CN103993901B CN201410172938.1A CN201410172938A CN103993901B CN 103993901 B CN103993901 B CN 103993901B CN 201410172938 A CN201410172938 A CN 201410172938A CN 103993901 B CN103993901 B CN 103993901B
Authority
CN
China
Prior art keywords
pressure
drilling
sequencing valve
discharge opeing
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410172938.1A
Other languages
Chinese (zh)
Other versions
CN103993901A (en
Inventor
郭保华
王辰霖
田采霞
席可峰
陈岩
马擎
王龙
李冰洋
郭文兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201410172938.1A priority Critical patent/CN103993901B/en
Publication of CN103993901A publication Critical patent/CN103993901A/en
Application granted granted Critical
Publication of CN103993901B publication Critical patent/CN103993901B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A kind of projecting coal bed drilling waterpower is handled up anti-reflection method.Handled up by waterpower, form flow at high speed water body in drilling surrounding medium, carry out fine coal and gas, improve gas drainage under suction effect.After the completion of drilling construction, installation supplies drain line, makes drilling surrounding medium fracturing using initial liquid supply pressure feed flow.Then close liquid-supplying system, open drainage system, minimum and maximum critical pressure is determined according to coal water slurry and gas density, maximum critical pressure is arranged to feed flow sequencing valve and closes pressure and the program-controlled valve opening pressure of discharge opeing, minimum critical pressure is arranged to feed flow sequencing valve Opening pressure and discharge opeing sequencing valve closes pressure, control the opening and closing of two sequencing valves in real time by digital pressure gauge numerical value, realize the program-controlled waterpower throughput operation of drilling surrounding medium.When coal water slurry and gas density are preferably minimized setting value, maximum critical pressure is improved, re-starts waterpower throughput operation, untill improving maximum critical pressure and cannot substantially change coal water slurry and gas density.

Description

A kind of projecting coal bed drilling waterpower is handled up anti-reflection method
Technical field
The present invention relates to a kind of projecting coal bed drilling waterpower handle up anti-reflection method, especially weak seam drilling it is anti-reflection, Extinction, the method for subtracting dirt.
Background technology
With the raising of coal mining mechanization degree, the gas and coal dust problem in coal production are more and more prominent, coal It is that a kind of serious natural calamity, coal dust can also explode when reaching a certain concentration in coal production with Gas Outburst, and And coal miner can be caused to suffer from pneumoconiosis, serious threat is brought to the safety and health of coal miner.Therefore, how coal is solved In ore deposit production coal and gas prominent and coal dust it is exceeded be important topic in Safety of Coal Mine Production.
For such phenomenon, coal industry takes following control measure:(1)Gas Drainage from Virgin Coal Seams, i.e., by negative pressure extraction Gas in coal seam is discharged, reduces gas pressure and gas bearing capacity, prevents coal and gas prominent accident from occurring;(2)Hydraulic fracturing, I.e. to coal seam high pressure water injection, force coal seam to produce crack, increase gas permeability, then induce gas in coal seam to discharge, reduce coal seam Gas pressure and gas bearing capacity, prevent the generation of coal and gas prominent or bump.Play dust-proof, anti-spontaneous fire again at the same time Effect.
At present, coal-bed flooding achieves a degree of effect in coal and gas prominent accident is prevented, but the technology There are still certain blindness.When projecting coal bed drilling hydrofracturing is anti-reflection under carrying out large ground pressure, when water body pressure After power reduces, the crack gap of opening re-closes under crustal stress effect, is unable to maintain that the open configuration in crack gap, because This, it is difficult to obtain anti-reflection effect.In the presence of crack gap is maintained with materials such as sand grains, due to soft coal body structural strength It is low, the effect of sand grains concentrated stress can not be subjected to and occur to destroy adjustment, finally or satisfied antireflective effect cannot be obtained.
The content of the invention
Projecting coal bed drilling waterpower of the invention a kind of is handled up anti-reflection method, it is intended to for problem present in prior art, With the thinking cleaned fine coal in coal body, retain the higher lump coal of intensity in coal body, there is provided a kind of method is simple, easy to operate, control Property is good, securely and reliably, the good coal and gas outburst prominent controlling of effect and subtracts the integrated method of dirt.
The object of the present invention is achieved like this:A kind of projecting coal bed drilling waterpower is handled up anti-reflection method, including is drilled, sealed Hole, the program such as be pressurized, handle up.The device that realizing this method needs includes:Topping-up pump, positive displacement pump, high pressure aluminium-plastic pipe, sequencing valve, Triple valve, pressure gauge, hole packer, high-pressure rubber pipe with holes.
The high-pressure rubber pipe with holes is positioned in the drilling for reaching projected depth, and aperture section uses hole packer sealing of hole, prevents High pressure water or gas are flowed out from the gap between high-pressure rubber pipe with holes and hole wall.The aperture size of the high-pressure rubber pipe with holes and Away from can be adjusted according to fine coal flushing effect.
The topping-up pump passes through high pressure by high pressure aluminium-plastic pipe, sequencing valve, triple valve to high-pressure rubber pipe feed flow, highly pressurised liquid Sebific duct aperture enters drilling surrounding medium, increases raw coal crack by high pressure or expands coal body preexisting crack.
The positive displacement pump is arranged by high pressure aluminium-plastic pipe, sequencing valve, triple valve, high-pressure rubber pipe aperture from drilling surrounding medium Liquid.
The positive displacement pump is coal slime pump.
The feed flow high pressure aluminium-plastic pipe, high-pressure rubber pipe with holes can bear system maximum pressure and minimum sub-atmospheric pressure.
This method by clean the fine coal in coal body increase drilling surrounding medium in permeability, drill surrounding medium in Water body is spent by high-pressure rubber pipe aperture seepage flow speed per hour into high-pressure rubber pipe to be then unfavorable for carrying out fine coal slowly.High pressure water flows automatically When going out, inside and outside head difference decay is very fast, and water volume flow rate is also decayed comparatively fast, is unfavorable for the carrying of fine coal;In addition, water body is unidirectional always The seepage flow out of high-pressure rubber pipe extroversion high-pressure rubber pipe, will cause the closure of high-pressure rubber pipe aperture, is unfavorable for the outflow of follow-up fine coal.Cause This, is alternately opened, the method that topping-up pump and positive displacement pump work alternatively, makes aperture is inside and outside to keep larger head using two sequencing valves Difference, flow at high speed state is maintained by water body, and is conducive to the carrying discharge of fine coal at a high speed, and since water body is from high-pressure rubber pipe Aperture alternately flows in and out, then will not block aperture for a long time.
Digital pressure gauge is installed in high pressure aluminium-plastic pipe, digital pressure gauge numeral can be used for control feed flow sequencing valve and discharge opeing Sequencing valve;When high pressure plastic-aluminum overpressure reaches relatively low critical value, open feed flow sequencing valve and close discharge opeing sequencing valve, by supplying Liquid pump to supply refrigerant;When high pressure plastic-aluminum overpressure reaches higher critical value, open discharge opeing sequencing valve and close feed flow sequencing valve, by Positive displacement pump discharge opeing.So move in circles repeatedly, when discharge concentration of coal-water is relatively low, and gas density is relatively low, dismountable drilling Outer device, is connected to gas exhaust system by high-pressure rubber pipe in drilling, carries out the long-term extraction of gas.
Extraction coal water slurry and high concentration gas are discharged by pipe special.
For drilling, feed flow water supplying pump and discharge opeing pump drainage, exactly gulp down water and gushing water, by gulping down water repeatedly and dashing forward Water, discharges pulverized coal particle in drilling surrounding medium, leaves the higher lump coal of intensity, can be easier to retain can be used as gas porous flow The crack of passage, improves coal gas extraction efficiency.
Brief description of the drawings
A kind of projecting coal bed waterpower that drills that Fig. 1 is the present invention is handled up anti-reflection method schematic diagram.
In figure:1 is solution feed pump;2 be feed flow high pressure aluminium-plastic pipe;3 be feed flow sequencing valve;4 be triple valve;5 be positive displacement pump; 6 be discharge opeing high pressure aluminium-plastic pipe;7 be discharge opeing sequencing valve;8 be for discharge opeing high pressure aluminium-plastic pipe;9 be digital pressure gauge;10 be height with holes Moulding pipe;11 be hole packer;12 be drilling;13 be high-pressure rubber pipe aperture with holes;14 be coal body.
Embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Handle up anti-reflection method the present invention provides a kind of projecting coal bed drilling waterpower.
As shown in Figure 1, the present invention's comprises the following steps that.
(1)Drilling construction takes out drilling rod to after projected depth, and high-pressure rubber pipe 10 with holes is put into drilling 12, and in hole Installation hole packer 11, prevents high pressure water from being flowed out from the gap between high-pressure rubber pipe 10 with holes and hole wall near mouthful.
(2)Connection drill outer device including solution feed pump 1, positive displacement pump 5, feed flow sequencing valve 3, discharge opeing sequencing valve 7, triple valve 4, Digital pressure gauge 9, feed flow high pressure aluminium-plastic pipe 2, discharge opeing high pressure aluminium-plastic pipe 6, for discharge opeing high pressure aluminium-plastic pipe 8, and connect for discharge opeing height Press aluminium-plastic pipe 8 and high-pressure rubber pipe 10 with holes.
(3)Positive displacement pump 5 and discharge opeing sequencing valve 7 are closed, opens solution feed pump 1 and feed flow sequencing valve 3, increases hydraulic pressure in drilling 12 Add, high pressure water enters drilling surrounding medium by high-pressure rubber pipe aperture 13 with holes, in the case of keeping hole packer 11 effective, reaches To the fracturing pressure designed according to crustal stress situation, and stable high voltage is for a period of time, makes the stress shape of 12 periphery coal body 14 of drilling State and Fracture Networks remain unchanged.
(4)Solution feed pump 1 and feed flow sequencing valve 3 are closed, opens positive displacement pump 5 and discharge opeing sequencing valve 7, extraction drilling surrounding medium Middle water body, if coal slurry density is higher or gas density is higher, by the Opening pressure of feed flow sequencing valve 3 and discharge opeing sequencing valve 7 The minimum pressure that pressure is set to digital pressure gauge 9 after unlatching positive displacement pump is closed, by the Opening pressure of discharge opeing sequencing valve 7 and feed flow journey The closing pressure of control valve 3 is set to the maximum pressure of digital pressure gauge 9 after unlatching solution feed pump, by the pressure value of digital pressure gauge 9 Signal control feed flow sequencing valve 3 and discharge opeing sequencing valve 7, to realize the automatic conversion of handling up of water body in the surrounding medium that drills;Until Coal slurry density and drawing-off gas concentration are all reduced to below setting value.
(5)If step(4)Middle coal slurry density and gas density are all relatively low, then further improve opening for discharge opeing sequencing valve 7 Open pressure and the closing pressure of feed flow sequencing valve 3, repeat step(3)And step(4).
(6)When improving hydraulic pressure coal dust around bleeder off hole and gas effect not significantly improved, then drainage Drilling Water Body, removes the outer device that drills, and the gas that high-pressure rubber pipe with holes in drilling is connected to gas drainage system concentrates delivery pipe.
(7)When using this method to next drilling, repeat step(1)~(6).
The specific embodiment of the above, the simply present invention, not makes the present invention limitation in any form, not On the basis of departing from technical scheme, made simple modification, equivalent variations or modification, each fall within the protection of the present invention Scope.

Claims (1)

  1. The anti-reflection method 1. a kind of projecting coal bed drilling waterpower is handled up, it is characterised in that include the following steps,
    A. drilling construction takes out drilling rod, by high-pressure rubber pipe with holes to after projected depth(10)It is put into drilling(12)It is interior, and in hole Installation hole packer near mouthful(11), prevent high pressure water from high-pressure rubber pipe with holes(10)Flowed out in gap between hole wall;
    B. the outer device of connection drilling includes solution feed pump(1), positive displacement pump(5), feed flow sequencing valve(3), discharge opeing sequencing valve(7), threeway Valve(4), digital pressure gauge(9), feed flow high pressure aluminium-plastic pipe(2), discharge opeing high pressure aluminium-plastic pipe(6), for discharge opeing high pressure aluminium-plastic pipe(8), And connect for discharge opeing high pressure aluminium-plastic pipe(8)With high-pressure rubber pipe with holes(10);The feed flow high pressure aluminium-plastic pipe(2), the high jewelling of discharge opeing Modeling pipe(6), for discharge opeing high pressure aluminium-plastic pipe(8), high-pressure rubber pipe with holes(10)System maximum pressure and minimum sub-atmospheric pressure can be born;
    C. positive displacement pump is closed(5)With discharge opeing sequencing valve(7), open solution feed pump(1)With feed flow sequencing valve(3), make drilling(12)It is interior Hydraulic pressure increase, high pressure water pass through high-pressure rubber pipe aperture with holes(13)Into drilling surrounding medium, hole packer is being kept(11)Effectively In the case of, reach the fracturing pressure designed according to crustal stress situation, and stable high voltage is for a period of time, makes drilling(12)Periphery coal Body(14)Stress state and Fracture Networks remain unchanged;
    D. solution feed pump is closed(1)With feed flow sequencing valve(3), open positive displacement pump(5)With discharge opeing sequencing valve(7), extraction drilling surrounding Water body in coal body, if coal slurry density or gas density are higher, by feed flow sequencing valve(3)Opening pressure and discharge opeing sequencing valve (7)Closing pressure be set to open positive displacement pump after digital pressure gauge(9)Minimum pressure, by discharge opeing sequencing valve(7)Unlatching pressure Power and feed flow sequencing valve(3)Closing pressure be set to open solution feed pump after digital pressure gauge(9)Maximum pressure, by digital pressure Table(9)Pressure value signal control feed flow sequencing valve(3)With discharge opeing sequencing valve(7), to realize water body in the surrounding medium that drills Automatic conversion of handling up;Until coal slurry density and drawing-off gas concentration are all reduced to below setting value;
    If e. coal slurry density and gas density are all relatively low in step d, discharge opeing sequencing valve is further improved(7)Unlatching pressure Power and feed flow sequencing valve(3)Closing pressure, repeat step c and step d;
    F. when raising hydraulic pressure does not significantly improve coal dust around bleeder off hole and gas effect, then drainage drilling water body, tears open Except the outer device of drilling, the gas that high-pressure rubber pipe with holes in drilling is connected to gas drainage system concentrates delivery pipe;
    G. next drilling is arrived when using this method, repeat step a ~ f.
CN201410172938.1A 2014-04-25 2014-04-25 A kind of projecting coal bed drilling waterpower is handled up anti-reflection method Expired - Fee Related CN103993901B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410172938.1A CN103993901B (en) 2014-04-25 2014-04-25 A kind of projecting coal bed drilling waterpower is handled up anti-reflection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410172938.1A CN103993901B (en) 2014-04-25 2014-04-25 A kind of projecting coal bed drilling waterpower is handled up anti-reflection method

Publications (2)

Publication Number Publication Date
CN103993901A CN103993901A (en) 2014-08-20
CN103993901B true CN103993901B (en) 2018-04-20

Family

ID=51308208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410172938.1A Expired - Fee Related CN103993901B (en) 2014-04-25 2014-04-25 A kind of projecting coal bed drilling waterpower is handled up anti-reflection method

Country Status (1)

Country Link
CN (1) CN103993901B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696938B (en) * 2014-11-24 2017-08-04 登封市君鑫煤业有限责任公司 A kind of removing method of hole packer
CN105909248B (en) * 2016-04-27 2019-08-20 何满潮 For the retaining wall attitude reference device of high-pressure water jet joint-cutting, water jet drilling joint-cutting device and method
CN106930746B (en) * 2017-03-06 2019-06-04 中国矿业大学 Drilling acetone invades the alternative expression coal seam anti-reflection method combined with hydraulic fracturing
CN113654969A (en) * 2021-08-31 2021-11-16 西南石油大学 Fluid huff-puff compact oil gas effect evaluation device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1467214A1 (en) * 1986-11-18 1989-03-23 Карагандинское отделение Восточного научно-исследовательского института по безопасности работ в горной промышленности Method of hydraulic treatment of coal seam
CN101029576A (en) * 2007-04-02 2007-09-05 中国矿业大学 Method and apparatus for protruding hazadous coal-bed safety guide-jet drilling
CN202064924U (en) * 2011-04-29 2011-12-07 中国矿业大学 Hydraulic fracturing equipment in coal mine
CN102889094A (en) * 2011-07-20 2013-01-23 平安煤矿瓦斯治理国家工程研究中心有限责任公司 Coal seam water injection system
CN103541710A (en) * 2013-10-16 2014-01-29 中国矿业大学 Method for forcedly draining gas from underground gas and liquid alternate phase-drive fracture coal of coal mine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1467214A1 (en) * 1986-11-18 1989-03-23 Карагандинское отделение Восточного научно-исследовательского института по безопасности работ в горной промышленности Method of hydraulic treatment of coal seam
CN101029576A (en) * 2007-04-02 2007-09-05 中国矿业大学 Method and apparatus for protruding hazadous coal-bed safety guide-jet drilling
CN202064924U (en) * 2011-04-29 2011-12-07 中国矿业大学 Hydraulic fracturing equipment in coal mine
CN102889094A (en) * 2011-07-20 2013-01-23 平安煤矿瓦斯治理国家工程研究中心有限责任公司 Coal seam water injection system
CN103541710A (en) * 2013-10-16 2014-01-29 中国矿业大学 Method for forcedly draining gas from underground gas and liquid alternate phase-drive fracture coal of coal mine

Also Published As

Publication number Publication date
CN103993901A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN103920310B (en) A kind of underground coal mine gas liquor release separator
CN103993901B (en) A kind of projecting coal bed drilling waterpower is handled up anti-reflection method
CN107387110A (en) A kind of air-cushion type bimodulus slurry shield machine and its control method
CN104481580B (en) A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof
CN207348834U (en) One kind extracts and the compound gas production system of foaming water discharge
CN102606190A (en) Method and device for using downward crossing hole to eliminate outburst in mining of coal mine
WO2022126801A1 (en) Barrel-type extraction device for natural gas hydrate in sea area and method therefor
CN203452801U (en) Sectional pulse grouting system for tunnel construction
CN206290281U (en) A kind of mine gas extraction pipe negative pressure automatic drainage device
CN102996160A (en) Safety protection device and method for slotting to increase permeability by water jet
CN204646568U (en) A kind of hydraulic pressure grouting device
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN205577925U (en) A layer drilling hole sealing device is worn in gas stifled and middle water seal in two for coal mine
CN102493834A (en) Water and waste rock discharging device for extracting gas and working method thereof
CN202250165U (en) Integration device for separating gas and water and discharging water and slag for drill hole in gas extraction crossheading drill site
CN205638532U (en) But colliery is reuse's integrative hole sealing device of gas drainage water injection in pit
CN105298443B (en) Oil pipe blowout, gaslift and pressure break connection make method under oil pipe float valve and insufficient balance well completion
CN205135697U (en) Prevent return -air ground gas drainage device
CN103114838B (en) High-pressure automatic sand discharge device
CN205100928U (en) Spy drain drilling sealing device
CN204327109U (en) Water under high pressure stirs, the double mode quarrying case of the rapidly opened and closed door of telescopic oil cylinder chute-type
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN204782884U (en) Coal seam gas well drags for buggy device
CN105201431B (en) A kind of coal and water separate system and its separation method
CN204040999U (en) A kind of hole diameter for coal-bed gas pump drainage is to hole packer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420

Termination date: 20210425

CF01 Termination of patent right due to non-payment of annual fee