CN100334308C - Concrete column employing steel box as permanent template and construction method thereof - Google Patents

Concrete column employing steel box as permanent template and construction method thereof Download PDF

Info

Publication number
CN100334308C
CN100334308C CNB2005102007082A CN200510200708A CN100334308C CN 100334308 C CN100334308 C CN 100334308C CN B2005102007082 A CNB2005102007082 A CN B2005102007082A CN 200510200708 A CN200510200708 A CN 200510200708A CN 100334308 C CN100334308 C CN 100334308C
Authority
CN
China
Prior art keywords
steel case
template
concrete
steel box
moulding board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2005102007082A
Other languages
Chinese (zh)
Other versions
CN1769619A (en
Inventor
张从思
李久林
杨俊峰
汪蛟
杜峰
杨军霞
杨庆德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CNB2005102007082A priority Critical patent/CN100334308C/en
Publication of CN1769619A publication Critical patent/CN1769619A/en
Application granted granted Critical
Publication of CN100334308C publication Critical patent/CN100334308C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to a construction method for a concrete column using a steel box as a permanent moulding board. The present invention comprises the following steps: firstly welding steel box moulding board; the outside box wall of the abutting end of two sections of steel box moulding board is welded and positioned with a steel plate, a column hoop is set along the longitudinal separation of the steel box moulding board, and side wall separation of the steel box moulding board is provided with ventilating viewing holes; a first section reinforcing cage is bound to the height of the first section steel box moulding board, and the first section steel box moulding board is sheathed on the reinforcing cage; binding a second section reinforcing cage, and the second section steel box moulding board is sheathed on the position and is welded with the first section steel box moulding board at combining position; binding the reinforcing cage to the height of a third section steel box moulding board by analogy; cutting a round hole plate from the root of the steel box moulding board; obliquely downwards welding an unloading pipe; the unloading pipe is communicated with a concrete conveying pipe, and the concrete is pumped towards the inner side of the steel box moulding board; compacting the concrete from bottom to top. The present invention can shorten the construction period, simplifies construction procedure, causes an obliquely-twisting column to conveniently and rapidly manufacture, ensures engineering quality, and is suitable for the construction of the obliquely-twisting column in the construction engineering.

Description

Adopt concrete column and the job practices thereof of steel case as permanent template
(1) technical field
The present invention relates to a kind of steel concrete cylindricality building unit and job practices thereof.
(2) background technology
Existing cylindrical steel reinforced concrete building unit is generally straight shape post, and the structure of straight shape post and construction are ripe.In my National Stadium Project, 124 18 meters high, stride layer, the post of tiltedly turning round that is obliquely installed constructs and brought many technical barriers to engineers and technicians, how to guarantee tiltedly to turn round post and reach design strength, how to realize tiltedly turning round the construction quality that post is conveniently made, how to be guaranteed tiltedly to turn round post, these technical barriers all do not have the solution precedent.
(3) summary of the invention
The purpose of this invention is to provide a kind of concrete column and job practices thereof that adopts the steel case as permanent template, solution is tiltedly turned round post and is guaranteed tiltedly to turn round the problem that post reaches design strength and design shape; Also solve will specify gradient tiltedly turn round the problem that post stands on assigned address; And the support and the construction problem of post are tiltedly turned round in solution.
Technical scheme of the present invention: this employing steel case is as the concrete column of permanent template, its post main body is a reinforced concrete structure, it is characterized in that: the steel case template of post main body and outsourcing is integral by concreting, and steel case template is not forever removed, and it is surrounded by four block plates and is welded.
The thickness of above-mentioned steel plate is 6 millimeters to 30 millimeters.
Above-mentioned steel case stencil sidewalls is offered the ventilative peep hole of 10-30 mm dia at interval.
Above-mentionedly tie is set along steel case template longitudinal separation, the per pass tie by the four sides stirrup with steel case template banding.
Above-mentionedly tie is set along steel case template longitudinal separation, the per pass tie by the four sides stirrup with steel case template banding.
Every stirrup of above-mentioned tie connects one by two parallel channel-section steels that connect side by side with connecting plate.
Solid to straining between symmetrical two stirrups of above-mentioned tie by through-wall bolt, or wear bolton in the bight of adjacent two stirrups.
A kind of job practices that adopts the steel case as the concrete column of permanent template is characterized in that making step is:
(1), merogenesis makes steel case template, with three steel plate supports support, is welded into the U-shaped casing;
(2), welded cover plate, form the column steel case template of a joint rectangular cross section;
(3), side box wall welds fixing steel plate in advance outside steel case template two joint butt ends;
(4), tie is set, along steel case template longitudinal separation the per pass tie by the four sides stirrup with steel case template banding;
(5), offer the ventilative peep hole of 10-20 mm dia at interval in steel case stencil sidewalls;
(6), with the colligation of first segment reinforcing cage to first segment steel case template height, first segment steel case template is sleeved on outside the reinforcing cage colligation second joint reinforcing cage;
(7), the second joint steel case template suit is in place, and weld at joint with first segment steel case template, connect the fixing steel plate of joint temporarily, assembling reinforcement cage to the three joint steel case template height, by that analogy;
(8), cut round hole plate at one meter to two meters of distance steel case template root, the blanking conduit of downward-sloping 45-60 ° of welding pumping of concrete in hole, this blanking conduit is communicated with elephant trunk through non-return pipe and bend pipe;
(9), in steel case template pumping of concrete, one-time-concreting, concrete be the jacking self-compaction from bottom to top;
(10), the round hole plate repair welding under will cutting returns the hole of steel case template, removes fixing steel plate and tie.
The concrete of above-mentioned pumping is a flowing concrete, and the slump is controlled to be 250 ± 10mm, and concrete is not more than 20mm from going out machine to the slump-loss in building during this period of time.
Add expansion agent and flyash in the above-mentioned flowing concrete, limited expansion rate is controlled at 28 days 2-6/10 4
Beneficial effect: the present invention is easy to make quick, can the reduction of erection time, simplify construction sequence, and guarantee workmanship.The present invention is applicable to rectangular section column in the construction work or tiltedly turns round the construction of post.
(4) description of drawings
Fig. 1 is the structural representation of cross section of the present invention;
Fig. 2 is the structural representation of steel case template embodiment;
Fig. 3 is the plan structure schematic diagram of tie embodiment;
Fig. 4 is the side-looking structural representation of tie embodiment;
Fig. 5 is the schematic diagram of fluid concrete from bottom to top.
Among the figure: 1-steel case template, 1 '-the second joint steel case template, 2-reinforcing cage, 3-concrete, 4-tie, 41-stirrup, 42-connecting plate, 43-through-wall bolt, 5-fixing steel plate, 6-blanking conduit, 7-non-return pipe, 8-bend pipe, 9-elephant trunk, the ventilative peep hole of 10-.
(5), the specific embodiment
Referring to Fig. 1, this employing steel case of the present invention is as the concrete column of permanent template, and its post main body is a reinforced concrete structure, and the steel case template 1 of post main body and outsourcing is built by reinforcing cage 2 and concrete 3 and is integral.Steel case template 1 is surrounded by four block plates and is welded.The thickness of above-mentioned steel plate is 10 millimeters to 30 millimeters any thickness.
Referring to Fig. 2, more closely knit for guaranteeing that concrete pouring gets, at about 2 meters ventilative peep holes 10 of offering 20 mm dias in interval on the sidewall of steel case template, be convenient to observe the cast situation, can guarantee workmanship.For guaranteeing the size constancy shape of pillar, tie 4 is set along steel case template longitudinal separation.Convenient for lifting, locating, side box wall welds fixing steel plate 5 in advance outside steel case template two joint butt ends, and this location-plate plays the hanger effect when lifting, play the role of positioning when docking.Be welding at joint between the steel case template 1 and the second joint steel case template 1 '.
Referring to Fig. 3, Fig. 4, the per pass tie by the four sides stirrup with steel case template banding.Every stirrup of above-mentioned tie connects one by two parallel channel-section steels that connect side by side with connecting plate.Solid to straining between symmetrical two stirrups of above-mentioned tie by through-wall bolt, or wear bolton in the bight of adjacent two stirrups.
The present invention adopts the job practices of steel case as the Rectangular Concrete post of permanent template, the steps include:
(1), merogenesis makes steel case template, with three steel plate supports support, is welded into the U-shaped casing.
(2), welded cover plate, form the column steel case template 1 of a joint rectangular cross section.
(3), side box wall welds fixing steel plate 5 in advance outside steel case template two joint butt ends.
(4), tie 4 is set, along steel case template longitudinal separation the per pass tie by the four sides stirrup with steel case template banding; Every stirrup of above-mentioned tie 4 is connected as one by two parallel channel-section steel 41 usefulness connecting plates 42 that connect side by side.Solid between symmetrical two stirrups of above-mentioned tie by 43 pairs of tensions of through-wall bolt, or wear bolton in the bight of adjacent two stirrups.
(5), offer the ventilative peep hole of 10-20 mm dia at interval in steel case stencil sidewalls.
(6), with the colligation of first segment reinforcing cage to first segment steel case template height, first segment steel case template is sleeved on outside the reinforcing cage colligation second joint reinforcing cage.
(7), the second joint steel case template, 1 ' suit is in place, and weld at joint with first segment steel case template, connect the fixing steel plate 5 of joint temporarily, assembling reinforcement cage to the three joint steel case template height, by that analogy.
(8), referring to Fig. 5, cut round hole plate at one meter to two meters of distance steel case template root, in hole downward-sloping 45-60 ° the welding pumping of concrete blanking conduit 6, this blanking conduit is communicated with elephant trunk 9 through non-return pipe 7 and bend pipe 8.
(9), in steel case template pumping of concrete, one-time-concreting, concrete be the jacking self-compaction from bottom to top; The concrete of above-mentioned pumping is the self-compaction flowing concrete, and intensity is C45, and the slump is controlled to be 250 ± 10mm, and concrete is not more than 20mm from going out machine to the slump-loss in building during this period of time, and concrete not stratified, do not emanate.Can add expansion agent and flyash in the above-mentioned flowing concrete, limited expansion rate is controlled at 28 days 2-6/10 4
(10), the round hole plate repair welding under will cutting returns the hole of steel case template, removes fixing steel plate and tie.

Claims (7)

1. concrete column that adopts the steel case as permanent template, its post main body is a reinforced concrete structure, it is characterized in that: the steel case template of post main body and outsourcing is integral by concreting, and steel case template is not forever removed, and it is surrounded by four block plates and is welded;
Along steel case template longitudinal separation tie is set, the per pass tie by the four sides stirrup with steel case template banding; Every stirrup of tie connects one by two parallel channel-section steels that connect side by side with connecting plate.
2. employing steel case according to claim 1 is characterized in that as the concrete column of permanent template: the thickness of above-mentioned steel plate is 6 millimeters to 30 millimeters.
3. employing steel case according to claim 1 is characterized in that as the concrete column of permanent template: above-mentioned steel case stencil sidewalls is offered the ventilative peep hole of 10-30 mm dia at interval.
4. employing steel case according to claim 1 is characterized in that as the preparation method of the concrete column of permanent template: solid to straining between symmetrical two stirrups of above-mentioned tie by through-wall bolt, or wear bolton in the bight of adjacent two stirrups.
According to claim 1 or 3 described employing steel casees as the job practices of the concrete column of permanent template, it is characterized in that making step is:
(1), merogenesis makes steel case template, with three steel plate supports support, is welded into the U-shaped casing;
(2), welded cover plate, form the column steel case template of a joint rectangular cross section;
(3), side box wall welds fixing steel plate in advance outside steel case template two joint butt ends;
(4), tie is set, along steel case template longitudinal separation the per pass tie by the four sides stirrup with steel case template banding;
(5), offer the ventilative peep hole of 10-20 mm dia at interval in steel case stencil sidewalls;
(6), with the colligation of first segment reinforcing cage to first segment steel case template height, first segment steel case template is sleeved on outside the reinforcing cage colligation second joint reinforcing cage;
(7), the second joint steel case template suit is in place, and weld at joint with first segment steel case template, connect the fixing steel plate of joint temporarily, assembling reinforcement cage to the three joint steel case template height, by that analogy;
(8), cut round hole plate at one meter to two meters of distance steel case template root, the blanking conduit of downward-sloping 45-60 ° of welding pumping of concrete in hole, this blanking conduit is communicated with elephant trunk through non-return pipe and bend pipe;
(9), in steel case template pumping of concrete, one-time-concreting, concrete be the jacking self-compaction from bottom to top;
(10), the round hole plate repair welding under will cutting returns the hole of steel case template, removes fixing steel plate and tie.
6. employing steel case according to claim 5 is as the job practices of the concrete column of permanent template, it is characterized in that: the concrete of above-mentioned pumping is a flowing concrete, the slump is controlled to be 250 ± 10mm, and concrete is not more than 20mm from going out machine to the slump-loss in building during this period of time.
7. employing steel case according to claim 6 is characterized in that as the job practices of the concrete column of permanent template: add expansion agent and flyash in the above-mentioned flowing concrete, limited expansion rate is controlled at 28 days 2-6/10 4
CNB2005102007082A 2005-11-17 2005-11-17 Concrete column employing steel box as permanent template and construction method thereof Active CN100334308C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005102007082A CN100334308C (en) 2005-11-17 2005-11-17 Concrete column employing steel box as permanent template and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005102007082A CN100334308C (en) 2005-11-17 2005-11-17 Concrete column employing steel box as permanent template and construction method thereof

Publications (2)

Publication Number Publication Date
CN1769619A CN1769619A (en) 2006-05-10
CN100334308C true CN100334308C (en) 2007-08-29

Family

ID=36751131

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005102007082A Active CN100334308C (en) 2005-11-17 2005-11-17 Concrete column employing steel box as permanent template and construction method thereof

Country Status (1)

Country Link
CN (1) CN100334308C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312578B (en) * 2011-07-08 2014-08-06 付强 Integral vibration-free pouring and constructing method
CN102267177B (en) * 2011-08-30 2013-01-09 四川国统混凝土制品有限公司 Self-compacting concrete moulding method for PCCP (prestressed concrete cylinder pipe) cores
CN102535746A (en) * 2011-12-30 2012-07-04 宁波建工股份有限公司 Concrete-filled steel tube column and casting method thereof
CN107313554A (en) * 2017-08-10 2017-11-03 滨州学院 A kind of reinforced column constructing device of free removal template
CN109707104B (en) * 2018-12-27 2023-10-27 中南大学 Concrete-filled steel tube casting body with tie bars and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04357224A (en) * 1991-01-18 1992-12-10 Ohbayashi Corp Precast concrete block formwork
JPH0533491A (en) * 1991-07-29 1993-02-09 Ohbayashi Corp Pc column form
CN2148123Y (en) * 1993-01-12 1993-12-01 北京市建筑工程研究所 Permanent column shuttering with finished surface
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
GB2317192A (en) * 1996-09-04 1998-03-18 Dinsdale Lawrence Permanent formwork
DE29803155U1 (en) * 1998-02-23 1998-04-23 Betonwerk Theodor Pieper Gmbh Formwork aid
WO2003102317A1 (en) * 2002-06-03 2003-12-11 Katsuki Takiguchi Ferrocement permanent formwork

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04357224A (en) * 1991-01-18 1992-12-10 Ohbayashi Corp Precast concrete block formwork
JPH0533491A (en) * 1991-07-29 1993-02-09 Ohbayashi Corp Pc column form
CN2148123Y (en) * 1993-01-12 1993-12-01 北京市建筑工程研究所 Permanent column shuttering with finished surface
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
GB2317192A (en) * 1996-09-04 1998-03-18 Dinsdale Lawrence Permanent formwork
DE29803155U1 (en) * 1998-02-23 1998-04-23 Betonwerk Theodor Pieper Gmbh Formwork aid
WO2003102317A1 (en) * 2002-06-03 2003-12-11 Katsuki Takiguchi Ferrocement permanent formwork

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
永久性轻型钢模板 辛一,建筑技术开发,第4期 1998 *

Also Published As

Publication number Publication date
CN1769619A (en) 2006-05-10

Similar Documents

Publication Publication Date Title
CN106013455B (en) A kind of manufacture of Prefabricated composite steel reinforcement cage component assembly method, reinforced concrete structure body method of construction
CN100334308C (en) Concrete column employing steel box as permanent template and construction method thereof
CN108385980A (en) Deformation joint shear wall set shaped steel formwork installs unidirectional fastening screw construction method
CN102102443B (en) Method for constructing combined steel and concrete column of large metallurgy industrial factory building
CN102351482B (en) Grouting material and perfusion of same into enclosed steel die for reinforcement of steel concrete beams and columns
CN105298020A (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN104060761A (en) U-shaped steel-concrete composite section beam and construction method of section beam
CN207878263U (en) Half precast pier segment and bridge pier
CN109403545A (en) A kind of high assembly rate concrete-filled steel tubular frame structural system and connection method
CN106193455A (en) A kind of ultra-high performance concrete cylinder permanent template and preparation method thereof
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN108571011B (en) Pouring system and pouring method for assembled template type micro underground comprehensive pipe rack
CN113738102A (en) Template building block for civil engineering and manufacturing method and using method thereof
CN106677527B (en) Every beam one-time-concreting molding construction method in elevator
CN207525962U (en) Side hangs reinforcing bar band shear key reinforced concrete slab structure
CN109519179A (en) Special-shaped well shield launching construction method
CN110528733A (en) A kind of construction method of steel-concrete combination shear wall with short piers
CN205799824U (en) A kind of circular hole xoncrete structure tool palette
CN110821039B (en) Construction method of steel ladle beam supporting structure
CN110629663A (en) Pier body construction method and pier body construction device
JP4298628B2 (en) Construction method of viaduct beam using steel pipe column joint element
CN102619303A (en) Square steel pipe high-strength concrete post restricted by internally tangent annular hoop reinforcement
CN108978887A (en) A kind of steel core concrete column ring beam joint and its reinforcing bar binding construction method
CN213015455U (en) Binding and fixing structure for longitudinal steel bars of column
CN219604686U (en) Hollow steel skeleton prefabricated column with built-in combined metal template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20060510

Assignee: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED

Assignor: Beijing City Building Group Co., Ltd.

Contract record no.: 2014990000265

Denomination of invention: Concrete column employing steel box as permanent template and construction method thereof

Granted publication date: 20070829

License type: Common License

Record date: 20140505

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model