CN100595388C - 大面积疏浚吹填土地基处理方法 - Google Patents

大面积疏浚吹填土地基处理方法 Download PDF

Info

Publication number
CN100595388C
CN100595388C CN200710022364A CN200710022364A CN100595388C CN 100595388 C CN100595388 C CN 100595388C CN 200710022364 A CN200710022364 A CN 200710022364A CN 200710022364 A CN200710022364 A CN 200710022364A CN 100595388 C CN100595388 C CN 100595388C
Authority
CN
China
Prior art keywords
dredging
fill
barged
treatment method
dredger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200710022364A
Other languages
English (en)
Other versions
CN101082211A (zh
Inventor
梅国雄
宋林辉
梅岭
周峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN200710022364A priority Critical patent/CN100595388C/zh
Publication of CN101082211A publication Critical patent/CN101082211A/zh
Application granted granted Critical
Publication of CN100595388C publication Critical patent/CN100595388C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种大面积疏浚吹填土地基处理方法及其渗水管,该处理方法包括以下步骤:首先在吹填场地(5)上竖向设置渗水管(2),并将吹填场地(5)分割成至少两个吹填区域,然后再将淤泥质吹填土(3)吹填至上述吹填区域中,最后在淤泥质吹填土(3)的上面设置人造硬壳层(1),且渗水管(2)的头部延伸至人造硬壳层(1)的上表面,本发明所采用的处理方法首先将大面积的吹填场地分割成小块区域,同时进行吹填处理,提高了地基处理的效率,同时,在土吹填之前就设置好排水通道,这样边吹填就能边排水固结,而不是将土吹填好再进行处理,缩短地基强度增长时间。

Description

大面积疏浚吹填土地基处理方法
技术领域
本发明涉及一种吹填土地基处理技术,尤其涉及一种大面积疏浚吹填土地基处理方法及其渗水管。
背景技术
随着沿海城市经济的发展和城市基本建设的蓬勃开展,国内一些港口出现陆域不足的情况,将疏浚出来的淤泥用来填海造陆,已经成为沿海城市土地开发的重要手段。相应地,与吹填土有关的岩土工程问题越来越突出,核心问题是吹填土的处理,目前,对于吹填土地基的加固措施主要有二灰桩、深层搅拌桩、堆载预压、真空预压等方法。但是,由于吹填土地基土质太差,固结性能又不好,使用二灰桩法和深层搅拌桩法往往不太理想;而堆载预压法和真空预压法需要吹填土地基经过1~3年的自然固结,因此,很有必要在吹填过程中对它进行一定的预加固处理。
发明内容
本发明提供一种能够加速地基的排水固结,缩短地基强度增长时间的大面积疏浚吹填土地基处理方法及其渗水管。
本发明采用如下技术方案:
一种大面积疏浚吹填土地基处理方法,该处理方法包括以下步骤:
①在吹填场地上竖向设置渗水管,并将吹填场地分割成至少两个吹填区域,
②将淤泥质吹填土吹填至上述吹填区域中,
③在淤泥质吹填土的上面设置人造硬壳层,且渗水管的开口延伸至人造硬壳层的上表面。
一种用于大面积疏浚吹填土地基处理方法的渗水管,在该渗水管的表面设有孔。
与现有技术相比,本发明具有以下优点:
1、本发明能够加速地基的排水固结,缩短地基强度增长时间。本发明所采用的处理方法首先将大面积的吹填场地分割成小块区域,同时进行吹填处理,提高了地基处理的效率,同时,在土吹填之前就设置好排水通道,这样边吹填就能边排水固结,而不是将土吹填好再进行处理,缩短地基强度增长时间,在土体排水固结和地基强度增长方面起到事半功倍的效果。
2、本发明能够降低工程造价成本。由于本发明在淤泥质吹填土的上面设置人造硬壳层,且人造硬壳层几乎不渗水,同时由于使用的渗水管的壁上设有孔,则吹填土中的水在自重作用下沿渗水管快速排出,并聚集到土层上部,则排出的水直接覆盖于土层上成为堆载的荷重,就不需要为堆载而另外动用其他物体,既方便了施工,又降低了工程造价成本。
附图说明
图1是本发明实施例的截面图。
图2是本发明实施例的俯视图。
图3是本发明实施例的处理过程示意图。
图4是本发明渗水管的结构示意图。
以上的图中有:1、人造硬壳层2、渗水管3、淤泥质吹填土4、设计标高地面5、吹填场地
具体实施方式
实施例1
一种大面积疏浚吹填土地基处理方法,该处理方法包括以下步骤:
①在吹填场地5上竖向设置渗水管2,并将吹填场地5分割成至少两个吹填区域,
②将淤泥质吹填土3吹填至上述吹填区域中,
③在淤泥质吹填土3的上面设置人造硬壳层1,且渗水管2的开口延伸至人造硬壳层1的上表面。
在本实施例中,渗水管2竖直放置后,将吹填区域分隔成四个小区域。实施例2
一种用于大面积疏浚吹填土地基处理方法的渗水管,在该渗水管2的表面设有孔,并且在渗水管2的外表面包覆有滤网。

Claims (1)

1、一种大面积疏浚吹填土地基处理方法,其特征在于该处理方法包括以下步骤:
①在吹填场地(5)上竖向设置渗水管(2),并将吹填场地(5)上分割成至少两个吹填区域,
②将淤泥质吹填土(3)吹填至上述吹填区域中,
③在淤泥质吹填土(3)的上面设置人造硬壳层(1),且渗水管(2)的开口延伸至人造硬壳层(1)的上表面。
CN200710022364A 2007-05-15 2007-05-15 大面积疏浚吹填土地基处理方法 Expired - Fee Related CN100595388C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710022364A CN100595388C (zh) 2007-05-15 2007-05-15 大面积疏浚吹填土地基处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710022364A CN100595388C (zh) 2007-05-15 2007-05-15 大面积疏浚吹填土地基处理方法

Publications (2)

Publication Number Publication Date
CN101082211A CN101082211A (zh) 2007-12-05
CN100595388C true CN100595388C (zh) 2010-03-24

Family

ID=38911974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710022364A Expired - Fee Related CN100595388C (zh) 2007-05-15 2007-05-15 大面积疏浚吹填土地基处理方法

Country Status (1)

Country Link
CN (1) CN100595388C (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225656B (zh) * 2008-01-31 2010-09-15 中交第四航务工程局有限公司 超软弱土浅表层快速加固方法
CN101235635B (zh) * 2008-02-05 2010-09-08 北京光彩恒溢科技有限公司 一种吹填淤泥造地施工工艺及其装置
CN102312416B (zh) * 2011-10-13 2013-10-30 长沙理工大学 一种吹填淤泥排水固结的方法
CN102817354B (zh) * 2012-08-31 2014-10-01 宝钢工程技术集团有限公司 吹填加固并举的疏浚软土地基处理方法
CN106192903B (zh) * 2016-08-01 2018-09-25 中国建筑土木建设有限公司路桥分公司 浅海滩涂陆域形成筑岛的施工方法
CN110241806B (zh) * 2019-06-30 2024-05-14 华中科技大学 一种在疏浚淤泥浆堆场表面形成硬壳层的方法及硬壳层

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
真空预压法在吹填土软基工程中的应用. 郑各椿.山西建筑,第31卷第15期. 2005
真空预压法在吹填土软基工程中的应用. 郑各椿.山西建筑,第31卷第15期. 2005 *

Also Published As

Publication number Publication date
CN101082211A (zh) 2007-12-05

Similar Documents

Publication Publication Date Title
CN102383413B (zh) 一种加固饱和流塑淤泥软土地基的施工方法
CN100595388C (zh) 大面积疏浚吹填土地基处理方法
CN101713291A (zh) 一种采煤塌陷区建筑用地混填复垦方法
CN110409359A (zh) 一种内排露天矿坑底水库分段建设方法
CN105220674A (zh) 深厚软基加固处理方法
CN105064383B (zh) 插管式负压空气射流深井降水装置
CN106638542A (zh) 吹填土固结排水系统及吹填土快速加固方法
CN104264653B (zh) 超高能级强夯与置换兼容施工工艺
CN103225306A (zh) 一种邻近水源基坑开挖过程中防止基坑渗漏的方法
CN101634139B (zh) 带疏水层的回填地基强夯方法
CN110080169A (zh) 一种基于地下室利用的围海造地的施工方法
CN103510504A (zh) 高饱和不均匀吹填土地基处理方法
CN103215945B (zh) 非均质场地软土地基立体式组合动力排水固结系统和方法
CN108277794B (zh) 一种吹填软土地基真空动力固结复合排水系统
CN106884427A (zh) 水下沉管隧道以及沉管隧道过渡段软土地基加固方法
CN107190709B (zh) 新近疏浚土吹填成陆围区内建设河道的方法
CN203247575U (zh) 非均质场地软土地基立体式组合动力排水固结系统
CN202626934U (zh) 建设于淤泥质地基上的重力式码头
CN100532729C (zh) 浅层振夯击密与深层爆炸挤密联合高真空井点降水地基处理方法
CN103556641A (zh) 一种既有地下室坑内地下连续墙成槽辅助方法
CN208293556U (zh) 一种吹填软土地基真空动力固结复合排水系统
CN206667225U (zh) 一种加固软土地基的新型立体排水系统
CN108442356A (zh) 吹填软土地基真空动力固结复合排水系统的施工工艺
CN204982857U (zh) 低位负压立体多通道排水组合夯实装置
CN107859040A (zh) 一种基坑大面积松软土层的开挖方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Free format text: FORMER OWNER: NANJING UNIVERSITY OF TECHNOLOGY

Effective date: 20110519

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210009 NO. 200, ZHONGSHAN NORTH ROAD, NANJING CITY, JIANGSU PROVINCE TO: 33000 NO. 1318, FENGHE AVENUE, HONGGUTAN NEW DISTRICT, NANCHANG CITY

TR01 Transfer of patent right

Effective date of registration: 20110519

Address after: Thirty-three thousand No. 1318 Nanchang Honggutan and Fung Avenue

Patentee after: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Address before: 210009 Zhongshan North Road, Jiangsu, No. 200,

Patentee before: Nanjing University of Technology

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150922

Address after: 330000 No. 248 West Beijing Road, Jiangxi, Nanchang

Patentee after: JIANGSU CONSTRUCTION ENGINEERING GROUP NO.3 CONSTRUCTION CO., LTD.

Address before: No. 1318 Nanchang Honggutan and Fung Avenue

Patentee before: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20190515

CF01 Termination of patent right due to non-payment of annual fee