Process and system for manufacturing prefabricated electrical conductors Download PDF

Info

Publication number
CN100351955C
CN100351955C CNB2003801067850A CN200380106785A CN100351955C CN 100351955 C CN100351955 C CN 100351955C CN B2003801067850 A CNB2003801067850 A CN B2003801067850A CN 200380106785 A CN200380106785 A CN 200380106785A CN 100351955 C CN100351955 C CN 100351955C
Authority
CN
China
Prior art keywords
conductor bar
bar
conductor
insulation sheath
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2003801067850A
Other languages
Chinese (zh)
Other versions
CN1729546A (en
Inventor
P·吉迪内利
L·彼得罗内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BBI Electric SpA
Original Assignee
BBI Electric SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BBI Electric SpA filed Critical BBI Electric SpA
Publication of CN1729546A publication Critical patent/CN1729546A/en
Application granted granted Critical
Publication of CN100351955C publication Critical patent/CN100351955C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/06Insulating conductors or cables
    • H01B13/10Insulating conductors or cables by longitudinal lapping
    • H01B13/106Insulating conductors or cables by longitudinal lapping the conductor having a rectangular cross-section
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/005Laminated bus-bars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/007Butt joining of bus-bars by means of a common bolt, e.g. splice joint
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/06Totally-enclosed installations, e.g. in metal casings

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Manufacture Of Motors, Generators (AREA)
  • Manufacturing Of Electrical Connectors (AREA)

Abstract

The invention relates to a process and system for manufacturing conductor elements for forming prefabricated electrical conductors according to which the following is carried out automatically: mechanical wrapping of each bare conductor bar in a pre-cut insulating sheath, bending of each sheathed bar in preset terminal and intermediate sections along its length, placing and holding together, side by side in a pack formation, sheathed and bent conductors bars, pick up and insertion of pack of bars in a pre-shaped profile or frame, and closure of profile or frame using a cover or hood.

Description

Make the technology and the system of prefabricated electric conductor
Technical field
The present invention relates to prefabricated electric conductor-also claim bus (busbar), relate in particular to the technology and the system that make the conductor element that is used to form this prefabricated electric conductor.
Background technology
The electric pipe that this place is considered can form the electric lead that extends along predetermined paths, and described electric lead is generally used for by output steering with current delivery and distribute to the user.They are made of the straight line conductor element usually, described conductor element according to the route that will follow by joint and-if necessary-elbow links together continuously, and be placed in place by the annex that matches.
The conductor element that helps to form these prefabricated electric conductors or bus is made of with lid or the closure member that seals its open side the framework of side opening one by one-also claim section bar, a plurality of Ampereconductors bar and that is placed in this framework or the section bar to be fixed on this framework usually.Conductor bar comprises phase bar (phase bar), neutral bar and earthing strip, and earthing strip is as the protectiveness conductor.All be coated with the insulation sheath that prevents that them from contacting with each other on all conductor bars, described conductor bar fitted together side by side by belt before being placed into framework or section bar.The place, end that only maybe needs in the place that needs are connected to shunt to be connected to other parts tears the SI semi-insulation crust.
At present, use such equipment to make described conductor element to form electric conductor: described equipment can only make the packaging technology partial automation, and described equipment is consuming time and it is artificial to need to use, so the manufacturing cost height.
Summary of the invention
An object of the present invention is to propose a kind of full automatic technology of cycles prepare stage that is used in the conductor element of prefabricated electric conductor, this technology helps reducing manufacturing time and reduces cost.
Another object of the present invention provides a kind of being designed in the automatic system that handles initial single parts and use limited operating personnel when finally assembling of access phase.
First purpose of the present invention can realize that this technology may further comprise the steps by the technology that is used to form conductor element of the present invention:
Coat each conductor bar with insulation sheath mechanically;
Along each the length of coating conductor bar make it crooked in predetermined end and mid portion;
Remove with conductor bar on need the regional corresponding insulation sheath part exposed;
With a plurality of by suit and crooked conductor bar is placed side by side and with being with it is grouped into packaged form;
Picking up a bag conductor bar is inserted in a preformed framework or the section bar then; And
Utilize a lid or cover this framework of sealing or section bar.
Another object of the present invention can realize by a kind of system that can actually carry out above-mentioned technology.
Description of drawings
Describe the present invention in detail below with reference to schematic and nonrestrictive accompanying drawing, wherein:
Fig. 1 illustrates the conductor bar and the crust of initial state;
Fig. 2 illustrates the crust that is encapsulated with conductor bar;
Fig. 3 illustrates by suit, bending and has the conductor bar of removing part;
Fig. 4 illustrates the conductor bar that fits together side by side and be positioned in the preformed framework;
Fig. 5 illustrates the block diagram of native system.
Embodiment
In described accompanying drawing, Fig. 1 illustrates a conductor bar 11 and the insulation sheath 12 under the initial state.What conductor bar was normally straight also can have all lengths and cross section, and insulation sheath launches and be cut in advance the size corresponding with the size of conductor bar.
According to this technology, crust 12 is loaded into one is roughly on the shaping supporting member of tunnel-shaped, and conductor bar 11 is placed on this crust fits into then in this passage so that crust according to the profile of conductor bar closely around its folding-Fig. 2.Go up coating layer of adhesive or adhesive in the part 11 ' of conductor bar and an edge 12 ' of crust in advance, when its opposed edges was overlapped, this adhesive or adhesive can make these two interactional parts-conductor bar/crusts be connected when crust is folding.
Thereby pick up the conductor bar of the insulation of suit by this way then with described tunnel-shaped supporting member, then send it to bending workstation, make the opposite end 13 of conductor bar and one or more mid portion 14 in this position as required along lateral thrust-Fig. 3.Next, with some part of crust-be generally end and sweep-remove, so that conductor bar is exposing with 15 places, district that electrically contact of other delivery outlet/electric current distribution member.
Then, the conductor bar for preparing by this way is sent to the assembly working station, conductor bar and other conductor bar for preparing is in the same manner put together to form a packing (pack) at this work station.This moment, conductor bar was placed side by side, and by being with 16 to tighten together.
The conductor bar of assembling by this way is sent to such work station: in this work station holds conductor bar the framework or section bar 17 of stand in channel shape-Fig. 4, use one to be convenient to be fixed to the lid on framework or the section bar or the cover (not shown) that matches seals this framework or section bar then.
Prepare framework or section bar in advance with known manner, and be equipped with the shaping of conductor bar or remove that the part of (crust)-be conductor bar must expose so that the part that is connected with other parts-opening or the window that conform to for this framework or section bar.
All operation stages all are mechanization, therefore can carry out until finishing conductor element automatically.
Correspondingly, the system that is used to implement above-mentioned steps mainly comprises (Fig. 5) one first work station 21, this first work station comprise tunnel-shaped supporting member, be used for along the direction of arrow F and G with the flat insulating crust with treat that related with it bare exposed conductor bar is placed into the device on the described supporting member, and one be used for conductor bar and insulation sheath insert this passage equipment, be used on the part of conductor bar and crust application of adhesive and seal the equipment that the device and of conductor bar is used for the conductor bar of suit is sent to next work station 22 to guarantee crust.Work station 22 comprises and is used for the crooked device of the conductor bar of suit, it is the work station 23 that is used for removing crust thereafter, it comprise can be as required specific part remove the crust of conductor bar device, conductor bar is sent to the device of another work station 24, work station 24 is equipped with one to be used for the conductor bar device of with belt they being packed side by side then placed side by side.Another work station 25 is made up of such device: this device is used for holding framework or section bar and picks up and with lid or before covering framework or section bar sealing this conductor bar group is being inserted wherein then in the conductor bar group of packing.

Claims (2)

1. make the technology of the conductor element that is used to form prefabricated electric conductor, may further comprise the steps:
Conductor bar each is exposed with mechanical system is encapsulated in the insulation sheath of cutting in advance;
Along each the length of the conductor bar of suit make it crooked in predetermined end and mid portion;
Remove with conductor bar on need the regional corresponding insulation sheath part exposed;
With a plurality of by suit and crooked conductor bar is placed side by side and with being with it is grouped into packaged form;
Picking up a bag conductor bar is inserted in a preformed section bar or the framework then; And
Utilize a lid or cover this section bar of sealing or framework.
2. a technology according to claim 1 is characterized in that, the step that conductor bar is encapsulated in the insulation sheath comprises:
On a tunnel-shaped supporting member, place insulation sheath;
On described insulation sheath, place exposed conductor bar;
Insulation sheath and conductor bar are cooperated in this tunnel-shaped supporting member of insertion, so that insulation sheath is sealed conductor bar;
Application of adhesive on the part of conductor bar and insulation sheath is so that insulation sheath closely connects and the sealing conductor bar.
CNB2003801067850A 2002-12-20 2003-12-16 Process and system for manufacturing prefabricated electrical conductors Expired - Fee Related CN100351955C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT000116A ITBS20020116A1 (en) 2002-12-20 2002-12-20 PROCESS AND PLANT FOR THE PREPARATION OF CONDUCTING ELEMENTS FOR PREFABRICATED ELECTRIC CONDUCT
ITBS2002A000116 2002-12-20

Publications (2)

Publication Number Publication Date
CN1729546A CN1729546A (en) 2006-02-01
CN100351955C true CN100351955C (en) 2007-11-28

Family

ID=32676829

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003801067850A Expired - Fee Related CN100351955C (en) 2002-12-20 2003-12-16 Process and system for manufacturing prefabricated electrical conductors

Country Status (6)

Country Link
EP (1) EP1573752A2 (en)
CN (1) CN100351955C (en)
AU (1) AU2003295205A1 (en)
IT (1) ITBS20020116A1 (en)
MY (1) MY140943A (en)
WO (1) WO2004057665A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107800094A (en) * 2016-08-29 2018-03-13 福特全球技术公司 Bus heat management assembly and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201800006119A1 (en) * 2018-06-07 2019-12-07 Bar element for a bar duct

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1135133A (en) * 1966-01-05 1968-11-27 Square D Co Insulated bus bar and method of making
EP0150685A2 (en) * 1984-02-01 1985-08-07 ISOLPIAVE s.r.l. Method and machine for insulating electric conductors for transformers by glueing insulation coating sheet and conductors thus insulated
US4678253A (en) * 1984-10-29 1987-07-07 Eaton Corporation Bus duct having improved bus bar clamping structure
CN2071392U (en) * 1990-08-08 1991-02-13 金坛县电子配件厂 Quick wire connector

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1135133A (en) * 1966-01-05 1968-11-27 Square D Co Insulated bus bar and method of making
EP0150685A2 (en) * 1984-02-01 1985-08-07 ISOLPIAVE s.r.l. Method and machine for insulating electric conductors for transformers by glueing insulation coating sheet and conductors thus insulated
US4678253A (en) * 1984-10-29 1987-07-07 Eaton Corporation Bus duct having improved bus bar clamping structure
CN2071392U (en) * 1990-08-08 1991-02-13 金坛县电子配件厂 Quick wire connector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107800094A (en) * 2016-08-29 2018-03-13 福特全球技术公司 Bus heat management assembly and method
CN107800094B (en) * 2016-08-29 2021-11-05 福特全球技术公司 Bus thermal management assembly and method

Also Published As

Publication number Publication date
WO2004057665A3 (en) 2004-08-12
WO2004057665A2 (en) 2004-07-08
AU2003295205A1 (en) 2004-07-14
EP1573752A2 (en) 2005-09-14
MY140943A (en) 2010-02-12
ITBS20020116A1 (en) 2004-06-21
CN1729546A (en) 2006-02-01
AU2003295205A8 (en) 2004-07-14

Similar Documents

Publication Publication Date Title
US6717058B2 (en) Multi-conductor cable with transparent jacket
WO2008020527A1 (en) Grounding structure and grounding method for shield wire
CN106655019B (en) Improved process for cold-shrink installation of 10-35KV cable intermediate joint
CN106451256B (en) Improved cold-contraction installation process for cable intermediate joint
CA2145608A1 (en) Wire Harness and Method of Manufacturing the Same
CN103124060B (en) A kind of optical fiber composite medium-pressure cable cold-shrinkable terminal and installation method thereof
WO2013134057A1 (en) Insulating and waterproofing member and insulating and waterproofing method
CA2284325A1 (en) Apparatus and method for installing a water well pump
CN100351955C (en) Process and system for manufacturing prefabricated electrical conductors
US9407081B2 (en) Wiring harness and method for fixing connector set
JP2018006267A (en) Branch line cable and installation method thereof
CN1659756A (en) Method for wrapping bus-bars for prefabricated electric ducts
KR102635697B1 (en) Insulation cover of electric wire sleeve
CN211859520U (en) Intensive insulation bus duct connecting joint side plates through cover plate
CN1122350C (en) Improvement in stators for refrigeration compressor motor
CN2127522Y (en) Lead cold crimping sleeve
US6903276B2 (en) Thermal shield and hermetic seal for preventing deterioration of plastic insulation in open access closures and method therefor
CN110854777A (en) Intensive insulation bus duct connecting joint side plates through cover plate
JP2004055197A (en) Flat cable and formation method of bent part in it
JP2001057252A (en) Waterproof splice structure and forming method for the waterproof splice structure
JP2002034141A (en) Low-voltage branch device
CN87106466A (en) Gas-insulated switchgear
US7527518B1 (en) Contact device for insulation displacement connector
CN2475160Y (en) Distributing terminal for multiconductor cable
JPH073762B2 (en) Wire harness manufacturing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071128

Termination date: 20100118