CN101117790A - Closure method of large-span continuous steel truss arch - Google Patents

Closure method of large-span continuous steel truss arch Download PDF

Info

Publication number
CN101117790A
CN101117790A CNA200710053007XA CN200710053007A CN101117790A CN 101117790 A CN101117790 A CN 101117790A CN A200710053007X A CNA200710053007X A CN A200710053007XA CN 200710053007 A CN200710053007 A CN 200710053007A CN 101117790 A CN101117790 A CN 101117790A
Authority
CN
China
Prior art keywords
steel
closure
arch
purlin
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710053007XA
Other languages
Chinese (zh)
Other versions
CN100543234C (en
Inventor
秦顺全
周外男
潘东发
李军堂
涂满明
毛伟琦
王东辉
马涛
龚国锋
覃勇刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNB200710053007XA priority Critical patent/CN100543234C/en
Publication of CN101117790A publication Critical patent/CN101117790A/en
Application granted granted Critical
Publication of CN100543234C publication Critical patent/CN100543234C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A closure method for a large-span continuous steel truss arch, which takes the adjustment of cable force of a cable of a tower with a suspended cable or a horizontal cable as the main means, combines the longitudinal moving of a steel truss to realize the closure of the steel truss. The present invention does not require truss lifting equipments, and is a safe, convenient and efficient closure method, which is applicable for the closure of general continuous steel truss beams.

Description

A kind of closure method of large-span continuous steel truss arch
Technical field
The present invention relates to the closure construction method of large-span continuous steel truss arch in the bridge engineering.
Background technology
The closure of traditional large-span steel braced arch for the amount of deflection of closure mouthful and the adjustment of yardarm corner, mainly utilizes Dun Ding to arrange vertical, direction across bridge, vertical bridge to hydraulic jack equipment, a closure mouthful construction need the steel braced arch be pushed up, fall (vertical position adjustment).In the long span bridge beam, the vertical top lifting amount and the horizontal adjustment displacement of purlin are very big, and the jacking force of jack is also very big, so the configuration difficulty and the operation easier of equipment such as jack are big, the system conversion process complexity, and construction risk is big.Bridge involved in the present invention is three Pin continuous steel truss arch structures, and as by tradition top, the beam method that falls closure, single Pin purlin lower fulcrum counter-force reaches 9000t, and every purlin need dispose 4 on the jack of 3000t level, and full-bridge needs 36 at least.Present domestic this tonnage jack that still do not have, what its research and development were produced involves great expense.
Abandoning tradition of the present invention with large-tonnage hydraulic jack top, the beam adjustment that falls closure mouth method, be the adjustment means with the suspension cable on the multilayer tower with suspended cable, in conjunction with the vertical shift of purlin section, the closure of realization steel braced arch, economical and practical.
Summary of the invention
The objective of the invention is at above-mentioned present situation, aim to provide a kind of a kind of closure method of economical and practical large-span continuous steel truss arch.
Feature of the present invention is to utilize close cable system of tower with suspended cable and the horizontal rope of multilayer to adjust yardarm displacement and corner, in conjunction with the vertical shift of purlin section, thereby closure mouthful rod member is installed smoothly, realizes the closure of steel braced arch.
Steel truss arch is established in the process, and when Dun Ding both sides steel braced arch was asymmetric, it is stressed that the close cable system participation of tower with suspended cable main truss is set, and constitutes the stress system of similar cable stayed bridge; When Dun Ding both sides steel braced arch is symmetrical fully, the flat rope of multilayer is set, realizes two cantilever erections of self-balancing type drawing system.Draw cable force to change the displacement and the corner of closure mouthful boom by adjustment, to translation, make be suitable for the joining the two sections of a bridge, etc unstressed installation of rod member of the gap of closure mouthful in conjunction with the vertical bridge of purlin section.
The main construction sequence of continuous steel truss arch span centre closure:
(1) behind the end bay closure of steel braced arch both sides, removes 3#, 5# pier pier-side bracket (4), 3#, the temporary fixed bearing of 5# pier are released to sliding support.2 gantry beams loop wheel machines (3) are installed on 4# pier vault girder steel, and the symmetric double cantilever is installed the steel braced arch.
(2) 3#, 5# pier steel purlin lock 3#, 5# pier girder steel sliding support afterwards to the about 170mm of 4# pier direction vertical shift.
(3) on the node that winds up of 3#, steel purlin, 5# Dun Dun top, tower with suspended cable (1) is installed.
(4) 3#, 5# pier girder erection crane continue to set up the steel purlin forward, hang three layers of hoist cable of stretch-draw (8), (9), (10) successively with the progress of setting up.Hoist cable one end is anchored on the tower with suspended cable, and the other end is anchored on the node of purlin.
(5) 4# pier two gantry beams loop wheel machines set up the steel purlin to bilateral symmetry, hang also three layers of flat rope of stretch-draw (11), (12), (13) successively with the progress of setting up.The two ends of flat rope all are anchored on the node of purlin.
(6) 3#, 4#, 5# pier steel girder erection are adjusted 3#, three layers of stay cable force of 5# pier tower with suspended cable to closure mouthful (7) position, adjust three layers of flat cable force of 4# pier simultaneously, to change main span steel braced arch closure mouthful both sides displacement; The vertical bridge of fine setting 3#, 5# Dun Ding is a mate-assist to displacement, successively realizes the closure of 4#-5# pier and 3#-4# pier two main span main trusses;
(7) remove 4# pier pier-side bracket; Progressively discharge 3#, 4#, the 5# pier draws cable force for three layers, makes main span tie-rod closure mouth be flared to design theory length, and a closure mouthful tie-rod is installed afterwards, finishes the closure of two main spans.
(8) progressively discharge removal suspension cable, flat cable force, and finally remove tower with suspended cable, remove girder erection crane, realize that continuous steel truss arch becomes the bridge state.
The closure method of this large-span continuous steel truss arch does not adopt traditional with large-tonnage hydraulic jack top, the beam adjustment that falls closure mouthful, with the suspension cable on the multilayer tower with suspended cable is the adjustment means, vertical shift in conjunction with the purlin section, realize the closure of steel braced arch, easy, the safety of this method has good economic effect.
Description of drawings
Fig. 1 continuous steel truss arch closure conceptual scheme
Fig. 2 a~Fig. 2 h continuous steel truss arch closing construction block diagram
The close cable system arrangement diagram of Fig. 3 tower with suspended cable
The horizontal rope self equilibrium systems of Fig. 4 arrangement diagram
Fig. 5 a, Fig. 5 b 3# pier, 5# Dun Dun top arrangement diagram
The corresponding relation of each several part title and numbering
The each several part title The representative numbering
Tower with suspended cable 1
Horizontal rope 2
Girder erection crane 3
Pier-side bracket 4
Hang beam and promote the station 5
Girder steel promotes the station 6
The closure mouth 7
The first floor provinculum 8
Second layer provinculum 9
The 3rd layer of provinculum 10
The flat rope of first floor 11
The flat rope of the second layer 12
The 3rd layer of flat rope 13
Formal bearing 14
Distribution beam 1 15
Jack 16
Support buttress 17
Bearing pad stone 18
Pier cap 19
Distribution beam 2 20
Put on the bearing 21
The specific embodiment
(1) three layer of close cable system of tower with suspended cable is referring to Fig. 3.
The close cable system of tower with suspended cable is respectively applied for 3#, 5# pier steel truss arch is established; The anchor point of tower with suspended cable height, rope and angle of inclination selection all will guarantee the safety of steel braced arch in erection process, and satisfy and adjust the closure mouth when joining the two sections of a bridge, etc to suitable position.Pylon column lower end and steel braced arch wind up, and to reserve the free bearing plate hinged for node, begins assembly unit after the closure of end bay girder steel.
The tower with suspended cable suspension cable adopts high-strength parallel steel wire, outsourcing PE topping, and two ends anchor case anchoring up and down, the chill casting anchor is adopted in anchoring, and the hoist cable lower end is the stretch-draw end.The length of chill casting ground tackle is selected meticulously, to guarantee suspension cable enough adjusting length is arranged.
(2) horizontal rope self equilibrium systems is referring to Fig. 4.
The assembly unit of 4# pier steel braced arch, 2 internodes in pier top are installed on pier-side bracket, and all the other internodes are two cantilever symmetry cantilevers.Utilize the symmetrical configuration characteristics of 4# pier both sides steel braced arch, respectively at the level that is provided with between the corresponding node to drag-line.This horizontal Suo Jineng improves the stress of Steel Cantilever braced arch, has reserved the adjustment means for the closure of steel braced arch again.The high-strength parallel steel wire of horizontal Suo Caiyong, two ends are anchored in the girder steel node by the anchor case and reserve on the swallow plate.When main span was joined the two sections of a bridge, etc, 4# pier steel braced arch and pier-side bracket were fixed, adjusted first, second, third layer of horizontal cable force successively, made closure mouthful beam-ends amount of deflection and corner reach the ideal design state.
(3) Dun Ding arranges, referring to Fig. 5
3#, the formal bearing of 5# Dun Ding are freely movable bearing, place the design theory position, are initially lock-out state, carry out spacing with the thrust upper frame to pendulum on the bearing.After the end bay closure, remove the bearing constraint, end bay girder steel integral body in stride the vertical shift New Testament bundle branch seat of laying equal stress on, stride the side girder steel in the free cantilever erection until closure.In stride steel braced arch closure before, to finely tuning, the girder steel vertical shift is to finish in the slip of laying out down by pendulum (21) on the bearing to 3#, the vertical bridge of 5# pier girder steel.The formal bearing of 4# Dun Ding (14) is a fixed bearing, places the design theory position, need not conversion.In the girder steel work progress, only arrange vertical bridge to thrustor at 3#, 5# Dun Ding, 4# Dun Ding does not establish top lifting equipment.

Claims (3)

1. a kind of closure method of large-span continuous steel truss arch is characterized by:
Based on main pier, when carrying out the two cantilever erection steel braced arch of complete symmetry, employing multilayer jump stay, implementation structure system self-balancing; With main pier is that two cantilever erection steel braced arch are carried out on the basis, when two side loads are asymmetric, adopts multilayer tower with suspended cable and guy system.By adjusting the internal force of each drag-line, regulate the displacement and the corner of steel braced arch closure mouth, and, a closure mouthful steel boom spare can be installed smoothly, thereby realize the closure of no roof fall purlin by vertical shift steel purlin.
2. according to the described large-span continuous steel truss arch closure method of claim 1, it is characterized in that: wind up on the node in the steel purlin that the multilayer tower with suspended cable is located at arch springing position correspondence, when tower with suspended cable is installed and the purlin temporary consolidation of bridge to keep stable, after the drag-line stretch-draw of tower with suspended cable, and revert to hinged stressed between the purlin of bridge to improve.
3. continuous steel truss arch closure method according to claim 1 when it is characterized in that the two free cantilever erection of girder steel on the arch springing, need be provided with pier-side bracket, with the effect of opposing construction out-of-balance force.
CNB200710053007XA 2007-08-22 2007-08-22 A kind of closure method of large-span continuous steel truss arch Active CN100543234C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710053007XA CN100543234C (en) 2007-08-22 2007-08-22 A kind of closure method of large-span continuous steel truss arch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710053007XA CN100543234C (en) 2007-08-22 2007-08-22 A kind of closure method of large-span continuous steel truss arch

Publications (2)

Publication Number Publication Date
CN101117790A true CN101117790A (en) 2008-02-06
CN100543234C CN100543234C (en) 2009-09-23

Family

ID=39054042

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710053007XA Active CN100543234C (en) 2007-08-22 2007-08-22 A kind of closure method of large-span continuous steel truss arch

Country Status (1)

Country Link
CN (1) CN100543234C (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101935985A (en) * 2010-09-19 2011-01-05 湖南路桥建设集团公司 Mid-span closure method for steel box girder of cable stayed bridge
CN102091886A (en) * 2009-12-14 2011-06-15 上海市基础工程有限公司 Integral welding closure method for large orthotropically combined steel truss bridge
CN102251487A (en) * 2011-04-29 2011-11-23 中铁五局集团建筑工程有限责任公司 Double oblique steel arch tower in-situ cantilever assembling method
CN103938552A (en) * 2014-04-04 2014-07-23 中铁第四勘察设计院集团有限公司 Self-balancing cantilevering construction method for large-span steel truss arch bridge and main pier limiting supports
CN104652286A (en) * 2015-02-03 2015-05-27 中交第二航务工程局有限公司 Pier top position regulating system for large-span steel truss arch bridge side pier and construction method
CN105648914A (en) * 2015-12-30 2016-06-08 海波重型工程科技股份有限公司 Construction method of middle-and-small-scale steel truss tied-arch bridge
CN105951609A (en) * 2016-03-23 2016-09-21 中铁四局集团钢结构有限公司 Wide span variable girder high continuous steel truss bridge cantilever erection mid-span closure construction method
CN105970836A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN106120573A (en) * 2016-06-30 2016-11-16 中国化学工程第三建设有限公司 Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN109778718A (en) * 2019-03-05 2019-05-21 中铁四局集团有限公司 A kind of construction method of the pure free cantilever erection Middle span closing of Large-Span Continuous steel box-girder main span
CN110016854A (en) * 2019-03-14 2019-07-16 中铁二院工程集团有限责任公司 A kind of short tower oblique pull is put more energy into combination arch bridge construction
CN111576252A (en) * 2020-06-17 2020-08-25 广西交科集团有限公司 Real-time adjusting device and adjusting method for main beam line type in bridge pushing process
CN112030780A (en) * 2020-08-19 2020-12-04 中铁大桥局第七工程有限公司 Steel arch bridge cantilever erection method
CN112227204A (en) * 2020-08-07 2021-01-15 中交二公局第二工程有限公司 Side span pushing closure construction method for cable-stayed bridge
CN112524334A (en) * 2020-11-27 2021-03-19 四川石油天然气建设工程有限责任公司 Construction method for large-scale cable crossing of oil and gas pipeline and tower dynamic stabilization process thereof
CN112900282A (en) * 2021-02-06 2021-06-04 中铁三局集团有限公司 Bidirectional quick pushing equipment system for large-span main beam and construction method
CN113047158A (en) * 2021-02-07 2021-06-29 中铁四局集团有限公司 Temporary limiting device for steel truss multidirectional movable support under action of high mountain valley wind load
CN113136803A (en) * 2021-04-19 2021-07-20 中交第三公路工程局有限公司 River-crossing steel truss bridge closure method
CN116044179A (en) * 2023-03-31 2023-05-02 河北新烨工程技术有限公司 Construction method for installing large-span arch pipe truss

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102091886A (en) * 2009-12-14 2011-06-15 上海市基础工程有限公司 Integral welding closure method for large orthotropically combined steel truss bridge
CN102091886B (en) * 2009-12-14 2013-12-04 上海市基础工程有限公司 Integral welding closure method for large orthotropically combined steel truss bridge
CN101935985A (en) * 2010-09-19 2011-01-05 湖南路桥建设集团公司 Mid-span closure method for steel box girder of cable stayed bridge
CN101935985B (en) * 2010-09-19 2011-11-23 湖南路桥建设集团公司 Mid-span closure method for steel box girder of cable stayed bridge
CN102251487A (en) * 2011-04-29 2011-11-23 中铁五局集团建筑工程有限责任公司 Double oblique steel arch tower in-situ cantilever assembling method
CN102251487B (en) * 2011-04-29 2013-01-02 中铁五局集团建筑工程有限责任公司 Double oblique steel arch tower in-situ cantilever assembling method
CN103938552A (en) * 2014-04-04 2014-07-23 中铁第四勘察设计院集团有限公司 Self-balancing cantilevering construction method for large-span steel truss arch bridge and main pier limiting supports
CN103938552B (en) * 2014-04-04 2016-03-02 中铁第四勘察设计院集团有限公司 Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
CN104652286A (en) * 2015-02-03 2015-05-27 中交第二航务工程局有限公司 Pier top position regulating system for large-span steel truss arch bridge side pier and construction method
CN104652286B (en) * 2015-02-03 2017-02-01 中交第二航务工程局有限公司 Pier top position regulating system for large-span steel truss arch bridge side pier and construction method
CN105648914A (en) * 2015-12-30 2016-06-08 海波重型工程科技股份有限公司 Construction method of middle-and-small-scale steel truss tied-arch bridge
CN105951609A (en) * 2016-03-23 2016-09-21 中铁四局集团钢结构有限公司 Wide span variable girder high continuous steel truss bridge cantilever erection mid-span closure construction method
CN105970836A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN106120573B (en) * 2016-06-30 2018-03-16 中国化学工程第三建设有限公司 Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN106120573A (en) * 2016-06-30 2016-11-16 中国化学工程第三建设有限公司 Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN109778718A (en) * 2019-03-05 2019-05-21 中铁四局集团有限公司 A kind of construction method of the pure free cantilever erection Middle span closing of Large-Span Continuous steel box-girder main span
CN110016854A (en) * 2019-03-14 2019-07-16 中铁二院工程集团有限责任公司 A kind of short tower oblique pull is put more energy into combination arch bridge construction
CN111576252A (en) * 2020-06-17 2020-08-25 广西交科集团有限公司 Real-time adjusting device and adjusting method for main beam line type in bridge pushing process
CN112227204A (en) * 2020-08-07 2021-01-15 中交二公局第二工程有限公司 Side span pushing closure construction method for cable-stayed bridge
CN112030780A (en) * 2020-08-19 2020-12-04 中铁大桥局第七工程有限公司 Steel arch bridge cantilever erection method
CN112524334A (en) * 2020-11-27 2021-03-19 四川石油天然气建设工程有限责任公司 Construction method for large-scale cable crossing of oil and gas pipeline and tower dynamic stabilization process thereof
CN112900282A (en) * 2021-02-06 2021-06-04 中铁三局集团有限公司 Bidirectional quick pushing equipment system for large-span main beam and construction method
CN113047158A (en) * 2021-02-07 2021-06-29 中铁四局集团有限公司 Temporary limiting device for steel truss multidirectional movable support under action of high mountain valley wind load
CN113047158B (en) * 2021-02-07 2023-02-24 中铁四局集团有限公司 Temporary limiting device for steel truss multidirectional movable support under action of high mountain valley wind load
CN113136803A (en) * 2021-04-19 2021-07-20 中交第三公路工程局有限公司 River-crossing steel truss bridge closure method
CN113136803B (en) * 2021-04-19 2022-09-27 中交第三公路工程局有限公司 River-crossing steel truss bridge closure method
CN116044179A (en) * 2023-03-31 2023-05-02 河北新烨工程技术有限公司 Construction method for installing large-span arch pipe truss
CN116044179B (en) * 2023-03-31 2023-06-09 河北新烨工程技术有限公司 Construction method for installing large-span arch pipe truss

Also Published As

Publication number Publication date
CN100543234C (en) 2009-09-23

Similar Documents

Publication Publication Date Title
CN100543234C (en) A kind of closure method of large-span continuous steel truss arch
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN106958206B (en) Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN101864737B (en) Secondary vertical rotating construction method for arch rib of long-span steel arch bridge
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN104695341B (en) Non-self-balanced beam string structure for reinforcing large-span continuous beam bridge
CN102713071A (en) Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
CN206553961U (en) The short light-duty expanded letter combined type Hanging Basket of tower cable-stayed bridge
CN101446065B (en) Combined cable support tower
CN102535348B (en) Method for tensioning stayed cables of hinged tower cable stayed bridge
CN101440598B (en) Steel box-concrete combined box plate arch structure and construction method thereof
WO2023016573A1 (en) Construction method for steel-concrete main girder of cable-stayed bridge
CN105887658A (en) Multi-purpose continuous construction temporary beam structure and construction method thereof
CN110130203B (en) Upper-bearing arch-rigid frame continuous beam combined bridge and construction method
KR101373169B1 (en) Tention typed cable-stayed bridge construction method using hybrid decksegment
CN214362953U (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN110130201A (en) A kind of half floats the cable-stayed bridge of truss-like bridge tower
CN207987749U (en) Ride cable-styled erection crane
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN210636294U (en) Cable-stayed bridge of semi-floating truss type bridge tower
CN112267390A (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN104847016A (en) Suspending transfer layer of stayed cable beam
CN112554043A (en) Transverse self-balancing antisymmetric cable-stayed bridge structure system
CN104562944A (en) Large span composite beam cable-stayed bridge side steel box temporary anchorage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150212

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150212

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road Business Street No. 6 building SBI

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.