CH421472A - Method of constructing a building structure in the basement, and structure obtained according to this method - Google Patents

Method of constructing a building structure in the basement, and structure obtained according to this method

Info

Publication number
CH421472A
CH421472A CH841265A CH841265A CH421472A CH 421472 A CH421472 A CH 421472A CH 841265 A CH841265 A CH 841265A CH 841265 A CH841265 A CH 841265A CH 421472 A CH421472 A CH 421472A
Authority
CH
Switzerland
Prior art keywords
sleepers
excavation
elementary
uprights
upright
Prior art date
Application number
CH841265A
Other languages
French (fr)
Inventor
Clercq Pierre Le
Original Assignee
Clercq Pierre Le
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clercq Pierre Le filed Critical Clercq Pierre Le
Priority to CH841265A priority Critical patent/CH421472A/en
Priority to BE682639D priority patent/BE682639A/xx
Priority to FR65689A priority patent/FR1483483A/en
Publication of CH421472A publication Critical patent/CH421472A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

  

  Procédé de     construction    d'une structure de     bâtiment    en sous-sol,  et     structure    obtenue selon ce procédé    La présente invention a pour objet un procédé  de     construction    d'une     structure    de bâtiment en     sous-          sol,    structure présentant des niveaux décalés de part  et d'autre d'un plan     vertical    intermédiaire entre deux  parois opposées d'une     fouille.    Ce procédé est carac  térisé par le fait que des demi-traverses sont dispo  sées entre les parois opposées de la fouille par groupe  de trois,

   deux de ces demi-traverses montées du  même côté     dudit    plan vertical     intermédiaire    étant  situées à des niveaux différents et reliées par un mon  tant central élémentaire à une demi-traverse située  de l'autre côté dudit plan vertical intermédiaire à un  niveau intermédiaire de celui des deux premières  demi-traverses, un vérin intercalé dans cette dernière  demi-traverse déterminant dans ce premier groupe de  trois     demi-traverses    un effort compatible avec la  poussée des terres et de l'eau contre les parois de la  fouille,

   en ce qu'on suspend au point d'articulation  inférieure dudit montant central élémentaire avec la       demi-traverse        inférieure    du     premier    groupe un nou  veau montant central élémentaire à l'extrémité infé  rieure duquel on     fixe    une demi-traverse, une nouvelle  demi-traverse avec vérin intercalé étant     fixée    entre la       paroi    opposée de la fouille et un niveau intermédiaire  du     second    montant central     élémentaire,

          ces    deux  nouvelles     demi-traverses    constituant avec la traverse  inférieure du premier groupe un nouveau groupe de  trois demi-traverses dans lesquelles on exerce, à  l'aide du second     vérin,    un effort compatible avec la  poussée des terres et de l'eau, et ainsi de suite au fur  et à mesure du creusage de la fouille.  



  L'invention a également pour objet une     structure     de bâtiment présentant des niveaux décalés de part  et d'autre d'un plan     vertical        intermédiaire    entre deux  parois opposées d'une fouille, cette structure étant    construite en sous-sol selon le procédé défini     ci-          dessus.    Cette structure est caractérisée par le fait  qu'elle comprend des groupes de demi-traverses  opposées montées trois par trois, deux demi-traverses  d'un même côté étant reliées par un montant     vertical     élémentaire intermédiaire à une     demi-traverse    oppo  sée munie d'un vérin de tension,

   le groupe de     demi-          traverses    suivant étant relié au premier par un nou  veau montant     vertical    élémentaire     intermédiaire,    et       ainsi    de suite jusqu'au niveau inférieur du bâtiment.  



  Le dessin annexé représente, schématiquement et  à titre d'exemple, plusieurs formes d'exécution du  procédé défini ci-dessus.  



  Les     fig.    1, 2 et 3 représentent, sous forme de  schémas, trois phases successives de la mise en     oeuvre     du procédé selon une première forme d'exécution.  



  Les     fig.    4, 5, 6, 7 et 8 représentent cinq autres  formes de réalisation du procédé.  



  La     fig.    9 montre une forme     d'exécution    d'un rac  cord entre deux montants constitués par des fers pro  filés.  



  La     fig.    10 montre une seconde forme d'exécu  tion de raccord entre montants en fer profilé.  



  La     fig.    11 montre une troisième forme d'exécu  tion de raccord pour des montants en béton armé.  La     fig.    12 montre une forme d'exécution de rac  cord appliquée à des montants en bois.  



  La     fig.    13 est une vue en plan partielle d'une       structure    en sous-sol en construction.  



  La     fig.    14 est une coupe selon     A-A    de la     fig.    13.  Le procédé de construction d'une structure de       bâtiment    en sous-sol, représenté au dessin annexé,  est     particulièrement    applicable à la construction d'une  structure présentant des niveaux décalés de part et  d'autre d'un plan vertical     intermédiaire    entre deux      parois opposées 1 et 2 d'une fouille 3. Une telle,  structure à niveaux décalés se rencontre notamment  dans la construction des     installations    de parcage pour  véhicules.

   Selon ce procédé, on construit tout d'abord  dans le sol les parois 1 et 2, par exemple en béton       armé    coulé directement dans une tranchée     aménagée     dans le terrain. Une fois les -parois- 1 et 2     établies,     le     terrain    est enlevé entre     celles-ci,    de     manière    à  construire la     fouille    3. Au     fur    et à mesure que cette  fouille 3 est -approfondie, les parois 1 et 2 doivent  être étayées pour résister à la poussée des terres et  de l'eau.

   C'est précisément dans la réalisation de cet  étayage que réside     principalement        l'originalité    - du  procédé. En effet, et comme le montre la     fig.    1, on  dispose alors dans la fouille 3 qui est     commencée    des       demi-traverses    4, 5, 6 entre les parois opposées 1 et 2  de la     fouille.    Ces demi-traverses sont disposées par  groupe de trois, les deux demi-traverses 4 et 5 étant  montées du même côté d'un plan vertical     intermé-          diaire    entre les deux parois 1 et 2.

   Ce     _    plan     vertical     intermédiaire peut être situé à mi-distance entre les  parois, ou à une distance quelconque de celles-ci.  Les demi-traverses 4 et 5 sont situées à des niveaux       différents.     



  Dans le cas d'une     construction    d'installation de  parcage souterrain, la distance     séparant    les     -demi-          traverses    4 et 5 sera, de préférence, égale à la hau  teur d'un étage. Ces demi-traverses 4 et 5 sont reliées  par un montant central- élémentaire 7     relié    lui-même  à la demi-traverse 6 située de l'autre -côté dudit plan  vertical     intermédiaire.    Cette demi-traverse 6 est  située à un niveau intermédiaire -de celui des deux  demi-traverses 4 et 5.

   Un vérin 8 est intercalé dans  cette dernière     demi-traverse    6 pour pouvoir détermi  ner dans ce premier groupe de trois demi-traverses  4, 5, 6 une charge (représentée par la flèche 9) com  patible avec la poussée des terres et de l'eau contre  les parois de la     fouille    3.

   Bien entendu, cet ensemble  formé des trois demi-traverses 4, 5, 6 et du montant  7, peut être     supporté    dans la     fouille    par des moyens  quelconques, soit en disposant une-traverse générale  au travers de la fouille     .3    et en .accrochant provisoi  rement le montant     élémentaire    7 à cette traverse  générale, non     représentée,    soit en construisant     :préala-          blement    dans la     partie    centrale de la fouille 3 un ou  plusieurs pieux de     support    de la traverse générale  située au     niveau    du sol.  



  Une fois ce     premier    groupe formé des trois demi  traverses 4 à 6 et du montant 7 en place dans la       fouille    et mis sous tension,, l'opération de creusage  de la fouille 3 se poursuit jusqu'à ce qu'un espace       suffisant    soit libéré pour     permettré    le montage sous  le point 10 de cette     première        structure    élémentaire  d'un nouveau montant vertical élémentaire 7a.

   Le  raccord entre les     montants    7 et 7a est     construit    de  préférence de manière     articulée    pour permettre un  déplacement angulaire relatif entre lesdits montants  7 -et     7a    au moins dans un plan perpendiculaire aux  parois- opposées     1_    et 2 de la fouille 3. Dans le cas où  ces montants 7     et.7a    seraient constitués -par des fers         profilés    en     H,    tels que représentés à la     fig.    9, le  raccord peut être obtenu en     fixant    bout à bout par  une soudure 11 leur     âme    centrale 12.

   Bien entendu,  d'autres systèmes de raccord pourraient être appli  qués. La     fig.    10 représente un raccord articulé clas  sique entre deux montants 7 et 7a constitués chacun  par un fer profilé en H. Dans ce cas, ces deux mon  tants sont articulés l'un à l'autre par un     axe    13 tra  versant des ouvertures 14 aménagées dans la partie  centrale des profilés formant- les montants 7 et 7a.  



  On peut également utiliser comme montants 7  et 7a des montants en béton armé tels que représen  tés à la     fig.    11. Dans ce cas, le raccord de deux  montants l'un à l'autre se fait en croisant les fers  d'armature 15 en leur     point    de jonction pour permet  tre une certaine     flexion    desdits montants en ce point  de jonction. Bien entendu, ces raccords       articulés       peuvent être bloqués une fois la construction de la  structure terminée. Dans le cas de la     fig.    9, il     suffit     de compléter la soudure entre les extrémités bout à  bout des montants 7 et 7a.

   De même, dans le cas  de la     fig.        10,.1es    montants 7 et 7a peuvent être soudés       définitivement    l'un à l'autre éventuellement en incor  porantune pièce     intermédiaire    entre ceux-ci. Dans  le cas de la     fig.    11, il suffit de     remplir    de béton  l'espace 16 situé entre les montants 7 et 7a tout en  disposant une     armature    complémentaire 17 dans ce  bétonnage - formant joint de blocage.  



  La     fig.    12 montre une forme d'exécution de rac  cord entre-deux montants 7 et 7a en bois, dont les  extrémités sont coupées de .biais pour pouvoir trans  mettre un effort transversal d'un des montants sur  l'autre: Une pièce     métallique    18 est engagée dans un  perçage     axial    des montants 7, 7a pour assurer leur  disposition bout à bout.  



  Pour     revenir    à la     fig.    2, le montant 7a est donc  accroché à l'extrémité inférieure 19 du montant 7  au moyen d'un des     raccords    décrits en regard des       fig:    9 à 12. Une nouvelle demi-traverse 20 est     fixée     entre les extrémités inférieures 21 du montant 7a et  la paroi 1: Une autre demi-traverse 22 est disposée  entre la paroi opposée 2 de la fouille et un point 23  situé - à -     un,    niveau     intermédiaire    du second montant  central     élémentaire    7a.

   Cette demi-traverse 22 est  également munie d'un vérin 8 permettant d'exercer  dans le nouveau groupe formé des traverses 5, 20 et  22 et du montant     7a.    un     effort    9a compatible avec la  poussée des terres     -.et    de l'eau à ce niveau de la  fouille 3.

   Le processus de construction se poursuit  comme     indiqué    plus haut- en continuant l'opération  de creusage de la fouille 3 pour dégager un espace       suffisant    permettant la suspension au point d'articula  tion 21     -d'un    nouveau montant     élémentaire    7b à l'ex  trémité     inférieure    24 duquel une demi-traverse 25 est       fixée,    reliée à la paroi 1. Une nouvelle demi-traverse  26 est     fixée    entre la paroi 2 et un niveau intermé  diaire 27 du montant 7b.

   Un vérin 8 permet égale  ment d'exercer dans le     -groupe    formé des     demi-traver-          ses    20, 25, 26 et le montant 7b des efforts. 9b compa  tibles avec la poussée des terres et de l'eau.      La construction se poursuit au fur et à mesure  du creusage de la     fouille    3, comme indiqué ci-dessus,  jusqu'à ce qu'on atteigne le     niveau    minimum 28 de  cette fouille 3 (voir     fig.    7 et 8).

   Une fois     ce    niveau  atteint, la série des montants 7,<I>7a, 7b,</I> etc. est sup  portée soit par une fondation locale 29, représentée  à la     fig.    7, et un dernier montant 30, soit par une  fondation générale 31     (fig.    8) et le même montant  terminal 30. C'est seulement alors qu'on est arrivé  au fond de la fouille 3 et que les montants successifs  <I>7, 7a, 7b,</I> etc. ont été     appuyés    sur le fond de la  fouille - 3 que les raccords des points d'articulation  19, 21, 24, etc. peuvent être bloqués, comme indiqué  plus haut, soit par soudure, soit par bétonnage ou  autre système .de     olavage.     



  Bien entendu,     un    tel procédé n'est pas lié à une       distance    obligatoirement     régulière    entre les     différents     niveaux des demi-traverses 4, 5, 6, etc. La     fig.    4  montre un exemple de réalisation du procédé selon  lequel les traverses munies de vérins 8 ne sont pas  nécessairement disposées du même côté de la fouille  3. Comme on le voit effectivement à cette     fig.    4, la  traverse inférieure 32 est munie d'un vérin 8 agissant  entre la paroi 1 de la fouille 3 et le montant 7b  central.  



  La     fig.    5 montre qu'il est également possible de  disposer deux     demi-traverses    33 et 34 au même       niveaux    entre les parois 1 et 2.  



  La     fig.    6 montre une     construction    selon laquelle  toute la structure débute par une traverse générale  35 traversant toute la     fouille    3 entre les parois de  soutènement 1 et 2 au voisinage de son niveau supé  rieur. Cette traverse générale 35 peut constituer alors  une traverse de     suspension    à laquelle est accroché  tout le reste de     la    structure en construction, jusqu'à  ce que les montants centraux 7, 7a, etc. soient sup  portés en fin de compte par le fond 28 de la fouille 3.

    Dans     cette    forme d'exécution, deux traverses 36 et  37 munies de vérins 8 sont reliées à la paroi 1, alors  que     lês    deux premières traverses 35 et 38 sont reliées  également par l'intermédiaire de vérins 8 à la paroi 2.  Toutes ces     différentes    formes d'exécution du procédé  permettent, bien entendu,     comme        cela    a été décrit  pour la     première    représentée aux     fig.    1 à 3, un  étayage successif .de la fouille 3 au fur et à mesure  du creusage de     celle-ci    entre les parois de soutène  ment 1 et 2.  



  Les     fig.    13 et 14 montrent un exemple     pratique     d'application du procédé décrit ci-dessus à la     cons-          truction    d'une installation de parcage souterrain pour       véhicules.    A la     fig.    13, on remarque les parois de  soutènement 1 et 2, les vérins 8 et les     demi-traverses     qui sont constituées par une série de fers profilés 39       disposés    entre la paroi 1 et les montants élémentaires       centraux    40 constitués également par des fers profilés  et comportant des articulations, décrites à la     fig.    10.

    Ces montants 40 sont disposés selon deux lignes       parallèles    aux parois 1 et 2, ceci pour faciliter la dis  position des     places@de    parcage 41 en épis, en utilisant       aux        maximum    la place disponible pour le parcage.    D'autres demi-traverses 42 sont, bien entendu, dispo  sées entre les montants élémentaires 40 et la paroi  de soutènement 2. Les demi-traverses 39 et 42 repo  sent sur des poutrelles provisoires 48.

   En principe,  les demi-traverses 39 sont décalées en hauteur par  rapport aux demi-traverses 42, l'ensemble des demi  traverses 39,     .ainsi    que l'ensemble des     demi-traverses     42 étant disposés selon deux rampes 43 et 44, incli  nées en sens contraire, comme montré à la     fig.    14.  



  Dans une telle construction, les rampes 43 et 44  aboutissent à des     paliers    horizontaux 45 faisant la  jonction entre une rampe 43 et une rampe 44.  



  A la     fig.    13 sont représentés également quelques  pieux 46     utilisés    pour supporter provisoirement la  structure en cours de creusage par l'intermédiaire de  massifs en béton 57 bétonnés autour de ces pieux.  Ces pieux 46 permettent également la construction  au-dessus du sol d'une superstructure, cette construc  tion de superstructure pouvant être effectuée avant  que la structure inférieure ait été terminée et, éven  tuellement, simultanément à la     construction    de     celle-          ci.    Pour ce faire, les poteaux de la superstructure 50  sont posés sur la structure inférieure par l'intermé  diaire de socles de     support    provisoires 51.

   Ils repor  tent ainsi leurs charges sur les pieux provisoires 46  et peuvent dès lors supporter la     superstructure    à con  currence de la charge disponible sur les pieux provi  soires 46. Lorsqu'on exécute le radier 56, on y incor  pore les chapiteaux 53 et les vérins 54. On met alors  en place les poteaux 52 en sous-sol et on charge les  vérins 54 de manière à soulever la superstructure de  quelques     millimètres,    de manière à décharger les  pieux provisoires 46 du poids de la superstructure.  A ce moment, les montants 40 reportent également  leurs charges sur le     radier    56 par l'intermédiaire des  chapiteaux 49. Les pieux 46 peuvent alors être démo  lis et enlevés pour dégager l'espace utile en sous-sol.  



  Bien entendu, des organes d'étayage provisoires  peuvent     également    être     utilisés    pour faciliter la réali  sation du procédé décrit. Ainsi, aux     fig.    5 et 8, une       demi-traverse    provisoire 47 a été indiquée en poin  tillé,     cette        demi-traverse    47     facilitant    la mise en     place     du     premier    groupe de     demi-traverses    4, 5, 6 et du  premier montant 7. Cette     demi-traverse    47 est aussi       susceptible    d'être mise sous tension à l'aide d'un  vérin 8.  



  Dans toutes les formes d'exécution décrites     ci-          dessus    en regard du dessin, les traverses ou demi  traverses étaient toujours représentées horizontales.  Toutefois; il serait possible     d'appliquer    ce     procédé     également en disposant les traverses ou     demi-traver-          ses        obliquement    par rapport aux parois 1, 2 de l'en  ceinte de la     fouille    3.  



  En cas de nécessité, les traverses 35,     demi-tra-          verses    4 à 6 et montant 7 pourraient comporter des  points d'appui provisoires ou     définitifs    supplémentai  res     disposés    en position intermédiaire par rapport à  ceux représentés.  



  Le processus de répartition des     efforts    dans une       telle        structure    s'opère de la manière suivante      En se référant à la     fig.    1, lorsqu'on fait agir dans  la demi traverse 6, à l'aide du vérin 8, un effort com  patible avec la poussée des terres et de l'eau, il en       résulte    des     efforts    correspondants     aux    points A et B  de     fixation    des demi-traverses 4 et 5 de la paroi 1.

    En se référant à la     fig.    2, lorsqu'on fait agir dans la  demi traverse 22, à l'aide du vérin 8     correspondant,     un     effort    compatible avec la poussée des terres et de  l'eau,     il    en résulte en A, B, C et K des nouveaux  efforts qui s'ajoutent ou se soustraient aux précédents.  



  Le même     processus    de répartition des     efforts    se  répète pour     les    étapes ultérieures de la réalisation du  procédé (voir     fig.    3).  



  Les montants 7, 7a, etc. ont été considérés       comme    montants     porteurs    dans la description qui  précède. Toutefois, ils pourraient également ne pas  être     porteurs    dans le cas où l'ultime montant 7n ne  prendrait pas appui sur le fond 28 de la     fouille    3.

    Toutefois, il est à noter que la réalisation décrite     ci-          dessus    dans     laquelle        l'ultime    montant     7n,    respective  ment 30, prend appui sur une     fondation    29 ou 31       (voir        fig.    7 et 8) est préférée, car elle permet de sup  primer des     supports    provisoires éventuels     utilisés    pen  dant la mise en place de la     structure.     



       Il    est à noter que pour réduire les hauteurs de  soutènement en cours d'exécution de la structure,     il     est toujours possible d'ajouter des éléments d'étayage  provisoires (voir     fig.    7 et 8).  



  Les éléments d'étayage décrits     ci-dessus,        c'est-à-          dire    aussi bien les traverses, les demi-traverses que  les montants peuvent être exécutés dans tous les  matériaux présentant la résistance nécessaire, tels que  métal, béton, béton armé ou précontraint, bois, etc.  



  Les éventuels     supports    provisoires peuvent être       réalisés    par toutes     sortes    de moyens, tels que sus  pentes,     pieux    provisoires de     support,    poutres de sus  pension, etc.  



  Les     raccords    des montants élémentaires 7, 7a,  etc. peuvent être exécutés suivant toutes les techni  ques usuelles de la construction, et les exemples  représentés aux     fig.    9 à 12 ne sont donnés qu'à titre       indicatif,    sans     limitation.    La     réalisation    des raccords       articulés    ou à rotules, décrite en regard de     ces        fig.     9 à 12,

   a l'avantage de     permettre    de     supprimer    pra  tiquement     l'hyperstaticité.    Ceci donne la     possibilité    de  n'imposer dans la structure strictement que les efforts  de soutènement que l'on souhaite     appliquer.    En pra  tique,     cela    revient à appliquer un     effort    dans une  demi-traverse, telle que la demi-traverse 6, à l'aide  d'un vérin 8     (fig.    1) qui produit des réactions dans  deux niveaux     s'ils    sont décalés par rapport à la  demi-traverse 6.

   Cette constatation est valable égale  ment pour les     demi-traverses    6 et 22 de la     fig.    2, et  les demi-traverses 6, 22 et 26 de la     fig.    3. Par contre,  si deux demi-traverses sont     alignées    sur un seul  niveau,     l'effort    ne produit des réactions que dans ce  niveau     déterminé    (voir par exemple la traverse 35,       fig.    6).

   Il est facile de montrer, à     titre    d'exemple,     que-          le    processus d'exécution des schémas représentés aux       fig.    1 à 3 est fortement     simplifié,    en adaptant des    rotules en     guise    de raccord entre les montants élé  mentaires 7, 7a, 7b. En effet, en se reportant à la       fig.    1,     l'effort    produit par le vérin 8 agissant sur la  demi-traverse 6 provoque une réaction pratiquement       définitive    en A et provisoire en B.  



  En se référant à la     fig.    2, l'effort produit par le  vérin agissant sur la demi-traverse 22 provoque une  réaction complémentaire en B qui, s'ajoutant à la  précédente, donne une réaction pratiquement défini  tive en B et une réaction provisoire en C.  



  A la     fig.    3,     l'effort    produit par le vérin 8 agissant  sur la demi-traverse 26 provoque une réaction com  plémentaire en C qui, s'ajoutant à la précédente,  donne une réaction pratiquement     définitive    en C et  une réaction pratiquement     définitive    en D, puisqu'on  est au fond de la     fouille    3. On voit, par l'explication  qui précède, l'avantage qu'il y a à     utiliser    des rac  cords articulés ou à rotules entre les montants 7, 7a,  7b, ce qui permet de contrôler avec précision les  réactions tout au long de l'exécution de la     structure.     



  Dans la description qui précède, on a toujours  supposé le procédé appliqué de manière que la struc  ture soit construite à partir du niveau du sol,     c'est-à-          dire    à     partir    de l'ouverture de la     fouille,    vers le bas  de celle-ci, soit en s'enfonçant de plus en plus dans  le terrain. Il est     clair    que ce procédé     pourrait    égale  ment être appliqué     dans    une fouille entièrement creu  sée et étayée provisoirement. Il serait alors également  possible de construire la structure à partir du bas de  la fouille en     éliminant    progressivement l'étayage pro  visoire.  



       L'application    du procédé     décrit    ci-dessus à la  construction en sous-sols d'une     installation    de par  cage pour véhicules est un exemple particulièrement  intéressant de     réalisation    de ce procédé, d'autant plus  que dans ces     installations    de parcage, des rampes  sont en général utilisées pour passer d'un niveau à  l'autre, ce qui     implique    nécessairement des places de  parcage décalées en hauteur d'un côté de l'installa  tion par     rapport    au côté opposé.

   Le procédé décrit  permet précisément de résoudre avec simplicité le  problème délicat que pose la construction en     sous-          sols    de telles     structures    à niveaux décalés. Bien en  tendu, ce     procédé    pourrait également être appliqué à  des constructions présentant certains     niveaux    non  décalés,     comme    cela a été déjà indiqué plus haut,  notamment en regard des     fig.    7 et 8.



  Method for constructing a building structure in the basement, and structure obtained according to this method The present invention relates to a method for constructing a building structure in the basement, a structure having levels offset on both sides. 'another of an intermediate vertical plane between two opposite walls of an excavation. This process is charac terized by the fact that half-sleepers are placed between the opposite walls of the excavation in groups of three,

   two of these half-sleepers mounted on the same side of said intermediate vertical plane being located at different levels and connected by an elementary central pole to a half-sleeper located on the other side of said intermediate vertical plane at an intermediate level of that of the two first half-sleepers, a jack inserted in this last half-sleeper determining in this first group of three half-sleepers a force compatible with the thrust of soil and water against the walls of the excavation,

   in that a new elementary central upright is suspended at the lower articulation point of said elementary central upright with the lower half-cross member of the first group, at the lower end of which a half-cross member is fixed, a new half-cross member with interposed jack being fixed between the opposite wall of the excavation and an intermediate level of the second elementary central upright,

          these two new half-sleepers constituting with the lower sleeper of the first group a new group of three half-sleepers in which a force is exerted, using the second jack, a force compatible with the thrust of the earth and of the water, and and so on as the excavation is dug.



  The subject of the invention is also a building structure having levels offset on either side of a vertical plane intermediate between two opposite walls of an excavation, this structure being built in the basement according to the method defined above. above. This structure is characterized by the fact that it comprises groups of opposite half-sleepers mounted three by three, two half-sleepers on the same side being connected by an intermediate elementary vertical upright to an opposite half-sleeper provided with a tension cylinder,

   the following group of half-sleepers being connected to the first by a new intermediate elementary vertical upright, and so on down to the lower level of the building.



  The appended drawing represents, schematically and by way of example, several embodiments of the process defined above.



  Figs. 1, 2 and 3 show, in the form of diagrams, three successive phases of the implementation of the method according to a first embodiment.



  Figs. 4, 5, 6, 7 and 8 represent five other embodiments of the method.



  Fig. 9 shows an embodiment of a rac cord between two uprights formed by profiled irons.



  Fig. 10 shows a second embodiment of connection between profiled iron uprights.



  Fig. 11 shows a third embodiment of connection for reinforced concrete uprights. Fig. 12 shows an embodiment of the rac cord applied to wooden uprights.



  Fig. 13 is a partial plan view of a basement structure under construction.



  Fig. 14 is a section along A-A of FIG. 13. The method of constructing a building structure in the basement, shown in the appended drawing, is particularly applicable to the construction of a structure having levels offset on either side of a vertical plane intermediate between two. opposite walls 1 and 2 of an excavation 3. Such a structure with staggered levels is found in particular in the construction of parking facilities for vehicles.

   According to this method, the walls 1 and 2 are first of all constructed in the ground, for example in reinforced concrete poured directly into a trench in the ground. Once the -walls- 1 and 2 have been established, the ground is removed between them, so as to construct the excavation 3. As this excavation 3 is deepened, the walls 1 and 2 must be supported for resist the pressure of land and water.

   It is precisely in the realization of this support that lies mainly the originality - of the process. Indeed, and as shown in fig. 1, we then have in the excavation 3 which has started half-sleepers 4, 5, 6 between the opposite walls 1 and 2 of the excavation. These half-sleepers are arranged in groups of three, the two half-sleepers 4 and 5 being mounted on the same side of an intermediate vertical plane between the two walls 1 and 2.

   This intermediate vertical plane may be located midway between the walls, or at any distance from them. Half-sleepers 4 and 5 are located at different levels.



  In the case of an underground parking installation construction, the distance separating the half-sleepers 4 and 5 will preferably be equal to the height of one floor. These half-sleepers 4 and 5 are connected by a central-elementary upright 7 itself connected to the half-sleeper 6 located on the other side of said intermediate vertical plane. This half-sleeper 6 is located at an intermediate level - that of the two half-sleepers 4 and 5.

   A jack 8 is interposed in this last half-crossmember 6 in order to be able to determine in this first group of three half-sleepers 4, 5, 6 a load (represented by the arrow 9) compatible with the thrust of the earth and of the water against the walls of the excavation 3.

   Of course, this set formed of three half-cross members 4, 5, 6 and the upright 7, can be supported in the excavation by any means, either by arranging a general cross-member through the excavation .3 and by hanging. provisionally the elementary upright 7 to this general crosspiece, not shown, either by constructing: previously in the central part of the excavation 3 one or more support piles for the general crosspiece located at ground level.



  Once this first group formed of the three half-sleepers 4 to 6 and the upright 7 in place in the excavation and energized, the digging operation of the excavation 3 continues until sufficient space is freed. to allow the assembly under point 10 of this first elementary structure of a new elementary vertical upright 7a.

   The connection between the uprights 7 and 7a is preferably constructed in an articulated manner to allow a relative angular displacement between said uprights 7 -and 7a at least in a plane perpendicular to the opposite walls 1_ and 2 of the excavation 3. In the case where these amounts 7 et.7a would be constituted by -profile H-shaped irons, as shown in FIG. 9, the connection can be obtained by fixing their central core 12 end to end by a weld 11.

   Of course, other connection systems could be applied. Fig. 10 shows a conventional articulated connection between two uprights 7 and 7a each constituted by an H-shaped iron. In this case, these two uprights are articulated to one another by an axis 13 passing through openings 14 made in the central part of the sections forming the uprights 7 and 7a.



  It is also possible to use as uprights 7 and 7a reinforced concrete uprights such as those shown in FIG. 11. In this case, the connection of two uprights to one another is made by crossing the reinforcing bars 15 at their junction point to allow a certain bending of said uprights at this junction point. Of course, these articulated joints can be blocked once the construction of the structure is completed. In the case of fig. 9, it suffices to complete the weld between the butt ends of the uprights 7 and 7a.

   Likewise, in the case of FIG. 10, .1es uprights 7 and 7a can be welded definitively to one another, optionally by incor porantune intermediate piece between them. In the case of fig. 11, it suffices to fill the space 16 located between the uprights 7 and 7a with concrete while placing a complementary reinforcement 17 in this concreting - forming a locking joint.



  Fig. 12 shows an embodiment of a connection between two wooden uprights 7 and 7a, the ends of which are cut with .biais in order to be able to transfer a transverse force from one of the uprights to the other: A metal part 18 is engaged in an axial drilling of the uprights 7, 7a to ensure their end-to-end arrangement.



  To return to fig. 2, the upright 7a is therefore hooked to the lower end 19 of the upright 7 by means of one of the connectors described with reference to FIGS: 9 to 12. A new half-crosspiece 20 is fixed between the lower ends 21 of the upright 7a and the wall 1: Another half-cross member 22 is arranged between the opposite wall 2 of the excavation and a point 23 located - at - an intermediate level of the second elementary central upright 7a.

   This half-cross member 22 is also provided with a jack 8 making it possible to exercise in the new group formed by cross members 5, 20 and 22 and the upright 7a. a force 9a compatible with the thrust of land -. and water at this level of the excavation 3.

   The construction process continues as indicated above - continuing the digging operation of the excavation 3 to free up a sufficient space allowing the suspension at the point of articulation 21 - of a new elementary upright 7b at the end lower 24 of which a half-cross member 25 is fixed, connected to the wall 1. A new half-cross member 26 is fixed between the wall 2 and an intermediate level 27 of the upright 7b.

   A jack 8 also makes it possible to exert efforts in the -group formed of half-cross-pieces 20, 25, 26 and the amount 7b. 9b compatible with land and water pressure. Construction continues as excavation 3 is being dug, as indicated above, until the minimum level 28 of excavation 3 is reached (see fig. 7 and 8).

   Once this level is reached, the series of amounts 7, <I> 7a, 7b, </I> etc. is supported either by a local foundation 29, shown in FIG. 7, and a last upright 30, or by a general foundation 31 (fig. 8) and the same terminal upright 30. It is only then that we arrived at the bottom of excavation 3 and that the successive uprights <I> 7, 7a, 7b, </I> etc. have been pressed on the bottom of the excavation - 3 that the joints of the articulation points 19, 21, 24, etc. can be blocked, as indicated above, either by welding, or by concreting or other system .de washing.



  Of course, such a method is not linked to a necessarily regular distance between the different levels of the half-sleepers 4, 5, 6, etc. Fig. 4 shows an exemplary embodiment of the method according to which the sleepers provided with jacks 8 are not necessarily arranged on the same side of the excavation 3. As can be seen in fact in this FIG. 4, the lower cross member 32 is provided with a jack 8 acting between the wall 1 of the excavation 3 and the central upright 7b.



  Fig. 5 shows that it is also possible to have two half-sleepers 33 and 34 at the same level between the walls 1 and 2.



  Fig. 6 shows a construction according to which the whole structure begins with a general cross member 35 crossing the entire excavation 3 between the retaining walls 1 and 2 in the vicinity of its upper level. This general cross member 35 can then constitute a suspension cross member to which the rest of the structure under construction is attached, until the central uprights 7, 7a, etc. are ultimately supported by the bottom 28 of the excavation 3.

    In this embodiment, two sleepers 36 and 37 provided with jacks 8 are connected to the wall 1, while the two first sleepers 35 and 38 are also connected by means of jacks 8 to the wall 2. All these different embodiments of the method allow, of course, as has been described for the first shown in FIGS. 1 to 3, a successive shoring of the excavation 3 as it is dug between the supporting walls 1 and 2.



  Figs. 13 and 14 show a practical example of application of the method described above to the construction of an underground parking installation for vehicles. In fig. 13, note the retaining walls 1 and 2, the jacks 8 and the half-sleepers which are constituted by a series of profiled irons 39 arranged between the wall 1 and the central elementary uprights 40 also formed by profiled irons and comprising joints, described in fig. 10.

    These uprights 40 are arranged in two lines parallel to the walls 1 and 2, this to facilitate the arrangement of the parking spaces 41 in spikes, making maximum use of the space available for parking. Other half-sleepers 42 are, of course, arranged between the elementary uprights 40 and the retaining wall 2. The half-sleepers 39 and 42 rest on provisional beams 48.

   In principle, the half-sleepers 39 are offset in height relative to the half-sleepers 42, all of the half-sleepers 39, .as well as all of the half-sleepers 42 being arranged in two ramps 43 and 44, inclined in the opposite direction, as shown in fig. 14.



  In such a construction, the ramps 43 and 44 end in horizontal bearings 45 making the junction between a ramp 43 and a ramp 44.



  In fig. 13 are also shown some piles 46 used to temporarily support the structure being excavated by means of concrete blocks 57 concreted around these piles. These piles 46 also allow the construction above ground of a superstructure, this superstructure construction being able to be carried out before the lower structure has been completed and, possibly, simultaneously with the construction of the latter. To do this, the posts of the superstructure 50 are placed on the lower structure by means of provisional support bases 51.

   They thus transfer their loads to the provisional piles 46 and can therefore support the superstructure in competition with the load available on the provisional piles 46. When the slab 56 is executed, the capitals 53 and the jacks are incorporated therein. 54. The posts 52 are then placed in the basement and the jacks 54 are loaded so as to lift the superstructure by a few millimeters, so as to unload the provisional piles 46 of the weight of the superstructure. At this time, the uprights 40 also transfer their loads to the raft 56 via the capitals 49. The piles 46 can then be demolished and removed to free up the useful space in the basement.



  Of course, temporary shoring members can also be used to facilitate the realization of the described method. Thus, in Figs. 5 and 8, a temporary half-cross member 47 has been indicated in dotted lines, this half-cross member 47 facilitating the installation of the first group of half-cross members 4, 5, 6 and of the first upright 7. This half-cross member 47 can also be energized using a jack 8.



  In all the embodiments described above with reference to the drawing, the sleepers or half sleepers were always shown horizontal. However; it would be possible to apply this process also by placing the sleepers or half-sleepers obliquely with respect to the walls 1, 2 of the enclosure of the excavation 3.



  If necessary, the sleepers 35, half-sleepers 4 to 6 and upright 7 could include additional provisional or final support points arranged in an intermediate position with respect to those shown.



  The process of distributing the forces in such a structure operates as follows. With reference to FIG. 1, when one makes act in the half crosspiece 6, using the jack 8, a force compatible with the thrust of the earth and of the water, this results in the corresponding forces at the points A and B of fixing of the half-sleepers 4 and 5 of wall 1.

    Referring to fig. 2, when one causes to act in the half cross-member 22, using the corresponding jack 8, a force compatible with the thrust of the earth and of the water, this results in A, B, C and K new forces which are added or subtracted from the previous ones.



  The same process of distributing the forces is repeated for the subsequent stages of carrying out the process (see fig. 3).



  Uprights 7, 7a, etc. have been considered as supporting uprights in the above description. However, they could also not be load-bearing in the event that the final upright 7n does not bear on the bottom 28 of the excavation 3.

    However, it should be noted that the embodiment described above in which the final upright 7n, respectively 30, rests on a foundation 29 or 31 (see fig. 7 and 8) is preferred, because it makes it possible to remove any temporary supports used during the installation of the structure.



       It should be noted that in order to reduce the supporting heights during execution of the structure, it is always possible to add temporary shoring elements (see fig. 7 and 8).



  The shoring elements described above, that is to say as well the sleepers, the half-sleepers as the uprights can be carried out in all the materials having the necessary resistance, such as metal, concrete, reinforced concrete or prestressed, timber, etc.



  Any temporary supports can be made by all kinds of means, such as sloping ceilings, temporary support piles, suspension beams, etc.



  The connections of the elementary uprights 7, 7a, etc. can be executed according to all the usual techniques of construction, and the examples shown in fig. 9 to 12 are only indicative, without limitation. The production of articulated or ball joints, described with reference to these figs. 9 to 12,

   has the advantage of making it possible to practically eliminate hyperstaticity. This gives the possibility of imposing in the structure strictly only the support forces that one wishes to apply. In practice, this amounts to applying a force in a half cross member, such as half cross member 6, using a jack 8 (fig. 1) which produces reactions in two levels if they are offset. in relation to the half-crosspiece 6.

   This observation is also valid for the half-sleepers 6 and 22 of FIG. 2, and the half-sleepers 6, 22 and 26 of FIG. 3. On the other hand, if two half-sleepers are aligned on a single level, the force produces reactions only in this determined level (see for example the traverse 35, fig. 6).

   It is easy to show, by way of example, that the execution process of the diagrams shown in FIGS. 1 to 3 is greatly simplified, by adapting ball joints as a connection between the elementary uprights 7, 7a, 7b. Indeed, referring to FIG. 1, the force produced by the jack 8 acting on the half-crossmember 6 causes a practically definitive reaction at A and temporary at B.



  Referring to fig. 2, the force produced by the jack acting on the half-crossmember 22 causes a complementary reaction at B which, in addition to the previous one, gives a practically definite reaction at B and a temporary reaction at C.



  In fig. 3, the force produced by the jack 8 acting on the half-crossmember 26 causes an additional reaction at C which, in addition to the previous one, gives a practically definitive reaction at C and a practically definitive reaction at D, since we are at the bottom of the excavation 3. We can see, from the preceding explanation, the advantage of using articulated or ball-and-socket joints between the uprights 7, 7a, 7b, which makes it possible to control with precise reactions throughout the execution of the structure.



  In the foregoing description, it has always been assumed that the process is applied so that the structure is built from the ground level, that is to say from the opening of the excavation, towards the bottom of that. here, either by sinking more and more into the ground. It is clear that this process could also be applied in an entirely excavated excavation and provisionally supported. It would then also be possible to build the structure from the bottom of the excavation, gradually eliminating the provisional shoring.



       The application of the method described above to the construction in the basement of a cage installation for vehicles is a particularly interesting example of implementation of this method, especially since in these parking installations, ramps are generally used to move from one level to another, which necessarily involves parking spaces offset in height on one side of the installation relative to the opposite side.

   The method described makes it possible precisely to solve with simplicity the delicate problem posed by the construction in basements of such structures with staggered levels. Although stretched, this method could also be applied to constructions having certain non-offset levels, as has already been indicated above, in particular with regard to FIGS. 7 and 8.

 

Claims (1)

REVENDICATIONS I. Procédé de construction d'une structure de bâtiment en sous-sol, structure présentant des niveaux décalés de part et d'autre d'un plan vertical intermé diaire entre deux parois opposées (1, 2) d'une fouille (3), procédé caractérisé par le fait que des demi traverses (4, 5, 6) sont disposées entre les parois opposées (1, 2) par groupe de trois, deux (4, 5) de ces demi-traverses (4, 5, 6) montées du même côté dudit plan vertical intermédiairé étant situées à des niveaux différents et reliées par un montant central élémentaire (7) CLAIMS I. Construction method of a building structure in the basement, structure having levels offset on either side of a vertical intermediate plane between two opposite walls (1, 2) of an excavation (3) ), a method characterized in that half sleepers (4, 5, 6) are arranged between the opposite walls (1, 2) in groups of three, two (4, 5) of these half-sleepers (4, 5, 6) mounted on the same side of said intermediate vertical plane being situated at different levels and connected by an elementary central upright (7) à une demi-traverse (6) située de l'autre côté dudit plan vertical intermédiaire à un niveau intermédiaire de celui des deux premières demi-traverses (4, 5), un vérin (8) intercalé dans cette dernière demi-traverse (6) déterminant dans ce pre mier groupe de trois demi-traverses (4 à 6) des efforts compatibles avec la poussée des terres et de l'eau .contre les parois (1, 2) de la fouille (3), en ce qu'on suspend au point d'articulation inférieure (19) dudit montant central élémentaire (7) avec la demi traverse inférieure (5) to a half-crossmember (6) located on the other side of said intermediate vertical plane at a level intermediate that of the first two half-sleepers (4, 5), a jack (8) interposed in this last half-sleeper (6 ) determining in this first group of three half-sleepers (4 to 6) forces compatible with the thrust of soil and water. against the walls (1, 2) of the excavation (3), in that is suspended at the lower articulation point (19) of said elementary central upright (7) with the lower half cross member (5) du premier groupe (4 à 6) un nouveau montant central élémentaire (7a) à l'extré mité inférieure (21) duquel on fixe une demi-traverse (20), une nouvelle demi-traverse (22) avec vérin (8) intercalé étant fixée entre la paroi opposée (2) de la fouille (3) et un niveau intermédiaire du second mon tant central . of the first group (4 to 6) a new elementary central upright (7a) at the lower end (21) of which a half-cross member (20) is fixed, a new half-cross member (22) with ram (8) interposed being fixed between the opposite wall (2) of the excavation (3) and an intermediate level of the second central column. élémentaire 7a, ces deux nouvelles demi-traverses (20, 22) constituant avec la traverse inférieure (5) du premier groupe (4 à 6) un nouveau groupe de trois demi-traverses (5, 20, 22, dans les quelles on applique, à l'aide du second vérin (8), une charge (9a) compatible avec la poussée des terres et de l'eau, et ainsi de suite au fur et à mesure du creu sage de la fouille (3). elementary 7a, these two new half-sleepers (20, 22) constituting with the lower beam (5) of the first group (4 to 6) a new group of three half-sleepers (5, 20, 22, in which one applies , using the second jack (8), a load (9a) compatible with the thrust of soil and water, and so on as and when the excavation is dug (3). II. Structure de bâtiment présentant des niveaux décalés de part et d'autre d'un plan vertical intermé- diaire entre deux parois opposées (1, 2) d'une fouille (3) et construite en sous-sol selon le procédé de la revendication I, caractérisée en ce qu'elle comprend un premier groupe de demi-traverses opposées (4 à 6) montées trois par trois, deux demi-traverses (4, 5) d'un même côté étant reliées par un montant vertical élémentaire intermédiaire (7) à une demi-traverse opposée (6) munie d'un vérin (8) de charge, le groupe suivant de demi-traverses (20, 22) montées deux par deux étant relié au premier (4 à 6) II. Building structure having levels offset on either side of an intermediate vertical plane between two opposite walls (1, 2) of an excavation (3) and constructed in the basement according to the method of claim I , characterized in that it comprises a first group of opposite half-sleepers (4 to 6) mounted three by three, two half-sleepers (4, 5) on the same side being connected by an intermediate elementary vertical upright (7 ) to an opposite half-cross member (6) provided with a load jack (8), the following group of half-cross members (20, 22) mounted two by two being connected to the first (4 to 6) par un nouveau montant vertical élémentaire intermédiaire (7a), et ainsi de suite jusqu'au niveau inférieur (28) du bâtiment. SOUS-REVENDICATIONS 1. Procédé selon la revendication 1, caractérisé en ce qu'on relie l'un à l'autre les montants élémentaires centraux (7, 7a) par des raccords articulés (19) per mettant un déplacement angulaire desdits montants (7, 7a) l'un par rapport à l'autre au moins dans un plan perpendiculaire aux parois opposées (1, 2) de la fouille (3). 2. by a new intermediate elementary vertical upright (7a), and so on up to the lower level (28) of the building. SUB-CLAIMS 1. Method according to claim 1, characterized in that the central elementary uprights (7, 7a) are connected to each other by articulated connectors (19) allowing angular displacement of said uprights (7). , 7a) relative to each other at least in a plane perpendicular to the opposite walls (1, 2) of the excavation (3). 2. Procédé selon la revendication I et la sous- revendication 1, caractérisé en ce que ces raccords articulés (19) sont bloqués une fois la structure en tièrement construite. 3. A method according to claim I and sub-claim 1, characterized in that these articulated joints (19) are blocked once the structure has been completely constructed. 3. Procédé selon la revendication 1, appliqué à la construction simultanée au-dessus du sol d'une superstructure, caractérisé en ce qu'on place en sous- sol au moins un pieu (46) de support provisoire d'au moins une traverse disposée au travers de la fouille (3), la superstructure prenant appui sur ce pieu (46), ledit pieu (46) étant enlevé après construction com plète de la structure en sous-sol qui reprend alors la charge de la superstructure. 4. Structure selon la revendication II, caractéri sée en ce que les montants verticaux élémentaires (7, 7a) sont reliés les uns aux autres par des raccords articulés (19). 5. Method according to Claim 1, applied to the simultaneous construction above the ground of a superstructure, characterized in that at least one pile (46) of provisional support of at least one crosspiece arranged at the bottom is placed in the basement. through the excavation (3), the superstructure resting on this pile (46), said pile (46) being removed after complete construction of the structure in the basement which then takes over the load of the superstructure. 4. Structure according to claim II, charac terized in that the elementary vertical uprights (7, 7a) are connected to each other by articulated connectors (19). 5. Structure selon la revendication II et la sous- revendication 4, dans laquelle les montants (7, 7a) sont constitués par .des fers profilés en H, caractérisée en ce que ceux-ci sont fixés bout à bout .par soudure (11) de leur âme centrale (12) seulement, de manière à permettre une flexion dans le plan de l'âme (12) du profilé. Structure according to claim II and sub-claim 4, in which the uprights (7, 7a) consist of H-profile irons, characterized in that these are fixed end to end by welding (11) of their central web (12) only, so as to allow bending in the plane of the web (12) of the profile.
CH841265A 1965-06-16 1965-06-16 Method of constructing a building structure in the basement, and structure obtained according to this method CH421472A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CH841265A CH421472A (en) 1965-06-16 1965-06-16 Method of constructing a building structure in the basement, and structure obtained according to this method
BE682639D BE682639A (en) 1965-06-16 1966-06-16
FR65689A FR1483483A (en) 1965-06-16 1966-06-16 Method of constructing a building structure in the basement, and structure obtained according to this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH841265A CH421472A (en) 1965-06-16 1965-06-16 Method of constructing a building structure in the basement, and structure obtained according to this method

Publications (1)

Publication Number Publication Date
CH421472A true CH421472A (en) 1966-09-30

Family

ID=4339921

Family Applications (1)

Application Number Title Priority Date Filing Date
CH841265A CH421472A (en) 1965-06-16 1965-06-16 Method of constructing a building structure in the basement, and structure obtained according to this method

Country Status (2)

Country Link
BE (1) BE682639A (en)
CH (1) CH421472A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2688246B1 (en) * 1992-03-09 1994-05-27 Freyssinet Int & Co IMPROVEMENTS IN UNDERGROUND PARKINGS OR THE LIKE MULTIPLE STORES AND THEIR CONSTRUCTION METHODS.

Also Published As

Publication number Publication date
BE682639A (en) 1966-12-01

Similar Documents

Publication Publication Date Title
EP0102340B1 (en) Method of making reinforced concrete constructions such as subways, road tunnels and the like; prefabricated concrete elements for making such constructions
FR2801328A1 (en) METAL BRIDGE APRON AND METHOD OF CONSTRUCTING A BRIDGE COMPRISING SUCH AN APRON
FR2960570A1 (en) WALL FORMED IN A SOIL, COMPRISING A HOLLOW PREFABRICATED ELEMENT, AND METHOD OF MAKING SUCH A WALL
CH642416A5 (en) METHOD OF CONSTRUCTING UNDERGROUND WORKS WITH VERTICAL WALLS, DEVICE FOR EXECUTING THE METHOD AND UNDERGROUND WORK.
FR2465835A1 (en) METHOD FOR CONSTRUCTING A BRIDGE-SUSPENDED BRIDGE OR SUSPENSION BRIDGE
EP0317458B1 (en) Process and apparatus for laying a foundation by creating a solid mass constituted by the soil itself
EP0560660B1 (en) Multistorey underground garages and construction method thereof
EP0245155B1 (en) Process for carrying out works under railway tracks in operation
EP0197021B1 (en) Method for driving a tunnel
CH421472A (en) Method of constructing a building structure in the basement, and structure obtained according to this method
EP0242497B1 (en) Tunnel construction process
FR2686356A1 (en) Improvements to the methods and devices for underpinning foundations and to the foundations thus obtained
CH434335A (en) Method of construction of a passage under track and installation for the implementation of this method
JP3470246B2 (en) Method of reinforcing steel pedestal and reinforced pedestal
FR2824851A1 (en) PREFABRICATED BRIDGE SUPPORT
FR2648841A1 (en) Underpinning method
FR3042525A1 (en) MOBILE-HOME COMPRISING FLOTATION MEANS AND A GUIDE DEVICE IN ELEVATION
EP0004998A2 (en) Construction frame
FR2619840A1 (en) Cable-stayed bridge and construction process for such a bridge to replace a pre-existing bridge
JPH04185816A (en) Construction of beam in underground wall
FR2670815A1 (en) Method and device for sheeting walls
FR2634236A1 (en) METHOD FOR REPAIRING A FOUNDATION COMPRISING DETERIORATED PILE HEADS, ESPECIALLY WOOD PILES
FR2615220A1 (en) METHOD FOR THE SUCCESSIVE CONSTRUCTION OF SUPERIMPOSED BUILDING FLOORS
BE864136A (en) METHOD AND DEVICE FOR CONSTRUCTION IN THE SOIL OF VERTICAL WALLS FROM AN UNDERGROUND DUCT
CH150842A (en) Process for establishing public works works, in particular those comprising masonry blocks. especially dams.