CN101070695A - Ecolocial-greening type buffering contact traffic isolation belt and construction method - Google Patents

Ecolocial-greening type buffering contact traffic isolation belt and construction method Download PDF

Info

Publication number
CN101070695A
CN101070695A CN 200610060701 CN200610060701A CN101070695A CN 101070695 A CN101070695 A CN 101070695A CN 200610060701 CN200610060701 CN 200610060701 CN 200610060701 A CN200610060701 A CN 200610060701A CN 101070695 A CN101070695 A CN 101070695A
Authority
CN
China
Prior art keywords
foundation pier
hollow bulb
ecological afforestation
bag
traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610060701
Other languages
Chinese (zh)
Other versions
CN100540810C (en
Inventor
徐亚男
徐洲平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WANXIANG TAIFU ENVIRONMENT-PROTECTION SCIENCE-TECHNOLOGY Co Ltd SHENZHEN
Original Assignee
WANXIANG TAIFU ENVIRONMENT-PROTECTION SCIENCE-TECHNOLOGY Co Ltd SHENZHEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WANXIANG TAIFU ENVIRONMENT-PROTECTION SCIENCE-TECHNOLOGY Co Ltd SHENZHEN filed Critical WANXIANG TAIFU ENVIRONMENT-PROTECTION SCIENCE-TECHNOLOGY Co Ltd SHENZHEN
Priority to CNB200610060701XA priority Critical patent/CN100540810C/en
Publication of CN101070695A publication Critical patent/CN101070695A/en
Application granted granted Critical
Publication of CN100540810C publication Critical patent/CN100540810C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention relates to a environmental green buffering contact traffic isolation belt includes horniness foundation pier (1), its characteristic lies in it also including the environmental green bag (2) covered on the said foundation pier(1), the environmental green bag is full of accumulation filler(21). The invention's helpful effect is: on the surface of heavyweight horniness foundation pier, comprehensively cover a layer of low degradation rate polymer environmental bag filled with filler helpful to botanical grow, make the traffic driving lane isolation lane have the function of reducing noise, isolating vehicle and reducing vehicle damage, reducing vehicle quadric accident rate, and reach to the totally green effect after planting grass and bush, make it easier to be restored after the traffic driveway lane isolation lane is damaged.

Description

Ecolocial-greening type buffering contact traffic isolation belt and construction method
[technical field]
The present invention relates to be used for driving vehicle and slow down, oppositely or the safety device that stops, particularly continuity guardrail or wall and construction method thereof that extend or between the track along the track; And road or railway traffic are through the absorption or the reflection unit of the noise of air transmitted.
[background technology]
Common now guardrail or divider wall along the road extension, a kind of is simple metal guardrail, and certain altitude and intensity are arranged.Suggesting effect with the separation of road up-run lane and road edge; And the shunting is run counter in attempt stipulate that the vehicle of breasting the tape by force has certain obstruction effect; And little to the inhibition of vehicle, also there is not any absorption of noise effect and to the protective effect of vehicle.
The isolation of improved shunting is to use cement effect semi-portable heavyweight divider wall, and vehicle is had inhibition, prevents to break through to isolate to enter reverse track.But tend to like this vehicle is caused great damage.Also there is not simultaneously the absorption of noise effect.Some heavyweight cement partition wall is climbed the tree or grass in the top kind, has certain greening effect, but to the cement that two sides expose, still can't afforest.Exposed cement face has also become the amplifier or the reflector of vehicle noise.
Therefore, the isolation strip of prior art can't solve the problem of comprehensive greening, noise reduction, more can not solve to prevent to stride the problem that accident can effectively reduce the vehicle damage again.
[summary of the invention]
Can't solve for overcoming above-mentioned prior art isolation strip " the comprehensive problem of greening, noise reduction; and should prevent to stride accident and can effectively reduce the problem that vehicle damages " deficiency, the present invention proposes a kind of Ecolocial-greening type buffering contact traffic isolation belt, surface at heavyweight hard foundation pier, cover the ecological bag that dress in one deck is beneficial to the plant growing filler comprehensively, isolation strip, shunting, traffic track had reduce noise, isolate vehicle and reduce the multiple action of vehicle damage.And behind plantation green grass and shrub, reach the effect of comprehensive greening.
The present invention solve prior art greening not enough, can not noise reduction, can not prevent to stride accident can not effectively reduce vehicle again and damage the technical scheme that problem adopted and provide a kind of Ecolocial-greening type buffering contact traffic isolation belt, comprise the hard foundation pier, especially also comprise the ecological afforestation bag that covers on the described foundation pier; Be full of the accumulation type filler in this ecological afforestation bag.
According to a preferred embodiment of the invention, the cross section of described foundation pier is an epsilon-type structure, has higher middle part and lower edge; The inboard at this edge is provided with lower collection rhone; The both sides of described ecological afforestation bag are included in the described collection draining translot.
According to a preferred embodiment of the invention, described foundation pier is that the boundary is divided into two parts with higher center, middle part; Leave certain distance between these two parts, form hollow bulb; Be full of the accumulation type filler in it.
According to a preferred embodiment of the invention, the hollow bulb between described foundation pier two parts comprises the last hollow bulb that is communicated with the top and the following hollow bulb of big volume.
According to a preferred embodiment of the invention, described foundation pier along etc. axial end, cross section be provided with the rhone that is communicated with described hollow bulb down and outer edge.
According to a preferred embodiment of the invention, the outside at the middle part that described foundation pier is higher is gentle slope shape, and is up-narrow and down-wide.
According to a preferred embodiment of the invention, described ecological afforestation bag is that soft low degradation rate polymer micro material is made; Described hard foundation pier is concrete prefabricated type.
According to a preferred embodiment of the invention, described accumulation type filler is a sandy soil type phytyl material, promptly is convenient to the material of plant growing.
The present invention solve prior art greening not enough, can not noise reduction, accident can not be prevented to stride and the vehicle damage technical scheme that problem adopted can not be effectively reduced again, provide a kind of Ecolocial-greening type buffering contact traffic isolation belt construction method, comprise preparation hard foundation pier; It is characterized in that: the preparation method who also comprises the ecological afforestation bag; This method comprises the steps:
Half product of a1, preparation ecological afforestation bag;
A2, in the ecological afforestation bag, be full of the accumulation type filler;
A3, the ecological afforestation bag is sealed.
B1, prepare the higher middle part of hard foundation pier, the lower lower collection rhone in edge and this inboard, edge, and be communicated with the last hollow bulb at top and the following hollow bulb of volume greatly with mould;
B2, the following hollow bulb that will go up hollow bulb and big volume are full of the accumulation type filler;
C, the ecological afforestation bag is from top to bottom covered described hard foundation pier, and include its avris in the collection rhone;
D, on ecological afforestation bag basis, cultivate green grass and shrub.
The beneficial effect of Ecolocial-greening type buffering contact traffic isolation belt of the present invention is: on the surface of heavyweight hard foundation pier, cover the ecological bag of low degradation rate polymer that the interior dress of one deck is beneficial to the plant growing filler comprehensively, make isolation strip, shunting, traffic track have the noise of reduction, isolate vehicle and reduce multiple actions such as vehicle damage, minimizing vehicle secondary accident accident rate.And behind plantation green grass and shrub, reach the effect of comprehensive greening.Make isolation strip, shunting, traffic track damage the back and repair easily, the repair amount is little.
The beneficial effect of Ecolocial-greening type buffering contact traffic isolation belt construction method of the present invention is: on the surface of heavyweight hard foundation pier, cover the ecological bag of low degradation rate polymer that the interior dress of one deck is beneficial to the plant growing filler comprehensively, make isolation strip, shunting, traffic track have the noise of reduction, isolate vehicle and reduce multiple actions such as vehicle damage, minimizing vehicle secondary accident accident rate.And behind plantation green grass and shrub, reach the effect of comprehensive greening.Make isolation strip, shunting, traffic track damage the back and repair easily, the repair amount is little.
[description of drawings]
Fig. 1 is the overall structure and the design sketch of Ecolocial-greening type buffering contact traffic isolation belt of the present invention;
Fig. 2 is the exploded view of described isolation strip critical piece.
[specific embodiment]
The present invention is further described below in conjunction with drawings and Examples.
Referring to Fig. 1, Fig. 2.A kind of Ecolocial-greening type buffering contact traffic isolation belt comprises hard foundation pier 1, it is characterized in that: also comprise the ecological afforestation bag 2 that covers on the described foundation pier 1; Be full of accumulation type filler 21 in this ecological afforestation bag 2.
The cross section of described foundation pier 1 is an epsilon-type structure, has higher middle part 11 and lower edge 13; The inboard at this edge is provided with lower collection rhone 12.When running into vehicle and cross the border, edge 13 can at first bear rolling of wheel, becomes the first line of defence of isolation strip.
The both sides 22 of described ecological afforestation bag 2 are included in the described collection draining translot 12.
Described foundation pier 1 is that the boundary is divided into two parts with higher center, middle part; Leave certain distance between these two parts, form hollow bulb 14; Be full of accumulation type filler 15 in this hollow bulb.
Accumulation type filler 21 in the outer field ecological afforestation bag 2 of Ecolocial-greening type buffering contact traffic isolation belt of the present invention, together with being full of filler 15 in the described hollow bulb, when running into the vehicle collision, can serve as the vibration damping thing, effectively absorb impact kinetic energy, reduce bounce-back, reduce the back vehicle rear-end collision and cause second accident.Simultaneously, be full of filler 15 in the hollow bulb and have the effect that stores water, fertilizer concurrently, strengthen afforestation effect.
Hollow bulb 14 between described foundation pier 1 two parts comprises the following hollow bulb 142 of the last hollow bulb 141 that is communicated with the top and big volume.
Axial ends, cross section such as described foundation pier 1 edge are provided with the rhone 16 that is communicated with described hollow bulb 142 down and outer edge.
Described hard foundation pier 1 is concrete prefabricated type, and its 11 outsides, higher middle part are gentle slope 110, and are up-narrow and down-wide.
Described ecological afforestation bag 2 is made for soft low degradation rate polymer micro material, is generally nonwoven 20.Described accumulation type filler 21 is sandy soil type phytyl material or sawmilling etc.,, is convenient to the material of plant growing that is.
After the ecological afforestation bag of described filling accumulation type filler was cultivated through sowing, its side slope growth green grass 3 can strengthen greening, beautifies view, reduces driver's fatigue; Its grown on top shrub 5 can be blocked the car light high light on opposite, reduces accident rate.
The present invention also provides a kind of Ecolocial-greening type buffering contact traffic isolation belt construction method, comprises preparation hard foundation pier; It is characterized in that: the preparation method who also comprises the ecological afforestation bag; This method comprises the steps:
Half product of a1, preparation ecological afforestation bag;
A2, in the ecological afforestation bag, be full of the accumulation type filler;
A3, the ecological afforestation bag is sealed.
B1, prepare the higher middle part of hard foundation pier 11, the lower lower collection rhone 12 in edge 13 and this inboard, edge, and be communicated with the last hollow bulb 141 at top and the following hollow bulb 142 of volume greatly with mould;
B2, the following hollow bulb 142 that will go up hollow bulb 141 and big volume are full of the accumulation type filler;
C, the ecological afforestation bag is from top to bottom covered described hard foundation pier, and include its avris in the collection rhone;
D, on ecological afforestation bag basis, cultivate green grass and shrub.
Above-mentioned detailed description only is exemplary description, and those skilled in the art can design various embodiments according to different actual needs under the situation of the scope and spirit that do not break away from the present invention and protected.But all within protection scope of the present invention.

Claims (10)

1, a kind of Ecolocial-greening type buffering contact traffic isolation belt comprises hard foundation pier (1), it is characterized in that:
Also comprise the ecological afforestation bag (2) that covers on the described foundation pier (1); Be full of accumulation type filler (21) in this ecological afforestation bag (2).
2, traffic according to claim 1 isolation strip is characterized in that:
The cross section of described foundation pier (1) is an epsilon-type structure, has higher middle part (11) and lower edge (13); The inboard at this edge is provided with lower collection rhone (12);
The both sides of described ecological afforestation bag (2) are included in the described collection draining translot (12).
3, traffic according to claim 2 isolation strip is characterized in that:
Described foundation pier (1) is that the boundary is divided into two parts with the center at higher middle part; Leave certain distance between these two parts, form hollow bulb (14); Be full of accumulation type filler (15) in this hollow bulb.
4, traffic according to claim 3 isolation strip is characterized in that:
Hollow bulb (14) between described foundation pier (1) two parts comprises the following hollow bulb (142) of the last hollow bulb (141) that is communicated with the top and big volume.
5, traffic according to claim 4 isolation strip is characterized in that:
Axial ends, cross section such as described foundation pier (1) edge are provided with the rhone (16) that is communicated with described hollow bulb (142) down and outer edge.
6, traffic according to claim 5 isolation strip is characterized in that:
The outside at the middle part (11) that described foundation pier (1) is higher is gentle slope shape, and is up-narrow and down-wide.
7, traffic according to claim 6 isolation strip is characterized in that:
Described ecological afforestation bag (2) is made for soft low degradation rate polymer micro material;
Described hard foundation pier (1) is concrete prefabricated type.
8, traffic according to claim 7 isolation strip is characterized in that:
Described accumulation type filler is a sandy soil type phytyl material.
9, a kind of Ecolocial-greening type buffering contact traffic isolation belt construction method comprises preparation hard foundation pier; It is characterized in that:
The preparation method who also comprises the ecological afforestation bag; This method comprises the steps:
Half product of a1, preparation ecological afforestation bag;
A2, in the ecological afforestation bag, be full of the accumulation type filler;
A3, the ecological afforestation bag is sealed.
10, traffic according to claim 9 isolation strip construction method is characterized in that:
The described method for preparing the hard foundation pier comprises the steps:
B1, prepare the higher middle part of hard foundation pier (11), the lower lower collection rhone (12) in edge (13) and this inboard, edge, and be communicated with the last hollow bulb (141) at top and the following hollow bulb (142) of volume greatly with mould;
B2, the following hollow bulb (142) that will go up hollow bulb (141) and big volume are full of the accumulation type filler; Described traffic isolation strip construction method also comprises the steps:
C, the ecological afforestation bag is from top to bottom covered described hard foundation pier, and include its avris in the collection rhone;
D, on ecological afforestation bag basis, cultivate green grass and shrub.
CNB200610060701XA 2006-05-12 2006-05-12 Ecolocial-greening type buffering contact traffic isolation belt and construction method Expired - Fee Related CN100540810C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200610060701XA CN100540810C (en) 2006-05-12 2006-05-12 Ecolocial-greening type buffering contact traffic isolation belt and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200610060701XA CN100540810C (en) 2006-05-12 2006-05-12 Ecolocial-greening type buffering contact traffic isolation belt and construction method

Publications (2)

Publication Number Publication Date
CN101070695A true CN101070695A (en) 2007-11-14
CN100540810C CN100540810C (en) 2009-09-16

Family

ID=38898092

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610060701XA Expired - Fee Related CN100540810C (en) 2006-05-12 2006-05-12 Ecolocial-greening type buffering contact traffic isolation belt and construction method

Country Status (1)

Country Link
CN (1) CN100540810C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532279B (en) * 2009-04-02 2011-08-24 华东师范大学 Method for building semitropics townscape type highway noise insulation forest
CN102352609A (en) * 2011-08-18 2012-02-15 黄必录 Road soil guardrail
CN103334392A (en) * 2013-07-18 2013-10-02 重庆交通大学 Road toe wall and construction method thereof
CN103821093A (en) * 2014-03-20 2014-05-28 哈尔滨工业大学 Isolation strip for road traffic noise
CN112962492A (en) * 2021-04-12 2021-06-15 金丽美 Road dust removal device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2313956Y (en) * 1997-10-09 1999-04-14 严仁基 Movable greenery safety fence of street
TW452613B (en) * 1998-08-07 2001-09-01 Ein Kohsan Co Ltd Shock absorber and method for producing the same, and filler for the same
JP2000087319A (en) * 1998-09-08 2000-03-28 Fukuzumi:Kk Greening partition wall for road
CN2542718Y (en) * 2002-04-17 2003-04-02 林泽明 Crash barrier for use in centre of road and on road side
CN2926310Y (en) * 2006-05-12 2007-07-25 深圳万向泰富环保科技有限公司 Traffic isolated belf of ecological greening buffering contact

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532279B (en) * 2009-04-02 2011-08-24 华东师范大学 Method for building semitropics townscape type highway noise insulation forest
CN102352609A (en) * 2011-08-18 2012-02-15 黄必录 Road soil guardrail
CN103334392A (en) * 2013-07-18 2013-10-02 重庆交通大学 Road toe wall and construction method thereof
CN103334392B (en) * 2013-07-18 2016-05-04 重庆交通大学 Highway spats wall and construction method thereof
CN103821093A (en) * 2014-03-20 2014-05-28 哈尔滨工业大学 Isolation strip for road traffic noise
CN112962492A (en) * 2021-04-12 2021-06-15 金丽美 Road dust removal device

Also Published As

Publication number Publication date
CN100540810C (en) 2009-09-16

Similar Documents

Publication Publication Date Title
CN100540810C (en) Ecolocial-greening type buffering contact traffic isolation belt and construction method
CN204551331U (en) Town road greening isolating and protecting hurdle
CN107513949A (en) A kind of railway sound insulation and noise reduction structure and preparation method thereof
CN2926310Y (en) Traffic isolated belf of ecological greening buffering contact
US20160312427A1 (en) Embankment Support
EP3724401B1 (en) Kinetic energy absorbing barrier structure
CN102071696B (en) Steep slope protective soft frame and construction method thereof
KR20070087942A (en) Protecting installation for planting the other plant under the street tree and shatter -proofing the dust
KR100736388B1 (en) Multi functional a road boundary stone
CN214046778U (en) Soil-building flower box and greening structure adopting same
CN208501426U (en) A kind of packaged type curb
KR100714806B1 (en) It is a safety zone according to the shock absorbing form cause that used a model rubber torr
CN201156906Y (en) Lawn protection mat
KR200346130Y1 (en) Grass protection mat
KR100687588B1 (en) Guard rail for afforestation
CN106677100A (en) Green anti-collision guard railing and construction process thereof
CN104746403A (en) Novel ecological parking lot pavement structure
KR101325944B1 (en) Guardrail
KR200358870Y1 (en) Guard rail for afforestation
KR100865518B1 (en) Ecological Landscape Architecture of Retaining Wall for Absorbing Impact of Vehicle
CN206260344U (en) A kind of environmental vegetable fiber blanket for Superhighway Side Slope Protection
KR101127630B1 (en) Box for planting
CN2362893Y (en) Separated type concrete guard fence for central separation area of high grade highway
Kocur-Bera et al. Roadside vegetation—The impact on safety
CN104612086B (en) Concrete road barrier wall and road barrier with same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Ecolocial-greening type buffering contact traffic isolation belt and construction method

Effective date of registration: 20130201

Granted publication date: 20090916

Pledgee: Bank of Hangzhou Limited by Share Ltd science and Technology Branch

Pledgor: Hangzhou Huaning Pacific Environmental Technology Co. Ltd., Shenzhen sunwealth Environmental Protection Technology Co., Ltd Sun Ailin

Registration number: 2013990000081

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160617

Granted publication date: 20090916

Pledgee: Bank of Hangzhou Limited by Share Ltd science and Technology Branch

Pledgor: Hangzhou Huaning Pacific Environmental Technology Co. Ltd., Shenzhen sunwealth Environmental Protection Technology Co., Ltd Sun Ailin

Registration number: 2013990000081

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090916

Termination date: 20160512

CF01 Termination of patent right due to non-payment of annual fee