DE1434530C - Device for the gradual lifting of structural parts - Google Patents
Device for the gradual lifting of structural partsInfo
- Publication number
- DE1434530C DE1434530C DE1434530C DE 1434530 C DE1434530 C DE 1434530C DE 1434530 C DE1434530 C DE 1434530C
- Authority
- DE
- Germany
- Prior art keywords
- lifting
- structural parts
- cam
- parts according
- gradual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004020 conductor Substances 0.000 claims 1
- 238000004873 anchoring Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 240000000800 Allium ursinum Species 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000036633 rest Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Description
Die Erfindung betrifft eine Einrichtung zum schrittweisen Heben von Bauwerksteilen durch baulich getrennte Hubwerke, welche jeweils paarweise an zwei voneinander abgekehrten Seiten von gegebenenfalls im endgültigen Bauwerk verbleibenden Stützen befestigt sind und je eine mit dem zu hebenden Bauwerksteil verbundene Zugstange aufweisen, welche beim schrittweisen Anheben abwechselnd an zwei übereinander angeordneten Gesperren des Hubwerks entgegen der Hubrichtung gehalten wird.The invention relates to a device for stepwise Lifting of structural parts by structurally separate hoists, which are each raised in pairs two sides facing away from each other of any supports remaining in the final structure are attached and each have a tie rod connected to the structural part to be lifted, which when lifting alternately on two locking mechanisms of the hoist is held against the stroke direction.
Bei einer bekannten Einrichtung dieser Art weisen die Zugstangen Gewinde auf, und die Hubwerke werden durch Keile und Muttern gebildet, wobei letztere laufend nachgezogen werden müssen. Das Hubwerk ist deshalb ziemlich kompliziert aufgebaut. Da nur zwei Gesperre angeordnet sind, rntiß das zu hebende Bauwerksteil nach Erreichen einer Hubhöhe, die der Länge der Zugstange entspricht, vorüber-■ gehend an den Stützen verankert werden.In a known device of this type, the tie rods have threads, and the hoists are formed by wedges and nuts, the latter having to be continuously tightened. The The hoist is therefore quite complex. Since there are only two locks, it snapped shut lifting structural part after reaching a lifting height that corresponds to the length of the tie rod, pass ■ going to be anchored to the supports.
Die Aufgabe der Erfindung besteht darin, die Hubwerke aus unkomplizierten Mitteln aufzubauen, die den auf Baustellen vorhandenen rauhen Bedingungen angepaßt sind und daher wenig störanfällig sind. Außerdem soll erreicht werden, daß auf ein zeitweiliges Abstützen des zu hebenden Bauwerksteils verzichtet werden kann. The object of the invention is to build the hoists from uncomplicated means, which are adapted to the rough conditions existing on construction sites and are therefore less prone to failure are. In addition, it should be achieved that a temporary support of the structural part to be lifted can be dispensed with.
Die Lösung dieser Aufgabe erfolgt bei einer Einrichtung der eingangs beschriebenen Art dadurch, daß die Zugstange als Nockenleiter ausgebildet ist, der drei überehianderliegende, selbsteinrastende Klinkenvorrichtungen als Gesperre zugeordnet sind. :This problem is solved in a device of the type described at the outset by that the pull rod is designed as a cam ladder, the three superimposed, self-engaging Ratchet devices are assigned as a locking mechanism. :
Durch diese Lösung wird der Vorteil erreicht, daß einfache Hubpressen verwendet werden können. Die Zugstange ist auch dann noch funktionsfähig, wenn geringfügige Verschmutzungen auftreten, was sich auf Baustellen nie ganz vermeiden läßt. Insbesondere wird jedoch durch die Ausbildung des Gesperres der Vorteil erreicht,-daß ein vorübergehendes Abstützen des zu hebenden Bauwerksteils nicht mehr notwendig ist, was zu einer Beschleunigung des gesamten Htibvorganges führt.This solution has the advantage that simple lifting presses can be used. the The drawbar is still functional even if minor soiling occurs, which is can never be completely avoided on construction sites. In particular, however, is due to the training of the locking mechanism the advantage achieved -that a temporary support of the structural part to be lifted is no longer necessary is necessary, which leads to an acceleration of the entire Htib process.
Vorteilhafte Ausgestaltungen sind Gegenstand der Unteranspriichc. . ■· .Advantageous refinements are the subject of the subclaims. . ■ ·.
Der Gegenstand der Erfindung ist an Hand eines Ausführungsbeispiels näher erläutert. Es zeigtThe subject matter of the invention is explained in more detail using an exemplary embodiment. It shows
Fig. 1 in Seitenansicht eine Hubstellc mit der Hebeeinrichtung in der Ausgangslage,Fig. 1 in side view of a Hubstellc with the Lifting device in the initial position,
F i g. 2 in kleinerer Darstellung die Hubstelle mit der Hebeeinrichtung in der Ansicht, und zwar in Richtung des Pfeiles Λ nach der Fig. I gesehen, in vier verschiedenen Arbeitsstellungen. undF i g. 2 in a smaller representation of the lifting point with the lifting device in the view, in the direction of the arrow Λ seen in FIG. I, in four different working positions. and
Fig. 3 einen Querschnitt nach der Linie III-III der Fig. 1. :'-...: -Fig. 3 shows a cross section along the line III-III of Fig. 1 .: '-...: -
Gemäß der Fig. I ist mit 1 das Fundament eine;; Gebäudes od. dgl. bezeichnet, auf welchem eine zu hebende Betondecke 2 liegt. Im Fundament 1 ist eine Vertikalstütze 3 verankert, welche sich durch einen in die Decke 2 eingegossenen Metallkragen 4 nach oben erstreckt. Die Vertikalstütze weist zwei nebencinanderliegende Längsreihen von durchgehenden Ausnehmungen 5 (s. Fig. 2) auf, in welche Stangen einsetzbar sind, an deren beiden aus der Stütze ragenden Enden Lager 6 lösbar befestigt sind. Im allgemeinen sind nur in zwei Höhenlagen Lager 6 verankert. In der Ausgangslage sind die Lager 6 in der untersten und in der zweituntersten Höhenlage verankert. Auf den unteren Lagern 6 ist beidseitig der Vertikalstütze 3 je eine erste Klinkenvorrichtung? verankert: Im Abstand über der ersten Klinkenvorrichtung 7 liegt je eine zweite Klinkenvorrichtung 8, die mittels zweier nebeneinander angeordneter Hubpressen 9 mit der ersten Klinkenvorrichtung 7 verbunden ist. Die Anordnung ist dabei so getroffen, daß die Hubzylinder an einer Deckplatte der unteren Klinkenvorrichtung 7 und die Preßstempel an einer Bodenplatte der oberen Klinkenvorrichtung 8 befestigt sind. Auf den oberen Lagern 6 ist beidseitig der Vertikalstütze 3 je eine dritte Klinkenvorrichtung 17 verankert. Durch die drei Klinkenvorrichtungen erstreckt sich beidseitig der Stütze 3 je eine Nockenleiter 10, 11 die an ihrem unteren Ende eine in die Decke 2 eingreifende Verankerung aufweist. Als Nockenleitern dienen Rohre 10, die zwei Längsreihen einander diametral gegenüberliegender Nocken aufweisen, die z. B. aus Bolzen Il bestehen können. Die Nocken wirken mit den in den Klinkenvorrichtungen schwenkbar gelagerten Rücklaiifsperrklinken zusammen. . According to FIG. I, with 1 the foundation is a ;; Building or the like. Designates on which a concrete ceiling 2 to be lifted lies. A vertical support 3 is anchored in the foundation 1 and extends upward through a metal collar 4 cast into the ceiling 2. The vertical support has two adjacent longitudinal rows of continuous recesses 5 (see FIG. 2), into which rods can be inserted, on the two ends of which protruding from the support bearings 6 are releasably attached. In general, bearings 6 are only anchored at two levels. In the starting position, the bearings 6 are anchored in the lowest and the second lowest altitude. On the lower bearings 6 on both sides of the vertical support 3 is a first ratchet device? anchored: At a distance above the first ratchet device 7 there is a second ratchet device 8, which is connected to the first ratchet device 7 by means of two jacks 9 arranged next to one another. The arrangement is such that the lifting cylinders are fastened to a cover plate of the lower ratchet device 7 and the press rams are fastened to a base plate of the upper ratchet device 8. A third ratchet device 17 is anchored on each of the upper bearings 6 on both sides of the vertical support 3. A cam ladder 10, 11 extends through the three ratchet devices on both sides of the support 3 and has an anchoring that engages in the ceiling 2 at its lower end. As a cam ladders tubes 10 are used, which have two longitudinal rows of diametrically opposed cams which, for. B. can consist of bolts II. The cams cooperate with the return pawls pivotably mounted in the pawl devices. .
Die Klinkenvorrichtungen 7, 8 und 17 weisen je zwei Sperrklinken 12,13 bzw. 15 auf, welche unter der Wirkung je einer in EingriffsrichUmg mit den Nocken wirkenden Feder 14 stehen. Im Schwenkbereich jeder Klinke ist in den Klinkenvorrichtungen je eine Bohrung 18 angeordnet, in welche ein Arretierungsstift 19 gesteckt werden kann. Die Klinken können außer Eingriff mit den Nocken gebracht und in dieser Stellung je mittels eines durch die jeweilige Bohrung 18 gesteckten Arreticrungsstiftes 19 gehalten werden. In der Ausgangslage gemäß der Fig. 1 befinden sich die Klinken 12 und 13 der Klinkenvorrichtungen 7 und 8 in der eingerasteten und die Klinken 15 der Klinkenvorrichtungen 17 in der ausgerasteten Stellung.The ratchet devices 7, 8 and 17 each have two pawls 12, 13 and 15, which are below the effect of a spring 14 acting in engagement direction with the cams. In the swivel range each pawl is arranged in the pawl devices in each case a bore 18 in which a locking pin 19 can be inserted. The pawls can be disengaged from the cams and held in this position by means of a locking pin 19 inserted through the respective bore 18 will. In the starting position according to FIG. 1, the pawls 12 and 13 of the pawl devices are located 7 and 8 in the engaged position and the pawls 15 of the pawl devices 17 in the disengaged position Position.
An Hand der Fig. 2 wird nachfolgend die Arbeitsweise der Hebeeinrichtung beschrieben.The mode of operation of the lifting device is described below with reference to FIG. 2.
Die Fig. 2a stellt die Ausgangslage gemäß der F i g. 1 dar, in welcher die über Verankerungen mit den Nockenlcitern verbundene Decke 2 auf dem Fundament I aufliegt. Der Vollständigkeit halber wurden in der Fig. 2a die dritten Künkenvorrichtungen 17 ebenfalls eingezeichnet. Während des ersten Teils des Hebevorganges werden sie jedoch nicht benutzt, und dementsprechend befinden sich ihre Sperrklinken außer Eingriff mit den Nockenleitern. Nun wird den Hubpressen (d. h. sämtlichen Hubpressen aller Hubstellen) Druckflüssigkeit zugeführt, z. B. durch eine gemeinsame Pumpe, so daß die Preßstempel und mit ihnen die oberen Klinkenvorrichtungen 8 sowie mittels der zwangsläufig unter die Nocken greifenden Klinken die Nockenleitern mit der Betondecke 2 um den Steinpelliub hochgedrückt werden. Die Klinken der untersten Klinkeiivorrichtungen 7 gleiten dabei frei über die Nocken der Nockenleitern, bis sie nach beendetem Hub zvvangläufig mit den Nockenleitern in Eingriff kommen. Anschließend werden die Hubpressen wieder ent-.FIG. 2a represents the starting position according to FIG. 1, in which the ceiling 2, which is connected to the anchoring with the Nockenlcitern rests on the foundation I. For the sake of completeness, the third tongue devices 17 have also been drawn in in FIG. 2a. However, they are not used during the first part of the lifting operation and accordingly their pawls are disengaged from the cam guides. Now the lifting presses (ie all lifting presses of all lifting points) hydraulic fluid is supplied, for. B. by a common pump, so that the ram and with them the upper ratchet devices 8 and by means of the pawls inevitably reaching under the cams, the cam ladders with the concrete ceiling 2 are pushed up around the stone shell. The pawls of the lowest pawl devices 7 slide freely over the cams of the cam ladders until they come into engagement with the cam ladders after the stroke has ended. The lifting presses are then released again.
lastet, die Klinkenvorrichtungen K senken sich, wobei die Klinken frei über die Nocken der Noekenleitern gleiten. Die Klinken der untersten an der Stütze 3 verankerten Klinkcnvorrichtungen 7 halten dabei die Nockenleitern mit dem Bauwerksteil 2 in der um den Pressenhub erhöhten Lage. Dies stellt die Ausgangslage für die nächsten Pressenhübe dar, mittels welcher die Decke schrittweise bis in die in Fig. 2b dargestellte Lage gebracht wird, in welcher sie knapploads, the latch devices K lower, wherein the pawls slide freely over the cams of the Noeken ladders. The pawls of the lowest on the support 3 Anchored Klinkcnvorrichtungen 7 hold the cam ladders with the structural part 2 in the around the Elevated press stroke. This represents the starting position for the next press strokes, by means of which the ceiling gradually up to the in Fig. 2b position shown is brought in which it is scarce
unter den an der Stütze 3 verankerten unteren Lagern liegt. Nun werden die oberen Lager 6 in der drittuntersten Höhenlage (s. F i g. 2 b) an der Stütze 3 und die Klinkenvorrichtungen 17 darauf verankert. Die Klinken dieser Klinkenvorrichtungen 17 werden in ihre in der Fig. 1 mit strichpunktierten Linien dargestellte Stellung eingerastet, so daß sie mit den Nockenleitern 10,11 in Eingriff kommen und die Betondecke 2 von den Klinken der obersten Klinkenvorrichtungen 17 in ihrer Lage gehalten wird. Darauf werden die unteren Klinkenvorrichtungen 7,8 mitsamt ihren Lagern 6 von der Stütze 3 gelöst und an dieser in der zweituntersten Höhenlage gemäß der F i g. 2 c wieder verankert. Nach Verankerung derselben werden die Sperrklinken der obersten Klinkenvorrichtungen wieder ausgerastet und in dieser Stellung mittels der Arretierungsstifte 19 festgehalten. lies under the lower bearings anchored to the support 3. Now the upper bearings 6 are in the third lowest altitude (see Fig. 2 b) anchored on the support 3 and the ratchet devices 17 on it. The pawls of these ratchet devices 17 are in their in Fig. 1 with dash-dotted lines position shown so that they come into engagement with the cam guides 10,11 and the Concrete ceiling 2 is held in place by the pawls of the uppermost pawl devices 17. The lower ratchet devices 7, 8 together with their bearings 6 are then removed from the support 3 solved and on this in the second lowest altitude according to the F i g. 2 c anchored again. After anchoring the same, the pawls of the top ratchet devices are disengaged again and in this Position held by the locking pins 19.
Damit ist auf einer ersten Höhenlage wieder die in den Fig. 2a und 1 dargestellte Ausgangslage hergestellt. Der Hebevorgang kann nun von neuem beginnen, bis die in Fig. 2d dargestellte Stellung erreicht ist, welche wieder derjenigen der Fig. 2b entspricht. Die Decke 2 läßt sich auf die beschriebene Weise emporheben, bis sie die gewünschte Höhe erreicht hat. In der Endlage wird die Decke an den Stützen 3 fixiert, worauf die Klinkenvorrichtungen, Nockenleitern und Lagerteile abgenommen werden können.The starting position shown in FIGS. 2a and 1 is thus again at a first altitude manufactured. The lifting process can now begin again until the position shown in FIG. 2d is reached, which again corresponds to that of FIG. 2b. The ceiling 2 can be on the described Lift up wise until it is the desired height. The ceiling is in the end position fixed to the supports 3, whereupon the ratchet devices, cam ladders and bearing parts are removed can be.
Beim dargestellten' Beispiel dient die Hebeeinrichtung zum Heben einer einzelnen Decke. Es läßt sich aber ohne weiteres ein Tragbalken oder ein ganzes Deckenpaket in der beschriebenen Weise emporheben. Zur Erhöhung der Sicherheit können an Stelle der dargestellten Klinkenvorrichtungen solche mit mehreren übereinander angeordneten Klinken verwendet werden. Beispielsweise könnten während des Hebevorganges die Klinken der Klinkenvorrichtungen 17 ebenfalls eingerastet sein, wodurch beim Absenken der Hubpressen die Last nicht nur von den untersten Klinkenvorrichtungen 7, sondern auch von den obersten Klinkenvorrichtungen 17 getragen wurden, was ebenso die Sicherheit erhöhen würde.In the example shown, the lifting device is used to lift a single ceiling. It leaves but without further ado, a support beam or an entire ceiling package can be raised in the manner described. To increase security, latch devices can be used in place of the illustrated latch devices can be used with several latches arranged one above the other. For example, during of the lifting process, the pawls of the ratchet devices 17 will also be engaged, whereby the The lifting presses lower the load not only from the lowermost ratchet devices 7, but also were carried by the uppermost latch devices 17, which would also increase safety.
Claims (6)
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2460697C2 (en) | Telescopic boom for a crane | |
DE69928462T2 (en) | Telescopic boom with locking device | |
DE2322023C2 (en) | Device for the gradual lifting of loads, especially heavy loads | |
DE1434530A1 (en) | Device for gradually lifting at least one structural part | |
DE2746216A1 (en) | CLIMBING DEVICE, IN PARTICULAR IN CONNECTION WITH A CRANE | |
DE3012986A1 (en) | AUXILIARY DEVICE FOR THE INSTALLATION OF HEAVY LOADS ON A PLOT | |
EP1648626B1 (en) | Rolling device | |
DE1932393C3 (en) | Method for lifting heavy flat components and device for carrying out the method | |
DE1434530C (en) | Device for the gradual lifting of structural parts | |
DE1147019B (en) | Device for the step-by-step lifting of structural parts produced on the construction site | |
DE2402054C2 (en) | Device for clamping workpieces on a clamping plate | |
DE2344266B2 (en) | GRIPPING DEVICE, IN PARTICULAR FOR CONTROL AND SHUT-OFF BARS IN A NUCLEAR REACTOR | |
DE3112702A1 (en) | LIFTING DEVICE FOR AN OFFSHORE CONSTRUCTION | |
DE2734550C3 (en) | Device for lifting and supporting a structure | |
DE1434530B (en) | Device for the gradual lifting of structural parts | |
DE4304553C2 (en) | Lifting platform, in particular motor vehicle lifting platform | |
DE1290320B (en) | Floating platform or work platform | |
CH404920A (en) | Device for the gradual lifting of structural parts | |
DE2623236A1 (en) | PROCEDURE FOR LIFTING OR LOWERING AN OBJECT USING SO-CALLED CLIMBING WINCHES | |
DE102017108898A1 (en) | Apparatus and method for raising or lowering a support bearing | |
DE7817700U1 (en) | SELF-CLIMBING TOWER CRANE | |
EP3372753B1 (en) | Method, locking device and system for pretensioning a tower structure | |
EP0265610B1 (en) | Telescoping mast with coaxially disposed mast elements | |
DE3425772C2 (en) | climbing frame | |
DE3911044C2 (en) |