Outburst danger coal seam safety is led method and the device that spray is crept into
Technical field
The present invention relates to outburst danger coal seam safety and lead method and the device that spray is crept into, be particularly useful for the outstanding security protection of coal mine gas.
Background technology
Along with the increase of the seam mining degree of depth, coal-bed gas pressure and content strengthen gradually, and coal and gas outburst risk are more and more serious, and above especially big moulded coal and the gas burst accident of kiloton taken place many mines.For the outburst danger mine of unprotect layer mining conditions, adopt at the end (top) slate lane layer-through drilling to take out the coal-bed gas measure in advance usually.But in the construction layer-through drilling, often coal occurs and gas vomits phenomenon, the single hole injecting coal quantity can reach 5~6t, and a few minutes, interior feeder amount can reach 200m
3The coal dust of ejection causes operating personnel's injures and deaths easily, and the gas of ejection often causes operation place and near tunnel gas density to transfinite, even reaches gas explosion concentration, creeps into to safety and brings very big threat.In order to solve the spray orifice problem in the layer-through drilling construction, domestic more existing blowout hookups, but all there are problems such as consolidation strength is not enough, frictional force deficiency, easily cause the blowout prevention disabler, this class blowout hookup only can change boring coal powder injection direction in addition, can't be when the spray orifice amount is big in time with coal, water, the gas separation of ejection, a large amount of gas enter the operation place, can not fundamentally solve the spray orifice potential safety hazard that exists in creeping into.
Summary of the invention
The objective of the invention is according to the problem that exists in the prior art, provide that a kind of method is simple, the blowout prevention function strong, compact conformation, the outburst danger coal seam safety that can simultaneously coal, water, gas be separated be led method and the device that spray is crept into.
Outburst danger of the present invention coal seam safety is led the method that spray is crept into,
A. at first determine that in rockhole the position construction diameter is that 150mm, length are the boring of 1900mm;
B. the sleeve pipe that with length is 2000mm inserts in the boring, exposes interface tube, with accelerated cement with casing cement;
C. expose one three admittance jet pipe of connection on the interface tube at fixed sleeving, the drilling rod that will have drill bit passes three admittance jet pipes and enters boring, seals follower head with end cover, realizes the rotatory sealing with drilling rod;
D. start rig, normally creep into to the coal seam and stop;
E. with leading the spray tube connector three admittance jet pipes are connected with eliminator, start the extraction system, continue to creep into;
F. during spray orifice, rig stops to advance, and keeps rotation, and the coal of ejection, water, gas enter eliminator to be separated, and gas enters the extraction pipeline, realizes finishing the separation of coal, water, gas when creep in the coal seam.
Outburst danger of the present invention coal seam safety is led the device that spray is crept into, comprise rig, drilling rod that links to each other with rig and high-pressure water pipe, in the feeder connection of described drilling rod, be provided with fixed sleeving, the fixed sleeving exposed junction is provided with drilling rod and leads the three admittance jet pipes that the spray tube connector communicates, be provided with the rotatory sealing end cap between three admittance jet pipes and the drilling rod, the spray tube connector of leading that is connected with three admittance jet pipes is connected with coal, water, gas eliminator, and eliminator is provided with the gas pumping tube connector that links to each other with the extraction system.
Described coal, water, gas eliminator are made of the casing that is located under the bracing frame on the bracing frame, the top of casing is provided with and connects the interface of leading spray tube connector and gas pumping tube connector, between be provided with the water proof baffle plate, wall box and bottom offer several drain holes, the bottom is provided with except that the coal mouth; The interface of described gas pumping tube connector and casing is provided with screen pack; Described extraction system comprises the gas pumping pipeline, by-pass valve control and the aspiration pump that links to each other with the gas pumping pipeline.
The invention has the beneficial effects as follows: coal, water, the gas of boring ejection in time effectively can be separated, and gas sent into the gas drainage under suction pipeline, can guarantee operating personnel's safety on the one hand, can avoid operation place and near tunnel gas density to transfinite on the other hand, prevent gas explosion.This device can be under 10MPa coal-bed gas pressure condition operate as normal, its method is simple, the blowout prevention function is strong, compact conformation, has practicality widely.
Description of drawings
Accompanying drawing is an apparatus structure schematic diagram of the present invention.
Among the figure: 1-boring; The 2-sleeve pipe; The 3-flange; 4-three admittance jet pipes; The 5-end cover; 6-coal, water, gas eliminator; The 7-drain hole; 8-removes the coal mouth; 9-gas pumping tube connector; 10-sprays tube connector; 11-water proof baffle plate; The 12-screen pack; 13-gas pumping pipeline; The 14-bracing frame; The 15-drilling rod; The 16-rig; The 17-water under high pressure; The 18-coal seam; The 19-rock stratum.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are further described:
Outburst danger of the present invention coal seam safety is led the method that spray is crept into, and at first 19 borings determine that the position construction diameter is that 150mm, length are the boring 1 of 1900mm in the rock stratum; With length is in the fixed sleeving 2 insertion borings of 2000mm, exposes interface tube, with accelerated cement that sleeve pipe 2 is fixed; With flange 3 with three admittance jet pipes 4 with after sleeve pipe 2 is connected, the drilling rod that will have the 90mm drill bit passes three admittance jet pipes 4 and enters boring 1, the end cover sealing follower head that adopts cover plate and sealing mat to constitute is realized the rotatory sealing with drilling rod; Start rig 16, normally creep into to the coal seam and stop; With leading spray tube connector 10 three admittance jet pipes 4 are connected with eliminator 6, start the extraction system, continue to creep into; Because projecting coal bed ature of coal is soft, gas pressure is big, and coal and gas vomit from boring suddenly and is called spray orifice in the drilling process, and this moment, rig stopped to advance, and kept rotation, realized finishing the separation of coal, water, gas when creep in the coal seam.Coal, water, gas by three admittance jet pipes 4, lead after spray tube connector 10 enters eliminator 6, gas enters extraction pipeline 13 by outlet, water is discharged by sidewall and bottom discharge hole 7, coal dust is deposited in eliminator bottom, periodic cleaning.
Outburst danger of the present invention coal seam safety is led the device that spray is crept into, mainly by rig 16, fixed sleeving 2, three admittance jet pipes 4, coal, water, gas eliminator 6 and extraction system constitute, and are connected with drilling rod 15 and high-pressure water pipe 17 on the rig 16, fixed sleeving 2 external diameters are that Φ 108mm, internal diameter are Φ 100mm, the long 2000mm of being, be located in the boring 1, its exposed junction connects three admittance jet pipes, 4, three admittance jet pipes, 4 external diameters to be Φ 108mm, internal diameter Φ 100mm, the long 400mm of straight tube, to lead the long 250mm of jet pipe; Three admittance jet pipes, 4 straight tube two ends are welded with flange 3, its front end is connected with fixed sleeving 2, rotatory sealing end cap 5 realizations of cover plate and sealing mat formation and the rotatory sealing between the drilling rod are adopted in the rear end, the spray tube connector 10 of leading that is connected with three admittance jet pipes 4 is connected with coal, water, gas eliminator 6, coal, water, gas eliminator 6 are made of the casing that bracing frame is located on the bracing frame 14 for 14 times, according to injecting coal quantity size design eliminator 6, eliminator 6 volumes are generally 1~6m
3, process by iron plate.Eliminator 6 tops are provided with each one of import and export, orifice diameter 150mm, and import is connected with three admittance jet pipes 4 by leading spray tube connector 10, and outlet is taken out to be connected to adopt by gas-removing tube connector and gas and is managed 9 continuously, and the extraction ability of gas pumping pipeline is pressed 6m
3/ min design; Install water proof baffle plate 11 between import and export in the eliminator 6, installing screen pack 12 in exit prevents that coal, water from entering the gas pumping pipeline; The drain hole 7 that some diameters are 5mm is offered in sidewall and bottom at eliminator 6, is used for air inlet, draining; Eliminator 6 bottoms are provided with except that coal mouth 8, are used for bug dusting; Gas enters the extraction pipeline by the outlet of eliminator 6 tops, and it is the rubber tube of 150mm that gas pumping tube connector 9 adopts diameter.The extraction system comprises gas pumping pipeline 13, by-pass valve control and the aspiration pump that links to each other with gas pumping pipeline 13.