CN100427687C - 一种压密石灰土换填实体边坡支护方法 - Google Patents
一种压密石灰土换填实体边坡支护方法 Download PDFInfo
- Publication number
- CN100427687C CN100427687C CNB2005100192407A CN200510019240A CN100427687C CN 100427687 C CN100427687 C CN 100427687C CN B2005100192407 A CNB2005100192407 A CN B2005100192407A CN 200510019240 A CN200510019240 A CN 200510019240A CN 100427687 C CN100427687 C CN 100427687C
- Authority
- CN
- China
- Prior art keywords
- soil
- compacting
- support method
- slope
- lime
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
一种压密石灰土换填实体边坡支护方法,涉及岩土工程领域基坑中压密石灰土实体边坡支护方法,特别是软土地区基坑支护方法。具体为一种边坡支护方法。具体操作为,就地取土,土中掺入生石灰拌合均匀,再消化,或向拌合土中掺入1-8%纤维,拌合均匀,将拌合土或拌有纤维的拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。本发明使用的掺合材料为普通建筑材料,各地都有,取材方便,且价格便宜,适用范围广,工程造价低;施工设备简单,只需要挖掘机配合施工即可:施工方便,施工工期短。用本发明建成的换填实体安全性能好,造价低。本发明适用于开挖深度十米以下,具备临时放坡条件,安全等级在二级以下的临时边坡和永久性边坡处理。
Description
技术领域
本发明涉及岩土工程领域基坑中压密石灰土实体边坡支护方法,特别是软土地区基坑支护方法。
背景技术
在工程建设中,软弱地基土开挖基坑或道路边坡,都需要对边坡采取支护措施,以保证开挖后的边坡保持稳定。目前通常用于边坡支护的主要技术手段,有粉喷桩重力式挡墙支护、悬臂桩支护、桩锚支护等方法,这些方法都是成熟有效的技术方法,但尚存在一定的缺陷:
粉喷桩重力式挡墙支护方法:在遇到含水量超过70%的淤泥或土中泥炭成分过大或酸性土时,有成桩困难或成桩强度低的问题,这种方法还有工期很长,质量不够稳定,造价偏高等缺陷;
悬臂桩支护和桩锚支护等方法:这种两种方法的优点是计算模型比较清晰,适合于六米以上的深基坑支护,但存在工期长,造价太高的问题,用于软弱地基的浅基坑十分浪费。
总之,以上方法各存在一定的局限性,施工周期长、工程造价高、施工所需机械设备多,施工工艺复杂等问题是其共同缺陷。
在现有传统技术中,有利用石灰土压实作为道路基层的传统做法,其原理是利用压实石灰土压缩性被改善的缘故。但是压密石灰土的抗剪强度指标也有显著的提高,在这点上,长期以来没有被岩土工程界充分认知和重视,也没有被有效的加以利用。
发明内容
本发明的目的是提供一种能就地取材,技术稳定性好、施工周期短、造价便宜的压密石灰土换填实体边坡支护方法。
本发明的目的的实现方式为,一种压密石灰土换填实体边坡支护方法,其特征在于具体操作步骤如下:
1)就地取土,取土重量的5-20%生石灰,掺入土中拌合均匀,再消化8-24小时;
2)将拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。
本发明优点如下:
1、使用的掺合材料生石灰和纤维材料为普通建筑材料,各地都有,取材方便,且价格便宜,适用范围广,工程造价低,造价只相当于传统方法的30-50%;
2、施工设备简单,只需要挖掘机配合施工即可;
3、施工方便,施工工期短;
4、用本发明建成的换填实体安全性能好。
本发明适用于开挖深度十米以下,具备临时放坡条件,可广泛应用于安全等级在二级以下的临时边坡支护和永久性边坡处理。
附图说明
图1为采用本发明作出的第一种支护方式示意图
图2为采用本发明作出的第二种支护方式示意图
图3为采用本发明作出的第三种支护方式示意图
图4为采用圆弧滑动法计算的换填前边坡整体稳定性分析结构图
图5为采用圆弧滑动法计算的换填后边坡整体稳定性分析结构图
具体实施方式
本发明的具体操作为,就地取土,土中掺入生石灰拌合均匀,再消化,将拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。向经消化8-24小时的拌合土中掺入1-8%纤维,拌合均匀,再将拌有纤维的拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。
就地所取的土为一般的粘性土、粉土、粉质粘土、淤泥、淤泥质土、砂性土、碎石土,回填土或其中掺有建筑垃圾和工业废料的上述土。
对粘粒含量低于20%的砂性土,需要向其中掺入粘性土或粉土,使粘粒含量高于于20%,以提高土中次生矿物的微粒的比例。
土中掺入生石灰拌合均匀,遇雨天需用薄膜覆盖。
生石灰掺量具体的比例视土的含水量确定:
土的含水量低于70%,生石灰掺量为5-10%,
土的含水量70-100%,生石灰掺量为10-12%,
土的含水量高于100%,生石灰掺量为12-20%,
土中掺入生石灰拌合均匀后要消化8-24小时,消化反应过程为:
CaO+H2O=Ca(OH)2
生石灰消化反应过程不仅仅是表面上改变了土的含水量,更重要的是对土的物理化学结构也产生了极为重要的改变,即结合水的改变,土中硅酸盐矿物颗粒与水的结合体被打破,后期Ca(OH)2的强碱性将硅酸盐的活性激活,并伴随硅酸盐、铝酸盐和水产生复杂而缓慢的化学反应过程,所以消化过程不仅起到了排水作用,还将对土中硅酸盐和铝酸盐等矿物颗粒起到结构重组的物理化学作用。
生石灰消化时间不能过长,因为暴露于空气时,同时进行的化学作用还有:
Ca(OH)2+CO2=CaCO3↓+H2O
这样会降低氢氧化钙的含量,又增加了土中的水分,对压密石灰土产生不利作用。
经过消化过程后,石灰土变得松散,向拌合土中掺入1-8%纤维,拌合均匀。纤维为50-200毫米长的稻草、麦秸、竹枝、树枝等植物纤维,或其它便宜的短矿物纤维或人工纤维。拌合纤维,可以大幅提高土的抗剪切强度2-5倍。
将拌有纤维的拌合土换填到边坡位,按照设计的边坡挡墙的几何形状,分层碾压密实,每层厚300-500毫米,碾压强度不小于80kPa,碾压强度越大,效果越好。
压密石灰土换填实体的几何尺寸的确定及安全度验算方法如下:
计算公式为:
khd=R/T
式中:
T——下滑力
R——抗滑力
Cki,——第i土条底面的按总应力法确定的粘聚力(kPa)标准值;
li——第i土条底面的弧长(m);
Qi——第i土条顶面的超载标准值(kN/m);
Wi——第i土条的自重加权平均值(kN/m);
αi——第i土条底中点切线与水平线的夹角(°);
n,nl——分别为分条总数、主动侧分条数;
khd——抗滑稳定安全系数。
khd对于重要性等级为一、二、三级的基坑分别应满足不小于1.30、1.15、1.05。(见湖北省地方标准《基坑工程技术规程》(DB42/159-2004)第16页)。
针对不同的土质情况,本发明采取不同的支护挡墙。当边坡土层较软,而坑底土质较硬时,采用如图1所示的换填实体4;当边坡土层较硬,而坑底土质较软时,采用如图2所示的换填实体5;当边坡土层和坑底土质都较软时,采用如图3所示的换填实体4和换填实体5组合体。图中1-地面、2-软硬土、3-软土。
下面举出本发明具体应用实施例:
二级基坑开挖深度3.35米,地质条件如下:
①层素填土,厚度4.46米,为新近堆填的粘性土混夹碎石等杂物,土质不均、松散。c=6kPa,Φ=14°,
②层淤泥,厚度1.7米,灰黑色,流塑,饱和,含水量平均60%,c=10kPa,Φ=5°,
③层粘土,厚度5.3米,黄褐~灰褐色,可塑,湿,c=21kPa,Φ=11°。
采用本方法换填边坡和坑底的淤泥,实测换填实体3天的粘聚力c值为11kPa,内摩擦角Φ值为11°。换填前、后的K计算结果见图4、5,从图中可见,换填前,抗滑稳定安全系数K(4)=1.114<1.15,不满足要求,而换填后抗滑稳定安全系数K(i)>1.15,满足要求。
可见换填前不满足稳定性要求,换填后完全可以满足稳定性要求。c值和Φ值随时间的持续还有较大的增长。
Claims (5)
1、一种压密石灰土换填实体边坡支护方法,具体操作步骤如下:
1)就地取土,所取的土为一般的粘性土,其特征在于取土重量的10-20%生石灰,掺入土中拌合均匀,再消化8-24小时,
2)将拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。
2、根据权利要求1所述的一种压密石灰土换填实体边坡支护方法,其特征在于向经消化8-24小时的拌合土中掺入拌合土重量1-8%的纤维,拌合均匀,再将拌有纤维的拌合土换填到边坡位,并按照设计尺寸碾压密实形成换填实体。
3、根据权利要求1或2所述的一种压密石灰土换填实体边坡支护方法,其特征在于就地所取的土为粉土、淤泥、淤泥质土、砂性土、碎石土或其中掺有建筑垃圾和工业废料的上述土。
4、根据权利要求1或2所述的一种压密石灰土换填实体边坡支护方法,其特征在于粘粒含量低于20%的砂性土和碎石土,需要向其中掺入粘性土或粉土,使粘粒含量高于20%。
5、根据权利要求2所述的一种压密石灰土换填实体边坡支护方法,其特征在于纤维为短矿物纤维、人工纤维或植物纤维长度在50-200毫米长的稻草、麦秸、竹枝或树枝。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100192407A CN100427687C (zh) | 2005-08-05 | 2005-08-05 | 一种压密石灰土换填实体边坡支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100192407A CN100427687C (zh) | 2005-08-05 | 2005-08-05 | 一种压密石灰土换填实体边坡支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1730841A CN1730841A (zh) | 2006-02-08 |
CN100427687C true CN100427687C (zh) | 2008-10-22 |
Family
ID=35963256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100192407A Expired - Fee Related CN100427687C (zh) | 2005-08-05 | 2005-08-05 | 一种压密石灰土换填实体边坡支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100427687C (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102021910B (zh) * | 2010-05-20 | 2011-12-28 | 山西省第二建筑工程公司 | 条形跳格铺摊灰土垫层的施工方法 |
CN102535476B (zh) * | 2010-12-27 | 2014-06-18 | 上海勘测设计研究院 | 减少边荷载影响的方法 |
CN102587385A (zh) * | 2011-12-30 | 2012-07-18 | 青建集团股份公司 | 一种换填淤泥质软土的基坑支护方法 |
CN102912801B (zh) * | 2012-10-08 | 2015-09-09 | 中冶集团武汉勘察研究院有限公司 | 一种用于处理后筑式高陡填方边坡的方法 |
CN102912803B (zh) * | 2012-10-08 | 2015-09-09 | 中冶集团武汉勘察研究院有限公司 | 一种用于处理后筑式高陡填方边坡的ltbd方法 |
CN103850258B (zh) * | 2014-03-24 | 2016-06-29 | 北京城建勘测设计研究院有限责任公司 | 一种天然冻结支护方法 |
CN105152588B (zh) * | 2015-09-29 | 2017-11-07 | 长安大学 | 黄土公路边坡坡面防护材料及制备 |
CN105625444A (zh) * | 2016-03-14 | 2016-06-01 | 攀枝花学院 | 用于土质边坡的防渗面层结构 |
CN115045163A (zh) * | 2017-09-21 | 2022-09-13 | 南昌工程学院 | 一种钢纤维自密实水泥及其应用、一种公路路面及其施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61257534A (ja) * | 1985-05-08 | 1986-11-15 | Kensetsu Kiso Eng Kk | 斜面安定化工法 |
CN1097033A (zh) * | 1993-06-26 | 1995-01-04 | 黄尊景 | 防止坡面被冲刷的施工法 |
DE19613389A1 (de) * | 1996-04-03 | 1997-10-09 | Leopold Peterstorfer | Verfahren zur Herstellung einer Abdeckungsschicht zur Abdeckung eines Untergrundes |
-
2005
- 2005-08-05 CN CNB2005100192407A patent/CN100427687C/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61257534A (ja) * | 1985-05-08 | 1986-11-15 | Kensetsu Kiso Eng Kk | 斜面安定化工法 |
CN1097033A (zh) * | 1993-06-26 | 1995-01-04 | 黄尊景 | 防止坡面被冲刷的施工法 |
DE19613389A1 (de) * | 1996-04-03 | 1997-10-09 | Leopold Peterstorfer | Verfahren zur Herstellung einer Abdeckungsschicht zur Abdeckung eines Untergrundes |
Non-Patent Citations (6)
Title |
---|
提高石灰土强度的技术措施. 何振东.山西建筑,第27卷第4期. 2001 |
提高石灰土强度的技术措施. 何振东.山西建筑,第27卷第4期. 2001 * |
用石灰对粘性土的处理与稳定. F.G.BELL,MSc,PhD等著,江锡民译.路基工程,第1期. 1990 |
用石灰对粘性土的处理与稳定. F.G.BELL,MSc,PhD等著,江锡民译.路基工程,第1期. 1990 * |
软土处理探讨. 李海梁,谭红鑫,谢永彰.公路与汽运,第2期. 2005 |
软土处理探讨. 李海梁,谭红鑫,谢永彰.公路与汽运,第2期. 2005 * |
Also Published As
Publication number | Publication date |
---|---|
CN1730841A (zh) | 2006-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100427687C (zh) | 一种压密石灰土换填实体边坡支护方法 | |
Patel | Geotechnical investigations and improvement of ground conditions | |
CN101368383B (zh) | 一种人造复合硬壳层处理软土路基的方法 | |
CN102021906A (zh) | 深层搅拌桩处治软土地基的方法 | |
CN103233468A (zh) | 高聚物碎石桩注浆方法 | |
Raj | Ground improvement techniques (HB) | |
CN104264653A (zh) | 超高能级强夯与置换兼容施工工艺 | |
Wei et al. | Reinforced terraced fields method for fine tailings disposal | |
CN101967819B (zh) | 一种用于变电站软土地基施工的强夯置换综合法 | |
Ischy et al. | AN INTRODUCTION TO ALLUVIAL GROUTING. | |
CN113201987B (zh) | 一种高液限粘土地面的路基基底及其施工方法 | |
CN214573877U (zh) | 一种淤泥与软土地基原位固化地基结构 | |
Dronamraju | Studies on field stabilization methods to prevent surficial slope failures of earthfill dams | |
CN103449784B (zh) | 适用于膨胀土地区铁路路堑基床的水泥基防水抗裂材料 | |
CN108867279B (zh) | 一种软土路基市政道路施工方法 | |
Yu et al. | Field test study on treatment of dredged soil with cotton straw | |
Cao et al. | The technology and application of improving bearing capacity of deep peat soil subgrade | |
CN112538798A (zh) | 高速公路低湿水田软基区路基直填施工工艺 | |
CN114032887B (zh) | 一种软弱地层在役桩基注浆加固材料及其注浆工艺 | |
CN109797616A (zh) | 一种水淬镍铁渣换填加筋垫层结构及其施工方法 | |
CN220352726U (zh) | 一种适用于软土堤基的抗滑结构 | |
Borio et al. | Characterization of soil conditioning for mechanized tunnelling | |
McNally | Engineering characteristics and uses of duricrusts in Australia | |
CN115897316A (zh) | 炭质页岩填料路基填筑施工方法 | |
Chu et al. | Investigating the impact of straw-to-tailings sand ratios on combined vertical drain performance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081022 Termination date: 20130805 |