CL2020002120A1 - Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip. - Google Patents
Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip.Info
- Publication number
- CL2020002120A1 CL2020002120A1 CL2020002120A CL2020002120A CL2020002120A1 CL 2020002120 A1 CL2020002120 A1 CL 2020002120A1 CL 2020002120 A CL2020002120 A CL 2020002120A CL 2020002120 A CL2020002120 A CL 2020002120A CL 2020002120 A1 CL2020002120 A1 CL 2020002120A1
- Authority
- CL
- Chile
- Prior art keywords
- micro chip
- real
- resources
- time monitoring
- construction projects
- Prior art date
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Sistema de monitoreo en tiempo real de los recursos en proyectos de construcción, durante la etapa de construcción y posteriormente en etapa de operación, para entregar información de las Horas Hombre por sector, por nivel y por frente de trabajo en tiempo real, en donde para realizar el monitoreo de los recursos será utilizado un micro chip electrónico que permitirá enviar datos de ubicación en cada instante durante la jornada laboral. Será utilizado un micro chip con tamaño y peso que permita ser colocado en un equipo de protección personal de los trabajadores que pertenecen a las cuadrillas a controlar, también podrá estar localizado en suministros para monitorear su ubicación. Las señales desde cada micro chip serán captadas por medio de antenas receptoras las cuales se encontrarán instaladas en sectores específicos del edificio con el objetivo de cubrir el 100% de los sectores del proyecto. Los datos registrados serán enviados a una nube privada, a través de un software de programación (software) la información será procesada y dispuesta para su posterior análisis, se dará acceso en un portal online a través del cual el cliente podrá ver la información de los recursos en obra en tiempo real.Real-time monitoring system of resources in construction projects, during the construction stage and later in the operation stage, to deliver information on Man-Hours by sector, by level and by work front in real time, where to To monitor the resources, an electronic micro chip will be used that will allow location data to be sent at all times during the working day. A micro chip with size and weight will be used that allows it to be placed in the personal protection equipment of the workers belonging to the crews to be controlled, it may also be located in supplies to monitor their location. The signals from each micro chip will be captured by means of receiving antennas which will be installed in specific sectors of the building in order to cover 100% of the project sectors. The registered data will be sent to a private cloud, through a programming software (software) the information will be processed and arranged for subsequent analysis, access will be given to an online portal through which the client can see the information of the on-site resources in real time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CL2020002120A CL2020002120A1 (en) | 2020-08-17 | 2020-08-17 | Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CL2020002120A CL2020002120A1 (en) | 2020-08-17 | 2020-08-17 | Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip. |
Publications (1)
Publication Number | Publication Date |
---|---|
CL2020002120A1 true CL2020002120A1 (en) | 2020-10-30 |
Family
ID=73048001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CL2020002120A CL2020002120A1 (en) | 2020-08-17 | 2020-08-17 | Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip. |
Country Status (1)
Country | Link |
---|---|
CL (1) | CL2020002120A1 (en) |
-
2020
- 2020-08-17 CL CL2020002120A patent/CL2020002120A1/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR102019009695B8 (en) | Method performed by a control system for a working machine and computing system | |
MX2021005305A (en) | Systems and methodology for construction management and equipment positioning via building information modeling. | |
ES2812205T3 (en) | Systems and Methods to Increase the Efficiency and Accuracy of a Walk Test in a Fire Alarm System | |
JP5113475B2 (en) | Seismic intensity prediction system for buildings based on earthquake information | |
GB2554212A (en) | Condition based maintenance program based on life-stress acceleration model and time-varying stress model | |
BR112022000552A2 (en) | Method for modeling downhole fluid flow and related apparatus and systems | |
WO2019235415A1 (en) | Disaster state determination system and disaster determination flight system | |
CL2023000544A1 (en) | Analysis and/or prediction procedure based on the sensor network and remote control sensor device | |
TW201617980A (en) | Working item audit system and method thereof | |
CN107103407A (en) | A kind of power transmission cable based on Internet of Things installs management system | |
AR109048A1 (en) | METHOD FOR THE EXPLORATION OF THE WELL FUND IN A TRAINING AND DRILLING SYSTEM TO DRILL A SUBSUPERFICIAL GROUND TRAINING | |
EA202191837A1 (en) | SYSTEMS FOR AUTOMATIC PLANNING OF THE DRILLING AND BLASTING PASSPORT AND RELATED METHODS | |
BR112016028992A2 (en) | device and system for representing impacts by firing and / or missiles and method for it. | |
BR112022022598A2 (en) | METHODS, APPARATUS AND MOVEMENT SYSTEMS FOR ROCK BLASTING OF DIFFERENT ELEMENTS | |
CL2020002120A1 (en) | Real-time monitoring and analysis system of labor resources to be applied in construction projects during the execution and operation stages, which uses a control micro chip. | |
Kosała et al. | Analysis of noise pollution in an andesite quarry with the use of simulation studies and evaluation indices | |
Spathis et al. | Tunneling in rock by drilling and blasting | |
Dudzik et al. | Preliminary analysis of the effectiveness of the use of artificial neural networks for modeling time-voltage signal of the combination wave generator | |
Teleka et al. | The automation of the" making safe" process in South African hard-rock underground mine | |
JP2022037786A (en) | Ground property evaluation method and ground property evaluation system in front of face | |
Könnecke et al. | BaSiGo: safety of large scale events–crowd flow modeling of ingress and egress scenarios | |
Mintoharjo et al. | Development of Risk-Based Standardized WBS (Work Breakdown Structure) of Stadium Main Building with Integrated Design-Build Contract for Cost and Time Planning | |
Skov et al. | ORJIP Bird avoidance behaviour and collision impact monitoring at offshore wind farms | |
Bengtson et al. | Brandskydd på byggarbetsplats: Vägledning | |
Srinivasan et al. | Factors influencing crisis management in construction projects |