CH86624A - Process for canceling or generating current surges of elastic fluids in pipelines. - Google Patents

Process for canceling or generating current surges of elastic fluids in pipelines.

Info

Publication number
CH86624A
CH86624A CH86624DA CH86624A CH 86624 A CH86624 A CH 86624A CH 86624D A CH86624D A CH 86624DA CH 86624 A CH86624 A CH 86624A
Authority
CH
Switzerland
Prior art keywords
parts
current surges
current
pipelines
canceling
Prior art date
Application number
Other languages
German (de)
Inventor
Sloman Ricardo
Original Assignee
Sloman Ricardo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sloman Ricardo filed Critical Sloman Ricardo
Publication of CH86624A publication Critical patent/CH86624A/en

Links

Landscapes

  • Pipe Accessories (AREA)

Description

  

  Verführen zum Aufheben oder Erzeuren von Stromstössen elastischer Fluida  in Rohrleitungen.    Den Gegenstand vorliegender Erfindung  bildet ein Verfahren zum Aufheben oder  Erzengen von Stromstössen elastischer Fluida  in Rohrleitungen, darin bestehend, dass ein  zelne Fluidumsteile in ihrer     Fördergeschwin-          digkeit    gegenüber andern Teilen vorüber  gehend verschieden stark verzögert werden,  so dass sie, wenn sie von Stromstössen aus  gehen, hintereinander wieder zusammen  tretend, den Zwischenraum zwischen den  nicht verzögerten Teilen zweier aufeinander  folgender Stromstösse ausfüllen und dadurch  ein kontinuierliches Weiterströmen der ge  samten Fluidummenge bewirken, wenn sie  aber von einem gleichförmig     fortlaufenden     Strom abweigen,

   relativ zueinander un  gleiche Geschwindigkeit annehmend, bei der  Wiedervereinigung einen Strom mit Verdün  nungen und als Stromstösse wirkenden Ver  dichtungen bilden.  



  Die praktische Durchführung des Ver  fahrens ist im folgenden anhand der Zeich  nung erläutert, die zwei Ausführungsbei  spiele einer Rohrleitung schematisch dar  stellt. Es sei hierbei von der Annahme aus-    gegangen, dass die in der Auspuffleitung  einer Kolbenmaschine sich periodisch wieder  holenden, dnrA Schliialfttren angedeuteten  Stromstösse eitles Gases aufzuheben, resp.  so auszugleichen seicn, dass Glasselbe die Aus  puffleitung in einem tunlichst gleichmässigen  kontinuierlichen Strome verlässt. Zu diesem  Behufe ist:     na(#li    dem .lusführungsheislriel ge  mäss Fig. 1 die Auspuffleitung 1 an einer  mäss Fig. 1 die Auspuffleitung 1 an einer  stelle in mehrere Arme 6, 7, S, 9, 10 und 11  verzweigt, die verschieden lang sind, ver  schiedenen Querschnitt haben und wieder  sich in eine gemein schaftliche Leitung 2 ver  einigen.

   Diese liegen in einer Ebene. Die  mittleren Rohre sind gestreckt, beziehungs  weise ganz wenig gebogen. Die Biegung der  äussern Rohre wird nach aussen hin sehärfer.  und zwar ist sie bei jedem von der des an  dern verschieden. Auf diese Weise wird die  Länge der Arme verschieden gestaltet, so dass  die Wege der dieselben durchströmenden Gas  mengen verschieden lang sind und letztere  daher nicht gleichzeitig im Vereinigungs  punkt eintreffen können; die die mittleren  Rohrarme durchfliessenden Gasmengen eines      Stromstosses werden an der Vereinigungs  stelle ankommen vor den die äussern Rohr  arme passierenden, so dass die gesamte Menge  Eines Stromstosses sich nach der Vereinigungs  stelle auf eine grössere Strecke verteilt, als  sie vor der Teilung einnimmt.

   Würden die'  Querschnitte aller Rohrarme gleichgross an  genommen und die Expansion der Grase ver  nachlässigt, so würde diese Strecke noch nicht  so gross sein, dass der Zwischenraum, der     zwi-          chen    den Gasmengen der einzelnen Strom  stösse liegt, ausgefüllt würde. Um dies zu er  reichen. werden die Querschnitte der ein  zelnen Rohrarme verschieden gross gestaltet,  und zwar von innen nach aussen zunehmend;  immerhin nur in dem Masse, dass der     Gesamt-          qucrschnitt    aller Rohrarme ungefähr gleich  demjenigen vor und hinter denselben ist.

    Dadurch wird erreicht, dass die die äussern  Rohrarme passierenden Teilmengen eines  Stromstosses gegenüber denen, welche die     in-          nern    Rohrarme rlurchströmen, eine Verzöge  rung erfahren, die sich mit der durch den  längeren Weg verursachten Verzögerung sum  miert: es wirrt also auch die     Geschwindig-          keil    der einzelnen Stromstossmengen ver  schieden gestaltet. Die die innern engeren und  kürzeren Rohrarme durchfliessenden Strom  stossmengen haben eine grössere Geschwindig  keit als diejenigen, welche die längeren und  weiteren Rohrarme passieren, erreichen also  auch die Vereinigungsstelle entsprechend  früher als die, welche eine grosse Verzögerung  erfahren haben.

   Die Lücken zwischen zwei  sich folgenden Stromstössen sind bezüglich  der durch Pfeile angedeuteten Stromrichtung  nach der Wiedervereinigung durch die     ver-          schiedenerv    zueinander verschobenen Teil  mengen der aufeinanderfolgenden Stromstösse  ausgefüllt, wie lies Fig. 1 deutlich erkennen  lässt. Die, ergibt, wenn die Expansion der  Gase noch in Rechnung gezogen wird, ein  vollkommen gleichförmiges Weiterströmen  des Gasstromes in Leitung 2. In vorstellend  erläutertem Beispiel ist eine Veränderung  der Rohrleitungsquerschnittsform durch Zer  legung einer zusammenhängenden Fläche in  voneinander getrenite Teile durchgeführt;    statt dessen kann der Rohrquerschnitt in der  Weise verändert werden, wie es beispielsweise  Fig. 2 zeigt.

   Der Rohrquerschnitt ist hier  nach lediglich anders geformt als vor und  hinter der Regulier-, resp. Stossausgleich  stelle. Das Rohr 3 mit kreisförmigem Quer  schnitt ist unter Beibehaltung des     Flächen-          inbaltes    des Leitungsquerschnittes vorüber  gehend zu einem solchen 4 mit etwa birnen  förmigem Querschnitt umgestaltet, wobei die  engste Stelle desselben mit einer Erzengen  den der zylindrischen Rohrteile 3 und a bün  dig ist, die weiteste Stelle hingegen dia  metral gegenüberliegend über letztere vor  stellt.

   Die Wirkung ist etwa die gleiche wie  bei der erstbeschriebenen Ausführungsform,  indem verschiedene Teile einer einen Strom  stoss ausmachenden Flüssigkeitsmenge in ihrer  Forthewegungsricht ung gegeneinander ver  schoben werden, so dass sie verschieden grosse  Verzögerung in ihrer Geschwindigkeit er  leiden und in der Folge statt nebeneinander  in der Bewegungsrichtung zueinander ver  schoben weiterfliessen, wodurch an Stelle der       früheren    einzelnen stossweisen Strömungen  ein gleichmässig dahinfliessender Strom tritt.

    S S tatt des vollständig freien, bezw. offe  nen Rohrquerschnittes könnte die Verände  rung der Querschnittsform auch mit dem  Einbau von sogenannten Schikanen kombi  niert sein, um den einzelnen Teilen eines  Stromstosses eine Art Führung zu geben,  durch welche sie in ihrer Fortbewegung ge  wissermassen mehr oder weniger gehemmt  werden. Solche Schikanen können zum Bei  spiel drallartige Schraubenwindungen auf  weisen, um den auf sie treffenden Strom  teilen eine gewisse Drehbewegung zu ur  teilen, stets mit dem Endergebnis, dass alle  Teile der aufeinanderfolgenden     Stromstösse     hinter der Stossausgleichstelle einen     zusam-          menhängenden,    stetig fortlaufenden Strom       bilden.     



  In den     vorstehend        beschriebenen        Beispielen     ist die     Aufhebung    von Stromstössen erläutert.  Es     können    aber .auch mit der beschriebenen  Vorrichtung ein gleichförmig , fortlaufender       Fluidumstrom    in. einen stossweise     stärker         und schwächer auftretenden Strom umgewan  delt werden, indem beim Wiedervereinigen  der verschieden verzögerten Strommengenteile       his    zu einem gewissen Grade     Verdünnungen     und Verdichtungen in dem sich bildenden  Strom entstehen. Diese Verdichtungen wirken  als Stromstösse.



  Seduce to cancel or generate current surges of elastic fluids in pipelines. The subject of the present invention is a method for canceling or generating current surges of elastic fluids in pipelines, consisting in that individual fluid converters are temporarily delayed differently in their conveying speed than other parts, so that when they are caused by current surges , coming together again one after the other, fill the gap between the non-delayed parts of two successive current surges and thereby cause the entire amount of fluid to flow continuously, but if they deviate from a steadily continuous flow,

   Assuming unequal speed relative to each other, when reunification a stream with dilutions and forming impulses acting as Ver seals.



  The practical implementation of the process is explained below with reference to the drawing voltage, which shows two Ausführungsbei games of a pipeline is schematically. It is assumed here that the current surges of vain gas, which are periodically repeated in the exhaust line of a piston engine and are indicated by the loop, cancel or. be balanced in such a way that the same glass leaves the exhaust line in an even and continuous flow as far as possible. For this purpose: na (#li the .lusführungheislriel ge according to FIG. 1 the exhaust line 1 at one point according to FIG. 1 the exhaust line 1 branches into several arms 6, 7, S, 9, 10 and 11, which are different are long, have different cross-sections and agree again in a common line 2.

   These are on one level. The middle tubes are stretched or bent very slightly. The bend of the outer tubes becomes sharper towards the outside. and in each case it is different from that of the other. In this way, the length of the arms is designed differently, so that the paths of the gas flowing through the same quantities are of different lengths and the latter can therefore not arrive at the same point at the union; The gas quantities of a current impulse flowing through the middle pipe arms will arrive at the union point before the one passing through the outer pipe arms, so that the entire quantity of a current surge is distributed over a greater distance after the union point than it occupies before the division.

   If the cross-sections of all pipe arms were assumed to be of the same size and the expansion of the grass neglected, this distance would not be so large that the space between the gas quantities of the individual streams would be filled. To achieve this. the cross-sections of the individual tubular arms are designed to be of different sizes, increasingly from the inside to the outside; at least only to the extent that the total cross-section of all pipe arms is roughly equal to that in front of and behind them.

    This ensures that the partial quantities of a current surge that pass the outer tube arms experience a delay compared to those that flow through the inner tube arms, which adds up to the delay caused by the longer path: the speed is also confused the individual current impulse quantities are designed differently. The amount of current flowing through the inner narrower and shorter tube arms have a greater speed than those that pass the longer and wider tube arms, so they also reach the junction earlier than those that have experienced a great delay.

   The gaps between two consecutive current surges are filled with regard to the current direction indicated by arrows after reunification by the differently shifted partial amounts of the successive current surges, as can be clearly seen in FIG. If the expansion of the gases is also taken into account, this results in a completely uniform onward flow of the gas flow in line 2. In the illustrative example, a change in the cross-sectional shape of the pipeline is carried out by dividing a coherent area into separate parts; instead, the pipe cross-section can be changed in the manner shown, for example, in FIG.

   The pipe cross-section is here only shaped differently than before and after the regulating, respectively. Shock compensation place. The pipe 3 with a circular cross-section is temporarily redesigned to such a 4 with an approximately pear-shaped cross-section while maintaining the surface inbaltes of the line cross-section, the narrowest point of the same with an ore that of the cylindrical pipe parts 3 and a flush, the widest Place, however, diametrically opposite over the latter.

   The effect is about the same as in the first described embodiment, in that different parts of a liquid quantity making up a current surge are displaced against each other in their direction of propagation, so that they suffer different degrees of deceleration in their speed and consequently instead of side by side in the direction of movement They continue to flow displaced to each other, whereby a steadily flowing stream takes the place of the earlier individual intermittent currents.

    S instead of the completely free, respectively. open pipe cross-section, the change in cross-sectional shape could also be combined with the installation of so-called baffles in order to give the individual parts of an electrical surge a kind of guidance through which they are more or less inhibited in their movement. Such baffles can, for example, have twist-like screw windings, in order to divide the stream that hits them into a certain rotational movement, always with the end result that all parts of the successive current surges behind the surge compensation point form a coherent, continuously continuous current.



  In the examples described above, the elimination of power surges is explained. However, with the device described, a steady, continuous fluid flow can also be converted into a flow that occurs intermittently, stronger and weaker, in that when the variously delayed parts of the flow are reunited, to a certain degree dilutions and densities occur in the flow that is being formed. These compressions act as current surges.

 

Claims (1)

PATENTANSPRUCH: Verfahren zum Aufheben oder Erzeugen von Stromstössen elastischer Fluida in Rohr leitungen, dadurch gekennzeichnet, dass ein zelne Fluidumteile in ihrer Fördergeschwin- digkeit gegenüber andern Teilen vorübergehend verschieden stark verzögert werden, so dass sie. PATENT CLAIM: A method for canceling or generating current surges of elastic fluids in pipelines, characterized in that individual fluid parts are temporarily delayed to a different extent in terms of their delivery speed compared to other parts, so that they. wenn sie von Stromstössen ausgehen, hinter einander wieder zusammentretend, den Zwi- cchenraum zwischen den nicht verzögerten Teilen zweier aufeinanderfolgender Strom stösse ausfüllen und dadurch mit denselben einen kontinuierlichen Strom bilden, wenn sie aber von einem gleichförmig fortlaufenden Strom abzweigen, relativ zueinander un gleiche Geschwindigkeit annehmend, bei der Wiedervereinigung einen Strom mit Verdün- rungen und als Stromstösse wirkenden Ver dichtungen bilden. UNTERANSPRÜCHE: 1. when they start from current surges, coming together again one after the other, fill the space between the undelayed parts of two successive current surges and thereby form a continuous current with them, but when they branch off from a steadily continuous current, assuming unequal speed relative to one another , when reunification form a stream with dilutions and densities that act as rushes. SUBCLAIMS: 1. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die stossweise auf- tretenden Fluidumströme vorübergehend in mehrere in ihrer Fortbewegungsrich tung gegeneinander verschobene Teilströme zerlegt werden. 2. Verfahren nach Patentanspruch und Un teranspruch 1, dadurch gekennzeichnet, dass die ungleich gestalteten Teilleitungs wege durch Rohre verschiedener Länge gebildet sind. 3. Verfahren nach Patentanspruch und Un teranspruch 1, dadurch gekennzeichnet. dass die verschiedenen Teilleitungswege durch Rohre verschiedener Länge und ver schieden grosser Querschnitte gebildet sind. 4. A method according to patent claim, characterized in that the intermittently occurring fluid flows are temporarily broken down into several partial flows which are mutually shifted in their direction of movement. 2. The method according to patent claim and un teran claim 1, characterized in that the unevenly designed partial line paths are formed by tubes of different lengths. 3. The method according to claim and un terclaim 1, characterized. that the various sub-line routes are formed by pipes of different lengths and different large cross-sections. 4th Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Verzögerung ein zelner Fluidumstromteile durch Ver änderung der Querschnittsform der Rohr leitung bewirkt wird. 5. Verfahren nach Patentanspruch, dadurch gekennzeichnet, class die Verzögerung ein zelner T'luidumstromteile durch den Ein bau von Schikanen in die Rohrleitun- be wirkt wird. Method according to claim, characterized in that the delay of individual fluid flow parts is brought about by changing the cross-sectional shape of the pipe. 5. The method according to claim, characterized in that the delay of an individual T'luidumstromteile is effected by the installation of baffles in the pipeline.
CH86624D 1917-07-10 1919-07-17 Process for canceling or generating current surges of elastic fluids in pipelines. CH86624A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE86624X 1917-07-10

Publications (1)

Publication Number Publication Date
CH86624A true CH86624A (en) 1921-10-01

Family

ID=5641366

Family Applications (1)

Application Number Title Priority Date Filing Date
CH86624D CH86624A (en) 1917-07-10 1919-07-17 Process for canceling or generating current surges of elastic fluids in pipelines.

Country Status (1)

Country Link
CH (1) CH86624A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1113119B (en) * 1959-07-01 1961-08-24 Leistritz Hans Karl Silencer for flowing and preferably also hot gases
US5033581A (en) * 1989-10-02 1991-07-23 Feuling Engineering, Inc. Muffler for an internal combustion engine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1113119B (en) * 1959-07-01 1961-08-24 Leistritz Hans Karl Silencer for flowing and preferably also hot gases
US5033581A (en) * 1989-10-02 1991-07-23 Feuling Engineering, Inc. Muffler for an internal combustion engine

Similar Documents

Publication Publication Date Title
DE720583C (en) Method of mixed synchronization in television
CH86624A (en) Process for canceling or generating current surges of elastic fluids in pipelines.
DE3300382A1 (en) DEVICE FOR GAS FLOWING FROM TWO TO BE WELDED, IN PARTICULAR SMALL-CALIBRATED TUBES
DE1794237A1 (en) Falling film evaporator
DE399192C (en) Pipe connection for concentric pipelines
DE2844489A1 (en) MANIFOLD WITH SEVERAL BRANCHES
DE648843C (en) Processing machine for chocolate masses
DE3715577A1 (en) Sorting conveyor for upright bottles - uses reversing guides forming bend one end of conveyor with belts travelling in opposite directions
DE2042772C3 (en) Welded connection between the wall body of a continuous muffle furnace and a co-rotating tubular body arranged within it
DE4321998B4 (en) Pulsation damping in a fuel injection system
DE2701560C2 (en)
DE1810080A1 (en) Flow center resonator
DE324048C (en) Method and device for eliminating impacts in pipelines of gas or liquid flows moving forward
DE827313C (en) Belt straps for conveyor belts of all kinds
DE1123256B (en) Pipe elbow for conveying lines for blown and flushed goods
DE402941C (en) Device for homogenizing liquids
DE1255413B (en) Process for the successive delivery of two liquids through a pipeline with the inclusion of a buffer liquid
DE3325607C2 (en)
DE68903579T2 (en) GAS / LIQUID CONTACT DEVICE.
DE1654096C3 (en)
DE1719479A1 (en) Device for separating liquid droplets or particles from a vaporous or gaseous medium
DE639536C (en) Process for the production of a soldered connection between nested metal pipes
Schmitzer Turnus und die Danaiden. Mythologische Verstrickung und personale Verantwortung
DE887302C (en) Foam fire extinguishing system for fuel tanks
DE8909992U1 (en) Wire bridge for bridging a circuit element arranged in an electrical line as required