CN100465846C - Crawler crane torque controlling method and apparatus under super lifting working condition - Google Patents

Crawler crane torque controlling method and apparatus under super lifting working condition Download PDF

Info

Publication number
CN100465846C
CN100465846C CNB2006101161078A CN200610116107A CN100465846C CN 100465846 C CN100465846 C CN 100465846C CN B2006101161078 A CNB2006101161078 A CN B2006101161078A CN 200610116107 A CN200610116107 A CN 200610116107A CN 100465846 C CN100465846 C CN 100465846C
Authority
CN
China
Prior art keywords
crane
pulling force
counterweight
super
number percent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006101161078A
Other languages
Chinese (zh)
Other versions
CN101021731A (en
Inventor
刘金江
龙刚强
谢军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sany Technology Co Ltd
Original Assignee
Shanghai Sany Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Sany Technology Co Ltd filed Critical Shanghai Sany Technology Co Ltd
Priority to CNB2006101161078A priority Critical patent/CN100465846C/en
Publication of CN101021731A publication Critical patent/CN101021731A/en
Application granted granted Critical
Publication of CN100465846C publication Critical patent/CN100465846C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A torque control method and device on the condition of superlift of a crawler crane takes the ratio of actual loading pressure and maximum permissible value of the crane main luffing rod as the main luffing percentage A, and the ratio of pull sum for crane superlift counterweight upgrading fuel tank and counterweight as the using percentage B to realize the torque control according to the relation of A and B. It also provides a method of achieving the above device, which includes: buzzers, lights, pull sensors set on the main luffing rod, pressure sensors on the superlift counterweight fuel tank, the controller coupled with the above components and the interface coupled with controller.

Description

The method and apparatus of Torque Control under the crawler crane super lifting working condition
Technical field
The present invention relates to a kind of method and apparatus of Torque Control, the method and apparatus of Torque Control under particularly a kind of crawler crane super lifting working condition.
Background technology
For improving the elevating capacity of crane, goliath is provided with super lifting working condition.Under the super lifting working condition, because the effect of additional bob-weight, when the moment unbalance of front and back, both there had been the possibility of toppling forward in crane, also had the possibility of toppling backward.General limiter of moment can only limit the preceding upsetting moment of crane, the ability of back upsetting moment without limits.
For the solution of crane moment restricted problem under super lifting working condition, beyond example still at present.
Summary of the invention
When the purpose of this invention is to provide a kind of crane band super lifting working condition, can reliably, reasonably prevent to tumble behind the crane and the method and apparatus of preceding Torque Control of tumbling.
In order to realize above-mentioned purpose, the technical solution used in the present invention is: the method for Torque Control under a kind of crawler crane super lifting working condition comprises following steps:
A. adopt central controller (CPU) to calculate the pulling force that crane main amplitude pull bar reality is born;
B. maximum to allow the ratio of value of thrust be main transformer width of cloth pulling force number percent A for the pulling force that is born with the crane main amplitude pull bar reality that obtains among the step a and crane main amplitude pull bar;
C. calculate the pulling force summation of superlift counterweight of crane lift cylinder, calculate counterweight weight;
D. the ratio with the pulling force summation of the superlift counterweight of crane lift cylinder that obtains among the step c and counterweight weight is counterweight utilization factor number percent B;
E. according to calculating the main transformer width of cloth pulling force number percent A of gained and the following relation of counterweight utilization factor number percent B in step b and the steps d, realize control to moment under the crawler crane super lifting working condition:
I. when A<15%, if B〉50%, end the action that all cause the crane loading moment to increase;
Ii. when A<15%, if B〉90%, end all and cause the crane loading moment to increase the action that reduces with loading moment;
Iii. as A〉90% the time, no matter why B is worth, and ends the action that all cause the crane loading moment to increase.
Realize the device of the method for Torque Control under the above-mentioned crawler crane super lifting working condition: comprise hummer and pilot lamp, place the pulling force sensor on the crane main amplitude pull bar, place the pressure transducer on the super-starting balance weight lift cylinder, the man-machine interface that controller that couples with hummer, pilot lamp, pulling force sensor, pressure transducer (for central processing unit) and controller couple.
Aforesaid structure, the analog quantity input end of pulling force sensor and controller couples, and is installed on the main transformer width of cloth pull bar, detects the pulling force that main transformer width of cloth pull bar is born; The analog quantity input end of pressure transducer and controller couples, and is installed on the super-starting balance weight lift cylinder, detects oil cylinder working-pressure; Controller input end and sensor couple, and the measured data based designing requirement of receiving sensor is calculated; And couple by CAN (controller local area network) bus interface and man-machine interface, the switching value output terminal of controller is to using crane control system of the present invention to provide loading moment to increase the signal that restriction, loading moment reduce to limit; Man-machine interface couples by CAN (controller local area network) bus and controller, is used to set quantity, demonstration pulling force number percent, counterweight utilization factor number percent and the fault alarm information of super-starting balance weight; Hummer, pilot lamp couple with the switching value output terminal of controller respectively, the sound and light alarm when being used for moment and transfiniting.
Principle of work of the present invention is:
Under the super lifting working condition, the pulling force that crawler crane main amplitude pull bar reality is born has reflected that loading moment acts on the situation on crane chassis, the maximal value that this pulling force allowed is to be determined by the structure on chassis itself and weight, and the definition main transformer width of cloth pull bar reality pulling force that is born and the peaked number percent of pulling force that is allowed are A (main transformer width of cloth pulling force number percent); The summation of 2 suffered pulling force of counterweight lift cylinder has reflected the size of the rearward-directed force square that super-starting balance weight provided, and definition counterweight lift cylinder pulling force sum is B (a counterweight utilization factor number percent) with the ratio of counterweight weight; Then A and B have following relationship:
1) when A<15%, if B〉50%, all actions that cause the crane loading moment to increase all should be ended, otherwise, may cause super-starting balance weight to lift away from ground suddenly, gib arm of crane frame system is turned forward suddenly;
2) when A<15%, if B〉90%, then all cause the crane loading moment to increase the actions that reduce with loading moment all should being ended.If continuing increases loading moment, then may cause super-starting balance weight to lift away from ground suddenly, gib arm of crane frame system is turned forward suddenly; If reduce loading moment, then super-starting balance weight may drop on suddenly on the ground, and boom system will recede suddenly;
3) as A〉90% the time, no matter why B is worth, and all actions that cause the crane loading moment to increase all should be ended.
The present invention has outstanding advantage:
(1) the method novelty of the present invention's employing easily realizes;
(2) the device Based Intelligent Control of the present invention's employing, control is accurate, the reliability height;
(3) principle of the invention is simple, and is simple for structure, and realization and cost are lower easily;
(4) the present invention adopts man-machine interaction, operation easily, and obtain real time data easily, be convenient to monitoring.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the installation site synoptic diagram of sensor in the one embodiment of the invention;
Fig. 3 is the key frame at the man-machine interface of the present invention;
Fig. 4 sets picture for the man-machine interface of the present invention super-starting balance weight;
Fig. 5 is the wiring diagram of the embodiment of the invention.
Embodiment
The structure that further specifies control method of the present invention and realize its square law device below in conjunction with accompanying drawing.
Fig. 1 is the structural representation of apparatus of the present invention, as shown in Figure 1, comprise hummer 5 and pilot lamp 6, place the pulling force sensor 1 on the crane main amplitude pull bar, place the pressure transducer 2 on the super-starting balance weight lift cylinder, the man-machine interface 4 that controller 3 that couples with hummer 5, pilot lamp 6, pulling force sensor 1 and pressure transducer 2 and controller 3 couple.Controller 3 is central processing unit (CPU)
Pulling force sensor 1 is installed on the main transformer width of cloth pull bar, and its signal output part links to each other with the analog quantity input end of controller 3; Pressure transducer 2 is installed on the super-starting balance weight lift cylinder, and the analog quantity input end of its signal output part and controller 3 couples, and detects the super-starting balance weight oil cylinder working-pressure; Controller 3 couples with pulling force sensor 1, pressure transducer 2, man-machine interface 4, is installed in the electrical control cubicles; Man-machine interface 4 couples by CAN (controller local area network) bus and controller 3; Hummer, pilot lamp couple with the switching value output terminal of controller respectively; Man-machine interface 4, hummer 5, pilot lamp 6 all are installed in the cab.
Fig. 2 is the installation site synoptic diagram of sensor in the one embodiment of the invention, as shown in Figure 2, the 1st, pulling force sensor is installed on the main transformer width of cloth pull bar 21 '; 2 is pressure transducer, is installed on the super-starting balance weight oil cylinder 22 '; As figure, 23 ' is super-starting balance weight, and 24 ' is the chassis, and 25 ' is jib, and 26 ' is load.
Fig. 3 is the key frame at the man-machine interface of the present invention, and in the picture, man-machine interface shows main transformer width of cloth pulling force number percent, the super-starting balance weight utilization factor number percent that controller sends respectively with bar chart form and digital form; When alerting signal occurs, eject warning message, after alerting signal disappeared, warning message was hidden automatically.The function button F3 of man-machine interface is used to enter super-starting balance weight and sets picture, and function button F5 is used for the alarm buzzer noise reduction, when hummer is rung, as presses this button, and then hummer stops to ring.
Fig. 4 sets picture for the man-machine interface of the present invention super-starting balance weight.In pressing key frame, during function button F3, enter super-starting balance weight and set picture.In this picture, with showing the original counterweight quantity of setting, press function button F3, counterweight quantity increases progressively; Press function button F4, counterweight quantity is successively decreased; Press function button F5, the counterweight quantity of change is identified, and sends to controller by man-machine interface.Function button F1 is for returning the key frame button.
Fig. 5 is the wiring diagram of one embodiment of the invention.Among the figure, 7 is fuse, and 3 is controller of the present invention, is installed in the electrical control cubicles; 1 is main transformer width of cloth draw-bar pull sensor, is installed on the main transformer width of cloth pull bar; 2 is pressure transducer, is installed in respectively on the equalizing valve of super-starting balance weight oil cylinder 1 and super-starting balance weight oil cylinder 2; 4 is man-machine interface, is installed in crane cabin seat dead ahead; 5 is hummer, and 6 is alarm lamp, is installed on the indoor guidance panel of hoister.
In the present embodiment, among Fig. 5,7 is fuse, and 8 is the control system controller of crane, is installed in the electrical control cubicles; 9 is control crank, and the elevator that is used for crane is handled, and it is indoor to be installed on hoister, links to each other with control system controller 8; 10 is crane hoisting detent solenoid valve, is installed on the hoist brake; 11 is crane hoisting system liquid press pump proportion magnetic valve, controls the lifting and the decline of elevator respectively, is installed on the hoisting system hydraulic pump, all links to each other with control system controller 8.Two switching value output terminal a, b of the controller 3 in the present embodiment, corresponding with switching value input end a ', the b ' of control system controller 8 respectively, can respectively loading moment increase restricting signal, the loading moment that produces be reduced restricting signal and send control system controller 8 to during connection.Control system controller 8 is according to the signal that transmits, and the action of control crane hoisting detent solenoid valve 10, crane hoisting system liquid press pump proportion magnetic valve 11 realizes the effect of moment restriction.
Apparatus of the present invention are work like this: the operator at first sets the quantity of super-starting balance weight on man-machine interface, man-machine interface sends to controller by the CAN bus with super-starting balance weight quantity.The work that controller is finished is:
(1) read the super-starting balance weight quantitative value, calculate the weight of super-starting balance weight;
(2) the analog quantity input signal with pulling force sensor carries out D/A switch, calculates value of thrust according to transducer range, and allows value of thrust to calculate main transformer width of cloth pulling force number percent A according to the maximum of setting in the program;
(3) the analog quantity input signal with pressure transducer carries out D/A switch, calculates the oil cylinder pulling force according to oil cylinder cross section, transducer range, and calculates super-starting balance weight utilization factor number percent B according to 2 oil cylinder pulling force sums and super-starting balance weight weight;
(4) carry out logical operation according to value and both relations of A, B, producing loading moment increases signal and the alerting signal that restriction or loading moment reduce to limit, and makes that hummer is rung, alarm lamp is lighted;
(5) main transformer width of cloth pulling force number percent A, super-starting balance weight utilization factor number percent B and alerting signal are sent to man-machine interface.
Man-machine interface is divided into key frame and super-starting balance weight is set picture; Key frame shows main transformer width of cloth pulling force number percent A, super-starting balance weight utilization factor number percent B with the bar chart form; When alerting signal occurs, eject warning message, after alerting signal disappeared, warning message was hidden automatically; It is the interface that the operator sets super-starting balance weight quantity that super-starting balance weight is set picture.

Claims (1)

1. the method for Torque Control under the crawler crane super lifting working condition is characterized in that the concrete steps of control method are:
A. adopt central processing unit at first to calculate the pulling force that crane main amplitude pull bar reality is born;
B. maximum to allow the ratio of value of thrust be main transformer width of cloth pulling force number percent A for the pulling force that is born with the crane main amplitude pull bar reality that obtains among the step a and crane main amplitude pull bar;
C. calculate the pulling force summation of superlift counterweight of crane lift cylinder, calculate counterweight weight;
D. the ratio with the pulling force summation of the superlift counterweight of crane lift cylinder that obtains among the step c and counterweight weight is counterweight utilization factor number percent B;
E. according to calculating the main transformer width of cloth pulling force number percent A of gained and the following relation of counterweight utilization factor number percent B in step b and the steps d, realize control to moment under the crawler crane super lifting working condition:
I. when A<15%, if B〉50%, end the action that all cause the crane loading moment to increase;
Ii. when A<15%, if B〉90%, end all and cause the crane loading moment to increase the action that reduces with loading moment;
Iii. as A〉90% the time, no matter why B is worth, and ends the action that all cause the crane loading moment to increase.
CNB2006101161078A 2006-09-15 2006-09-15 Crawler crane torque controlling method and apparatus under super lifting working condition Expired - Fee Related CN100465846C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101161078A CN100465846C (en) 2006-09-15 2006-09-15 Crawler crane torque controlling method and apparatus under super lifting working condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101161078A CN100465846C (en) 2006-09-15 2006-09-15 Crawler crane torque controlling method and apparatus under super lifting working condition

Publications (2)

Publication Number Publication Date
CN101021731A CN101021731A (en) 2007-08-22
CN100465846C true CN100465846C (en) 2009-03-04

Family

ID=38709521

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101161078A Expired - Fee Related CN100465846C (en) 2006-09-15 2006-09-15 Crawler crane torque controlling method and apparatus under super lifting working condition

Country Status (1)

Country Link
CN (1) CN100465846C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718160A (en) * 2012-07-03 2012-10-10 徐工集团工程机械股份有限公司 Super-lift counterweight luffing system and lifter

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101774514B (en) * 2010-01-26 2012-02-22 昆山三一机械有限公司 Super-starting balance weight stepless luffing mechanism of crawler crane and operating method thereof
JP5625377B2 (en) * 2010-02-09 2014-11-19 コベルコクレーン株式会社 Mobile crane
CN101891125B (en) * 2010-08-03 2012-07-11 上海三一科技有限公司 Device and method for detecting deviation of superlift counterweight of crane
CN102259799B (en) * 2011-05-05 2012-12-05 中联重科股份有限公司 Torque control method and device for crawler crane installation, and crawler crane
CN102249152B (en) * 2011-06-01 2014-01-15 三一汽车起重机械有限公司 Device and method for detecting movable counter weight of crane
CN102275837B (en) * 2011-06-14 2015-03-18 上海三一科技有限公司 Super-lifting counter weight optimization control device and method and crane comprising same
CN102390781B (en) * 2011-11-14 2014-07-09 三一汽车起重机械有限公司 Lateral load protection device and method for crane
CN105084233A (en) * 2015-06-29 2015-11-25 北汽福田汽车股份有限公司 Crane and method for establishing super-lifting device on crane
DE102016014571B4 (en) * 2016-12-07 2021-07-29 Liebherr-Werk Ehingen Gmbh Crane with device for determining the effective counterweight of the crane
CN107651565B (en) * 2017-08-28 2019-07-19 北汽福田汽车股份有限公司 A kind of method of inspection, device and the limiter of moment of Car Crane Retractable Arms operating condition
CN110673653B (en) * 2019-09-12 2020-07-17 中联重科股份有限公司 Anti-tipping control method and device for engineering machinery and engineering machinery

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2161592Y (en) * 1991-12-29 1994-04-13 铁道部宝鸡工程机械厂 Lifting force moment limiter for microcomputer drive
CN2232430Y (en) * 1995-01-20 1996-08-07 吕东明 Intelligent liquid-crystal moment limiter for crane
CN1250745A (en) * 1999-06-30 2000-04-19 西安建筑科技大学 High-safety protecting system and method for monitoring running state of tower crane
US20020013666A1 (en) * 2000-05-12 2002-01-31 Schmid Josef Kaspar Method for the overload protection of a mobile crane
US6655662B2 (en) * 2000-09-21 2003-12-02 Kci Konecranes Plc Method for controlling crane brake operation
CN2592616Y (en) * 2002-12-31 2003-12-17 三一重工股份有限公司 Towercrane operation monitoring apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2161592Y (en) * 1991-12-29 1994-04-13 铁道部宝鸡工程机械厂 Lifting force moment limiter for microcomputer drive
CN2232430Y (en) * 1995-01-20 1996-08-07 吕东明 Intelligent liquid-crystal moment limiter for crane
CN1250745A (en) * 1999-06-30 2000-04-19 西安建筑科技大学 High-safety protecting system and method for monitoring running state of tower crane
US20020013666A1 (en) * 2000-05-12 2002-01-31 Schmid Josef Kaspar Method for the overload protection of a mobile crane
US6655662B2 (en) * 2000-09-21 2003-12-02 Kci Konecranes Plc Method for controlling crane brake operation
CN2592616Y (en) * 2002-12-31 2003-12-17 三一重工股份有限公司 Towercrane operation monitoring apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
履带式起重机的变幅力矩限制器. 胡文山,周洪,吴邦春.起重运输机械,第12期. 2004 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718160A (en) * 2012-07-03 2012-10-10 徐工集团工程机械股份有限公司 Super-lift counterweight luffing system and lifter

Also Published As

Publication number Publication date
CN101021731A (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN100465846C (en) Crawler crane torque controlling method and apparatus under super lifting working condition
CN200951937Y (en) Moment control device under super lifting working condition of caterpillar crane
CN2897976Y (en) Intelligent controller of hoisting brake for crane
CN100478813C (en) Hydraulic hoisting monitor system and its use in hydraulic hoisting control
US5579931A (en) Liftcrane with synchronous rope operation
CN200946070Y (en) Secondary lifting control device of closed hydraulic loop crane
CN201442833U (en) Arm support lifting mechanism
CN103058060B (en) Hoisting crane and arm control method, equipment and system
CN102431896A (en) Method, device and system for detecting load of crane and crane
CN103303817B (en) Hoisting mechanism and dynamic compactor
CN101508402A (en) Control system and control method of railway breakdown crane
CN203476861U (en) Emergency power system, and hoisting mechanism and hoisting equipment comprising same
CN201002930Y (en) Electric caterpillar crane
CN110407102A (en) A kind of straight-arm lorry-mounted crane receives hook hydraulic system automatically
CN103832927A (en) Load protection system based on proximity sensors and application thereof
CN201080240Y (en) Fast releasing hook
CN101565154A (en) Automatic turning device for hydraulic control wire rope leg
CN201362558Y (en) Diaphragm wall grab bucket with double hoists
EP3546414B1 (en) Method for determining the weight of a load held by a loading machine and loading machine for same
CN202967957U (en) Road wrecker shackle hook security control system based on moment detection
CN109969960A (en) A kind of crane load monitoring system and method
CN210795553U (en) Hoisting hydraulic system for straight-arm lorry-mounted crane
CN103321202B (en) An arm method of boom hoisting, dynamic compaction machinery and dynamic compaction machinery
CN103663152A (en) Mast rising-falling control system, method and apparatus, super-lift apparatus and crane
CN201269792Y (en) Pulling force and static settlement hydraulic test device for raiser of tractor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090304

Termination date: 20130915