CN101112707A - Process for the dynamic regulation of top head front-extending quantity - Google Patents

Process for the dynamic regulation of top head front-extending quantity Download PDF

Info

Publication number
CN101112707A
CN101112707A CNA2007100169927A CN200710016992A CN101112707A CN 101112707 A CN101112707 A CN 101112707A CN A2007100169927 A CNA2007100169927 A CN A2007100169927A CN 200710016992 A CN200710016992 A CN 200710016992A CN 101112707 A CN101112707 A CN 101112707A
Authority
CN
China
Prior art keywords
steel pipe
push rod
time
head front
top head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100169927A
Other languages
Chinese (zh)
Other versions
CN100515594C (en
Inventor
王旭午
李学进
杨为国
迟黎明
张英江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Lubao Steel Pipe Co Ltd
Original Assignee
Yantai Lubao Steel Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Lubao Steel Pipe Co Ltd filed Critical Yantai Lubao Steel Pipe Co Ltd
Priority to CNB2007100169927A priority Critical patent/CN100515594C/en
Publication of CN101112707A publication Critical patent/CN101112707A/en
Application granted granted Critical
Publication of CN100515594C publication Critical patent/CN100515594C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Metal Rolling (AREA)

Abstract

The invention discloses a method dynamically adjusting the front extension quantity of the top head. The invention is characterized in that the invention includes the steps of the record parameters, the automatic supplementation of the abrasion quantity of the top head diameter, the automatic supplementation of the top head and rolling hot expansion which can adopt the closed ring control method or adopt the trend control method and the automatic supplementation of the top rod length L; the front extension quantity is dynamically adjusted in the production clearance time and production time of the pipe expanding or perforation, thus implementing the precision control to the wall thickness of the steel pipe, ensuring the same produced steel pipe have uniform wall thickness and the same batch of steel pipes have basically uniform wall thickness.

Description

A kind of method of dynamic adjustment top head front-extending quantity
Technical field:
The present invention relates to the seamless steel tube production technical field, is a kind of method of dynamic adjustment top head front-extending quantity specifically, is used for the perforation and the expander operation of seamless steel pipe.
Technical background:
At present, in the trasistor manufacture process of seamless steel pipe, perforation and expander are two important plastic deformation operations, and this plastic deformation is finished in pass, and usually pass all is to be made of a pair roller, two godets or guide plate and a top.Its deformation principle: the roll of active rotation is with nip deformed area and the wall of the lumen in the deformed area is carried out roll off repeatedly with the top of supplied materials pipe or hollow billet, impel thickness of steel pipe attenuate, diameter in the deformed area to become big, length extension, and guide plate or godet play guiding and auxiliary control progradation therein.Measure with top head front-extending quantity the position that wherein comes directly towards in pass, and top head front-extending quantity mainly plays decision and shuts out the thickness of steel pipe size.The present perforation and the top head front-extending quantity of expander all are changeless in tube rolling or perforation procedure, and the thickness of steel pipe that shuts out in theory or pass is constant, but owing to be subjected to the influence of following factor, it is uneven causing the thickness of steel pipe that shuts out or pass:
1. roll, top expanded by heating in rolling or perforation procedure make the thickness of steel pipe that shuts out or pass be the thin variation tendency of a thick tail;
2. the top is in expander or perforation procedure repeatedly, can be gradually wearing and tearing and diameter diminishes, therefore expand also thickening gradually of the thickness of steel pipe that or pass;
3. under the situation of top circulation, diameter difference, the rate of wear difference of different tops cause the different thickness of steel pipe that expand or pass inconsistent;
4. under the situation of push rod and top circulation, the length of different push rods is inconsistent, causes the different thickness of steel pipe that expand or pass inconsistent.
Summary of the invention:
The objective of the invention is to overcome the deficiency of above-mentioned prior art, and a kind of method of dynamic adjustment top head front-extending quantity is provided, mainly solve the inconsistent end to end problem of the wall thickness that is prone to same batch of steel pipe in existing seamless steel tube production technological process wall thickness inconsistent and same Zhi Gangguan.
For achieving the above object, the present invention is achieved in that a kind of method of dynamic adjustment top head front-extending quantity, and its special character is that it comprises the steps:
The a recording parameters; Each push rod that participates in circulation is numbered, host computer can be remembered the priority position of push rod in the space automatically, also can be by the push rod different push rod of automatic identifier identification of encoding, write down the steel pipe number N that each top produces with this, the angle [alpha] of the original outer diameter D of each top, the equal wall section in top, top rate of wear V, the push rod length L;
The automatic compensation of b top diameter wear extent; The equal wall section cone angle of top is α, and the top diameter D rate of wear is V, and unit: mm/ props up, and the top produces number N, vary in diameter amount Δ D=V * N then, and Δ D unit is mm, corresponding top head front-extending quantity H offset Δ H=Δ D/2/TAN (α); This compensation is finished producing in off time;
The automatic compensation of c top, thermal expansion of rollers; Can adopt closed loop control method, also can employing trend control method;
Closed loop control method is that a calibrator is set on the backstage of expander or perforation, measure the wall thickness that expands the back or wear the back steel pipe in good time, to the multiple spot wall thickness of continuous measurement average Sp and with standard value So relatively, draw wall thickness difference DELTA S=Sp-So, calculate top head front-extending quantity H offset Δ H=Δ S/TAN (α) thus, carrying out this compensation finishes with t in the time in production rolling (on-load) second, come directly towards adjusted thickness of steel pipe by behind the calibrator, automatically the multiple spot wall thickness of measuring steel pipe again average Spi and with standard value So relatively, draw wall thickness difference DELTA Si=Spi-So, calculate top head front-extending quantity H offset Δ Hi=Δ Si/TAN (α) thus; So circulation is carried out, to this steel pipe rolling end;
Trend control method is in the expander or the same Zhi Gangguan process of boring a hole, the total from the beginning to the end trend of thickness of steel pipe is attenuation gradually, when detecting roll transmission master motor load arranged, pick up counting, surpass the T1 of setting after the time when the time, the servo-drive system that top head front-extending quantity is adjusted in control in the time, retreats the distance, delta H of setting at the T2 that sets equably, and this compensation is finished in the time at steel pipe rolling; Can adjust the size of T1, T2 and Δ H by whether even before and after the in good time curve of the electric current that detects later process, even before and after the in good time curve of the electric current of later process;
The automatic compensation of d push rod length L; If the physical length of push rod is L, theoretical length is L 0, Dui Ying top head front-extending quantity H offset Δ H=L then 0-L; This compensation is finished producing in off time.
Compared with the prior art the method for a kind of dynamic adjustment top head front-extending quantity of the present invention has outstanding substantive distinguishing features and marked improvement, 1, by in production off time of expander or perforation and production time, top head front-extending quantity dynamically being adjusted, thereby realize the accurate control to thickness of steel pipe, promptly top head front-extending quantity is an automatic and adjustable; 2, this method has advantages such as reliability height, adaptability and autgmentability are strong, and same thickness of steel pipe of production is even, and the wall thickness extreme difference of whole Zhi Gangguan is not more than 0.7mm, is not more than 1mm with the wall thickness extreme difference of a collection of steel pipe.
The specific embodiment:
In order to understand better and to implement, describe the method for a kind of dynamic adjustment top head front-extending quantity of the present invention in detail below in conjunction with embodiment.
Embodiment 1, in expander's process flow of seamless steel tube production, at first each push rod that participates in circulation is numbered, host computer can be remembered the priority position of push rod in the space automatically, also can be by the push rod different push rod of automatic identifier identification of encoding, write down the steel pipe number N that each top produces with this, the original outer diameter D of each top, unit is the angle [alpha] of mm, the equal wall section in top, top rate of wear V, unit: mm/ props up, the push rod length L, and unit is mm; Then come directly towards vary in diameter amount Δ D=V * N, Δ D unit is mm, corresponding top head front-extending quantity H offset Δ H=Δ D/2/TAN (α), and the automatic compensation of this top diameter wear extent can be finished in production off time; Adopt closed loop control method to the top, the automatic compensation of thermal expansion of rollers, closed loop control method is that a calibrator is set on the backstage of expander, measure the wall thickness that expands the back steel pipe in good time, to the multiple spot wall thickness of continuous measurement average Sp and with standard value So relatively, draw wall thickness difference DELTA S=Sp-So, calculate top head front-extending quantity H offset Δ H=Δ S/TAN (α) thus, carrying out this compensation finishes with t in the time in production rolling (on-load) second, come directly towards adjusted thickness of steel pipe by behind the calibrator, automatically the multiple spot wall thickness of measuring steel pipe again average Spi and with standard value So relatively, draw wall thickness difference DELTA Si=Spi-So, calculate top head front-extending quantity H offset Δ Hi=Δ Si/TAN (α) thus; So circulation is carried out, to this steel pipe rolling end; To the automatic compensation of push rod length L, if the physical length of push rod is L, theoretical length is L at last 0, Dui Ying top head front-extending quantity H offset Δ H=L then 0-L, this compensation is finished producing in off time.
Embodiment 2, in the poling technological process of seamless steel tube production, at first each push rod that participates in circulation is numbered, host computer can be remembered the priority position of push rod in the space automatically, also can be by the push rod different push rod of automatic identifier identification of encoding, write down the steel pipe number N that each top produces with this, the original outer diameter D of each top, unit is the angle [alpha] of mm, the equal wall section in top, top rate of wear V, unit: mm/ props up, the push rod length L, and unit is mm; Then come directly towards vary in diameter amount Δ D=V * N, Δ D unit is mm, corresponding top head front-extending quantity H offset Δ H=Δ D/2/TAN (α), and the automatic compensation of this top diameter wear extent can be finished in production off time; Employing trend control method is to the automatic compensation of top, thermal expansion of rollers, trend control method is in the same Zhi Gangguan process of perforation, the total from the beginning to the end trend of thickness of steel pipe is attenuation gradually, when detecting roll transmission master motor load arranged, pick up counting, the T1 that surpass to set when the time is after the time, and the servo-drive system that top head front-extending quantity is adjusted in control is at the T2 that sets in the time, retreat the distance, delta H of setting equably, this compensation was finished in the production time; Can adjust the size of T1, T2 and Δ H by whether even before and after the in good time curve of the electric current that detects later process, even before and after the in good time curve of the electric current of later process; To the automatic compensation of push rod length L, if the physical length of push rod is L, theoretical length is L at last 0, Dui Ying top head front-extending quantity H offset Δ H=L then 0-L, this compensation is finished producing in off time.

Claims (1)

1. a method of dynamically adjusting top head front-extending quantity is characterized in that it comprises the steps:
The a recording parameters; Each push rod that participates in circulation is numbered, host computer can be remembered the priority position of push rod in the space automatically, also can be by the push rod different push rod of automatic identifier identification of encoding, write down the steel pipe number N that each top produces with this, the angle [alpha] of the original outer diameter D of each top, the equal wall section in top, top rate of wear V, the push rod length L;
The automatic compensation of b top diameter wear extent; The equal wall section cone angle of top is α, and the top diameter D rate of wear is V, and unit: mm/ props up, and the top produces number N, vary in diameter amount Δ D=V * N then, and Δ D unit is mm, corresponding top head front-extending quantity H offset Δ H=Δ D/2/TAN (α); This compensation is finished producing in off time;
The automatic compensation of c top, thermal expansion of rollers; Can adopt closed loop control method, also can employing trend control method;
Closed loop control method is that a calibrator is set on the backstage of expander or perforation, measure the wall thickness that expands the back or wear the back steel pipe in good time, to the multiple spot wall thickness of continuous measurement average Sp and with standard value So relatively, draw wall thickness difference DELTA S=Sp-So, calculate top head front-extending quantity H offset Δ H=Δ S/TAN (α) thus, carrying out this compensation finishes with t in producing rolling time second, come directly towards adjusted thickness of steel pipe by behind the calibrator, automatically the multiple spot wall thickness of measuring steel pipe again average Spi and with standard value So relatively, draw wall thickness difference DELTA Si=Spi-So, calculate top head front-extending quantity H offset Δ Hi=Δ Si/TAN (α) thus; So circulation is carried out, to this steel pipe rolling end;
Trend control method is in the expander or the same Zhi Gangguan process of boring a hole, the total from the beginning to the end trend of thickness of steel pipe is attenuation gradually, when detecting roll transmission master motor load arranged, pick up counting, surpass the T1 of setting after the time when the time, the servo-drive system that top head front-extending quantity is adjusted in control in the time, retreats the distance, delta H of setting at the T2 that sets equably, and this compensation is finished in the time at steel pipe rolling; Can adjust the size of T1, T2 and Δ H by whether even before and after the in good time curve of the electric current that detects later process, even before and after the in good time curve of the electric current of later process;
The automatic compensation of d push rod length L; If the physical length of push rod is L, theoretical length is L 0, Dui Ying top head front-extending quantity H offset Δ H=L then 0-L; This compensation is finished producing in off time.
CNB2007100169927A 2007-08-31 2007-08-31 Process for the dynamic regulation of top head front-extending quantity Expired - Fee Related CN100515594C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100169927A CN100515594C (en) 2007-08-31 2007-08-31 Process for the dynamic regulation of top head front-extending quantity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100169927A CN100515594C (en) 2007-08-31 2007-08-31 Process for the dynamic regulation of top head front-extending quantity

Publications (2)

Publication Number Publication Date
CN101112707A true CN101112707A (en) 2008-01-30
CN100515594C CN100515594C (en) 2009-07-22

Family

ID=39021329

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100169927A Expired - Fee Related CN100515594C (en) 2007-08-31 2007-08-31 Process for the dynamic regulation of top head front-extending quantity

Country Status (1)

Country Link
CN (1) CN100515594C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513359A (en) * 2011-12-23 2012-06-27 太原重工股份有限公司 Seamless steel tube perforator piercing point on-line regulating device
CN107774715A (en) * 2016-08-30 2018-03-09 林州凤宝管业有限公司 The double chi production technology of the pipes of vehicle bridge pipe Φ 220
CN113441551A (en) * 2021-06-30 2021-09-28 北京科技大学 Thick-walled seamless steel pipe and preparation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513359A (en) * 2011-12-23 2012-06-27 太原重工股份有限公司 Seamless steel tube perforator piercing point on-line regulating device
CN102513359B (en) * 2011-12-23 2014-03-19 太原重工股份有限公司 Seamless steel tube perforator piercing point on-line regulating device
CN107774715A (en) * 2016-08-30 2018-03-09 林州凤宝管业有限公司 The double chi production technology of the pipes of vehicle bridge pipe Φ 220
CN107774715B (en) * 2016-08-30 2019-11-05 林州凤宝管业有限公司 The double ruler production technology of 220 pipe of vehicle bridge pipe Φ
CN113441551A (en) * 2021-06-30 2021-09-28 北京科技大学 Thick-walled seamless steel pipe and preparation method thereof
CN113441551B (en) * 2021-06-30 2022-07-01 北京科技大学 Thick-walled seamless steel pipe and preparation method thereof

Also Published As

Publication number Publication date
CN100515594C (en) 2009-07-22

Similar Documents

Publication Publication Date Title
CN103921065B (en) A kind of manufacture method of automobile specified seamless steel pipe
CN104259206B (en) A kind of production method of the titanium alloy seamless pipe for tubing coupling
CN100515594C (en) Process for the dynamic regulation of top head front-extending quantity
CN108856305B (en) Load distribution method for non-oriented silicon steel production rolling mill
CN103170506B (en) Hot rolling and finish rolling multi-level threading speed control method
CN103722042A (en) Preparation device and method for Ti6A14V alloy flat filament
CN101444793B (en) Method for fabricating seamless steel pipes for large-diameter high-pressure gas cylinders used in trailer production
CN101020191A (en) Hot rolling process of seamless steel pipe
CN101823075A (en) Rolling method for sharpening head and tail wall thickness of seamless steel tube
CN101711190A (en) Seamless pipe manufacturing method
CN106216400A (en) The external diameter roll seamless steel tube Processes and apparatus installation system more than 60mm
CN105290281A (en) Production method for large thick-wall nickel-contained ring forgings
WO2011030273A2 (en) Plant for rolling tubes
EP2442923B1 (en) Tube rolling plant
CN107138532A (en) A kind of drilling/rolling method and special equipment for producing thin-wall seamless steel pipe
CN113664048A (en) Method for judging and controlling strip steel rollover during pressure measurement of rough rolling vertical roll of hot continuous rolling mill
JPS63230214A (en) Pipe rolling control method
JPS58196109A (en) Method for elongation rolling of steel pipe
CN113664049B (en) Control method for preventing strip steel from turning over during pressure measurement of rough rolling vertical roll of hot continuous rolling mill
JPS62202712A (en) Method of extruding parison and its device
CN1116133C (en) Method for controlling length and position of mandrel in use
SU944703A1 (en) Tube production method
JP2001340910A (en) Manufacturing method of seamless steel pipe
JPS6216812A (en) Tube rolling control method
SU1720766A1 (en) Pilger tube rolling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090722

Termination date: 20170831

CF01 Termination of patent right due to non-payment of annual fee