CL2011001337A1 - Metodo para determinar la estabilidad de la formacion durante la perforacion de un sondeo que comprende determinar una presion de fluido anular; ajustar la presion anular; , comparar la velocidad de flujo del fluido de perforacion fuera y dentro del sondeo; y determinar la presion intersticial y la presion de fractura. - Google Patents
Metodo para determinar la estabilidad de la formacion durante la perforacion de un sondeo que comprende determinar una presion de fluido anular; ajustar la presion anular; , comparar la velocidad de flujo del fluido de perforacion fuera y dentro del sondeo; y determinar la presion intersticial y la presion de fractura.Info
- Publication number
- CL2011001337A1 CL2011001337A1 CL2011001337A CL2011001337A CL2011001337A1 CL 2011001337 A1 CL2011001337 A1 CL 2011001337A1 CL 2011001337 A CL2011001337 A CL 2011001337A CL 2011001337 A CL2011001337 A CL 2011001337A CL 2011001337 A1 CL2011001337 A1 CL 2011001337A1
- Authority
- CL
- Chile
- Prior art keywords
- pressure
- determining
- probe
- fluid
- drilling
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 7
- 238000000034 method Methods 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 title abstract 2
- 238000005553 drilling Methods 0.000 title 2
- 239000000523 sample Substances 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/003—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Drilling And Boring (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
UN MÉTODO PARA DETERMINAR LA INTEGRIDAD DE LA FORMACIÓN DURANTE LA PERFORACIÓN DE UN SONDEO INCLUYE DETERMINAR UNA PRESIÓN DE FLUIDO ANULAR EN UN SONDEO DURANTE LA PERFORACIÓN DEL MISMO. LA PRESIÓN ANULAR ES AJUSTADA EN UNA CANTIDAD PREDETERMINADA. LA VELOCIDAD DE FLUJO DEL FLUIDO DE PERFORACIÓN EN EL SONDEO ES COMPARADA CON LA VELOCIDAD DEL FLUIDO DE PERFORACIÓN FUERA DEL SONDEO. POR LO MENOS UNA PRESIÓN INTERSTICIAL DE LA FORMACIÓN ES DETERMINADA A PARTIR DE LA PRESIÓN ANULAR CUANDO LAS VELOCIDADES DE FLUJO COMPARADAS DIFIEREN EN UNA CANTIDAD SELECCIONADA. EL MÉTODO ALTERNATIVO A LA DETERMINACIÓN DE LA PRESIÓN INTERSTICIAL Y/O DE FRACTURA INCLUYE DETERMINAR UNA RESPUESTA DEL SONDEO AL AJUSTE DE LA PRESIÓN DEL FLUIDO Y DETERMINAR LA PRESIÓN DEL FLUIDO ANULAR ÓPTIMA A PARTIR DE LA RESPUESTA DEL SONDEO.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/326,925 US7984770B2 (en) | 2008-12-03 | 2008-12-03 | Method for determining formation integrity and optimum drilling parameters during drilling |
Publications (1)
Publication Number | Publication Date |
---|---|
CL2011001337A1 true CL2011001337A1 (es) | 2011-09-02 |
Family
ID=42221778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CL2011001337A CL2011001337A1 (es) | 2008-12-03 | 2011-06-03 | Metodo para determinar la estabilidad de la formacion durante la perforacion de un sondeo que comprende determinar una presion de fluido anular; ajustar la presion anular; , comparar la velocidad de flujo del fluido de perforacion fuera y dentro del sondeo; y determinar la presion intersticial y la presion de fractura. |
Country Status (11)
Country | Link |
---|---|
US (1) | US7984770B2 (es) |
EP (1) | EP2368009B1 (es) |
CN (1) | CN102272410B (es) |
BR (1) | BRPI0922775B1 (es) |
CL (1) | CL2011001337A1 (es) |
EA (1) | EA023468B1 (es) |
EG (1) | EG26416A (es) |
MX (1) | MX2011005780A (es) |
MY (1) | MY154155A (es) |
PE (1) | PE20120369A1 (es) |
WO (1) | WO2010065646A2 (es) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MX2009004270A (es) * | 2006-10-23 | 2009-07-02 | Mi Llc | Metodo y aparato para controlar la presion del fondo de un pozo en una formacion subterranea durante la operacion de una bomba de plataforma petrolifera. |
US9435162B2 (en) | 2006-10-23 | 2016-09-06 | M-I L.L.C. | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation |
CA2867387C (en) | 2006-11-07 | 2016-01-05 | Charles R. Orbell | Method of drilling with a string sealed in a riser and injecting fluid into a return line |
US8281875B2 (en) | 2008-12-19 | 2012-10-09 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9567843B2 (en) | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
AU2010346598B2 (en) | 2010-02-25 | 2014-01-30 | Halliburton Energy Services, Inc. | Pressure control device with remote orientation relative to a rig |
BR112012022420B1 (pt) * | 2010-03-05 | 2021-03-30 | Safekick Americas Llc | Método para controlar um poço sendo perfurado em uma formação subterrânea e sistema de controle de poço |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
US8201628B2 (en) | 2010-04-27 | 2012-06-19 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
US8684109B2 (en) * | 2010-11-16 | 2014-04-01 | Managed Pressure Operations Pte Ltd | Drilling method for drilling a subterranean borehole |
US9574432B2 (en) | 2010-12-13 | 2017-02-21 | Schlumberger Technology Corporation | Optimized drilling |
EP2694772A4 (en) | 2011-04-08 | 2016-02-24 | Halliburton Energy Services Inc | AUTOMATIC LEVEL TUBE PRESSURE CONTROL ON HOLES |
US9080407B2 (en) | 2011-05-09 | 2015-07-14 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9605507B2 (en) | 2011-09-08 | 2017-03-28 | Halliburton Energy Services, Inc. | High temperature drilling with lower temperature rated tools |
US9033048B2 (en) * | 2011-12-28 | 2015-05-19 | Hydril Usa Manufacturing Llc | Apparatuses and methods for determining wellbore influx condition using qualitative indications |
BR112014017674A8 (pt) * | 2012-02-24 | 2017-07-11 | Halliburton Energy Services Inc | Método para controle de pressão de poço |
US9823373B2 (en) | 2012-11-08 | 2017-11-21 | Halliburton Energy Services, Inc. | Acoustic telemetry with distributed acoustic sensing system |
GB2542928B (en) * | 2014-04-15 | 2020-12-30 | Halliburton Energy Services Inc | Determination of downhole conditions using circulated non-formation gasses |
CN104500054B (zh) * | 2014-12-15 | 2017-07-07 | 中国石油天然气集团公司 | 地层孔隙压力的确定方法及装置 |
WO2016099483A1 (en) * | 2014-12-17 | 2016-06-23 | National Oilwell Dht L.P. | Method of pressure testing a wellbore |
EP3559395B1 (en) * | 2016-12-22 | 2022-06-22 | Services Pétroliers Schlumberger | Staged annular restriction for managed pressure drilling |
US11746276B2 (en) | 2018-10-11 | 2023-09-05 | Saudi Arabian Oil Company | Conditioning drilling fluid |
CN111852441B (zh) * | 2019-04-29 | 2023-08-22 | 中国石油天然气股份有限公司 | 油井垮塌判断方法及设备 |
GB2582841B (en) * | 2019-08-19 | 2021-09-08 | Clear Solutions Holdings Ltd | Automated fluid system |
US11028648B1 (en) * | 2020-11-05 | 2021-06-08 | Quaise, Inc. | Basement rock hybrid drilling |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020112888A1 (en) | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US7185719B2 (en) | 2002-02-20 | 2007-03-06 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
US6926081B2 (en) * | 2002-02-25 | 2005-08-09 | Halliburton Energy Services, Inc. | Methods of discovering and correcting subterranean formation integrity problems during drilling |
JP3859543B2 (ja) | 2002-05-22 | 2006-12-20 | レーザーフロントテクノロジーズ株式会社 | レーザ加工装置 |
US7908034B2 (en) * | 2005-07-01 | 2011-03-15 | Board Of Regents, The University Of Texas System | System, program products, and methods for controlling drilling fluid parameters |
AU2007205225B2 (en) * | 2006-01-05 | 2010-11-11 | Prad Research And Development Limited | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
US20070227774A1 (en) | 2006-03-28 | 2007-10-04 | Reitsma Donald G | Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System |
CA2679649C (en) * | 2007-02-27 | 2012-05-08 | Precision Energy Services, Inc. | System and method for reservoir characterization using underbalanced drilling data |
-
2008
- 2008-12-03 US US12/326,925 patent/US7984770B2/en not_active Expired - Fee Related
-
2009
- 2009-12-02 BR BRPI0922775A patent/BRPI0922775B1/pt not_active IP Right Cessation
- 2009-12-02 CN CN200980154288.5A patent/CN102272410B/zh not_active Expired - Fee Related
- 2009-12-02 MX MX2011005780A patent/MX2011005780A/es active IP Right Grant
- 2009-12-02 WO PCT/US2009/066422 patent/WO2010065646A2/en active Application Filing
- 2009-12-02 MY MYPI2011002504A patent/MY154155A/en unknown
- 2009-12-02 EA EA201170748A patent/EA023468B1/ru not_active IP Right Cessation
- 2009-12-02 EP EP09831057.6A patent/EP2368009B1/en not_active Not-in-force
- 2009-12-02 PE PE2011001153A patent/PE20120369A1/es active IP Right Grant
-
2011
- 2011-06-02 EG EG2011060905A patent/EG26416A/en active
- 2011-06-03 CL CL2011001337A patent/CL2011001337A1/es unknown
Also Published As
Publication number | Publication date |
---|---|
WO2010065646A3 (en) | 2010-07-29 |
EP2368009A4 (en) | 2013-05-22 |
MX2011005780A (es) | 2011-09-06 |
EP2368009B1 (en) | 2019-11-20 |
EA023468B1 (ru) | 2016-06-30 |
EP2368009A2 (en) | 2011-09-28 |
BRPI0922775A2 (pt) | 2016-09-06 |
CN102272410B (zh) | 2014-06-18 |
EA201170748A1 (ru) | 2011-12-30 |
BRPI0922775B1 (pt) | 2019-09-03 |
CN102272410A (zh) | 2011-12-07 |
US7984770B2 (en) | 2011-07-26 |
EG26416A (en) | 2013-10-22 |
US20100133007A1 (en) | 2010-06-03 |
PE20120369A1 (es) | 2012-05-13 |
MY154155A (en) | 2015-05-15 |
WO2010065646A2 (en) | 2010-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CL2011001337A1 (es) | Metodo para determinar la estabilidad de la formacion durante la perforacion de un sondeo que comprende determinar una presion de fluido anular; ajustar la presion anular; , comparar la velocidad de flujo del fluido de perforacion fuera y dentro del sondeo; y determinar la presion intersticial y la presion de fractura. | |
NZ592387A (en) | Devices, systems, and methods for determining fractional flow reserve | |
BR112014005469A2 (pt) | aparelhos de perfuração incluindo um dispositivo de desvio de fluido e métodos de uso dos mesmos | |
EA201201247A1 (ru) | Система и способ безопасных операций управления скважиной | |
BRPI0704640A (pt) | método para caracterização de fluido em uma formação subterránea circundando um furo perfurado, sistema para orientação durante a perfuração de uma formação subterránea, e aparelho para orientação durante a perfuração de uma formação subterránea | |
WO2018035400A3 (en) | Method for determining characteristics of a network of hydraulic fractures | |
GB2546937A8 (en) | Enhanced seismic surveying | |
EA201992243A1 (ru) | Мониторинг скважины и перекрывающих пород с использованием распределенных акустических датчиков | |
CY1115385T1 (el) | Μετρηση του ρυθμου ροης λασπης στο δακτυλιο κατα τη διατρηση γεωτρησης και χρηση αυτου για τον εντοπισμο δυσλειτουργιων της γεωτρησης | |
MY144145A (en) | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system | |
EA201491663A1 (ru) | Измерение потока с использованием индикатора | |
EP1898044A3 (en) | Annulus pressure control drilling systems and methods | |
GB2477880A (en) | Pressure and flow control in drilling operations | |
AR086884A1 (es) | Metodo y aparato para determinar y controlar una presion estatica de fluido a traves de un medidor vibratorio | |
EP2295712A3 (en) | Rotating control device for drilling wells | |
RU2013158132A (ru) | Бурение с оптимизацией давления непрерывной бурильной колонной насосно-компрессорных труб | |
EP2088282A3 (en) | Casing or work string orientation indicating apparatus and methods | |
AR076790A1 (es) | Metodo y aparato para determinar un error de indice de flujo en un caudalimetro vibrante | |
BR0309153A (pt) | Método para prognosticar uma pressão de formação à frente de uma broca em um poço, dispositivo de armazenamento de programa, e, sistema para prognosticar uma pressão de formação à frente de uma broca em um poço | |
NO20150744A1 (en) | A method of plugging and abandoning a well | |
AR112577A1 (es) | Múltiple, módulos y métodos para el manejo de la presión durante la perforación | |
FI20105081A0 (fi) | Menetelmä ja järjestely kallioporakoneen poraniskan voitelemiseksi | |
SA521431016B1 (ar) | طريقة وجهاز لكشف تدفق الغاز باستخدام الإشارات الصوتية لنبضات الطين في تجويف بئر | |
GB2542720A (en) | Downhole pressure sensing device for open-hole operations | |
CO2017007367A2 (es) | Método y configuracion para operar un proceso de extracción en un pozo |