CN100558523C - 分离张拉力活壳体轨枕模具 - Google Patents

分离张拉力活壳体轨枕模具 Download PDF

Info

Publication number
CN100558523C
CN100558523C CNB2008103020302A CN200810302030A CN100558523C CN 100558523 C CN100558523 C CN 100558523C CN B2008103020302 A CNB2008103020302 A CN B2008103020302A CN 200810302030 A CN200810302030 A CN 200810302030A CN 100558523 C CN100558523 C CN 100558523C
Authority
CN
China
Prior art keywords
girder
punching block
block shell
sleeper
rail groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2008103020302A
Other languages
English (en)
Other versions
CN101298172A (zh
Inventor
姜忠仁
曹凤洁
黄放
孟国珍
李广坤
朱勇更
吴玉树
朱蕾
韩占峰
许子龙
金鹏伟
Original Assignee
Beijing Loyal Inter Co ltd
China Railway 14th Bureau Group Co Ltd
Beijing China Railway Fangshan Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Loyal Inter Co ltd, China Railway 14th Bureau Group Co Ltd, Beijing China Railway Fangshan Bridge Co Ltd filed Critical Beijing Loyal Inter Co ltd
Priority to CNB2008103020302A priority Critical patent/CN100558523C/zh
Publication of CN101298172A publication Critical patent/CN101298172A/zh
Application granted granted Critical
Publication of CN100558523C publication Critical patent/CN100558523C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

一种分离张拉力活壳体轨枕模具,由主体框架梁组合与钢模壳连接而成,主体框架梁组合由主梁外框梁、主梁、张拉端梁、固定端梁和紧固件连接而成,在两侧主梁之间固定连接至少两块轨槽托板,各轨槽托板沿轨枕模具轴向开有长条槽,轨槽托板之上连接活动钢模壳,活动钢模壳可沿长条槽滑动。在两侧主梁之间还固定连接有横梁板,横梁板与活动钢模壳沿轨枕模具轴向由弹簧连接。活动钢模壳在框架内是可以移动的,避免了轨枕挡肩部位的受损。除宽枕外各种类型轨枕主体框架都可以通用,对于新的轨枕类型只需要加工相应的活动钢模壳,大幅度降低了生产成本,提高了生产质量。

Description

分离张拉力活壳体轨枕模具
技术领域
本发明涉及一种预应力混凝土轨枕钢制模具。
背景技术
传统的预应力混凝土轨枕模具由主梁张拉端梁/固定端梁壳体轨槽板等部件整体焊接而成,每种轨枕模具仅对应相应的轨枕规格型号,各种类型轨枕模具的主要部件不能通用。在生产有挡肩的轨枕时,由于放张过程中会产生相对位移,容易使轨枕挡肩部分受到破坏,而且在张拉反力和的作用下,致使模具在数次使用后,便会产生较大变形,对产品外观质量有很大影响,如加快模具的淘汰速度,则会使生产成本大幅上涨。而且轨枕规格型号很多,每种类型都需要专门制造模具,增加了制造费用。
发明内容
本发明的目的是提供一种分离张拉力活壳体轨枕模具,要解决各种轨枕模具的主要部件不能通用的技术问题;并解决轨枕挡肩部位容易受损、影响产品质量的问题。
为实现上述目的,本发明采用如下技术方案:
一种分离张拉力活壳体轨枕模具,由主体框架梁组合与钢模壳连接而成,主体框架梁组合由外框梁、主梁、张拉端梁、固定端梁和紧固件连接而成,其特征在于:外框梁安装在主梁的外侧,主梁和外框梁的一端分别以螺栓与固定端梁相连接,外框梁的另一端与张拉端梁相螺接;在两侧主梁之间固定连接至少两块轨槽托板,各轨槽托板沿轨枕模具轴向开有长条槽,轨槽托板之上连接活动钢模壳,活动钢模壳可沿长条槽滑动;在两侧主梁之间还固定连接有横梁板,横梁板下面有短立柱和长孔,横梁板与上方的活动钢模壳由弹簧连接,弹簧沿轨枕模具轴向布置,其一端与上述的短立柱连接,另一端穿过上述长孔与活动钢模壳底面连接的挂簧柱连接。从而使整个钢模结构在承受钢丝张拉力时,模壳不受力,仅靠外框梁承受钢丝张拉力的反力。
上述轨槽托板的一边或两边开有长条槽。
上述轨槽托板每边的长条槽有两至四个。
上述轨槽托板与主梁焊接或由螺栓连接。
上述主梁外面固定连接有外框梁支架板。
与现有技术相比本发明具有以下特点和效果:本发明结构合理,通用性好,多种类型的轨枕只需要制造一套模具,轨枕模具由主体框架和活动钢模壳两部分采用螺栓连接而成,张拉力及反作用力主要由外框梁承受,活动钢模壳在框架内是可以移动的,避免了轨枕挡肩部位的受损。而且除宽枕外各种类型轨枕主体框架都可以通用,对于新的轨枕类型只需要加工相应的活动钢模壳,大幅度降低了生产成本和工程造价,而且提高了生产质量,减少了废品率。本发明可广泛地应用于预应力混凝土轨枕生产领域。
附图说明
下面结合附图对本发明作进一步详细的说明。
图1是本发明的底面结构示意图。
图2是本发明的侧面结构示意图。
图3是本发明的俯视结构示意图。
图4是图1的A处结构的放大示意图。
图5是图1的B处结构的放大示意图。
1-主梁、2-外框梁、3-轨槽托板、4-张拉端梁、5-固定端梁、6-紧固件、7-螺母、8-长条槽、9-短螺柱、10-活动钢模壳、11-横梁板、12-弹簧、13-长孔、14-短立柱、15-挂簧柱、16-螺栓、17-外框梁支架板。
具体实施方式
实施例参见图1、图2、图3所示,这种分离张拉力活壳体轨枕模具,由主体框架梁组合与钢模壳连接而成,主体框架梁组合由外框梁2、主梁1、张拉端梁4、固定端梁5和紧固件6连接而成。主梁1外面固定连接有外框梁支架板17。
参见图1,图2,外框梁2安装在主梁1的外侧,主梁和外框梁的一端分别以螺栓与固定端梁5相连接,外框梁的另一端与张拉端梁4相螺接。
参见图1,图5,在两侧主梁之间焊接或由螺栓16连接至少两块轨槽托板3,各轨槽托板3沿轨枕模具轴向开有长条槽8,上述轨槽托板3的一边或两边开有长条槽8。轨槽托板3每边的长条槽8有两至四个。
轨槽托板3之上由短螺柱9和螺母7连接活动钢模壳10,活动钢模壳由钢板整体冲压而成,可沿轨槽托板上的长条槽8滑动。
参见图1,图4,在两个侧边框之间还固定连接有横梁板11,横梁板11下面有短立柱14和长孔13,横梁板11与上方的活动钢模壳10由弹簧12连接,弹簧沿轨枕模具轴向布置,其一端与上述的短立柱14连接,另一端穿过上述长孔13与活动钢模壳底面连接的挂簧柱15连接。
本发明对传统的轨枕生产模具进行了革新,当生产不同型号的轨枕时,张拉端梁与固定端梁之间锚固预应力钢筋,活动钢模壳10可根据不同型号轨枕的需要拆卸调换,也可在主体框架内沿轨枕模具轴向调节,参见图5,活动钢模壳10底面的短螺柱9在长条槽8内移动至合适位置,由螺母7固定。如此这样,一套轨枕模具的主体框架,就可以生产多种型号的轨枕。

Claims (5)

1.一种分离张拉力活壳体轨枕模具,由主体框架梁组合与钢模壳连接而成,主体框架梁组合由外框梁(2)、主梁(1)、张拉端梁(4)、固定端梁(5)和紧固件(6)连接而成,其特征在于:外框梁(2)安装在主梁(1)的外侧,主梁(1)和外框梁(2)的一端分别以螺栓与固定端梁(5)相连接,外框梁(2)的另一端与张拉端梁(4)相螺接,在两侧主梁之间固定连接至少两块轨槽托板(3),各轨槽托板沿轨枕模具轴向开有长条槽(8),轨槽托板(3)之上连接活动钢模壳(10),活动钢模壳可沿长条槽(8)滑动;在两侧主梁之间还固定连接有横梁板(11),横梁板(11)下面有短立柱(14)和长孔(13),横梁板(11)与上方的活动钢模壳(10)由弹簧(12)连接,弹簧沿轨枕模具轴向布置,其一端与上述的短立柱(14)连接,另一端穿过上述长孔(13)与活动钢模壳底面连接的挂簧柱(15)连接。
2.根据权利要求1所述的分离张拉力活壳体轨枕模具,其特征在于:上述轨槽托板(3)的一边或两边开有长条槽(8)。
3.根据权利要求2所述的分离张拉力活壳体轨枕模具,其特征在于:上述轨槽托板(3)每边的长条槽(8)有两至四个。
4.根据权利要求3所述的分离张拉力活壳体轨枕模具,其特征在于:上述轨槽托板(3)与主梁(1)焊接或由螺栓(16)连接。
5.根据权利要求3所述的分离张拉力活壳体轨枕模具,其特征在于:上述主梁(1)外面固定连接有外框梁支架板(17)。
CNB2008103020302A 2008-06-05 2008-06-05 分离张拉力活壳体轨枕模具 Expired - Fee Related CN100558523C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008103020302A CN100558523C (zh) 2008-06-05 2008-06-05 分离张拉力活壳体轨枕模具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008103020302A CN100558523C (zh) 2008-06-05 2008-06-05 分离张拉力活壳体轨枕模具

Publications (2)

Publication Number Publication Date
CN101298172A CN101298172A (zh) 2008-11-05
CN100558523C true CN100558523C (zh) 2009-11-11

Family

ID=40078190

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008103020302A Expired - Fee Related CN100558523C (zh) 2008-06-05 2008-06-05 分离张拉力活壳体轨枕模具

Country Status (1)

Country Link
CN (1) CN100558523C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104526852A (zh) * 2014-12-19 2015-04-22 中铁七局集团郑州工程有限公司 T形预制梁梁底拼装钢模的制造方法

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102126251A (zh) * 2010-12-28 2011-07-20 北京中铁房山桥梁有限公司 用于机组流水长模生产线的活动张拉装置
CN105818266B (zh) * 2015-01-09 2018-09-07 四川华西绿舍建材有限公司 槽形板模具及采用槽形板模具制作槽形板的方法
CN106493857A (zh) * 2016-12-06 2017-03-15 汝州郑铁三佳水泥制品有限公司 一种充气型地铁枕模型及其生产地铁枕的方法
CN108858699B (zh) * 2018-05-21 2023-12-19 光明铁道控股有限公司 一种组合式预应力混凝土长轨枕组合模具

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992008589A1 (en) * 1990-11-20 1992-05-29 Schokbeton B.V. Apparatus for manufacturing prestressed concrete railway ties, and ties manufactured using such apparatus
CN2381458Y (zh) * 1999-03-26 2000-06-07 北京市城建设计研究院 一种后张拉轨枕模具
DE10133607A1 (de) * 2001-02-14 2002-08-29 Boegl Max Bauunternehmung Gmbh Verfahren und Palette zur Herstellung eines präzisen Betonfertigteiles
CN2616352Y (zh) * 2003-05-23 2004-05-19 朱勇更 分离张拉力混凝土轨枕钢模结构
JP2005254692A (ja) * 2004-03-12 2005-09-22 Oriental Construction Co Ltd プレテンシヨン方式によるプレストレスコンクリート枕木製造用型枠

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992008589A1 (en) * 1990-11-20 1992-05-29 Schokbeton B.V. Apparatus for manufacturing prestressed concrete railway ties, and ties manufactured using such apparatus
CN2381458Y (zh) * 1999-03-26 2000-06-07 北京市城建设计研究院 一种后张拉轨枕模具
DE10133607A1 (de) * 2001-02-14 2002-08-29 Boegl Max Bauunternehmung Gmbh Verfahren und Palette zur Herstellung eines präzisen Betonfertigteiles
CN2616352Y (zh) * 2003-05-23 2004-05-19 朱勇更 分离张拉力混凝土轨枕钢模结构
JP2005254692A (ja) * 2004-03-12 2005-09-22 Oriental Construction Co Ltd プレテンシヨン方式によるプレストレスコンクリート枕木製造用型枠

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104526852A (zh) * 2014-12-19 2015-04-22 中铁七局集团郑州工程有限公司 T形预制梁梁底拼装钢模的制造方法
CN104526852B (zh) * 2014-12-19 2016-11-23 中铁七局集团郑州工程有限公司 T形预制梁梁底拼装钢模的制造方法

Also Published As

Publication number Publication date
CN101298172A (zh) 2008-11-05

Similar Documents

Publication Publication Date Title
CN100558523C (zh) 分离张拉力活壳体轨枕模具
CN104129093B (zh) 多向模复合挤压液压机
JP5164004B2 (ja) プレテンションpc部材の製造方法
CN201159337Y (zh) 电缆桥架串联连接机构
CN205343396U (zh) 抗弯无砟轨道板模具
CN204382470U (zh) 高铁先张预应力轨道板钢模
CN103669835A (zh) 一种采用贝雷架的顶模体系的支撑立柱及其安装方法
CN201645621U (zh) 预应力混凝土多边形实心或空心桩成型张拉模具
CN102079334A (zh) 一种分体式车架纵梁
CN201524729U (zh) 防反向毛刺钣金模具
CN2933805Y (zh) 一种先张法双向预应力混凝土轨道板钢模型
CN104129094B (zh) 组合式双x型复合导向系统
CN2616352Y (zh) 分离张拉力混凝土轨枕钢模结构
CN203755161U (zh) 一种站场内双梁并置现浇箱梁用外模模具
CN221314595U (zh) 一种水泥房外模具
CN211806899U (zh) 一种建筑混凝土预制模具用脱模装置
CN211850828U (zh) 一种立柱侧模倒角成型件
CN106894546B (zh) 直线连接的铝合金混凝土组合剪力墙
CN201952735U (zh) 一种快速制作钢筋笼的定型模具
CN221216884U (zh) 启闭机轨道
CN201012879Y (zh) 单梁起重机
CN112207185A (zh) 一种汽车中冷支架成型模具
CN202357243U (zh) 工字轮芯弧型板竖直热压模具
CN213613699U (zh) 一种挖掘机整体配重面板模具
CN220521967U (zh) 一种固定结构及方圆特钢拼装式建筑模具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20081212

Address after: Zip code 1, Heping Road, Lixia District, Ji'nan, Shandong, China: 250014

Applicant after: CHINA RAILWAY SHISIJU Group Corp.

Co-applicant after: CHINA RAILWAY 14TH BUREAU GROUP FANGQIAO CO.,LTD

Co-applicant after: Beijing Loyal-Inter Co.,Ltd.

Address before: Zip code 1-7, Fangshan District Da Jie Road, Fangshan District, Beijing, Beijing: 102400

Applicant before: CHINA RAILWAY 14TH BUREAU GROUP FANGQIAO CO.,LTD

Co-applicant before: Beijing Loyal-Inter Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY NO.14 BUREAU GROUP CO.,LTD.

Free format text: FORMER OWNER: BEIJING ZHONGTIE FANGSHAN BRIDGE CO., LTD.

Effective date: 20081212

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091111