CN100475729C - 污泥载体干燥工艺 - Google Patents

污泥载体干燥工艺 Download PDF

Info

Publication number
CN100475729C
CN100475729C CNB2006100361062A CN200610036106A CN100475729C CN 100475729 C CN100475729 C CN 100475729C CN B2006100361062 A CNB2006100361062 A CN B2006100361062A CN 200610036106 A CN200610036106 A CN 200610036106A CN 100475729 C CN100475729 C CN 100475729C
Authority
CN
China
Prior art keywords
sludge
mud
drying process
dry powder
minute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2006100361062A
Other languages
English (en)
Other versions
CN1884154A (zh
Inventor
钟环声
李雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Utlity Environmental Technology Co Ltd
Original Assignee
GUANGZHOU PUDE ENVIRONMENTAL PROTECTION FACILITY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU PUDE ENVIRONMENTAL PROTECTION FACILITY CO Ltd filed Critical GUANGZHOU PUDE ENVIRONMENTAL PROTECTION FACILITY CO Ltd
Priority to CNB2006100361062A priority Critical patent/CN100475729C/zh
Publication of CN1884154A publication Critical patent/CN1884154A/zh
Application granted granted Critical
Publication of CN100475729C publication Critical patent/CN100475729C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/20Sludge processing

Abstract

污泥载体干燥工艺,主要包括污泥预处理、污泥特性调理、好氧熟化、干燥工艺流程,污泥的特性调理工艺是指把预处理过的污泥与污泥干粉按质量比1∶1-5混合,用高速对辊搅拌机搅拌。搅拌速度控制在50-150转/分,线速度78.54-235.62米/分,特性调理后的污泥呈颗粒状,本发明的有益效果是设备简单,占地面积少,日处理600吨污泥的厂房仅需10亩用地;能耗少,每吨耗煤仅大约60公斤,且处理过程无臭气、废水产生。

Description

污泥载体干燥工艺
技术领域:
本发明涉及污泥的干燥方法,特别是污泥载体干燥工艺。
背景技术:
污泥指城市生活污水和工业废水经污水处理厂进行污水处理后产生的以弹性固体形态存在的生物物料,也包括河流湖泊疏浚时产生的底泥。污泥一般含水80%以上,有机质6-16%,无机质4-12%及少量的重金属和大量的细菌。污泥对环境的危害是人所共知的,所以必须进行无害化处理。目前国内外应用的污泥处理技术主要是堆肥、焚烧和干化。由于污泥含有重金属,用作肥料有重金属在农作物中富集的危险,故欧美发达国家已对此方法的使用有严格的限制或逐渐放弃使用这种方法,越来越多的选择焚烧和干化的方法。国内也有些大城市采用这种方法,将焚烧后的余渣用作建筑材料。但是,含水量高达80%的污泥不能直接点燃。所以污泥的深度脱水干化是污泥处理和综合利用必经的关键环节。如中国发明专利申请号200510200271.2公开的污泥脱水和稳定化处理方法,就公开了第一步加热干燥处理;中国专利“湖泊及城市污泥无害化综合利用的工艺”(ZL01108478.2)就要求污泥干燥后的含水量为2-15%,然后才能在“干燥后的污泥加入固硫、固氮剂进行配料,配好的物料进入熔融炉熔融焚烧”。这种干燥方法,其能耗巨大,污泥处理的成本高,经济较不发达的城市和地区一般难以承受。而发明专利申请“三段式低温污泥干化成粒系统”(申请号200510049036.X)公开的方法就需要有斗带式提升机和三个体积不同的回转烘干窑、冷却输送带、筛分设备,供热系统的沸腾炉等,这种方法能耗还是较大,且设备投资及场地占用也较大,也就是说,污泥的处理成本还是比较高。
现有技术中,一般干燥工艺能耗大。如某污水厂采用日本三菱技术的空心桨叶搅拌干燥机对污泥进行干燥,每吨能耗成本就达350元以上。
现有技术的缺陷,是因为对污泥性状认识不足。污水污泥是由水处理过程中的细菌胶团构成的凝胶状物质,其水相是自由水,双电层吸附水,胶体表面吸附水和细胞水组成。除自由水外,其它形式的水相的汽化由于要克服双电层、表面能和细胞壁的禁锢作用,其汽化潜热均大于自由水。污泥表面板结部分质地致密坚硬,传热系数小,降低了污泥颗粒“干燥前沿”的水分汽化的传热和传质效率,而且其干燥前沿区域极窄,其内部的胶团的结构降低了水分子的热运动能力,使得胶团所禁锢的水分难以通过热运动进行传导传热,从宏观的角度表现为污泥干燥过程热传导效率很低。正因为现有技术没有消除污泥胶体对水分的禁锢作用,使得污泥干燥过程中能耗大。
发明内容:
本发明的目的是提供一种大大降低污泥处理的能源消耗的污泥载体干燥工艺。
污泥载体干燥工艺,主要包括以下工艺流程:
1)污泥预处理:用物理和化学的方法对污泥进行除臭和重金属钝化处理;
2)污泥特性调理:把预处理过的污泥与污泥干粉按质量比1∶1-5混合,用高速对辊搅拌机搅拌。搅拌速度控制在50-150转/分,线速度78.54-235.62米/分,特性调理后的污泥呈颗粒状;
3)好氧熟化:上述经特性调理的污泥送到堆放场,用翻料机每6-10小时翻拌一次,直到污泥含水量为20-25%。
4)干燥:好氧熟化后部分用作循环用料的污泥,送入热风干燥系统干燥。热风通风量为10000m3/h-15000m3/h,物料停留时间为3-6分钟,控制出料污泥含水量小于10%;作为首次启用热风干燥系统,用作循环料的污泥要添加含水量小于25%的粘土,添加量为污泥的30-40%,粘土可以是河流湖泊疏浚的底泥。
在干燥后,对排出的尾气还需除尘。
先对收集到的污泥进行预处理,接着进行污泥特性调理,将预处理过的污泥与污泥干粉混合,用高速对辊搅拌机搅拌,目的是使污泥与污泥干粉充分混合,消除污泥胶团对水分的禁锢作用,同时使混合物料处于塑性区间以下,并呈颗粒状。这样可获得巨大的分散表面积,大幅度提高干燥过程的热传导效率。好氧熟化工序是把特性调理后的污泥送进堆放场,用翻料机不定时进行翻拌,消除了胶体双电层对水的禁锢,汽化潜热大大降低;巨大的分散表面积及翻拌令污泥充分接触氧化,使厌氧菌死亡,细胞壁破裂而失去对水的禁锢作用。污泥有机物质的好氧熟化过程产生的高温加速了水分的蒸发,最后污泥含水量已达到20-25%。经过好氧熟化后的污泥,大部分用作建材原料,部分作为本工艺循环用料进入干燥工序。经过前述各工序处理的污泥,凝胶状结构已彻底破坏并获得了巨大的分散表面积,所以干燥工序的时间很短,物料停留时间为3-6分钟,最后得到含水量小于10%的污泥干粉,用作特性调理的原料。
作为改进,污泥与污泥干粉按质量比1∶1-3混合;搅拌速度控制在75-100转/分,线速度117.81-157.06米/分,热风通风量为11500m3/h-12500m3/h。
作为进一步改进,污泥与污泥干粉按质量比1∶2混合;搅拌速度90转/分,线速度141.4米/分,热风通风量为12000m3/h。
作为再进一步改进,污泥与污泥干粉按质量比1∶2.4混合;搅拌速度120转/分,线速度188.5米/分,热风通风量为13000m3/h。
作为又一改进,粘土的添加量为污泥的30-40%。
作为另一改进,粘土为河流或湖泊疏浚的底泥。
本发明的有益效果是:本发明开发的污泥载体干燥工艺,设备简单,占地面积少,日处理600吨污泥的厂房仅需10亩用地;能耗少,每吨耗煤仅60公斤,且处理过程无臭气、废水产生。
附图说明:
图1是本发明污泥载体干燥工艺流程图。
具体实施方式:
实施例1
下面通过实施例但不限于实施例,对本发明进一步说明。
实施例1
如图1所示,将预处理后的污泥与污泥干粉按质量比1∶1配比1000公斤,再进行特性调理,用高速对辊搅拌机搅拌,搅拌速度为60转/分,线速度94.25米/分,呈颗粒状后送进堆放场进行好氧熟化。在好氧熟化工序中,用翻料机不定时进行翻拌,直到出料时污泥含水量约为23%,好氧熟化后,污泥部分作为循环用料送进干燥系统,热风通风量为11000m3/h,物料停留时间6分钟,干燥后出料的污泥干粉含水量约为8.1%。本实施例每吨耗煤58.7公斤。
实施例2
按实施例1的工艺过程进行。污泥与污泥干粉质量比为1∶2配制1000公斤,搅拌机速度90转/分。线速度141.4米/分。好氧熟化后出料含水约为23.6%,热风通风量为12000m3/h,物料停留时间3分钟,出料污泥干粉含水量约为7.6%,每吨耗煤56.73公斤。
实施例3
按实施例1的工艺过程进行。污泥与污泥干粉质量比为1∶2.4配制1000公斤,搅拌机速度120转/分。线速度188.5米/分。好氧熟化后出料含水约为24.3%,热风通风量为12000m3/h,物料停留时间5分钟,出料污泥干粉含水量约为9.3%,每吨耗煤57.61公斤。
实施例4
按实施例1的工艺过程进行。污泥与污泥干粉质量比为1∶5配制1000公斤,搅拌机速度145转/分,线速度227.8米/分。好氧熟化后出料含水约为24.3%,热风通风量为15000m3/h,物料停留时间5分钟,出料污泥干粉含水量约为6%,每吨耗煤58.5公斤。

Claims (8)

1、污泥载体干燥工艺,其特征在于包括以下工艺流程:
1)污泥预处理:对污泥进行除臭和重金属钝化处理;
2)污泥特性调理:把预处理过的污泥与污泥干粉按质量比1∶1-5混合,用高速对辊搅拌机搅拌,搅拌速度50-150转/分,线速度78.54-235.62米/分;
3)好氧熟化;经特性调理的污泥送进堆放场,用翻料机每6-10小时翻拌一次,直到污泥含水量为20-25%;
4)干燥:好氧熟化后的部分用作循环料的污泥,送入热风干燥系统干燥,热风通风量为10000m3/h-15000m3/h,物料停留时间3-6分钟,控制出料污泥干粉含水量小于10%。
2、如权利要求1所述的污泥载体干燥工艺,其特征在于:污泥与污泥干粉按质量比1∶1-3混合;搅拌速度控制在75-100转/分,线速度117.81-157.06米/分;热风通风量为11500m3/h-12500m3/h。
3、如权利要求2所述的污泥载体干燥工艺,其特征在于:污泥与污泥干粉按质量比1∶2混合;搅拌速度90转/分,线速度141.4米/分;热风通风量为12000m3/h。
4、如权利要求2所述的污泥载体干燥工艺,其特征在于:污泥与污泥干粉按质量比1∶2.4混合;搅拌速度120转/分,线速度188.5米/分;热风通风量为13000m3/h。
5、如权利要求1至4任一权利要求所述的污泥载体干燥工艺,其特征在于:经调理后的污泥是颗粒状。
6、如权利要求1至4任一权利要求所述的污泥载体干燥工艺,其特征在于:在干燥工序首次启用热风干燥系统时,用作循环料的污泥要添加含水量小于25%的粘土。
7、如权利要求6所述的污泥载体干燥工艺,其特征在于:粘土的添加量为污泥的30-40%。
8、如权利要求6所述的污泥载体干燥工艺,其特征在于:粘土为河流或湖泊疏浚的底泥。
CNB2006100361062A 2006-06-28 2006-06-28 污泥载体干燥工艺 Active CN100475729C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100361062A CN100475729C (zh) 2006-06-28 2006-06-28 污泥载体干燥工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100361062A CN100475729C (zh) 2006-06-28 2006-06-28 污泥载体干燥工艺

Publications (2)

Publication Number Publication Date
CN1884154A CN1884154A (zh) 2006-12-27
CN100475729C true CN100475729C (zh) 2009-04-08

Family

ID=37582477

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100361062A Active CN100475729C (zh) 2006-06-28 2006-06-28 污泥载体干燥工艺

Country Status (1)

Country Link
CN (1) CN100475729C (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201116292Y (zh) * 2007-05-11 2008-09-17 广州普得环保设备有限公司 多功能连续式污泥处理系统
CN101224912B (zh) * 2008-01-25 2011-03-23 广州普得环保设备有限公司 一种污泥干燥的方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
北京污水处理厂污泥干化处理工艺选择的探讨. 王钊.市政技术,第22卷第6期. 2004
北京污水处理厂污泥干化处理工艺选择的探讨. 王钊.市政技术,第22卷第6期. 2004 *
污泥的特性与建筑材料资源化利用. 黄晓庆,黄少斌,杨顺汉.粉煤灰,第1期. 2006
污泥的特性与建筑材料资源化利用. 黄晓庆,黄少斌,杨顺汉.粉煤灰,第1期. 2006 *

Also Published As

Publication number Publication date
CN1884154A (zh) 2006-12-27

Similar Documents

Publication Publication Date Title
CN101823825B (zh) 一种污泥脱水干化工艺方法及装置
CN1331819C (zh) 利用污泥粉煤灰混合造粒净化气体并副产复合肥料的方法
CN102206091B (zh) 一种利用污泥制作陶粒的方法
CN104649650A (zh) 一种新型污泥制砖工艺
CN102161562B (zh) 一种利用粉煤灰处置剩余污泥的工艺方法
WO2013026263A1 (zh) 脱水污泥再处理方法
JP2011511703A (ja) 汚泥乾燥の方法
CN109851265B (zh) 一种孔隙可调控污泥渣土基陶粒及其制备方法
CN103524008B (zh) 一种城镇污水厂污泥零排放自动化处理处置工艺
CN109731544A (zh) 一种赤泥-炉渣-水泥复合除磷剂制备方法
CN105948866A (zh) 利用河塘淤泥和污水处理厂污泥制备腐植质有机肥的方法
CN101914405B (zh) 一种污泥成型燃料及其生产方法和生产系统
EP4046970A1 (en) Process for treating residual biological sludge for the production of granular fertilizer
CN106007324A (zh) 一种污泥的固化干化工艺
CN100475729C (zh) 污泥载体干燥工艺
CN105217918B (zh) 污泥生物质球团化、燃料化处理方法
CN105906397B (zh) 有机固体废物造粒变压堆肥化生产粒状有机肥的方法及装置
CN101100347A (zh) 一种化学法干燥污泥焚烧制加气砖技术
CN113462393A (zh) 一种高寒高海拔地区湿有机质生物干化处理方法
JP2005138074A (ja) 廃棄物の安定化処理物
CN106587004A (zh) 一种生物碳基缓释肥及其制备方法
KR100220210B1 (ko) Fly ash를 수분 조절제로 이용한 수도작용 완효성 비료 및 그 제조방법
JPH11106773A (ja) 泥状物からの固形燃料の製造方法
JP3301606B2 (ja) 有機廃棄物処理方法
JP4649361B2 (ja) 産業廃液を活用した複合材料、産業廃液の固液分離方法、並びに産業廃液の保存方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GUANGZHOU ENVIRONMENTAL PROTECTION EQUIPMENT CO.

Free format text: FORMER OWNER: GUANGZHOU GEDE ENGINEERING CO., LTD.

Effective date: 20080718

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080718

Address after: Guangzhou City, Yuexiu District Province, Guangdong Siyou new roads 111115 No. 1112 room 510600: Post encoding

Applicant after: Guangzhou Pude Environmental Protection Facility Co., Ltd.

Address before: Room 1719, Wuyang Town Plaza, Guangzhou, Guangdong Province, China: 510600

Applicant before: Guangzhou Gedeng Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Sludge carrier drying process

Effective date of registration: 20121112

Granted publication date: 20090408

Pledgee: Societe Generale Bank, Limited by Share Ltd, Guangzhou branch

Pledgor: Guangzhou Pude Environmental Protection Facility Co., Ltd.

Registration number: 2012440000001

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20130221

Granted publication date: 20090408

Pledgee: Societe Generale Bank, Limited by Share Ltd, Guangzhou branch

Pledgor: Guangzhou Pude Environmental Protection Facility Co., Ltd.

Registration number: 2012440000001

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
ASS Succession or assignment of patent right

Owner name: GUANGZHOU XINZHICHENG ENVIRONMENTAL PROTECTION TEC

Free format text: FORMER OWNER: GUANGZHOU PUDE ENVIRONMENTAL PROTECTION FACILITY CO., LTD.

Effective date: 20130606

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130606

Address after: 510600 Guangzhou, Yuexiu District, Temple Road, the right of the new layer on the ground floor, No. third, No. 90, No. 168

Patentee after: Guangzhou Xinzhicheng Environmental Protection Technology Machinery Equipment Co., Ltd.

Address before: 510600, room 111-115, 1112 Xin Xin Road, Yuexiu District temple, Guangdong, Guangzhou

Patentee before: Guangzhou Pude Environmental Protection Facility Co., Ltd.

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20061227

Assignee: Guangzhou utlity Environmental Technology Co. Ltd.

Assignor: Guangzhou Xinzhicheng Environmental Protection Technology Machinery Equipment Co., Ltd.

Contract record no.: 2015440000140

Denomination of invention: Sludge carrier drying process

Granted publication date: 20090408

License type: Common License

Record date: 20150518

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170119

Address after: 510000 Guangdong city of Guangzhou province Yuexiu District Shuiyin Road No. 119 room 2201 star Ying Jing

Patentee after: Guangzhou utlity Environmental Technology Co. Ltd.

Address before: Shop third, level 168, new street, temple, Guangzhou, Yuexiu District, No. 90

Patentee before: Guangzhou Xinzhicheng Environmental Protection Technology Machinery Equipment Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Sludge carrier drying process

Effective date of registration: 20220509

Granted publication date: 20090408

Pledgee: China Minsheng Banking Corp Guangzhou branch

Pledgor: UTALY ENVIRONMENTAL TECHNOLOGIES CO.,LTD.

Registration number: Y2022980005254

PE01 Entry into force of the registration of the contract for pledge of patent right