CN100450707C - Process of welding flow passage cover plate and frame of through-flow generator set - Google Patents

Process of welding flow passage cover plate and frame of through-flow generator set Download PDF

Info

Publication number
CN100450707C
CN100450707C CNB2006100214044A CN200610021404A CN100450707C CN 100450707 C CN100450707 C CN 100450707C CN B2006100214044 A CNB2006100214044 A CN B2006100214044A CN 200610021404 A CN200610021404 A CN 200610021404A CN 100450707 C CN100450707 C CN 100450707C
Authority
CN
China
Prior art keywords
welding
temperature
cover plate
flow passage
passage cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100214044A
Other languages
Chinese (zh)
Other versions
CN1887514A (en
Inventor
胡应雄
潘勤
秦仲君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dongfeng Electric Machinery Works Co Ltd
Original Assignee
Sichuan Dongfeng Electric Machinery Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dongfeng Electric Machinery Works Co Ltd filed Critical Sichuan Dongfeng Electric Machinery Works Co Ltd
Priority to CNB2006100214044A priority Critical patent/CN100450707C/en
Publication of CN1887514A publication Critical patent/CN1887514A/en
Application granted granted Critical
Publication of CN100450707C publication Critical patent/CN100450707C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)
  • Heat Treatment Of Articles (AREA)
  • Arc Welding In General (AREA)

Abstract

The process of welding flow passage cover plate and frame of through-flow generator set includes the steps of: assembling, welding, annealing treatment and flame correcting. By means of a reasonable technological process of assembling and welding the flow passage cover plate and frame of through-flow generator set with great size, great weight, great amount of parts and complicated structure, the present invention makes the flow passage cover plate and frame of through-flow generator set meet strict requirement in planar torsional deformation to ensure the stable performance of the through-flow generator set.

Description

Tubular unit flow passage cover plate and framework welding procedure
Technical field
The present invention relates to the welding procedure of a kind of tubular unit flow passage components flow passage cover plate and framework.
Background technology
The main flow passage components flow passage cover plate and the framework of Bulb Turbine Units are the critical components that influences unit performance, and their profiles are big, Heavy Weight, and amount of parts is many, and complex structure but has extremely strict requirement to the plane torsion resistance.Flow passage cover plate and framework adopt the welding rod arc welding more at present, and contact is many, weld seam is many, and workpiece is in the STRESS VARIATION state all the time in the dress weldering process, and welding sequence and method are inappropriate very easily to cause the workpiece gross distortion, even scraps.Flow passage cover plate and framework are made up of a plurality of little square frames, and assembly quality is bad, and weld seam is not of uniform size, can make the weld seam node shrinkage stress on the little square frame inhomogeneous because of how many differences of welding capacity, cause little square frame torsional deformation.
Summary of the invention
For the profile that satisfies flow passage cover plate and framework and the strict demand of structure, the invention provides a kind of tubular unit flow passage cover plate and framework welding procedure, by appropriate design reference for assembling, welding method and dress weldering order, guarantee product quality and manufacturing schedule.
The technical scheme that the present invention is adopted for its technical problem of solution is, a kind of tubular unit flow passage cover plate and framework welding procedure, and it comprises assembling, the processing of welding, withdraw from a secret society or underworld gang, flame correction operation.
Assembly process may further comprise the steps:
(1) center line of the runner Fang Bianyuan of selection flow passage cover plate and framework is as the erection welding benchmark;
(2) flange with flow passage cover plate and framework places on the full pattern of workbench, and dress is firm;
(3) the paired joint welding of joint close plate is firm, on flanged plate, mark each deckle board, gusset, joint close plate rigging position line;
(4) lifting enters hole flange, runner liner plate;
(5) decorate the technology lacing wire.
Welding sequence may further comprise the steps:
(1) cleans out each 50mm scope of both sides, commissure interior greasy dirt impurity and iron rust;
(2) welding.
The parameter of withdrawing from a secret society or underworld gang of the treatment process of withdrawing from a secret society or underworld gang comprises:
(1) charging temperature :≤200 ℃;
(2) intensification temperature: 100-120 ℃/h;
(3) holding temperature: 600-650 ℃;
(4) temperature retention time: 2-2.5 hour;
(5) cooling temperature: lower the temperature with stove;
(6) tapping temperature :≤200 ℃.
The mode of heating of flame correction is the triangle heating, and temperature is controlled at 690-710 ℃.
The welding step comprises:
(1) with the bottoming of Φ 3.2 welding rods;
(2) fill with Φ 4 welding rods;
(3) with Φ 5 welding rod cappings;
Adopt many people to be symmetrically welded during welding, layer temperature control all knocked weld seam with pneumatic shovel at 100 ℃-150 ℃ except that surface layer and bottom.Earlier the vertical position welding of each frame of weldering is treated to weld downhand weld again after vertical position welding is finished, to same weld seam from the centre to the both sides backstep, every section is no more than 495-505mm.
The invention has the advantages that, Heavy Weight big to profile, amount of parts flow passage cover plate and frameworks many, baroque tubular unit adopt a series of rational assembly technologies and welding procedure to control, satisfy the strict demand of the plane torsion resistance of flow passage cover plate and framework, make flow passage cover plate and framework can not cause serious torsional deformation, guarantee that unit performance is stable because of STRESS VARIATION.
The specific embodiment
Embodiment 1: a kind of tubular unit flow passage cover plate and framework welding procedure, it comprises assembling, the processing of welding, withdraw from a secret society or underworld gang, flame correction operation.
Assembly process may further comprise the steps:
(1) center line of the runner Fang Bianyuan of selection flow passage cover plate and framework is as the erection welding benchmark;
(2) flange with flow passage cover plate and framework places on the full pattern of workbench, and dress is firm;
(3) the paired joint welding of joint close plate is firm, on flanged plate, mark each deckle board, gusset, joint close plate rigging position line;
(4) lifting enters hole flange, runner liner plate;
(5) decorate the technology lacing wire.
Welding sequence may further comprise the steps:
(1) cleans out each 50mm scope of both sides, commissure interior greasy dirt impurity and iron rust;
(2) welding.
The parameter of withdrawing from a secret society or underworld gang of the treatment process of withdrawing from a secret society or underworld gang comprises:
(1) charging temperature: 180 ℃;
(2) intensification temperature: 100 ℃/h;
(3) holding temperature: 600 ℃;
(4) temperature retention time: 2.5 hours;
(5) cooling temperature: lower the temperature with stove;
(6) tapping temperature: 180 ℃.
The mode of heating of flame correction is the triangle heating, and temperature is controlled at 690 ℃.
The welding step comprises:
(1) with the bottoming of Φ 3.2 welding rods;
(2) fill with Φ 4 welding rods;
(3) with Φ 5 welding rod cappings;
Adopt many people to be symmetrically welded during welding, layer temperature control all knocked weld seam with pneumatic shovel at 100 ℃ except that surface layer and bottom.Earlier the vertical position welding of each frame of weldering is treated to weld downhand weld again after vertical position welding is finished, to same weld seam from the centre to the both sides backstep, every section is no more than 495mm.
Adopt the flow passage cover plate and the framework of as above technology welding, its plane unevenness is no more than 15mm after testing, and the runner liner plate is ground one's teeth and is no more than 3mm, and weldquality conforms to quality requirements fully.
Embodiment 2: a kind of tubular unit flow passage cover plate and framework welding procedure, it comprises assembling, the processing of welding, withdraw from a secret society or underworld gang, flame correction operation.
Assembly process may further comprise the steps:
(6) center line of the runner Fang Bianyuan of selection flow passage cover plate and framework is as the erection welding benchmark;
(7) flange with flow passage cover plate and framework places on the full pattern of workbench, and dress is firm;
(8) the paired joint welding of joint close plate is firm, on flanged plate, mark each deckle board, gusset, joint close plate rigging position line;
(9) lifting enters hole flange, runner liner plate;
(10) decorate the technology lacing wire.
Welding sequence may further comprise the steps:
(1) cleans out each 50mm scope of both sides, commissure interior greasy dirt impurity and iron rust;
(2) welding.
The parameter of withdrawing from a secret society or underworld gang of the treatment process of withdrawing from a secret society or underworld gang comprises:
(1) charging temperature: 180 ℃;
(2) intensification temperature: 120 ℃/h;
(3) holding temperature: 650 ℃;
(4) temperature retention time: 2 hours;
(5) cooling temperature: lower the temperature with stove;
(6) tapping temperature: 180 ℃.
The mode of heating of flame correction is the triangle heating, and temperature is controlled at 710 ℃.
The welding step comprises:
(1) with the bottoming of Φ 3.2 welding rods;
(2) fill with Φ 4 welding rods;
(3) with Φ 5 welding rod cappings;
Adopt many people to be symmetrically welded during welding, layer temperature control all knocked weld seam with pneumatic shovel at 150 ℃ except that surface layer and bottom.Earlier the vertical position welding of each frame of weldering is treated to weld downhand weld again after vertical position welding is finished, to same weld seam from the centre to the both sides backstep, every section is no more than 505mm.
Adopt the flow passage cover plate and the framework of as above technology welding, its plane unevenness is no more than 15mm after testing, and the runner liner plate is ground one's teeth and is no more than 3mm, and weldquality conforms to quality requirements fully.
Embodiment 3: a kind of tubular unit flow passage cover plate and framework welding procedure, it comprises assembling, the processing of welding, withdraw from a secret society or underworld gang, flame correction operation.
Assembly process may further comprise the steps:
(11) center line of the runner Fang Bianyuan of selection flow passage cover plate and framework is as the erection welding benchmark;
(12) flange with flow passage cover plate and framework places on the full pattern of workbench, and dress is firm;
(13) the paired joint welding of joint close plate is firm, on flanged plate, mark each deckle board, gusset, joint close plate rigging position line;
(14) lifting enters hole flange, runner liner plate;
(15) decorate the technology lacing wire.
Welding sequence may further comprise the steps:
(1) cleans out each 50mm scope of both sides, commissure interior greasy dirt impurity and iron rust;
(2) welding.
The parameter of withdrawing from a secret society or underworld gang of the treatment process of withdrawing from a secret society or underworld gang comprises:
(1) charging temperature: 180 ℃;
(2) intensification temperature: 110 ℃/h;
(3) holding temperature: 630 ℃;
(4) temperature retention time: 2.2 hours;
(5) cooling temperature: lower the temperature with stove;
(6) tapping temperature: 180 ℃.
The mode of heating of flame correction is the triangle heating, and temperature is controlled at 700 ℃.
The welding step comprises:
(1) with the bottoming of Φ 3.2 welding rods;
(2) fill with Φ 4 welding rods:
(3) with Φ 5 welding rod cappings;
Adopt many people to be symmetrically welded during welding, layer temperature control all knocked weld seam with pneumatic shovel at 130 ℃ except that surface layer and bottom.Earlier the vertical position welding of each frame of weldering is treated to weld downhand weld again after vertical position welding is finished, to same weld seam from the centre to the both sides backstep, every section is no more than 500mm.
Adopt the flow passage cover plate and the framework of as above technology welding, its plane unevenness is no more than 14mm after testing, and the runner liner plate is ground one's teeth and is no more than 2mm, and weldquality conforms to quality requirements fully.

Claims (1)

1, a kind of tubular unit flow passage cover plate and framework welding procedure is characterized in that it comprises assembling, welding, annealing in process, flame correction operation, wherein,
Described assembly process may further comprise the steps:
(1) center line of the runner Fang Bianyuan of selection flow passage cover plate and framework is as the erection welding benchmark;
(2) flange with flow passage cover plate and framework places on the full pattern of workbench, and dress is firm;
(3) the paired joint welding of joint close plate is firm, on flanged plate, mark each deckle board, gusset, joint close plate rigging position line;
(4) lifting enters hole flange, runner liner plate;
(5) decorate the technology lacing wire;
Described welding sequence may further comprise the steps:
(1) cleans out each 50mm scope of both sides, commissure interior greasy dirt impurity and iron rust;
(2) with the bottoming of Φ 3.2 welding rods;
(3) fill with Φ 4 welding rods;
(4) with Φ 5 welding rod cappings;
(5) adopt many people to be symmetrically welded, layer temperature control all knocked weld seam with pneumatic shovel at 100 ℃-150 ℃ except that surface layer and bottom, the vertical position welding of each frame of weldering earlier, treat to weld downhand weld again after vertical position welding is finished, to same weld seam from the centre to the both sides backstep, every section is no more than 495-505mm;
The annealing parameter of described annealing in process operation comprises:
(1) charging temperature :≤200 ℃;
(2) intensification temperature: 100-120 ℃/h;
(3) holding temperature: 600-650 ℃;
(4) temperature retention time: 2-2.5 hour;
(5) cooling temperature: lower the temperature with stove;
(6) tapping temperature :≤200 ℃;
The mode of heating of described flame correction is the triangle heating, and temperature is controlled at 690-710 ℃.
CNB2006100214044A 2006-07-17 2006-07-17 Process of welding flow passage cover plate and frame of through-flow generator set Expired - Fee Related CN100450707C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100214044A CN100450707C (en) 2006-07-17 2006-07-17 Process of welding flow passage cover plate and frame of through-flow generator set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100214044A CN100450707C (en) 2006-07-17 2006-07-17 Process of welding flow passage cover plate and frame of through-flow generator set

Publications (2)

Publication Number Publication Date
CN1887514A CN1887514A (en) 2007-01-03
CN100450707C true CN100450707C (en) 2009-01-14

Family

ID=37576796

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100214044A Expired - Fee Related CN100450707C (en) 2006-07-17 2006-07-17 Process of welding flow passage cover plate and frame of through-flow generator set

Country Status (1)

Country Link
CN (1) CN100450707C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103240576B (en) * 2013-04-27 2015-08-05 哈尔滨飞机工业集团有限责任公司 A kind of split quenching pattern processing method
CN104439744B (en) * 2014-12-01 2016-08-24 哈尔滨电机厂有限责任公司 1000MW generator unit stator transport end cap welding method
CN105414790B (en) * 2015-12-22 2017-10-03 常州齐丰机械电子有限公司 Thin bottom plate steel construction piece welding procedure
CN105834564B (en) * 2016-04-28 2018-01-16 柳州煜华科技有限公司 A kind of soldering appliance and using the instrument without fixture welding technique method
CN110102852B (en) * 2019-06-17 2021-01-22 中国船舶重工集团柴油机有限公司 Assembly welding method for press slide block

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4191504A (en) * 1976-11-02 1980-03-04 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Duct-mounted turbine and method of installing the same
GB2212420A (en) * 1987-11-18 1989-07-26 Belleli Spa Manufacturing a junction of a tubular reticular structure
JPH08197241A (en) * 1995-01-23 1996-08-06 Hitachi Ltd Manufacture of tubular vessel and tubular vessel
JPH1162569A (en) * 1997-08-14 1999-03-05 Yamaha Motor Co Ltd Exhauster of engine
CN2575320Y (en) * 2002-10-11 2003-09-24 钟挺 Wind power generating apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4191504A (en) * 1976-11-02 1980-03-04 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Duct-mounted turbine and method of installing the same
GB2212420A (en) * 1987-11-18 1989-07-26 Belleli Spa Manufacturing a junction of a tubular reticular structure
JPH08197241A (en) * 1995-01-23 1996-08-06 Hitachi Ltd Manufacture of tubular vessel and tubular vessel
JPH1162569A (en) * 1997-08-14 1999-03-05 Yamaha Motor Co Ltd Exhauster of engine
CN2575320Y (en) * 2002-10-11 2003-09-24 钟挺 Wind power generating apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
大型灯泡贯流式水轮机管型座装焊新工艺. 崔永焕,李滨,马杰,张立斌.大电机技术,第3期. 2001
大型灯泡贯流式水轮机管型座装焊新工艺. 崔永焕,李滨,马杰,张立斌.大电机技术,第3期. 2001 *

Also Published As

Publication number Publication date
CN1887514A (en) 2007-01-03

Similar Documents

Publication Publication Date Title
CN100545073C (en) Method for assembling and welding cased crane-beam in circular rail of nuclear-power station
CN100450707C (en) Process of welding flow passage cover plate and frame of through-flow generator set
CN102632344A (en) Welding deformation control process for ship superstructure
CN105436665A (en) Surfacing reconstructed layer of large hot-rolled supporting roll Cr4 and method for repairing roll
CN108747065A (en) A kind of manufacturing process of big-size thinning plastic TA5 alloy strip T-type gusset piece
CN105149827B (en) The welding method of electric motor coach electric machine stand
CN105108273A (en) Welding process for high-strength type steel plate
CN106238866A (en) Ni-based membrane panel welding method
CN112935479A (en) Welding device and repairing process for large wheel fixing table base fracture
CN102151942A (en) Hydraulic support self-preheating and automatic step-by-step welding process
CN107030446A (en) The online repair system of high temperature and high pressure steam valve sealing face
CN102909479B (en) Square long girder steel welding method
CN104120278B (en) A kind of Novel welding cinder ladle being applicable to copper ashes retarded cooling process
CN107254938A (en) A kind of anistree box-shaped king-post suspension column and preparation method thereof
CN102974917B (en) Stellite alloy bead weld method of gas turbine combustion chamber
CN112935480B (en) Repairing process for surface abrasion of large wheel fixing table base
CN206925519U (en) The online repair system of steam valve sealing surface
CN106312251A (en) Build-up welding method of flanges
CN106346156B (en) The method deformed in control condenser water box manufacture
CN108856969A (en) Bevelled welding method is exempted from a kind of full submerged-arc welding of cut deal T junction
CN104907658A (en) Welding method for air purifier honeycomb mesh
CN110303227B (en) Nuclear power large-scale penetration piece welding and post-welding treatment method and application thereof
CN111360363A (en) Manual gas welding repair device and repair process for large heat-resistant steel heating furnace door
CN103551705A (en) Chongqing monorail roof assembly welding process method
CN215238459U (en) Cracked welding device for base of large wheel fixing table

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090114

Termination date: 20100717