CH691267A5 - Foundation for a building, especially a residence. - Google Patents

Foundation for a building, especially a residence. Download PDF

Info

Publication number
CH691267A5
CH691267A5 CH00962/96A CH96296A CH691267A5 CH 691267 A5 CH691267 A5 CH 691267A5 CH 00962/96 A CH00962/96 A CH 00962/96A CH 96296 A CH96296 A CH 96296A CH 691267 A5 CH691267 A5 CH 691267A5
Authority
CH
Switzerland
Prior art keywords
steel profiles
profiles
floor
foundation
building
Prior art date
Application number
CH00962/96A
Other languages
German (de)
Inventor
Andreas Haemmerli
Wolfgang Le Marie
Frank Schneider
Axel Villa
Original Assignee
Comparo Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comparo Ag filed Critical Comparo Ag
Priority to CH00962/96A priority Critical patent/CH691267A5/en
Priority to DE1997114617 priority patent/DE19714617A1/en
Publication of CH691267A5 publication Critical patent/CH691267A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Residential Or Office Buildings (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

       

  
 



  Es ist bekannt, Gebäudefundamente auf Pfählen abzustützen, wenn der zu bebauende Boden nicht tragfähig genug ist. Dabei werden viele Pfähle beabstandet voneinander in den Boden gerammt. Der üblicherweise aus Beton bestehende Boden des Kellers wird auf diesen Pfählen abgestützt. 



  Als Gebäudefundament in normal tragfähigen Böden sind dagegen Kellerbauten üblich, auf welchen das Gebäude abgestützt ist. 



  Der vorliegenden Erfindung liegt die Aufgabe zu Grunde, ein kostengünstiges Verfahren zur Herstellung eines Gebäudefundamentes und ein damit hergestelltes Gebäudefundament anzugeben. Diese Aufgabe wird durch die Merkmalskombination der unabhängigen Patentansprüche gelöst. 



  Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnung erläutert. Darin zeigt: 
 
   Fig. 1 einen Querschnitt durch ein Fundament mit einem Teil eines Gebäudes, und 
   Fig. 2 eine Schnitt längs der Linie II-II in Fig. 1. 
 



  In der Zeichnung ist ein Teil eines Fundamentes für ein Gebäude 1 dargestellt. Es besteht aus mehreren in einem vorgegebenen quadratischen oder rechteckigen Raster in den Boden gerammten Stahlprofilen 11, z.B. I-Profilen. Die Mehrzahl dieser Profile 11 hat unten eine Verdickung 12. Dadurch entsteht beim Eintreiben der Profile 11 in den Boden 13 ein Hohlraum um das Profil 11 herum, der anschliessend mit Beton 14 gefüllt wird. An einer ausgewählten Stelle wird dagegen eines oder einige wenige der Profile 11 ohne die Verdickung 12 in den Boden 13 getrieben. Dadurch erhält dieses Profil 11 elektrisch leitenden Kontakt mit dem umgebenden Boden 13, während die mit Beton ummantelten Profile elektrisch gegenüber dem Boden besser isoliert sind. Dadurch können Potentialdifferenzen im Boden nicht Kriechströme in der nachfolgend beschriebenen Tragstruktur 20 verursachen.

   Solche Kriechströme sind elektrophysiologisch bedenklich. Sie treten bei der bisherigen Anwendung gepfählter Betonfundamente nicht auf, weil die eingetriebenen Pfähle nur über das Betonfundament miteinander verbunden werden. 



  Die Profile 11 werden maschinell in den Boden 13 getrieben, z.B. mittels eines Rammbocks oder mit einem Vibrator. Beim Eintreiben wird die Eintreibegeschwindigkeit bzw. der Eintriebsbetrag pro Schlag oder Zeiteinheit gemessen. Sobald ein vorgegebener Minimalwert erreicht ist, wird der Eintreibvorgang gestoppt, das Profil 11 auf einem vorgegebenen Niveau abgetrennt und das nächste Profil 11 eingetrieben. Der vorgegebene Wert, an welchem das Eintreiben des Profils 11 gestoppt wird, hängt nicht von der Bodenstruktur, der Schichtung und der Tragfähigkeit des Bodens ab. Die Profile 11 werden einfach so tief eingerammt, bis sie die ihnen zugedachte Last sicher tragen können. Falls ein Profil 11 noch nicht tragfähig genug ist, wenn sich sein oberes Ende dem Boden nähert, wird ein weiteres, gleiches Profil 11 fluchtend auf das erste geschweisst und der Eintreibvorgang fortgesetzt.

   Durch dieses Vorgehen erübrigen sich vorgängige Bodenuntersuchungen betreffend Tragfähigkeit des Bodens. 



  Die meisten Profile 11 haben unten die Erweiterung 12. Das damit gebildete Loch ist im Querschnitt etwas grösser als das Profil 11. Dadurch wird das weitere Eintreiben erst dann gestoppt, wenn die Erweiterung 12 auf hinreichend Widerstand stösst. Nach dem Auffüllen des Zwischenraums mit dem Beton 14 und dessen Aushärten ist dagegen das Profil 11 auf seiner ganzen Länge (unter Boden) über den Beton 14 mit dem Boden 13 zumindest reibschlüssig verbunden. Die Tragkraft des Profils 11 erhöht sich damit um ein Vielfaches. 



  Auf die Profile 11 ist eine Tragstruktur 20 des Gebäudes 1, bestehend aus horizontalen, in einem vorgegebenen Raster angeord neten Längsträger - I-Profilen 21 aus Stahl aufgeschraubt. Die Profile 21 sind durch rechtwinklig zu ihnen verlaufende, aufgeschraubte Querprofile 22 miteinander verbunden. Dieser rechteckige oder quadratische Raster von Längsträgern 21 und Querstreben 22 ist in einem der Felder zwischen zwei Längsträgern 21 und einem der Felder zwischen zwei Querträgern 22 durch Diagonalversteifungs-Profile 23 längs des ganzen Feldes versteift. 



  Auf diese Tragstruktur 20 ist die Gebäudestruktur 30 aufgebaut, bestehend aus vertikalen Stützen 31 aus I-Stahlprofilen, weiteren, im Abstand der Geschosshöhe über den Profilen 21, 22 an den Stützen 31 angeschraubten Längsträgern und Querprofilen sowie auf den Längsträgern 21 abgestützten Bodenplatten 32 aus Gasbeton. 



  Innerhalb und beabstandet von den Profilen 11 ist ein Gewölbekeller 40 eingebaut. Er besteht aus viertelkreissektorförmigen, aneinander gereihten, zylindrischen Schalenelementen 41, die unten auf zwei Beton-Fundamentbalken 42 abgestützt sind. Die Schalenelemente 41 bestehen vorwiegend aus gebranntem Ton. Der Kellerzugang erfolgt über einen Schacht 43, der durch eine \ffnung 33 in den Bodenplatten 32 durchgeführt ist. Der Spalt zwischen der \ffnung 33 und dem Schacht 43 ist z.B. mit Silikongummi 44 abgedichtet. Auf der andern Seite ist das Kellergewölbe 40 mit einer Platte abgeschlossen. Der Boden des Kellers 40 wird z.B. durch eine Kiesschicht 45 oder durch Klinker gebildet. Der Keller 40 ist mit Erde 13 zugedeckt. Die Längsträger 21 und Querprofile 22 erstrecken sich freitragend oberhalb der Bodenoberfläche 15 über den Keller 40.

   Der Keller 40 trägt also im Gegen satz zur herkömmlichen Bauweise nicht die Tragstruktur 20 des Gebäudes. Durch die geschilderte Bauweise des Kellers 40 wird eine kostengünstige Herstellung mit einer hervorragenden ökologischen Eignung kombiniert. Der Keller 40 ist z.B. für die Lagerung von Wein, Obst oder Gemüse sehr gut geeignet, weil er die Feuchtigkeit und Temperatur des umgebenden Erdreichs annimmt. 



  
 



  It is known to support building foundations on piles if the floor to be built is not stable enough. Many piles are rammed into the ground at a distance from each other. The basement of the basement, which is usually made of concrete, is supported on these piles.



  In contrast, basement buildings on which the building is supported are common as building foundations in normal load-bearing floors.



  The present invention is based on the object of specifying an inexpensive method for producing a building foundation and a building foundation produced therewith. This object is achieved by the combination of features of the independent claims.



  An exemplary embodiment of the invention is explained below with reference to the drawing. It shows:
 
   Fig. 1 shows a cross section through a foundation with part of a building, and
   FIG. 2 shows a section along the line II-II in FIG. 1.
 



  In the drawing, part of a foundation for a building 1 is shown. It consists of several steel profiles 11 rammed into the ground in a predetermined square or rectangular grid, e.g. I profiles. The majority of these profiles 11 has a thickening 12 at the bottom. This creates a cavity around the profile 11 when the profiles 11 are driven into the floor 13, which is then filled with concrete 14. At a selected point, however, one or a few of the profiles 11 are driven into the ground 13 without the thickening 12. As a result, this profile 11 receives electrically conductive contact with the surrounding floor 13, while the profiles encased in concrete are better insulated electrically from the floor. As a result, potential differences in the ground cannot cause leakage currents in the support structure 20 described below.

   Such leakage currents are problematic electrophysiologically. They do not occur in the previous application of piled concrete foundations because the driven piles are only connected to one another via the concrete foundation.



  The profiles 11 are driven mechanically into the floor 13, e.g. with a battering ram or with a vibrator. When driving in, the driving speed or the driving amount per stroke or unit of time is measured. As soon as a predetermined minimum value has been reached, the driving-in process is stopped, the profile 11 is cut off at a predetermined level and the next profile 11 is driven. The predetermined value at which the driving in of the profile 11 is stopped does not depend on the floor structure, the stratification and the load-bearing capacity of the floor. The profiles 11 are simply rammed in until they can safely carry the intended load. If a profile 11 is not yet load-bearing enough when its upper end approaches the ground, a further, identical profile 11 is welded in alignment with the first and the driving-in process is continued.

   This procedure eliminates the need for previous soil investigations into the load-bearing capacity of the soil.



  Most of the profiles 11 have the extension 12 at the bottom. The hole thus formed is somewhat larger in cross section than the profile 11. As a result, the further driving in is only stopped when the extension 12 meets with sufficient resistance. After filling the intermediate space with the concrete 14 and hardening it, on the other hand, the profile 11 is at least frictionally connected over its entire length (under the floor) via the concrete 14 to the floor 13. The load capacity of the profile 11 increases many times over.



  On the profiles 11 is a support structure 20 of the building 1, consisting of horizontal, arranged in a predetermined grid angeord Neten longitudinal members - I-profiles 21 screwed from steel. The profiles 21 are connected to one another by screwed cross profiles 22 running at right angles to them. This rectangular or square grid of side members 21 and cross struts 22 is stiffened in one of the fields between two side members 21 and one of the fields between two cross members 22 by diagonal stiffening profiles 23 along the entire field.



  The building structure 30 is constructed on this supporting structure 20, consisting of vertical supports 31 made of I-steel profiles, further longitudinal members and transverse profiles screwed to the supports 31 at a distance of the storey height above the profiles 21, 22, and base plates 32 made of gas concrete supported on the longitudinal members 21 .



  A vaulted cellar 40 is installed inside and at a distance from the profiles 11. It consists of quarter-circle sector-shaped, lined up, cylindrical shell elements 41, which are supported at the bottom on two concrete foundation beams 42. The shell elements 41 consist predominantly of fired clay. The cellar access is via a shaft 43, which is carried out through an opening 33 in the base plates 32. The gap between the opening 33 and the shaft 43 is e.g. sealed with silicone rubber 44. On the other side, the cellar vault 40 is closed off with a plate. The bottom of the basement 40 is e.g. formed by a layer of gravel 45 or by clinker. The basement 40 is covered with earth 13. The longitudinal members 21 and transverse profiles 22 extend cantilevered above the floor surface 15 over the basement 40.

   The basement 40 thus does not support the supporting structure 20 of the building in contrast to the conventional design. The described construction of the cellar 40 combines cost-effective production with excellent ecological suitability. The basement 40 is e.g. very suitable for storing wine, fruit or vegetables because it takes on the moisture and temperature of the surrounding soil.


    

Claims (7)

1. Verfahren zum Herstellen eines Fundamentes für ein Gebäude, insbesondere ein Wohnhaus, wobei senkrecht in den Boden erste Stahlprofile (11) eingetrieben werden, bis ein vorgegebener Widerstand beim Eintreiben jedes dieser ersten Stahlprofile (11) erreicht ist, wobei anschliessend das über den Boden (13) vorstehende Ende der ersten Stahlprofile (11) auf einem vorbestimmten Niveau abgetrennt wird, wobei die oberen Enden der verbleibenden ersten Stahlprofile (11) durch eine Tragstruktur (20) miteinander verbunden werden, und wobei die Tragstruktur (20) parallel zueinander verlegte, horizontale zweite Stahlprofile (21) umfasst.     1. A method for producing a foundation for a building, in particular a residential building, wherein first steel profiles (11) are driven vertically into the floor until a predetermined resistance is achieved when driving in each of these first steel profiles (11), which is then carried out over the floor (13) the projecting end of the first steel profiles (11) is cut off at a predetermined level, the upper ends of the remaining first steel profiles (11) being connected to one another by a supporting structure (20), and the supporting structure (20) being laid parallel to one another, includes horizontal second steel profiles (21). 2. Verfahren nach Anspruch 1, wobei die ersten und zweiten Stahlprofile (11, 21) I-Profile sind, und wobei die zweiten Stahlprofile (21) durch Querprofile 22 miteinander verbunden werden. 2. The method according to claim 1, wherein the first and second steel profiles (11, 21) are I-profiles, and wherein the second steel profiles (21) are connected to one another by transverse profiles 22. 3. 3rd Verfahren nach Anspruch 1 oder 2, wobei wenigstens zwei der zweiten Stahlprofile (21) durch Diagonalverstrebungen (23) miteinander verbunden werden.  Method according to claim 1 or 2, wherein at least two of the second steel profiles (21) are connected to one another by diagonal struts (23). 4. Verfahren nach einem der Ansprüche 1-3, wobei mindestens eines der ersten Stahlprofile (11) am unteren Ende keine Verdickung (12) aufweist, sodass es nach dem Eintreiben den umgebenden Boden (13) direkt berührt, und dass alle übrigen ersten Stahlprofile (11) am unteren Ende mit einer Verdickung (12) versehen werden und nach dem Eintreiben in den Boden (13) der diese Stahlprofile (11) umgebende Hohlraum mit Mörtel oder Beton (14) ausgegossen wird. 4. The method according to any one of claims 1-3, wherein at least one of the first steel profiles (11) has no thickening (12) at the lower end, so that it touches the surrounding soil (13) directly after driving, and that all other first steel profiles (11) are provided with a thickening (12) at the lower end and, after driving into the floor (13), the cavity surrounding these steel profiles (11) is poured out with mortar or concrete (14). 5. 5. Nach dem Verfahren gemäss einem der Ansprüche 1-4 hergestelltes Fundament für ein Gebäude, umfassend in den Boden in einem vorgegebenen Raster eingetriebene erste Stahlprofile (11), deren obere Enden durch eine horizontale Tragstruktur (20) mit horizontalen, parallel zueinander verlegten zweiten Stahlprofilen (21) miteinander verbunden sind.  Foundation for a building produced according to the method according to one of claims 1-4, comprising first steel profiles (11) driven into the floor in a predetermined grid, the upper ends of which are supported by a horizontal supporting structure (20) with horizontal, parallel steel profiles (20) 21) are interconnected. 6. Fundament nach Anspruch 5, wobei beabstandet von den ersten Stahlprofilen (11) im Boden (13) ein Keller (40) eingebaut ist, über welchen die Tragstruktur (20) freitragend und mit vertikalem Abstand verlegt ist, sodass sie nur auf den ersten Stahlprofilen (11) abgestützt ist. 6. Foundation according to claim 5, wherein spaced from the first steel profiles (11) in the floor (13) a basement (40) is installed, over which the support structure (20) is cantilevered and laid at a vertical distance, so that it is only on the first Steel profiles (11) is supported. 7. Fundament nach Anspruch 6, wobei der Keller (14) Halbschalen (41) umfasst, die vorwiegend aus gebranntem Ton bestehen. 7. Foundation according to claim 6, wherein the basement (14) comprises half-shells (41) which consist predominantly of fired clay.  
CH00962/96A 1996-04-16 1996-04-16 Foundation for a building, especially a residence. CH691267A5 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH00962/96A CH691267A5 (en) 1996-04-16 1996-04-16 Foundation for a building, especially a residence.
DE1997114617 DE19714617A1 (en) 1996-04-16 1997-04-09 Method fro assembling foundation for building e.g. house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH00962/96A CH691267A5 (en) 1996-04-16 1996-04-16 Foundation for a building, especially a residence.

Publications (1)

Publication Number Publication Date
CH691267A5 true CH691267A5 (en) 2001-06-15

Family

ID=4199244

Family Applications (1)

Application Number Title Priority Date Filing Date
CH00962/96A CH691267A5 (en) 1996-04-16 1996-04-16 Foundation for a building, especially a residence.

Country Status (2)

Country Link
CH (1) CH691267A5 (en)
DE (1) DE19714617A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2086977A (en) * 1935-08-24 1937-07-13 Chapman Paul Pile foundation construction
DE1280160B (en) * 1965-12-09 1968-10-10 Starkstromanlagen Gemeinschaft Injection pile
FR2615543A1 (en) * 1987-05-22 1988-11-25 Pruvost Francis Device for the construction of a precast underground premises, cellar or the like
FR2698391A1 (en) * 1992-11-20 1994-05-27 Agrion Habitat Rural Sa Load bearing structure and construction process for agricultural buildings - includes steps of forming support piles, marking points for implantation of piles, and driving piles into ground and erecting preassembled structural framework on them
WO1995026444A1 (en) * 1994-03-25 1995-10-05 Blue Ribbon Products, Ltd. Multiple pier foundation and method of constructing same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2086977A (en) * 1935-08-24 1937-07-13 Chapman Paul Pile foundation construction
DE1280160B (en) * 1965-12-09 1968-10-10 Starkstromanlagen Gemeinschaft Injection pile
FR2615543A1 (en) * 1987-05-22 1988-11-25 Pruvost Francis Device for the construction of a precast underground premises, cellar or the like
FR2698391A1 (en) * 1992-11-20 1994-05-27 Agrion Habitat Rural Sa Load bearing structure and construction process for agricultural buildings - includes steps of forming support piles, marking points for implantation of piles, and driving piles into ground and erecting preassembled structural framework on them
WO1995026444A1 (en) * 1994-03-25 1995-10-05 Blue Ribbon Products, Ltd. Multiple pier foundation and method of constructing same

Also Published As

Publication number Publication date
DE19714617A1 (en) 1997-10-30

Similar Documents

Publication Publication Date Title
DE69532510T2 (en) TENSION-FREE PILLAR FOUNDATION
DE2025449A1 (en) Method and device for location fixing of a building
EP0080143B1 (en) Foundation for a pole, a pillar or the like
DE2521777A1 (en) STRUCTURE FOR FASTENING HOUSING
DE102006051707A1 (en) Gabion wall for use as sound insulation wall, has monolithic concrete core extending over entire length of gabion wall in interior of gabion wall, and enclosed by natural stone layering and filler material layering
DE3719523A1 (en) Foundation or protection element
EP0031154A1 (en) Construction element system for erecting plant accommodating walls
CH691267A5 (en) Foundation for a building, especially a residence.
DE715314C (en) Foundation for buildings
DE3814885C2 (en)
DE3002739C2 (en) Waterproof building structure
DE102010018811A1 (en) Anchor for wooden masts, particularly for wooden masts carrying electric cables, has elongated hollow body, in which wooden mast is used, where elongated hollow body is held with lower section in ground or in socket
DE4015474A1 (en) Concrete floor for building - is supported by parallel tubular structural elements
DE4104045C2 (en) Process for the production of a versatile supporting wall construction for the stabilization of terrain jumps
EP1457609B1 (en) Floor for a building
DE2943329A1 (en) Prefabricated house - made of segmental cylindrical shells of foam lined concrete with vertical and horizontal subdivisions
DE3938541A1 (en) Method of erecting tank under foundations - consists of placing concrete layer on flat sub-base, with walls, spacers and plates
AT317092B (en) Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production
EP1482098A1 (en) Water-impermeable cellar and method of its construction
DE3714742C2 (en)
DE3520755C2 (en)
DE711114C (en) Process for the production of structures lying in the ground or in the open water in an open structure
DE202022100654U1 (en) mushroom foundation
CH420575A (en) Free-standing silo
DE736878C (en) Process for achieving uniform settlement of structures

Legal Events

Date Code Title Description
PUE Assignment

Owner name: GOEHNER MERKUR AG TRANSFER- UBS AG * UBS AG -DANN

PL Patent ceased