zh) 2008-02-06
CN100499310C CN100499310C (zh) 2009-06-10

Family

ID=39055013

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007101752513A Expired - Fee Related CN100499310C (zh) 2007-09-28 2007-09-28 一种电力系统自动发电控制的超前控制方法

Country Status (1)

Country Link
CN (1) CN100499310C (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101938141A (zh) * 2010-08-02 2011-01-05 中国南方电网有限责任公司 大电网并网发电厂自动发电控制效果评价优化方法
CN102074957A (zh) * 2010-12-24 2011-05-25 中国长江三峡集团公司 一次调频与agc负荷调节协同控制的方法
CN102222936A (zh) * 2011-06-20 2011-10-19 浙江省电力试验研究院 一种并发电网的磨组启停控制方法和系统
CN101645599B (zh) * 2009-08-25 2012-05-02 广东电网公司电力科学研究院 一种自动发电控制目标负荷预处理装置
CN103490413A (zh) * 2013-09-27 2014-01-01 华南理工大学 一种基于智能体均衡算法的智能发电控制方法
CN104218617A (zh) * 2014-09-22 2014-12-17 国家电网公司 一种柔性负荷参与有功超前调度的一致性控制方法
CN105391095A (zh) * 2015-12-17 2016-03-09 国家电网公司 基于在线安全稳定分析的电网自动发电控制方法
CN107992059A (zh) * 2018-01-08 2018-05-04 陕西理工大学 电磁智能车的控制方法
CN110912188A (zh) * 2019-11-27 2020-03-24 天津瑞能电气有限公司 基于ai的新型微电网能源管理系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295859C (zh) * 2004-05-08 2007-01-17 上海慧能科技有限公司 发电机组一次调频调节效能测定方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101645599B (zh) * 2009-08-25 2012-05-02 广东电网公司电力科学研究院 一种自动发电控制目标负荷预处理装置
CN101938141A (zh) * 2010-08-02 2011-01-05 中国南方电网有限责任公司 大电网并网发电厂自动发电控制效果评价优化方法
CN102074957A (zh) * 2010-12-24 2011-05-25 中国长江三峡集团公司 一次调频与agc负荷调节协同控制的方法
CN102222936A (zh) * 2011-06-20 2011-10-19 浙江省电力试验研究院 一种并发电网的磨组启停控制方法和系统
CN102222936B (zh) * 2011-06-20 2013-06-26 浙江省电力公司电力科学研究院 一种并发电网的磨组启停控制方法和系统
CN103490413A (zh) * 2013-09-27 2014-01-01 华南理工大学 一种基于智能体均衡算法的智能发电控制方法
CN103490413B (zh) * 2013-09-27 2015-09-02 华南理工大学 一种基于智能体均衡算法的智能发电控制方法
CN104218617A (zh) * 2014-09-22 2014-12-17 国家电网公司 一种柔性负荷参与有功超前调度的一致性控制方法
CN104218617B (zh) * 2014-09-22 2016-04-20 国家电网公司 一种柔性负荷参与有功超前调度的一致性控制方法
CN105391095A (zh) * 2015-12-17 2016-03-09 国家电网公司 基于在线安全稳定分析的电网自动发电控制方法
CN107992059A (zh) * 2018-01-08 2018-05-04 陕西理工大学 电磁智能车的控制方法
CN110912188A (zh) * 2019-11-27 2020-03-24 天津瑞能电气有限公司 基于ai的新型微电网能源管理系统

Also Published As

Publication number Publication date
CN100499310C (zh) 2009-06-10

Similar Documents

Publication Publication Date Title
CN101119029A (zh) 一种电力系统自动发电控制的超前控制方法
CN109492819B (zh) 基于时间优化分区的感潮泵站系统变台数+变角日优化运行方法
WO2022252382A1 (zh) 一种源网荷储网络化协调频率控制方法
CN203442950U (zh) 超高温电力蓄能系统
CN104143839B (zh) 基于功率预测的风电场集群限出力有功功率分配方法
CN103151795A (zh) 降低风机损耗的分散式风电场无功优化控制方法及系统
CN205011850U (zh) 铝电解槽热平衡控制装置
CN102751724A (zh) 一种面向需求侧响应基于预测的三相负载调度方法及装置
Sayeed et al. A novel and comprehensive mechanism for the energy management of a Hybrid Micro-grid System
Yu et al. Adaptive load control of electrolytic aluminum for power system frequency regulation based on the aluminum production operation state
Lim et al. Control of Photovoltaic-Variable Speed Diesel Generator battery-less hybrid energy system
CN114243742B (zh) 一种基于5g技术的储能消纳地区风电的调控方法
CN113486509A (zh) 一种综合能源系统多目标优化控制方法
CN110112775B (zh) 一种含分布式储能的微能源网系统
CN207518286U (zh) 电站内储能系统协同汽轮机组调节级全负荷运行系统
Qian et al. Research on source-load coordinated dispatch based on multi-scenario wind power consumption
CN112421686A (zh) 一种信息物理融合的分布式可再生能源分层消纳调控方法
CN106300443B (zh) 一种用于减少弃风的三层热电联供微网能量控制方法
Zhang et al. Research on the wind power accommodation based on peak shaving by using heat storage electric boiler
CN110661267A (zh) 一种蓄热电锅炉负荷参与电网调峰的短时间尺度控制方法
CN117081177B (zh) 一种孤岛模式下水电主调机组微电网运行功率控制方法
CN117013535B (zh) 一种兼顾生态调度需求的水风光火互补容量配置方法
Tian et al. Research on the Influence of Demand Response on the Life of Distribution Network Transformer
CN109004688A (zh) 一种支撑配电网全局电压控制的光伏电站功率协调分配方法
CN114336675B (zh) 光储电站的调频控制方法及装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090610

Termination date: 20190928