CN101042744A - 集装箱港口资源作业效率综合考评系统及方法 - Google Patents
集装箱港口资源作业效率综合考评系统及方法 Download PDFInfo
- Publication number
- CN101042744A CN101042744A CNA2006100248816A CN200610024881A CN101042744A CN 101042744 A CN101042744 A CN 101042744A CN A2006100248816 A CNA2006100248816 A CN A2006100248816A CN 200610024881 A CN200610024881 A CN 200610024881A CN 101042744 A CN101042744 A CN 101042744A
- Authority
- CN
- China
- Prior art keywords
- data
- com
- dcom
- terminal
- client
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- General Factory Administration (AREA)
Abstract
本发明公开了一种集装箱港口资源作业效率综合考评系统及方法,它由后台数据库、中间应用服务器和终端三大部分组成。它利用信息技术和数据挖掘技术,从终端获得集装箱机械作业效率,动态跟踪多种机械的即时状况和能源消耗情况;采集到的数据通过无线网络,经由中间服务器,存储到后台数据库;中间服务器中的服务程序对数据进行作业成本分析及预测,从经过提炼的数据中获取有关作业效率、作业能耗、有关作业成本和人力资源成本的精华数据,供码管理人员查询,为公司决策层提供技术保证和科学依据。
Description
技术领域
本发明属于集装箱码头数字化管理系统,具体是一种集装箱港口资源作业系统及方法。
背景技术
提高装卸效率、降低消耗是集装箱码头生产经营的目标。如何尽快获取各种生产数据并对其进行分析,从而帮助作业操作部门加强作业管理,提高作业效率,并及时发现问题,采取应对措施;充分发挥港口资源的最大利用率和人力资源的利用率,充分发挥和调动现场作业人员作业积极性;为评估个人和集装箱机械在作业中发挥的作用提供科学依据,同时也为公司领导提供决策分析依据,是集装箱码头的一项重要课题。
传统上,集装箱码头一直采用事后考评的方法,其缺点是不能及时有效的发现问题,从而导致码头资源的生产力得不到充分发挥;而且事后考评为码头管理者提供的生产数据有限,使其难以较好的对生产过程进行控制,并对码头生产资源进行优化配置。
发明内容
本发明是为了解决传统集装箱码头一直采用事后考评的方法而存在的缺点,为实时获取并分析生产数据,将生产管理中传统的事后考评方式改进为过程管理模式,并进一步发挥考核作用,而提供一种集装箱港口资源作业效率综合考评系统及方法,该系统及方法能综合集装箱机械作业效率考核、集装箱机械作业能耗考核、计件考核、作业成本分析预测为一体。
为实现本发明的目的而采用的技术方案如下:
一种港口资源作业效率综合考评系统,由后台数据库、中间应用服务器和终端三大部分组成。中间应用服务器包括COM/DCOM应用服务器和Web Service应用服务器,所述终端包括维修部PDA、手持PDA、轮胎吊终端和客户端。客户端通过Web Service应用服务器与后台数据库进行双向数据通讯,用于码头管理人员客户端查询后台数据库中所需要的效率分析、油耗统计、机械状况的数据以及中间服务器中的服务程序对数据进行作业成本分析及预测,通过从经过提炼的数据中获取有关作业效率、作业能耗、有关作业成本和人力资源成本的精华数据,供码头管理人员查询。终端和客户端通过COM/DCOM应用服务器向后台数据库传送数据,用于从终端获得集装箱机械作业效率,动态跟踪多种机械的即时状况和能源消耗情况以及采集到的数据通过无线网络,经由中间服务器,存储到后台数据库。
一种港口资源作业效率综合考评系统的应用方法,其步骤为:
(1)手持PDA通过无线局域网(WLAN)向COM/DCOM应用服务程序发送码头机械的加油量生产数据;
(2)胎吊终端通过WLAN向COM/DCOM应用服务程序发送油耗数据、作业效率相关数据、机械运行状况数据以及报警数据;
(3)维修部PDA通过WLAN从COM/DCOM应用服务程序获取机械报修信息,维修人员根据此信息,及时对码头设备进行维修,当修理完毕后,通过PDA向COM/DCOM应用服务程序报告状态;
(4)管理人员客户端通过有线网络向COM/DCOM服务器输入码头生产效率数据。
本发明的有益效果在于:以数据挖掘技术为依托,将生产管理系统数据库中有关机械作业量、机械作业效率、机械利用率、机械出勤率、司机作业量数据、司机作业效率数据、司机出勤率等一系列数据,通过科学统计测算得出综合成本消耗,并细化出各类作业模式下的成本消耗,提供出具有实际意义的成本核算,同时出具详细的成本分析预测,为公司决策层最大限度地提高生产作业效率提供技术保证和科学依据。
附图说明
图1是本发明的系统构架图。
具体实施方式
下面结合附图,对本发明的具体实施方式做详细说明:
如图1所示,本发明的整个系统由后台数据库、中间应用服务器和终端三大部分组成。系统共有四种终端:维修部PDA、手持PDA、轮胎吊终端和客户端(码头管理人员)。
中间应用服务器包括COM/DCOM应用服务器和Web Service应用服务器。终端包括维修部PDA、手持PDA、轮胎吊终端和客户端,所述客户端通过Web Service应用服务器与后台数据库进行双向数据通讯,用于码头管理人员客户端查询后台数据库中所需要的效率分析、油耗统计、机械状况的数据以及中间服务器中的服务程序对数据进行作业成本分析及预测,通过从经过提炼的数据中获取有关作业效率、作业能耗、有关作业成本和人力资源成本的精华数据,供码头管理人员查询。终端和客户端通过COM/DCOM应用服务器向后台数据库传送数据,用于从终端获得集装箱机械作业效率,动态跟踪多种机械的即时状况和能源消耗情况以及采集到的数据通过无线网络,经由中间服务器,存储到后台数据库。
COM/DCOM应用服务程序在终端和后台数据库之间通讯,保障同步或异步数据流的准确传输。
Web Service应用服务程序只在码头管理人员客户端和后台数据库之间通讯,码头管理人员客户端主要通过Web Service查询后台数据库中所需要的数据,例如效率分析、油耗统计、机械状况等数据。
使用COM/DCOM和Web Service技术是为了保障同步或异步数据流的准确传输,并利用该两项技术实现多层应用数据库的访问和操作,确保协同操作和安全。
在Web Service中间服务程序中,引用概率论、关键路线统计法、数理统计等方法将各种集装箱机械的作业量、作业方式、作业能耗、作业效率以及包括各人在集装箱机械上的作业效率和操作技能数据进行分析,为评估个人和集装箱机械在作业中发挥的作用提供科学依据。
在系统的后台数据库中,以聚类分析方式把数据按照其作业方式的相似性归纳成若干类别,利用分类方法是将数据集通过一定的算法而求得分类规则,以时序模式方式通过作业完成时间序列搜索出的重复发生概率较高的数据类型并加以统计分析,并将这一系列作业量数据加以保存,用于进行统计分析。
本发明的具体应用方法是:
1、手持PDA通过无线局域网(WLAN)向COM/DCOM应用服务程序发送码头机械的加油量等生产数据;
2、轮胎吊终端通过WLAN向COM/DCOM应用服务程序发送油耗数据、作业效率相关数据、机械运行状况数据以及报警数据等;
3、维修部PDA通过WLAN从COM/DCOM应用服务程序获取机械报修信息,维修人员根据此信息,及时对码头设备进行维修,当修理完毕后,通过PDA向COM/DCOM应用服务程序报告状态;
4、码头管理人员客户端通过有线网络向COM/DCOM服务器输入码头生产效率等数据。
Claims (2)
1.一种港口资源作业效率综合考评系统,由后台数据库、中间应用服务器和终端三大部分组成,其特征在于,所述中间应用服务器包括COM/DCOM应用服务器和Web Service应用服务器,所述终端包括维修部PDA、手持PDA、轮胎吊终端和客户端,所述客户端通过WebService应用服务器与后台数据库进行双向数据通讯,用于码头管理人员客户端查询后台数据库中所需要的效率分析、油耗统计、机械状况的数据以及中间服务器中的服务程序对数据进行作业成本分析及预测,通过从经过提炼的数据中获取有关作业效率、作业能耗、有关作业成本和人力资源成本的精华数据,供码头管理人员查询;所述终端和客户端通过COM/DCOM应用服务器向后台数据库传送数据,用于从终端获得集装箱机械作业效率,动态跟踪多种机械的即时状况和能源消耗情况以及采集到的数据通过无线网络,经由中间服务器,存储到后台数据库。
2.一种权利要求1的应用方法,其特征在于,其步骤为:
(1)手持PDA通过无线局域网(WLAN)向COM/DCOM应用服务程序发送码头机械的加油量生产数据;
(2)吊终端通过WLAN向COM/DCOM应用服务程序发送油耗数据、作业效率相关数据、机械运行状况数据以及报警数据;
(3)维修部PDA通过WLAN从COM/DCOM应用服务程序获取机械报修信息,维修人员根据此信息,及时对码头设备进行维修,当修理完毕后,通过PDA向COM/DCOM应用服务程序报告状态;
(4)管理人员客户端通过有线网络向COM/DCOM服务器输入码头生产效率数据。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006100248816A CN101042744A (zh) | 2006-03-21 | 2006-03-21 | 集装箱港口资源作业效率综合考评系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006100248816A CN101042744A (zh) | 2006-03-21 | 2006-03-21 | 集装箱港口资源作业效率综合考评系统及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101042744A true CN101042744A (zh) | 2007-09-26 |
Family
ID=38808242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2006100248816A Pending CN101042744A (zh) | 2006-03-21 | 2006-03-21 | 集装箱港口资源作业效率综合考评系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101042744A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102027383A (zh) * | 2008-05-15 | 2011-04-20 | 尼尔森(美国)有限公司 | 测定和分析便携式设备内事件的能耗的系统和方法 |
CN102622665A (zh) * | 2011-01-26 | 2012-08-01 | 固特异轮胎和橡胶公司 | 轮胎管理系统 |
CN102960032A (zh) * | 2011-05-20 | 2013-03-06 | 华为技术有限公司 | 一种基站功耗的监测方法及装置 |
CN104076686A (zh) * | 2013-03-29 | 2014-10-01 | 沈阳铝镁设计研究院有限公司 | 一种氧化铝生产过程动态成本控制方法 |
CN106354814A (zh) * | 2016-08-29 | 2017-01-25 | 长江勘测规划设计研究有限责任公司 | 一种水利水电工程施工期能耗分析方法及系统 |
CN107784336A (zh) * | 2016-08-31 | 2018-03-09 | 厦门集装箱码头集团有限公司 | 一种码头场内无线应用系统 |
CN108762202A (zh) * | 2018-04-20 | 2018-11-06 | 天津重电气自动化有限公司 | 一种新型的天车智能调度系统及其调度流程 |
CN109118012A (zh) * | 2018-08-28 | 2019-01-01 | 成都天衡智造科技有限公司 | 一种工业动态多维度能耗成本预测方法、系统、存储介质和终端 |
CN112261043A (zh) * | 2020-10-21 | 2021-01-22 | 深圳市思迅软件股份有限公司 | Pos系统数据交互方法、装置、计算机设备及存储介质 |
-
2006
- 2006-03-21 CN CNA2006100248816A patent/CN101042744A/zh active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102027383A (zh) * | 2008-05-15 | 2011-04-20 | 尼尔森(美国)有限公司 | 测定和分析便携式设备内事件的能耗的系统和方法 |
US8364429B2 (en) | 2008-05-15 | 2013-01-29 | The Nielsen Company (Us), Llc | Systems and methods for metering and analyzing energy consumption of events within a portable device |
US9222963B2 (en) | 2008-05-15 | 2015-12-29 | The Nielsen Company (Us), Llc | Systems and methods for metering and analyzing energy consumption of events within a portable device |
US8620607B2 (en) | 2008-05-15 | 2013-12-31 | The Nielsen Company (Us), Llc | Systems and methods for metering and analyzing energy consumption of events within a portable device |
CN102622665A (zh) * | 2011-01-26 | 2012-08-01 | 固特异轮胎和橡胶公司 | 轮胎管理系统 |
CN102960032B (zh) * | 2011-05-20 | 2015-11-25 | 华为技术有限公司 | 一种基站功耗的监测方法及装置 |
CN102960032A (zh) * | 2011-05-20 | 2013-03-06 | 华为技术有限公司 | 一种基站功耗的监测方法及装置 |
CN104076686A (zh) * | 2013-03-29 | 2014-10-01 | 沈阳铝镁设计研究院有限公司 | 一种氧化铝生产过程动态成本控制方法 |
CN106354814A (zh) * | 2016-08-29 | 2017-01-25 | 长江勘测规划设计研究有限责任公司 | 一种水利水电工程施工期能耗分析方法及系统 |
CN107784336A (zh) * | 2016-08-31 | 2018-03-09 | 厦门集装箱码头集团有限公司 | 一种码头场内无线应用系统 |
CN108762202A (zh) * | 2018-04-20 | 2018-11-06 | 天津重电气自动化有限公司 | 一种新型的天车智能调度系统及其调度流程 |
CN109118012A (zh) * | 2018-08-28 | 2019-01-01 | 成都天衡智造科技有限公司 | 一种工业动态多维度能耗成本预测方法、系统、存储介质和终端 |
CN109118012B (zh) * | 2018-08-28 | 2020-11-17 | 成都天衡智造科技有限公司 | 一种工业动态多维度能耗成本预测方法、系统、存储介质和终端 |
CN112261043A (zh) * | 2020-10-21 | 2021-01-22 | 深圳市思迅软件股份有限公司 | Pos系统数据交互方法、装置、计算机设备及存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101042744A (zh) | 集装箱港口资源作业效率综合考评系统及方法 | |
CN106503807B (zh) | 一种改进型rcm分析方法及基于其的动设备完整性评价系统 | |
Qing et al. | Quality risk management model for railway construction projects | |
CN112785458A (zh) | 一种桥梁健康大数据智能管养系统 | |
CN1967579A (zh) | 金融风险管理辅助挖掘分析系统 | |
CN105760980A (zh) | 一种基于智能电网框架下的智能运营系统 | |
Matin et al. | AIoT for sustainable manufacturing: Overview, challenges, and opportunities | |
CN112446549A (zh) | 基于大数据的城市垃圾智慧监管平台 | |
Pearson | Measurements and the knowledge revolution | |
CN109739912A (zh) | 数据分析方法及系统 | |
Jiang et al. | Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data | |
CN118014536A (zh) | 基于资源约束的轨道交通全场景智慧施工管控方法及系统 | |
CN108681888B (zh) | 一种面向再制造全工艺流程的制造执行系统 | |
Adeloye et al. | Applications of Artificial Intelligence (AI) in the construction industry: A review of Observational Studies | |
CN109145175A (zh) | 基于stacking集成学习算法的时空数据预测方法 | |
CN101261696B (zh) | 铁路机务站段信息化建设整体方法 | |
El Wakil et al. | Data management for construction processes using fuzzy approach | |
Lilan et al. | An improved MPGA-ACO-BP algorithm and comprehensive evaluation system for intelligence workshop multi-modal data fusion | |
Wenjing et al. | Data mining based dynamic scheduling approach for semiconductor manufacturing system | |
Shlafman et al. | Modern theoretical foundations of formation of the market of innovative technologies in the context of the concept of neoindustrialization | |
Lee et al. | Machine learning approach to analyze the status of forklift vehicles with irregular movement in a shipyard | |
Carriegos et al. | Towards forecasting time-series of cyber-security data aggregates | |
Rahimnezhad et al. | Application of community detection in stock market analysis | |
Schweiger | An environmental management information system to support the decision-making process in the recycling sector for end-of-life-vehicles | |
CN108961128A (zh) | 一种节能减排监管信息系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20070926 |