CH404920A CH1015263A CH1015263A CH404920A CH 404920 A CH404920 A CH 404920A CH 1015263 A CH1015263 A CH 1015263A CH 1015263 A CH1015263 A CH 1015263A CH 404920 A CH404920 A CH 404920A
Authority
CH
Switzerland
Prior art keywords
cam
lifting
ladders
support
latch
Prior art date
Application number
CH1015263A
Other languages
German (de)
Inventor
Waelli Ernst
Original Assignee
Waelli Ernst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Waelli Ernst filed Critical Waelli Ernst
Priority to CH1015263A priority Critical patent/CH404920A/en
Publication of CH404920A publication Critical patent/CH404920A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0836Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
    • E02B17/0863Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks with rack and pawl mechanism
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0836Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
    • E02B17/0854Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks with clamping wedges, eccentric clamping devices and so on

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Description

  

  Einrichtung zum     schrittweisen    Heben von     Bauwerkteilen       Gegenstand der vorliegenden Erfindung ist eine  Einrichtung zum schrittweisen Heben von Bauwerk  teilen, die für jede Hubstelle ein Paar     Nockenleitern     mit zugeordneter Klinkenvorrichtung zum vorüber  gehenden Abstützen des     Bauwerkteils    während des  Hebevorganges besitzt. Solche Einrichtungen sind  zum Heben von am Boden der Baustelle hergestellten  Gebäudedecken, Tragbalken und dergleichen schon  mehrfach vorgeschlagen worden.

   Diese besitzen pro       Nockenleiternpaar    jeweils nur eine Klinkenvorrich  tung, was bedingt, dass die eine     Nockenleiter    beweg  lich ist und dass die Hubpresse unter dem zu heben  den     Bauwerkteil    angeordnet ist, was trotz verschiede  ner Vorteile einen relativ komplizierten Aufbau er  gibt.

   Es sind auch Einrichtungen bekannt mit fest  stehenden     Nockenleitern,    längs welchen über den       Bauwerkteilen    liegende Hubpressen hochklettern, wo  bei aber die mit den     Nockenleitem    zusammenwirken  den Elemente durch seitlich wirkende Kräfte (Fe  dern, hydraulisch usw.) mit diesen     Nockenleitern    in  bzw. ausser Eingriff gebracht werden müssen, was  nicht nur den Aufbau kompliziert, sondern auch  aus Sicherheitsgründen spezielle Massnahmen bedingt  und nur relativ kleine Lasten zu heben gestattet.

    Diese Nachteile sind bei der erfindungsgemässen Ein  richtung vermieden; sie ist dadurch gekennzeichnet,  dass an einander gegenüberliegenden Seiten einer der       Endverankerung    des gehobenen     Bauwerkteils    dienen  den Vertikalstütze je eine     Nockenleiter    lösbar be  festigt ist, während die Klinkenvorrichtung zwei  mit Abstand     übereinanderliegende,    die zugeordnete  Stütze     mit    den     Nockenleitern    umfassende     Klinken-          kästen    aufweist,

   die je     mindestens    ein Paar von     mit     den     Nockenleitern        zwangläufig    zusammenwirkenden  Klinken enthalten, wobei der eine     Klinkenkasten    mit  dem     Bauwerkteil        kuppelbar    ist, während zwei gleich  artige, beidseits der Stütze angeordnete und gleich-    sinnig pneumatisch oder hydraulisch     betätigbare    Hub  pressen je mit dem einen     Pressenteil    am unteren und  mit dem andern     Pressenteil    am oberen     Klinkenkasten     befestigt sind.  



  In der beiliegenden Zeichnung     ist        ein    Ausfüh  rungsbeispiel der erfindungsgemässen Einrichtung  dargestellt.  



  Es zeigen:       Fig.    1 in Seitenansicht und     teilweisem    Vertikal  schnitt eine Hubstelle     mit    den ihr zugeordneten  Elementen der Hebeeinrichtung in ihrer Ausgangs  lage,       Fig.    2 eine gegenüber     Fig.    1 um 90  gedrehte  Ansicht der Hubstelle nach     Fig.    1,       Fig.    3 eine     Ansicht    analog     Fig.    1 nach erst  maligem Anhebender     Pressstempel    und       Fig.    4 eine Ansicht analog     Fig.    3 nach Be  endigung des ersten     Hebeschrittes.     



  Mit 1 ist das Fundament einer Baustelle be  zeichnet, auf welchem eine zu hebende Betondecke 2  liegt. An jeder Hubstelle     (üblicherweise    vier wovon  nur eine gezeichnet ist) ist im Fundament 1 eine  Vertikalstütze 3     verankert,    die beim gezeichneten  Beispiel durch ein     I-Profil        gebildet    wird. Die Stütze  3 ragt durch einen in die Decke 2 eingegossenen  Metallkragen 4, der zwei seitlich der Stütze 3 über  die Decke 2 vorstehende Ankerlaschen 4a besitzt.  An den beiden     Stegseiten    der Stütze 3 ist je eine  als Zahnstange ausgebildete     Nockenleiter    5 lösbar  befestigt.

   Diese     Nockenleitern    brauchen sich     nicht     über die ganze     Stützenhöhe    zu erstrecken und be  stehen zweckmässig aus zwei getrennten Abschnitten,  so dass beim Fortschreiten des Hebevorganges je  weils der untere freigewordene Abschnitt oben wieder       angesetzt    werden kann. Jede Stütze 3 wird von zwei       mit    Abstand     übereinanderliegenden        Klinkenkästen    6  umfasst, in welchen zum Zusammenwirken     mit    den      beiden     Nockenleitern    5 je ein Paar Klinken 7  schwenkbar gelagert ist.

   Jede Klinke 7 ist mit einem  nach aussen ragenden Gewichtshebel 8 versehen, der  die Klinke im Sinne des Eingriffs in die zugeordnete       Nockenleiter    5 belastet. Zwei einander gegenüberlie  gende Seitenwände des oberen Klinkenkastens 6 sind  je mittels eines Hebels 9     mit    einer der Ankerlaschen  4a des Kragens 4 fest verbunden.     Anderseits    sind  die beiden Klinkenkästen 6 untereinander durch ein  Paar pneumatische oder hydraulische Hubpressen 10  miteinander verbunden, und zwar so, dass der Stem  pel der Pressen am einen und der Zylinder der  Pressen am andern Klinkenkasten befestigt ist.

   Beim  gezeichneten Beispiel sind die     Pressstempel    an der  Bodenplatte des oberen Klinkenkastens und die Zy  linder an der Deckplatte des unteren     Klinkenkastens     angeschraubt. Dadurch ist eine durch den     Pressenhub     gegebene Relativbewegung der beiden Klinkenkästen  ermöglicht.  



  Beim gezeichneten Beispiel sind die beiden Hub  pressen auf der Seite der     Nockenleitern    5 bzw. der  Klinken 7 angeordnet; es ist aber ohne weiteres  möglich, die Pressen auch um 90  versetzt anzu  ordnen. In diesem Fall würden zwar die     Klinken-          kästen    6 entsprechend breiter ausfallen, doch könn  ten dann die Pressen miteinander zum Teil in den  Klinkenkästen versenkt angeordnet sein, indem der  obere     Pressenteil    an der Deckplatte des oberen und  der untere     Pressenteil    an der Bodenplatte des unteren  Klinkenkastens 6 festgeschraubt wird. Ferner ent  hält jeder gezeichnete Klinkenkasten 6 je nur ein  Klinkenpaar.

   Es versteht sich aber, dass in jedem  Klinkenkasten auch zwei oder drei mit Abstand       untereinanderliegend    angeordnete Klinkenpaare vor  gesehen sein könnten. Die     Abstände    dieser Klinken  paare sind zweckmässig etwas kleiner oder grösser  als die Abstände der Nocken der     Nockenleitern,        iso     dass jeweils nur ein Klinkenpaar zum     Eingriff    kommt.  



  Die Arbeitsweise der beschriebenen Hebeeinrich  tung     ist    dabei die folgende: In der in den     Fig.l     und 2 gezeigten Ausgangslage liegt die zu hebende  Decke 2 auf dem Fundament 1 auf und ist über  die Hebel 9 mit dem oberen Klinkenkasten 6 ver  bunden; die     Klinken    7 des unteren Klinkenkastens 6  sind auf den     Nockenleitern    5 abgestützt. Nun wird  den Hubpressen 10 (d. h. sämtliche     Hubpressen    aller  Hubstellen) Arbeitsfluidum     zugeführt    (z. B. durch  eine gemeinsame     Druckfluidumpumpe),    so dass die       Pressstempel    und mit ihnen der obere Klinkenkasten  6 um den Stempelhub hochgedrückt werden.

   Die  Klinken 7 des oberen Klinkenkastens 6 gleiten dabei  frei über die Nocken der beiden     Nockenleitern,    bis  sie nach beendetem Hub     zwangläufig    wieder mit  den     Nockenleitern    5 in Eingriff kommen. Zufolge  der Hebelverbindung des oberen Klinkenkastens 6  mit der Decke 2 wurde letztere entsprechend dem  Stempelhub der Pressen 10 ebenfalls angehoben       (Fig.    3).

   Anschliessend werden die Hubpressen 10  wieder entlastet; da die Klinken des oberen     Klinken-          kastens    6 den letzteren an den     Nockenleitern    5 ab-    stützen, senkt sich dabei nicht der obere Klinken  kasten, sondern der untere Klinkenkasten 6 wird  zufolge seiner Verbindung mit den     Pressenzylindern     mit den letzteren in die in     Fig.    4 gezeigte Lage  gehoben. Dies stellt die Ausgangslage für den näch  sten Arbeitshub der Hubpressen 10 dar, während  welchem die Decke 2 um einen weiteren Schritt in  die in     Fig.    4 mit strichpunktierten Linien angedeutete  Lage geheben wird.

   Wenn die Decke 2 so weit ge  hoben ist, dass die unteren     Nockenleiterabschnitte     vom unteren Klinkenkasten 6 freigegeben sind, so  können diese Abschnitte von der Stütze 3 abge  nommen und anschliessend an den oberen Abschnitt  oben an diesen wieder angesetzt werden. Hat die  Decke 2 ihre gewünschte Hubhöhe erreicht, so wird  sie z. B. mittels der Ankerlaschen 4a an den Stützen 3  fixiert; Klinkenkästen und     Nockenleitern    können  dann abgenommen werden. Um dies zu erleichtern,  sind die Klinkenkästen zweckmässig mehrteilig aus  gebildet, wobei die Teilkästen seitlich an die Stützen  angesetzt bzw. von diesen abgenommen werden kön  nen.  



  Beim gezeichneten Beispiel dient die Hebeeinrich  tung zum Heben einer     einzelnen    Decke. Es lässt sich  aber ohne weiteres auch ein ganzes Deckenpaket oder  ein Tragbalken in der beschriebenen Weise heben.  



  Anstatt die durch die Pressen miteinander ver  bundenen Klinkenkästen wie gezeichnet als Zuganker  über dem zu hebenden     Bauwerkteil    anzuordnen,  könnten sie auch unter dem     Bauwerkteil    angeordnet  werden, wobei der     Bauwerkteil    auf dem oberen Klin  kenkasten     aufliegen    könnte. Wenn z.

   B. die Decke  in eine Lage bündig mir dem oberen     Stützenende     gebracht werden soll, kann die Einrichtung vorerst  in der gezeichneten Art verwendet werden, wobei  nach Erreichen einer bestimmten Hubhöhe und vor  übergehendem Fixieren der Decke direkt an den  Stützen, die Klinkenkästen abgenommen und unter  der Decke wieder montiert werden, um anschliessend  die Decke durch Druck bis auf die gewünschte     End-          höhe    zu heben.



  Device for gradual lifting of structural parts The present invention is a device for gradual lifting of structural parts, which has a pair of cam ladders with an associated latch device for each lifting point for temporarily supporting the structural part during the lifting process. Such devices have been proposed several times for lifting building ceilings, supporting beams and the like produced on the ground of the construction site.

   These have only one Klinkenvorrich device per pair of cam ladders, which means that one cam ladder is movable and that the lifting press is arranged under the structural part to be lifted, which despite various advantages has a relatively complicated structure.

   There are also devices known with fixed cam ladders, along which lifting presses located above the structural parts climb, but where the elements interacting with the cam ladders by side forces (springs, hydraulic, etc.) brought into or out of engagement with these cam ladders must be, which not only complicates the structure, but also requires special measures for safety reasons and only allows relatively small loads to be lifted.

    These disadvantages are avoided in the inventive device; It is characterized in that on opposite sides of one of the end anchors of the raised structural part, a cam ladder is releasably fastened to each vertical support, while the ratchet device has two ratchet boxes that are spaced apart and encompass the assigned support with the cam ladders,

   each of which contains at least one pair of pawls that inevitably cooperate with the cam ladders, whereby one pawl box can be coupled to the structural part, while two similar, pneumatically or hydraulically actuated lifts, arranged on both sides of the support, press each with the one press part at the lower and are attached to the other press part on the upper latch case.



  In the accompanying drawing, an exemplary embodiment of the device according to the invention is shown.



  1 shows a side view and partially vertical section of a lifting point with the elements of the lifting device assigned to it in its starting position, FIG. 2 a view of the lifting point according to FIG. 1 rotated by 90 compared to FIG. 1, FIG. 3 a view analogous to FIG. 1 after the ram has been lifted for the first time and FIG. 4 shows a view analogous to FIG. 3 after the first lifting step has been completed.



  With 1 the foundation of a construction site is be characterized on which a concrete slab 2 to be lifted lies. At each lifting point (usually four of which only one is drawn), a vertical support 3 is anchored in the foundation 1, which in the example shown is formed by an I-profile. The support 3 protrudes through a metal collar 4 which is cast into the ceiling 2 and which has two anchor straps 4a projecting over the ceiling 2 to the side of the support 3. On each of the two web sides of the support 3, a cam conductor 5 designed as a rack is detachably attached.

   These cam ladders do not need to extend over the entire height of the support and are conveniently made up of two separate sections, so that as the lifting process progresses, the lower section that has become free can be set back on top. Each support 3 is encompassed by two latch boxes 6, which are spaced one above the other and in which a pair of latches 7 is pivotably mounted in order to interact with the two cam guides 5.

   Each pawl 7 is provided with an outwardly projecting weight lever 8 which loads the pawl in the sense of engaging the associated cam conductor 5. Two opposite side walls of the upper latch case 6 are each firmly connected to one of the anchor straps 4a of the collar 4 by means of a lever 9. On the other hand, the two ratchet boxes 6 are interconnected by a pair of pneumatic or hydraulic lifting presses 10, in such a way that the stem of the presses is attached to one and the cylinder of the presses on the other ratchet box.

   In the example shown, the ram are screwed to the bottom plate of the upper latch case and the cylinder on the cover plate of the lower latch case. This enables a relative movement of the two ratchet boxes given by the press stroke.



  In the example shown, the two stroke presses are arranged on the side of the cam ladders 5 and the pawls 7; but it is easily possible to arrange the presses offset by 90. In this case, the latch boxes 6 would be correspondingly wider, but the presses could then be partially sunk into the latch boxes with the upper press part on the cover plate of the upper and the lower press part on the base plate of the lower latch box 6 is screwed tight. Furthermore, each drawn latch case 6 contains only one pair of latches.

   It goes without saying, however, that two or three pairs of pawls arranged at a distance from one another could also be seen in each pawl box. The distances between these pairs of pawls are expediently somewhat smaller or larger than the distances between the cams of the cam ladders, iso that only one pair of pawls is engaged.



  The operation of the described Hebeeinrich device is as follows: In the starting position shown in Fig.l and 2, the ceiling 2 to be lifted rests on the foundation 1 and is connected via the lever 9 to the upper latch case 6; the pawls 7 of the lower pawl box 6 are supported on the cam ladders 5. Now the lifting presses 10 (i.e. all lifting presses of all lifting points) are supplied with working fluid (e.g. by a common pressure fluid pump) so that the press rams and with them the upper latch box 6 are pushed up by the ram stroke.

   The pawls 7 of the upper pawl box 6 slide freely over the cams of the two cam guides until they inevitably come into engagement with the cam guides 5 again after the end of the stroke. As a result of the lever connection of the upper latch case 6 with the ceiling 2, the latter was also raised in accordance with the punch stroke of the presses 10 (FIG. 3).

   The lifting presses 10 are then relieved again; Since the pawls of the upper pawl box 6 support the latter on the cam ladders 5, the upper pawl box is not lowered, but the lower pawl box 6 becomes the one shown in FIG. 4 as a result of its connection to the press cylinders with the latter Upscale location. This represents the starting position for the next working stroke of the lifting presses 10, during which the ceiling 2 is raised by a further step into the position indicated in Fig. 4 with dash-dotted lines.

   When the ceiling 2 is raised so far that the lower cam conductor sections are released from the lower latch case 6, these sections can be removed from the support 3 and then attached to the upper section at the top of this again. When the ceiling 2 has reached its desired height, it is z. B. fixed by means of the anchor straps 4a on the supports 3; Latch boxes and cam ladders can then be removed. In order to facilitate this, the latch boxes are expediently formed in several parts, with the part boxes being attached to the side of the supports or removed from them.



  In the example shown, the Hebeeinrich device is used to lift a single ceiling. However, an entire ceiling package or a supporting beam can easily be lifted in the manner described.



  Instead of arranging the latch boxes connected to each other by the presses as drawn as tie rods over the structural part to be lifted, they could also be arranged under the structural part, the structural part could rest on the upper Klin kenkasten. If z.

   B. the ceiling is to be brought into a position flush with the upper end of the support, the device can be used for the time being in the type shown, after reaching a certain lifting height and before temporary fixing of the ceiling directly on the supports, the latch boxes removed and under the The ceiling can be reassembled in order to then lift the ceiling to the desired final height by applying pressure.

 

Claims (1)

PATENTANSPRUCH Einrichtung zum schrittweisen Heben von Bau werkteilen, die für jede Hubstelle ein Paar Nocken leitern mit zugeordneter Klinkenvorrichtung zum vor übergehenden Abstützen des Bauwerkteils während des Hebevorganges besitzt, dadurch gekennzeichnet, dass an einander gegenüberliegenden Seiten einer der Endverankerung des gehobenen Bauwerkteils die nenden Vertikalstütze je eine Nockenleiter lösbar befestigt ist, während die Klinkenvorrichtung zwei mit Abstand übereinanderliegende, die zugeordnete Stütze mit den Nockenleitern umfassende Klinken kästen aufweist, PATENT CLAIM Device for the gradual lifting of construction parts, which has a pair of cam ladders with an associated ratchet device for each lifting point to temporarily support the structural part during the lifting process, characterized in that on opposite sides of one of the end anchoring of the raised structural part, the nenden vertical support each one Cam ladder is releasably attached, while the latch device has two spaced one above the other, the associated support with the cam ladders comprehensive latches, die je mindestens ein Paar von mit den Nockenleitern zwangläufig zusammenwirken den Klinken enthalten, wobei der eine Klinkenkasten mit dem Bauwerkteil kuppelbar ist, während zwei gleichartige, beidseits der Stütze angeordnete und gleichsinnig pneumatisch oder hydraulisch betätig- bare Hubpressen je mit dem einen Pressenteil am unteren und mit dem andern Pressenteil am oberen Klinkenkasten befestigt sind. UNTERANSPRÜCHE 1. which each contain at least one pair of the pawls inevitably cooperate with the cam ladders, whereby the one pawl box can be coupled to the structural part, while two similar lifting presses, arranged on both sides of the support and pneumatically or hydraulically actuated in the same direction, each with one press part at the lower and are attached to the other press part on the upper latch case. SUBCLAIMS 1. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass die Nockenleitern (5) als Zahn stangen ausgebildet sind und dass die Klinkenvor- richtungen je einen mindestens ein Paar von mit Gewichtshebeln (8) versehenen Klinken (7) enthal tenden Klinkenkasten (6) aufweisen. 2. Einrichtung nach Unteranspruch 1, dadurch gekennzeichnet, dass an jeder Hubstelle ein die Stütze umfassender in dem zu hebenden Bauwerkteil ver ankerter Kragen (4) vorgesehen ist, der mit dem oberen Klinkenkasten (6) lösbar verbunden ist. 3. Device according to patent claim, characterized in that the cam conductors (5) are designed as toothed racks and that the latch devices each have at least one pair of latches (7) provided with weight levers (8) containing latch boxes (6). 2. Device according to dependent claim 1, characterized in that at each lifting point a support comprehensive in the structural part to be lifted ver anchored collar (4) is provided, which is releasably connected to the upper latch case (6). 3. Einrichtung nach Unteranspruch 2, dadurch gekennzeichnet, dass die Hubpressen (10) auf den die Klinken (7) für die Nockenleitern (5) aufweisen den Seiten der Klinkenkästen angeordnet sind. 4. Einrichtung nach Unteranspruch 2, dadurch gekennzeichnet, dass die Hubpressen (10) in klinken- freie Abschnitte der Klinkenkästen (6) versenkt ein gelassen sind. Device according to dependent claim 2, characterized in that the lifting presses (10) on which the pawls (7) for the cam ladders (5) have are arranged on the sides of the pawl boxes. 4. Device according to dependent claim 2, characterized in that the lifting presses (10) are sunk into pawl-free sections of the pawl boxes (6).
CH1015263A 1963-08-16 1963-08-16 Device for the gradual lifting of structural parts CH404920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH1015263A CH404920A (en) 1963-08-16 1963-08-16 Device for the gradual lifting of structural parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1015263A CH404920A (en) 1963-08-16 1963-08-16 Device for the gradual lifting of structural parts

Publications (1)

Publication Number Publication Date
CH404920A true CH404920A (en) 1965-12-31

Family

ID=4359931

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1015263A CH404920A (en) 1963-08-16 1963-08-16 Device for the gradual lifting of structural parts

Country Status (1)

Country Link
CH (1) CH404920A (en)

Similar Documents

Publication Publication Date Title
DE2322023C2 (en) Device for the gradual lifting of loads, especially heavy loads
DE102018117727A1 (en) LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM
WO1998013565A1 (en) Climbing shuttering system and method for successive concreting high vertical walls
DE69603503T2 (en) LIFTING DEVICE FOR ROOF CHAIRS AND EVENTULE FOR COMPONENTS RESTING ON THESE ROOF CHAIRS
DE2746216A1 (en) CLIMBING DEVICE, IN PARTICULAR IN CONNECTION WITH A CRANE
DE1147019B (en) Device for the step-by-step lifting of structural parts produced on the construction site
DE1932393A1 (en) Method for lifting a monolithic cell, which is part of a building, in particular its cover, to a certain height in order to carry out this method
DE1284076B (en) Method of erecting a building
DE2500859A1 (en) HYDRAULIC LIFTING DEVICE
DE1808989C3 (en) Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor
DE2935726A1 (en) DEVICE FOR MOLDING CONCRETE WALLS
CH404920A (en) Device for the gradual lifting of structural parts
DE1434530C (en) Device for the gradual lifting of structural parts
EP0187326A2 (en) Manipulator and method for moving parts from a base to their fitting position
DE2426539A1 (en) DEVICE FOR LIFTING AND LOWERING A HEAVY LOAD
AT372458B (en) Prefabricated ceiling element
DE1684653A1 (en) Device for lifting and then lowering room-sized structures, such as prefabricated garages
AT229556B (en) Device for lifting structural parts manufactured on the construction site
DE1182411B (en) Method and device for erecting multi-storey buildings with basements
DE2249166A1 (en) METHOD AND DEVICE FOR ERECTING MULTI-STORY BUILDINGS
DE2656430A1 (en) DEVICE FOR ACHIEVING SIGNIFICANTLY SAME STEP LENGTHS OF EACH WINCH IN A GROUP OF CLIMBING WINCHES OPERATED WITH HYDROGEN
DE483889C (en) Method for building lattice towers or similar structures
DE102017108898A1 (en) Apparatus and method for raising or lowering a support bearing
DE1434530B (en) Device for the gradual lifting of structural parts
AT344973B (en) WORK PLATFORM