CN106655019B - A kind of 10-35KV cable intermediate joints shrinkage installation modified technique - Google Patents

A kind of 10-35KV cable intermediate joints shrinkage installation modified technique Download PDF

Info

Publication number
CN106655019B
CN106655019B CN201611044151.2A CN201611044151A CN106655019B CN 106655019 B CN106655019 B CN 106655019B CN 201611044151 A CN201611044151 A CN 201611044151A CN 106655019 B CN106655019 B CN 106655019B
Authority
CN
China
Prior art keywords
cable
layer
tape
shrink tube
adhesive tape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611044151.2A
Other languages
Chinese (zh)
Other versions
CN106655019A (en
Inventor
符晓洪
毛骏
胡冉
王若思
唐会东
韩立海
雷文东
常明玉
肖斐鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201611044151.2A priority Critical patent/CN106655019B/en
Publication of CN106655019A publication Critical patent/CN106655019A/en
Application granted granted Critical
Publication of CN106655019B publication Critical patent/CN106655019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/16Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for repairing insulation or armouring of cables

Landscapes

  • Cable Accessories (AREA)

Abstract

The invention discloses a kind of 10-35KV cable intermediate joints shrinkages to install modified technique, it is wrapped in outer semiconductive shielding layer outer surface and cold shrink tube fracture outer surface respectively by using two layers of water-proof self-adhesion adhesive tape, and two layers of water-proof self-adhesion adhesive tape is bonded together, to which the good natural shrinking characteristic of cold shrink tube both be utilized, gap that may be present between cold shrink tube and cable can be thoroughly closed by the bonding between water-proof self-adhesion adhesive tape again, substantially increase the water resistance of the cable intermediate joint of technique making;Simultaneously by reserved transition gap between connecting tube and insulating layer, and semi-conductive adhesive band is wound on the transition gap and middle adapter, can solve the problems in insulating layer and middle adapter junction electric field height collection.

Description

A kind of 10-35KV cable intermediate joints shrinkage installation modified technique
Technical field
The present invention relates to technical field of electric power, modified technique is installed in especially a kind of 10-35KV cable intermediate joints shrinkage.
Background technology
It is well known that moisture and moisture are to endanger one of maximum factor to cable accessory insulation, once into inside it Dielectric level will be caused to decline even to puncture, and cable intermediate joint is the weak spot of whole cable, so in cable indirectly Requirement higher of the head to waterproof;Transition joint mounting process is mainly by pyrocondensation technique and chilling shrink process at present, and pyrocondensation technique is because needing Heat-shrink tube is toasted using flame, it is same uniform to cannot be guaranteed that any position of heat-shrink tube all carries out in baking process Heat shrinkable, such transition joint, there are bubble or gap in pipe, can cause water resistance because heat-shrink tube contraction is uneven Difference, the defect of insulation performance difference;Traditional chilling shrink process is sealed cable connector both ends using cold shrink tube, utilizes cold shrink tube Elastic compression power relies solely on elastic compression to be close to seal with the out semiconductor layer outer surface at cable connector Power is difficult to ensure that there is no gaps, even if being also wound with adhesive waterproof tape outside cold shrink tube, but as long as moisture and moisture can enter Outside cold shrink tube, it is possible to be entered inside transition joint by the gap between cold shrink tube and out semiconductor layer, and cause centre The dielectric level of connector, which declines, even to be punctured.Moreover, because the thickness of insulating layer of 10-35KV cables is bigger, intermediate connection tube Hierarchic structure can be formed between insulating layer, which can lead to electric field height concentration problem, be brought to the operation of cable Security risk.
Invention content
For the above-mentioned prior art the problem of, the present invention provide a kind of 10-35KV cable intermediate joints shrinkage peace Fill modified technique, in order to which the sealing performance and insulation performance for improving cable intermediate joint effectively solve intermediate connection tube Electric field concentration problem between insulating layer, and higher mechanical strength can be born.
The present invention is realized by following technical proposals:
A kind of 10-35KV cable intermediate joints shrinkage installation modified technique, material therefor include:Water-proof self-adhesion adhesive tape, it is cold The draw, middle adapter, constant force spring, ground wire, armoring tape, adhesive waterproof tape, PVC tape, insulating tape, silicone grease cream;Specific work Steps are as follows for skill:
Step 1:Remove oversheath:Long cut cable peels off 700mm-800mm, and 500-600mm is peelled off at stub cable end;
Step 2:Remove steel armour:At oversheath fracture 20-30mm, steel armour is tied with constant force spring, then along steel armour It packs tightly direction and saws a ring, lever up the cut edge of steel armour, pull down and turn Song Gangkai, deviate from steel armour, and handle the burr at sawed-off place well;
Step 3:Remove inner sheath:At steel armour fracture 90-100mm, inner sheath is shelled, when operation prevents from scratching copper shield Layer;
Step 4:Band and filler are peeled off, each phase cable fork is operated;
Step 5:Remove copper strip shielding layer:At cable fracture 200mm ± 5mm, simultaneously mark position is tightened with insulating tape, Copper strip shielding layer is removed, when operation prevents from scratching outer semiconducting layer;
Step 6:Remove out semiconductor layer:At copper strip shielding layer fracture 40-50mm, semi-conductive shield outside is removed Layer, when operation, prevent from scratching insulating layer;
Step 7:Stripping insulation layer and inner semiconductor layer:Strip length is slightly larger than the half of middle adapter overall length, with There is certain transition gap with insulating layer after so that connecting tube is crimped, when operation prevents from scratching copper conductor;
Step 8:Polishing cleaning:45 ° of chamferings for being multiplied by 2mm are cut on insulating layer notch, the notch for insulating layer of polishing is beaten After mill, slope surface answers smooth bright and clean, clean copper conductor, insulating layer and out semiconductor layer, removal to be embedded in insulating layer table The semiconductive particle in face, outer semiconducting layer fracture should be concordant, to improve the field distribution in transition joint, solve outer semiconducting layer The problems in incision position electric field height collection;
Step 9:Wrapped first layer water-proof self-adhesion adhesive tape:Wrapped first layer waterproof is from viscose outside out semiconductor layer Band;
Step 10:It is set with cold shrink tube and copper shield net cover:Cold shrink tube is sleeved on long cut cable, copper shield net cover is mounted in Stub cable end.
Step 11:Crimp middle adapter:Middle adapter is sleeved on the outside of cable copper conductor and is crimped with by two cables It connects, it is after crimping that the processing of the burr on middle adapter surface is clean;
Step 12:Semi-conductive adhesive band is wound on transition gap between middle adapter and insulating layer, and in connecting tube Surface is wrapped with the semi-conductive tape of suitable thickness, makes middle adapter and insulating layer rounding off;
Step 13:Copper conductor and insulating layer are wiped clean, silicone grease cream is uniformly smeared;
Step 14:Location and installation cold shrink tube:Shrinkage pipe end is overlapped on the of cable out semiconductor layer outer surface On one layer of water-proof self-adhesion adhesive tape, the plastic support item in pull cold shrink tube makes cold shrink tube envelope cable interface, and cold shrink tube Two-port be bonded in respectively long cut cable, stub cable end first layer water-proof self-adhesion adhesive tape on;
Step 15:Wrapped second layer water-proof self-adhesion adhesive tape:It is anti-that the wrapped second layer is partly put up respectively in the two-port of cold shrink tube Water is overlapped from the half of adhesive tape with cold shrink tube from adhesive tape, second layer waterproof, the other half is taken with first layer waterproof from adhesive tape It connects;
Step 16:Copper shield net cover and interior ground wire are installed:It is covered mounted in the copper shield net cover at stub cable end before pulling out The both ends of copper shield net cover and ground wire are fixed on copper strip shielding layer, with insulating tape packet by cable connector with constant force spring Tight constant force spring;
Step 17:Backfill filler:By band of stripping and filler backfill, is packed tightly with PVC tape, marine glue is used in combination Band puts up the entire cable connector of winding;
Step 18:External ground wire is installed:One end of external ground wire is fixed to the steel band armour of cable at one end with constant force spring It loads onto, then wind cable with external ground wire and is fixed on the steel-tape armouring of another end cable using constant force spring, used PVC tape packs tightly, and adhesive waterproof tape is used in combination to put up the entire cable connector of winding;
Step 19:Armoring tape is installed:After opening armoring tape packaging, its half overlapping overlap joint is wound into entire cable rapidly and is connect Head;
Step 20:Installation is complete, and standing 30 minutes or more can removal cable.
A kind of advantageous effect of present invention 10-35KV cable intermediate joints shrinkage installation modified technique is:By using two Layer water-proof self-adhesion adhesive tape is wrapped in outer semiconductive shielding layer outer surface and cold shrink tube fracture outer surface respectively, and two layers of water-proof self-adhesion Adhesive tape is bonded together, to which the good natural shrinking characteristic of cold shrink tube not only be utilized, but also can be by between water-proof self-adhesion adhesive tape Bonding and thoroughly close gap that may be present between cold shrink tube and cable, substantially increase the technique making cable among The water resistance of connector;Simultaneously by reserved transition gap between connecting tube and insulating layer, and in the transition gap and centre Winding semi-conductive adhesive band is taken over, the problems in insulating layer and middle adapter junction electric field height collection can be solved.
Specific implementation mode
The present invention is a kind of modified technique of 25-40mm diameter cables transition joint shrinkage installation, and material therefor includes:It is anti- Water single-coated foam, cold shrink tube, middle adapter, constant force spring, ground wire, armoring tape, adhesive waterproof tape, PVC tape, insulating tape, Silicone grease cream improves safety and the stabilization of cable to increase water-proof sealing performance, insulation performance, the mechanical performance of transition joint Property.
Specific process step is as follows:
Step 1:Remove oversheath:Long cut cable peels off 800mm, and 600mm is peelled off at stub cable end;
Step 2:Remove steel armour:At oversheath fracture 30mm, steel armour is tied with constant force spring, is then packed tightly along steel armour A ring is sawed in direction, levers up the cut edge of steel armour, pulls down and turn Song Gangkai after prying open with pliers, deviates from steel armour, and handle sawed-off place well Burr;
Step 3:Remove inner sheath:At steel armour fracture 100mm, inner sheath is cut off, the cut mark of inner sheath should be less than interior shield The thickness of set, to prevent from scratching copper shield;
Step 4:Band and filler are peeled off, each phase cable fork is operated;
Step 5:Remove copper strip shielding layer:At cable fracture 205mm, simultaneously mark position, stripping are tightened with insulating tape Copper strip shielding layer, when cutting, one tool marks of first ring cutting cannot be cut through, and prevent from scratching outer semiconducting layer, when divesting, should be with tool marks at Stripping is torn, mouth is disconnected and is divested to core end;
Step 6:Remove out semiconductor layer:At copper strip shielding layer fracture 50mm, out semiconductor layer, behaviour are removed As when prevent scratch insulating layer;
Step 7:Stripping insulation layer and inner semiconductor layer:Strip length is slightly larger than the half of middle adapter overall length, with There is certain transition gap with insulating layer after so that connecting tube is crimped, when operation prevents from scratching copper conductor;
Step 8:Polishing cleaning:45 ° of chamferings for being multiplied by 2mm are cut on insulating layer notch, the notch for insulating layer of polishing is beaten After mill, slope surface answers smooth bright and clean, clean copper conductor, insulating layer and out semiconductor layer, removal to be embedded in insulating layer table The semiconductive particle in face, outer semiconducting layer fracture should be concordant, to improve the field distribution in transition joint, solve outer semiconducting layer The problems in incision position electric field height collection;
Step 9:Wrapped first layer water-proof self-adhesion adhesive tape:Wrapped first layer waterproof is from viscose outside out semiconductor layer Band;
Step 10:It is set with cold shrink tube and copper shield net cover:Cold shrink tube is sleeved on long cut cable, copper shield net cover is mounted in Stub cable end.
Step 11:Crimp middle adapter:Middle adapter is sleeved on the outside of cable copper conductor and is crimped with by two cables It connects, it is after crimping that the processing of the burr on middle adapter surface is clean;
Step 12:Semi-conductive adhesive band is wound on transition gap between middle adapter and insulating layer, and in connecting tube Surface is wrapped with the semi-conductive tape of suitable thickness, makes middle adapter and insulating layer rounding off, due to the thickness of insulating layer ratio of cable It is larger, by reserved transition gap between connecting tube and insulating layer, and winds on the transition gap and middle adapter and partly lead Electric adhesive tape can solve the problems in insulating layer and middle adapter junction electric field height collection;
Step 13:Copper conductor and insulating layer are wiped clean, silicone grease cream is uniformly smeared;
Step 14:Location and installation cold shrink tube:Shrinkage pipe end is overlapped on the of cable out semiconductor layer outer surface On one layer of water-proof self-adhesion adhesive tape, the plastic support item that overlapped in preferred 20mm, pull cold shrink tube makes cold shrink tube envelope Cable interface, and the two-port of cold shrink tube be bonded in respectively long cut cable, stub cable end first layer water-proof self-adhesion adhesive tape on;
Step 15:Wrapped second layer water-proof self-adhesion adhesive tape:It is anti-that the wrapped second layer is partly put up respectively in the two-port of cold shrink tube Water is overlapped from the half of adhesive tape with cold shrink tube from adhesive tape, second layer waterproof, the other half is taken with first layer waterproof from adhesive tape It connects;It is wrapped in outer semiconductive shielding layer outer surface and cold shrink tube fracture outer surface respectively by using two layers of water-proof self-adhesion adhesive tape, And two layers of water-proof self-adhesion adhesive tape is bonded together, to which the good natural shrinking characteristic of cold shrink tube not only be utilized, but also can be by anti- Bonding between water single-coated foam and thoroughly close gap that may be present between cold shrink tube and cable, substantially increase the technique The water resistance of the cable intermediate joint of making;
Step 16:Copper shield net cover and interior ground wire are installed:It is covered mounted in the copper shield net cover at stub cable end before pulling out The both ends of copper shield net cover and ground wire are fixed on copper strip shielding layer, with insulating tape packet by cable connector with constant force spring Tight constant force spring;
Step 17:Backfill filler:By band of stripping and filler backfill, is packed tightly with PVC tape, marine glue is used in combination Band puts up the entire cable connector of winding, to improve the insulation performance and water resistance of transition joint;
Step 18:External ground wire is installed:One end of external ground wire is fixed to the steel band armour of cable at one end with constant force spring It loads onto, then wind cable with external ground wire and is fixed on the steel-tape armouring of another end cable using constant force spring, used PVC tape packs tightly, and adhesive waterproof tape is used in combination to put up the entire cable connector of winding;
Step 19:Armoring tape is installed:After opening armoring tape packaging, its half overlapping overlap joint is wound into entire cable rapidly and is connect Head, to improve the mechanical performance of transition joint;
Step 20:Installation is complete, and standing 30 minutes or more can removal cable.
In conclusion present disclosure is not limited in above-described embodiment, those skilled in the art can be at this Other embodiments are proposed within the technological guidance's thought of invention, but these embodiments are included within the scope of the present invention.

Claims (1)

1. modified technique is installed in a kind of 10-35KV cable intermediate joints shrinkage, which is characterized in that material therefor includes:Semiconductive Adhesive tape, water-proof self-adhesion adhesive tape, cold shrink tube, middle adapter, constant force spring, ground wire, armoring tape, adhesive waterproof tape, PVC tape, absolutely Edge adhesive tape, silicone grease cream;Specific process step is as follows:
Step 1:Remove oversheath:Long cut cable peels off 700mm-800mm, and 500-600mm is peelled off at stub cable end;
Step 2:Remove steel armour:At oversheath fracture 20-30mm, steel armour is tied with constant force spring, is then packed tightly along steel armour A ring is sawed in direction, levers up the cut edge of steel armour, pulls down and turn Song Gangkai, deviates from steel armour, and handle the burr at sawed-off place well;
Step 3:Remove inner sheath:At steel armour fracture 90-100mm, inner sheath is shelled, when operation prevents from scratching copper shield;
Step 4:Band and filler are peeled off, each phase cable fork is operated;
Step 5:Remove copper strip shielding layer:At cable fracture 200mm ± 5mm, simultaneously mark position, stripping are tightened with insulating tape Copper strip shielding layer, when operation, prevent from scratching outer semiconducting layer;
Step 6:Remove out semiconductor layer:At copper strip shielding layer fracture 40-50mm, out semiconductor layer, behaviour are removed As when prevent scratch insulating layer;
Step 7:Stripping insulation layer and inner semiconductor layer:Strip length is slightly larger than the half of middle adapter overall length, so that even Take over after crimping has certain transition gap with insulating layer, and when operation prevents from scratching copper conductor;
Step 8:Polishing cleaning:45 ° of chamferings for being multiplied by 2mm, the notch for insulating layer of polishing, polishing are cut on insulating layer notch Afterwards, slope surface answers smooth bright and clean, clean copper conductor, insulating layer and out semiconductor layer, removal to be embedded in surface of insulating layer Semiconductive particle, outer semiconducting layer fracture should be concordant;
Step 9:Wrapped first layer water-proof self-adhesion adhesive tape:Wrapped first layer waterproof is from adhesive tape outside out semiconductor layer;
Step 10:It is set with cold shrink tube and copper shield net cover:Cold shrink tube is sleeved on long cut cable, copper shield net cover is mounted in short electricity Cable-end;
Step 11:Crimp middle adapter:Middle adapter is sleeved on the outside of cable copper conductor and is crimped with by two cable connections Get up, it is after crimping that the processing of the burr on middle adapter surface is clean;
Step 12:Semi-conductive adhesive band is wound on transition gap between middle adapter and insulating layer, and on the surface of connecting tube It is wrapped with the semi-conductive tape of suitable thickness, makes middle adapter and insulating layer rounding off;
Step 13:Copper conductor and insulating layer are wiped clean, silicone grease cream is uniformly smeared;
Step 14:Location and installation cold shrink tube:Shrinkage pipe end is overlapped on to the first layer of cable out semiconductor layer outer surface On water-proof self-adhesion adhesive tape, the plastic support item in pull cold shrink tube makes cold shrink tube envelope cable interface, and the both ends of cold shrink tube Mouth be bonded in respectively long cut cable, stub cable end first layer water-proof self-adhesion adhesive tape on;
Step 15:Wrapped second layer water-proof self-adhesion adhesive tape:Wrapped second layer waterproof is partly put up respectively certainly in the two-port of cold shrink tube Adhesive tape, second layer waterproof are overlapped from the half of adhesive tape with cold shrink tube, the other half is overlapped with first layer waterproof from adhesive tape;
Step 16:Copper shield net cover and interior ground wire are installed:The copper shield net cover covering cable at stub cable end is mounted in before pulling out The both ends of copper shield net cover and ground wire are fixed on copper strip shielding layer with constant force spring, perseverance are packed tightly with insulating tape by connector Power spring;
Step 17:Backfill filler:By band of stripping and filler backfill, is packed tightly with PVC tape, adhesive waterproof tape is used in combination to take Lid winds entire cable connector;
Step 18:External ground wire is installed:One end of external ground wire is fixed on the steel-tape armouring of cable at one end with constant force spring, Then it winds cable with external ground wire and is fixed on the steel-tape armouring of another end cable using constant force spring, with PVC glue Band packs tightly, and adhesive waterproof tape is used in combination to put up the entire cable connector of winding;
Step 19:Armoring tape is installed:After opening armoring tape packaging, its half overlapping overlap joint is wound into entire cable connector rapidly;
Step 20:Installation is complete, and standing 30 minutes or more can removal cable.
CN201611044151.2A 2016-11-24 2016-11-24 A kind of 10-35KV cable intermediate joints shrinkage installation modified technique Active CN106655019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611044151.2A CN106655019B (en) 2016-11-24 2016-11-24 A kind of 10-35KV cable intermediate joints shrinkage installation modified technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611044151.2A CN106655019B (en) 2016-11-24 2016-11-24 A kind of 10-35KV cable intermediate joints shrinkage installation modified technique

Publications (2)

Publication Number Publication Date
CN106655019A CN106655019A (en) 2017-05-10
CN106655019B true CN106655019B (en) 2018-11-09

Family

ID=58812726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611044151.2A Active CN106655019B (en) 2016-11-24 2016-11-24 A kind of 10-35KV cable intermediate joints shrinkage installation modified technique

Country Status (1)

Country Link
CN (1) CN106655019B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109616962A (en) * 2018-12-21 2019-04-12 吴江市华鼎热缩制品有限公司 A kind of hot melten type cable centre connection mounting process

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108365577A (en) * 2018-02-07 2018-08-03 江苏亨通高压海缆有限公司 Manufacturing method of intelligent cable connector capable of wirelessly measuring temperature
CN109473944B (en) * 2018-03-09 2020-06-16 东阳市光明电力建设有限公司 Cable connection structure convenient to detect and connection method
CN108471092A (en) * 2018-04-18 2018-08-31 日照港股份有限公司动力分公司 The single-phase dry packet restorative procedure of high-tension cable
CN108988230A (en) * 2018-07-31 2018-12-11 国网福建省电力有限公司 Cable semi-conductive fracture chamfered method
CN109378775B (en) * 2018-11-30 2021-06-18 国网江苏省电力有限公司无锡供电分公司 Optimized manufacturing method for sealing and water-blocking of cable cold-shrinkage type joint
CN111585217A (en) * 2019-02-19 2020-08-25 安徽省浩辉电力技术有限公司 Manufacturing method of fireproof and waterproof intermediate joint

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006129477A1 (en) * 2005-06-02 2006-12-07 Sumitomo Wiring Systems, Ltd. Method for waterproofing joint part in electric wire terminal and waterproof structure
CN200973011Y (en) * 2006-11-13 2007-11-07 深圳市长园新材料股份有限公司 Heat-shrinkable cable joint structure
CN102780195A (en) * 2012-07-27 2012-11-14 中国二十二冶集团有限公司 10-35KV cold-shrink cable terminal and manufacture method thereof
CN105207133A (en) * 2014-06-07 2015-12-30 国家电网公司 Manufacturing method for 10 kV contraction type power cable intermediate joint
CN105207134A (en) * 2015-09-21 2015-12-30 国家电网公司 High-voltage cable joint manufacturing method by means of semiconductor coating

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006129477A1 (en) * 2005-06-02 2006-12-07 Sumitomo Wiring Systems, Ltd. Method for waterproofing joint part in electric wire terminal and waterproof structure
CN200973011Y (en) * 2006-11-13 2007-11-07 深圳市长园新材料股份有限公司 Heat-shrinkable cable joint structure
CN102780195A (en) * 2012-07-27 2012-11-14 中国二十二冶集团有限公司 10-35KV cold-shrink cable terminal and manufacture method thereof
CN105207133A (en) * 2014-06-07 2015-12-30 国家电网公司 Manufacturing method for 10 kV contraction type power cable intermediate joint
CN105207134A (en) * 2015-09-21 2015-12-30 国家电网公司 High-voltage cable joint manufacturing method by means of semiconductor coating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109616962A (en) * 2018-12-21 2019-04-12 吴江市华鼎热缩制品有限公司 A kind of hot melten type cable centre connection mounting process

Also Published As

Publication number Publication date
CN106655019A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106655019B (en) A kind of 10-35KV cable intermediate joints shrinkage installation modified technique
CN106451256B (en) A kind of cable intermediate joint shrinkage installation improvement technique
CN105552791B (en) A kind of preparation method of the core twisted polyethylene cable transition joint of 10KV pyrocondensations three
CN105281260A (en) 35kV heat shrink power cable intermediate connector manufacturing technology method
CN203367959U (en) A cable intermediate connector
CN103630804B (en) Method for manufacturing local discharge model of conductive particles on insulating surface of intermediate head of cable
CN107706879A (en) A kind of cable intermediate joint and its fabrication and installation method
CN101252266B (en) Mounting process of three-core cable shrink terminal
CN108683149A (en) A kind of crosslinked cable hot melting connector and preparation method thereof
CN207705751U (en) A kind of cable intermediate joint
CN109473944A (en) A kind of cable connection structure and connection method convenient for detection
CN107611861A (en) A kind of manufacturing cable head technique
CN205882178U (en) Power cable connector lug
CN105207133A (en) Manufacturing method for 10 kV contraction type power cable intermediate joint
CN105226582A (en) 35kV pyrocondensation power cable terminal process for making
CN105207134A (en) High-voltage cable joint manufacturing method by means of semiconductor coating
CN103944034A (en) Manufacturing method for cable intermediate joint
CN208190228U (en) A kind of crosslinked cable hot melting connector
CN202026070U (en) Power cable intermediate joint device capable of improving waterproof ability
CN211579556U (en) Fusion type cold-shrinkage terminal
CN105322471A (en) Method for manufacturing 10kV cold shrink type power cable terminal
CN103915811A (en) Method for manufacturing 35 kV thermal shrinkage intermediate cable head
CN106340850A (en) Cable intermediate joint with high waterproof performance, and installation method thereof
CN107482543A (en) Shrinkage private cable method for making head
CN104201621A (en) Manufacturing process of cold shrink cable accessory

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant