CN201362558Y - Diaphragm wall grab bucket with double hoists - Google Patents

Diaphragm wall grab bucket with double hoists Download PDF

Info

Publication number
CN201362558Y
CN201362558Y CNU200920068970XU CN200920068970U CN201362558Y CN 201362558 Y CN201362558 Y CN 201362558Y CN U200920068970X U CNU200920068970X U CN U200920068970XU CN 200920068970 U CN200920068970 U CN 200920068970U CN 201362558 Y CN201362558 Y CN 201362558Y
Authority
CN
China
Prior art keywords
grab bucket
winchs
hydraulic
control system
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200920068970XU
Other languages
Chinese (zh)
Inventor
李道华
林坚
王宇清
李士战
钱雨笙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jintai Engineering Machinery Co Ltd
Original Assignee
Shanghai Jintai Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jintai Engineering Machinery Co Ltd filed Critical Shanghai Jintai Engineering Machinery Co Ltd
Priority to CNU200920068970XU priority Critical patent/CN201362558Y/en
Application granted granted Critical
Publication of CN201362558Y publication Critical patent/CN201362558Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the underground construction machinery, in particular to diaphragm wall excavating equipment. A diaphragm wall grab bucket with double hoists comprises a tracked chassis of a control room, wherein a mast system is arranged on the tracked chassis; the top part of the mast system is provided with a crown block mechanism; power lifting mechanisms are also arranged on the tracked chassis and then are connected with a working mechanism after passing through the crown block mechanism by a steel cable; the power lifting mechanisms are two hoists with balance control systems; and the two hoists are arranged on the chassis. For the grab bucket, the working mechanism is stressed evenly, therefore, the working is stable; moreover, the working mechanism can realize the swing action, and the working is reliable.

Description

A kind of continuous concrete wall grab bucket with the double hoisting machine
Technical field
The utility model relates to underground construction machinery, specifically, relates to a kind of continuous concrete wall excavating equipment.
Background technology
Underground continuous wall construction technique extensively adopts in modern capital construction construction, this kind equipment is normally having installation mast system on the crawler body of control cabin, mast system top is provided with a day mechanism of car, also be provided with power-lifter on the crawler body, and connect an operating mechanism after utilizing steel rope by the sky mechanism of car and increase hoisting capacity by the pulley mechanism that doubly restricts; The pulley mechanism structure complexity of doubly restricting, the manufacturing cost height; And winch of the general employing of so-called power-lifter, this kind equipment has problems such as cost height, poor reliability in application process.
For addressing the above problem, people consider to adopt the double hoisting machine.Yet owing to adopt the double hoisting machine, two strand steel wire ropes will inevitably run into the problem of tension imbalance, thereby cause operating mechanism to be rocked, and influence construction safety.
Summary of the invention
The utility model is intended to solve the described defective of prior art, and a kind of continuous concrete wall grab bucket with the double hoisting machine is provided.Grab bucket of the present utility model operating mechanism stress equalization, and can realize wobbling action, working stability is reliable.
The utility model is achieved in that a kind of continuous concrete wall grab bucket with the double hoisting machine, it includes the crawler body of control cabin, the mast system is installed on it, mast system top is provided with a day mechanism of car, also be provided with power-lifter on the crawler body, and utilize steel rope to pass through to connect an operating mechanism behind day mechanism of car, it is characterized in that, described power-lifter is two winchs that have balance control system, and these two winchs are arranged on the chassis.
The continuous concrete wall grab bucket of described band double hoisting machine, described balance control system is a hydraulic control system.
The continuous concrete wall grab bucket of described band double hoisting machine, described hydraulic control system comprises:
One cover feed apparatus, it comprises oil resevoir and two Hydraulic Pumps and hydraulic oil circuit, and one of them Hydraulic Pump is the active force pump, and another is auxilliary kinetic pump;
Two reducing valves, they are parallel to described active force pump discharge, and the winch of connecting respectively;
A change-over valve, it is series at auxilliary kinetic pump outlet, and its outlet is respectively by plumbing connection to two winch of hydraulic oil circuit;
A switch change-over valve, after it and described two reducing valves were parallel to the active force pump jointly, its outlet connected two winchs respectively;
An electrical controller, it comprises a controller, an actuating unit and two sensors, and these two sensors are separately positioned near the steel rope of two winchs, and described actuating unit then is positioned at switch change-over valve place and controls its unlatching or close.
Two winchs of the utility model have been installed pulling force sensor, measure the pulling force of winch respectively in real time, and signal is sent to controller, controller according to the input signal compare, if the difference that two signals take place greater than allowed band, controller will be to the reducing valve signal, change its pressure output, the discharge capacity of winch motor is with regard to corresponding change, and pull of steel wire is also along with change, up to their pulling force difference in allowed band.When controller detected two winch pulling force sums less than preset value, controller will be to the change-over valve give a signal, and the pressure oil of pump will drive winch and promote, and arrived preset value up to lineoutofservice signal pull.
Description of drawings
Below, in conjunction with the accompanying drawings, further specify the utility model:
Fig. 1 is the utility model scheme drawing;
Fig. 2 is a winch balance control system scheme drawing.
The specific embodiment
As shown in Figure 1: a kind of continuous concrete wall grab bucket with the double hoisting machine, it includes the crawler body (20 is that top bottom-disc, 14 is low bottom-disc) of control cabin, mast system 15 is installed on it, mast system 15 tops are provided with day mechanism of car 16, also be provided with power-lifter on the crawler body, and connect an operating mechanism 17 after utilizing steel rope 12,13 by day mechanism of car, described power-lifter is two winchs 4,5 that have balance control system (failing among the figure to illustrate), and these two winchs 4,5 are arranged on the top bottom-disc 20.
As an embodiment of the present utility model, described balance control system is a hydraulic control system.
And described hydraulic control system comprises (see figure 2):
One cover feed apparatus, it comprises oil resevoir and two Hydraulic Pumps 9,10 and corresponding hydraulic oil circuit, and one of them Hydraulic Pump is an active force pump 9, and another is auxilliary kinetic pump 10;
Two reducing valves 6,7, they are parallel to described active force pump 9 outlets, and the winch 4,5 of connecting respectively;
A change-over valve 11, it is series at auxilliary kinetic pump 10 outlets, and its outlet is respectively by plumbing connection to two winch 4,5 of hydraulic oil circuit;
A switch change-over valve 8, after it and described two reducing valves 6,7 were parallel to active force pump 9 jointly, its outlet connected two winchs 4,5 respectively;
An electrical controller, it comprises a controller 1, actuating unit (failing among the figure to illustrate) and two sensors 2,3, these two sensors are separately positioned near the steel rope 13,12 of two winchs 4,5, and described actuating unit then is positioned at switch change-over valve 8 places and controls its unlatching or close.

Claims (3)

1. continuous concrete wall grab bucket with the double hoisting machine, it includes the crawler body of control cabin, the mast system is installed on it, mast system top is provided with a day mechanism of car, also be provided with power-lifter on the crawler body, and utilize steel rope to pass through to connect an operating mechanism behind day mechanism of car, it is characterized in that, described power-lifter is two winchs that have balance control system, and these two winchs are arranged on the chassis.
2. the continuous concrete wall grab bucket of band double hoisting machine according to claim 1 is characterized in that described balance control system is a hydraulic control system.
3. the continuous concrete wall grab bucket of band double hoisting machine according to claim 2 is characterized in that described hydraulic control system comprises:
One cover feed apparatus, it comprises oil resevoir and two Hydraulic Pumps and hydraulic oil circuit, and one of them Hydraulic Pump is the active force pump, and another is auxilliary kinetic pump;
Two reducing valves, they are parallel to described active force pump discharge, and the winch of connecting respectively;
A change-over valve, it is series at auxilliary kinetic pump outlet, and its outlet is respectively by plumbing connection to two winch of hydraulic oil circuit;
A switch change-over valve, after it and described two reducing valves were parallel to the active force pump jointly, its outlet connected two winchs respectively;
One electrical controller, it comprises a controller, an actuating unit and two sensors, and these two sensors are separately positioned near the steel rope of two winchs, and described actuating unit then is positioned at switch change-over valve place and controls its unlatching or close.
CNU200920068970XU 2009-03-17 2009-03-17 Diaphragm wall grab bucket with double hoists Expired - Fee Related CN201362558Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200920068970XU CN201362558Y (en) 2009-03-17 2009-03-17 Diaphragm wall grab bucket with double hoists

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200920068970XU CN201362558Y (en) 2009-03-17 2009-03-17 Diaphragm wall grab bucket with double hoists

Publications (1)

Publication Number Publication Date
CN201362558Y true CN201362558Y (en) 2009-12-16

Family

ID=41473219

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200920068970XU Expired - Fee Related CN201362558Y (en) 2009-03-17 2009-03-17 Diaphragm wall grab bucket with double hoists

Country Status (1)

Country Link
CN (1) CN201362558Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518158A (en) * 2011-12-29 2012-06-27 北京南车时代机车车辆机械有限公司 Connector for hydraulic bucket of underground diaphragm wall
CN102797274A (en) * 2012-08-28 2012-11-28 北京南车时代机车车辆机械有限公司 Hydraulic system for rubber hose reel and continuous wall grab bucket with hydraulic system
CN110921538A (en) * 2019-12-23 2020-03-27 三一汽车起重机械有限公司 Hoisting system and crane
CN113482077A (en) * 2021-08-13 2021-10-08 中国水电基础局有限公司 Safety inspection method of double-wheel slot milling machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518158A (en) * 2011-12-29 2012-06-27 北京南车时代机车车辆机械有限公司 Connector for hydraulic bucket of underground diaphragm wall
CN102518158B (en) * 2011-12-29 2014-03-26 北京南车时代机车车辆机械有限公司 Connector for hydraulic bucket of underground diaphragm wall
CN102797274A (en) * 2012-08-28 2012-11-28 北京南车时代机车车辆机械有限公司 Hydraulic system for rubber hose reel and continuous wall grab bucket with hydraulic system
CN110921538A (en) * 2019-12-23 2020-03-27 三一汽车起重机械有限公司 Hoisting system and crane
CN113482077A (en) * 2021-08-13 2021-10-08 中国水电基础局有限公司 Safety inspection method of double-wheel slot milling machine

Similar Documents

Publication Publication Date Title
CN101700856B (en) Hydraulic system for automatically controlling mast retraction of crawler crane
CN103130099B (en) Crawler crane mast lifting hydraulic control system and method
CN201362558Y (en) Diaphragm wall grab bucket with double hoists
CN103342288B (en) Caterpillar crane mast rises and falls synchronous control system
CN202558406U (en) Hoisting sheave and skip bucket monitoring device of mine hoisting machine
CN103395695A (en) Super-lifting winch control method and system for crane
CN102003209B (en) Moving pump station usage method for underground drainage of coal mine
CN103274314B (en) Wave compensating device of oceanic crane
CN102942088A (en) Detection device for steel wire rope tension of friction type hoister
CN103613021A (en) Winch hydraulic control system and engineering machinery
CN201817214U (en) Automatic hook collection device of marine crane
CN203411244U (en) Control system for synchronous lifting and descending of crawler crane mast
CN102674158A (en) Crane derrick electric control system and crane including same
CN202729663U (en) Superlift counterweight luffing system and crane
CN202390116U (en) High-intensity small-tonnage hoist
CN103663152B (en) Mast rising-falling control system, method and apparatus, super-lift apparatus and crane
CN103693562B (en) Method, device and system for controlling rope threading winching of hoist, and rope threading equipment
CN203702753U (en) Engineering machinery and hydraulic system
CN202897885U (en) System for preventing electro-mechanical and hydraulic integrated crawler crane arm frame from leaning backward
CN202279647U (en) Cargo boom of lorry-mounted crane
CN103407927A (en) Hydraulic tensioning winch brake for belt conveyor
CN102417143A (en) Fixed gantry crane
CN202296941U (en) Hoisting hydraulic system for preventing dropping of secondary lifting loads
CN201982416U (en) Motor pressure cutting control system and crane employing same
CN101993013B (en) Hydraulic system for sideboom

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091216

Termination date: 20170317

CF01 Termination of patent right due to non-payment of annual fee