CN100478248C - Technology of half ship building berth construction launch and dock floating assembling - Google Patents

Technology of half ship building berth construction launch and dock floating assembling Download PDF

Info

Publication number
CN100478248C
CN100478248C CNB2005100459297A CN200510045929A CN100478248C CN 100478248 C CN100478248 C CN 100478248C CN B2005100459297 A CNB2005100459297 A CN B2005100459297A CN 200510045929 A CN200510045929 A CN 200510045929A CN 100478248 C CN100478248 C CN 100478248C
Authority
CN
China
Prior art keywords
ship
dock
tonnage
building berth
whole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2005100459297A
Other languages
Chinese (zh)
Other versions
CN1824571A (en
Inventor
马延德
窦钧
迟安峰
刘文民
包岩
于逢平
姜福茂
伞立忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
DALIAN NEW SHIPBUILDING HEAVY INDUSTRIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN NEW SHIPBUILDING HEAVY INDUSTRIES Co Ltd filed Critical DALIAN NEW SHIPBUILDING HEAVY INDUSTRIES Co Ltd
Priority to CNB2005100459297A priority Critical patent/CN100478248C/en
Publication of CN1824571A publication Critical patent/CN1824571A/en
Application granted granted Critical
Publication of CN100478248C publication Critical patent/CN100478248C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a half-ship building berth construction launching and in-dock floating closure process. Said process adopts the following measures: constructing a part of ship body on building berth suitable for a part of ship body tonnage or H3 building berth, launching said part of ship body and making its be floated into large dock suitable for whole ship tonnage and fallen on blocks, making in-dock closure operation with another large part of ship body, then making whole body assembly and welding and undocking whole ship.

Description

Water and dock floating closed up technology under half bar ship building berth was built
Technical field:
The present invention relates to hull and close up the operating procedure method of producing whole ship at building berth or the construction of dock branch, particularly at canoe platform constructing part hull, this part hull closes up to big dock and another section body section again, finishes whole assembling and welding.
Background technology:
Hull is built to close up in building berth or dock branch and is produced whole boatman's process, all is that the hull piecemeal is made moulding, on dock, a piece spliced again sectional part hull and simultaneously one section one section close up assembling and be welded into whole hull.Assembling of large-tonnage dock and welding that the large-tonnage ship will be suitable for mutually.Article one, ship is long in the assembling and the welding interval of dock, when having other ships, building on the large-tonnage dock, next bar ship will wait the marquis to last ship build and assemble and test run under behind the water, could begin assembling and weld next bar ship of construction, so the production cycle of ship is long especially.
Summary of the invention:
The present invention solves the assembly construction hull exactly will wait dock, and limited dock makes provides the technical matters that the hull construction cycle is long a kind of short-term to use dock to assemble and be welded into whole hull construction and close up technology.
In order to address the above problem, water and dock floating closed up technology under half bar ship building berth of the present invention was built, it is characterized in that: taked be suitable for one section hull part of one section hull tonnage building berth or H3 building berth construction, water floats to and is suitable for the pier that falls in the big dock of whole piece ship tonnage under one section hull, carry out another segment folding fortification of big section in the depressed place, finish whole assembling and welding at last, whole ship safety is floating undocks.。
The present invention compared with the prior art, can shorten greatly and adapt to the time that the field weld of tonnage dock is built, improved the whole efficiency of building large-tonnage ships at corresponding dock, particularly under the situation of corresponding dock anxiety, plug hole also can build the boats and ships of corresponding tonnage.
Specific embodiment: adopt 200,000 tons of FPSO ships of construction of the present invention, under normal circumstances can only be arranged in the construction of carrying out the whole piece ship in 300,000 tons of docks.But because it is more to need to build the boats and ships that are suitable for 300,000 tons of docks, the plan of 300,000 tons of dock ship closures has been arranged full.Still accept this product in this case, taked to build the long part of half bar ship 120m at improved H3 building berth, after half bar launches a ship, plug hole floats to the pier that falls in 300,000 docks, carries out another segment folding fortification of medium-sized section in the depressed place, finishes whole assembling and welding at last, the time that takies 300,000 docks has only been used one and a half months, just finished the construction that four months whole ships of normal need close up, this ship is floating undocks, and 300,000 docks are followed the normal assembling of following ship of plan and built with welding.

Claims (1)

1. water and dock floating closed up technology under one and half bar ship building berths were built, it is characterized in that: taked in the one section hull part that is suitable for one section hull tonnage of large-tonnage ships building berth construction large-tonnage ships, water under after described one section hull is partly built, float to then and be suitable for the pier that falls in the big dock of whole piece tonneaux de jauge, carry out the segment folding fortification of another big section hull part of large-tonnage ships in the depressed place, finish whole assembling and welding at last, the whole piece safety of ship is floating to undock.
CNB2005100459297A 2005-02-22 2005-02-22 Technology of half ship building berth construction launch and dock floating assembling Active CN100478248C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100459297A CN100478248C (en) 2005-02-22 2005-02-22 Technology of half ship building berth construction launch and dock floating assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100459297A CN100478248C (en) 2005-02-22 2005-02-22 Technology of half ship building berth construction launch and dock floating assembling

Publications (2)

Publication Number Publication Date
CN1824571A CN1824571A (en) 2006-08-30
CN100478248C true CN100478248C (en) 2009-04-15

Family

ID=36935447

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100459297A Active CN100478248C (en) 2005-02-22 2005-02-22 Technology of half ship building berth construction launch and dock floating assembling

Country Status (1)

Country Link
CN (1) CN100478248C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101670882B (en) * 2009-09-02 2012-11-14 惠生(南通)重工有限公司 Method for positioning water floating fall pier of super-huge type segmental dock
CN102101525B (en) * 2009-12-17 2013-10-23 舟山大神洲造船有限公司 Joining method of dock gate
CN101811555B (en) * 2009-12-21 2012-10-17 南通中远船务工程有限公司 Section assembly control method of bulk freighter body in floating dock
CN102328729B (en) * 2011-05-31 2013-08-14 江苏熔盛造船有限公司 Process of afloat ship twin-islet jointing
CN102530191A (en) * 2011-11-15 2012-07-04 江苏大学 Large-size floating state manufacturing method of marine engineering equipment
CN102490864B (en) * 2011-11-29 2014-10-15 广州中船黄埔造船有限公司 Underwater folding method for half ships
CN102582799B (en) * 2012-04-11 2013-04-17 广新海事重工股份有限公司 Buoyancy tank and afloat buoyancy tank joining process
CN104691704B (en) * 2015-03-18 2017-05-31 桂平市大众船舶修造厂 A kind of method of construction of inland navigation craft
CN110510062A (en) * 2019-09-17 2019-11-29 上海振华重工启东海洋工程股份有限公司 A kind of underwater closure workmanship in floating dock

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
20万吨级船坞与坞内造船浅谈. 隋月,戴淮波,姜福茂.造船技术,第9期. 1996
20万吨级船坞与坞内造船浅谈. 隋月,戴淮波,姜福茂.造船技术,第9期. 1996 *
对缩短造船周期的几点看法. 傅其钫.造船技术,第1期. 1991
对缩短造船周期的几点看法. 傅其钫.造船技术,第1期. 1991 *
日本专家谈二阶段造船法及船台改造. 卢业森,张灼端.广船科技,第2期. 1999
日本专家谈二阶段造船法及船台改造. 卢业森,张灼端.广船科技,第2期. 1999 *
浅析造船模式的转换. 胡飞.造船技术,第6期. 1996
浅析造船模式的转换. 胡飞.造船技术,第6期. 1996 *
船坞串联造船法中艉段再定位分析. 杨启,谭家华,陈民俊.造船技术,第2期. 2002
船坞串联造船法中艉段再定位分析. 杨启,谭家华,陈民俊.造船技术,第2期. 2002 *

Also Published As

Publication number Publication date
CN1824571A (en) 2006-08-30

Similar Documents

Publication Publication Date Title
CN100478248C (en) Technology of half ship building berth construction launch and dock floating assembling
CN100513251C (en) Systems and processes for opening covering vessel hulls
CN1955066B (en) Shipmaking method of split building and dock closure
CN105209334B (en) The design method of ship shape works and ship shape works
CN101209746B (en) Offshore multi-use buoyancy tank
CN101850834A (en) Semi-submersible type multifunctional jetty
CN104229099B (en) A kind of ocean engineering ship carries the system and method for lower water
CN104229084B (en) A kind of head and the tail floating box type shipbuilding platform
CN103112553A (en) Self-propelled semi-submersible type maintenance vessel
CN101367426A (en) Shaft, rudder system mounting process of ten-thousand-ton grade special multipurpose vessel
CN101357673A (en) Dock non-dry type multi-boat construction method
CN107640282A (en) A kind of multi-purpose vessel axle, rudder system mounting process
CN106167078A (en) A kind of boats and ships and drilling platforms floating aid system and construction method
CN101356091A (en) Inundation method used in tandem shipbuilding process
CN103895828A (en) Double-curved-surface floating type production oil storage platform
CN102874388A (en) Rotatable towboat structure with superstructure built based on modularization
KR101964141B1 (en) Module-built pontoon hull
KR100785479B1 (en) Installation method and structure with modulation for submerged turret loading into vessel
CN201882241U (en) Lightweight portable floating dock
CN106956745A (en) It is a kind of can modularization assembling ship
CN103921905B (en) Semi-submersible module for combining into large-scale floating body on the water and assembling method thereof
CN110104133A (en) Pontoon docking Multifunctional floating harbour
CN109080792A (en) The stowage method of half ship not floating in a kind of dock
CN105775057A (en) Modular self-lifting type maritime work platform
CN201762686U (en) Semi-submersible type multifunctional breakwater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DALIAN SHIPPING HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: DALIAN NEW SHIPBUILDING HEAVY INDUSTRIES CO., LTD.

Effective date: 20100720

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100720

Address after: 116100 No. 1, Haiphong street, Xigang District, Liaoning, Dalian

Patentee after: Dalian Shipping Heavy Industry Group Co., Ltd.

Address before: 116100 No. 1, Haiphong street, Xigang District, Liaoning, Dalian

Patentee before: Dalian New Shipbuilding Heavy Industries Co., Ltd.