CH316469A - Manufacturing process of a tube - Google Patents

Manufacturing process of a tube

Info

Publication number
CH316469A
CH316469A CH316469DA CH316469A CH 316469 A CH316469 A CH 316469A CH 316469D A CH316469D A CH 316469DA CH 316469 A CH316469 A CH 316469A
Authority
CH
Switzerland
Prior art keywords
tube
layers
strip
copper
tape
Prior art date
Application number
Other languages
French (fr)
Inventor
J Snively Andrew
Original Assignee
Bundy Tubing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bundy Tubing Co filed Critical Bundy Tubing Co
Publication of CH316469A publication Critical patent/CH316469A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/09Making tubes with welded or soldered seams of coated strip material ; Making multi-wall tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Description

  

  Procédé de     fabrication    d'un     tube       On connaît divers procédés de fabrication  d'un tube à partir d'une bande d'acier, rendu  étanche et soudé à l'aide d'un métal de liaison  tel que le cuivre ou un alliage de cuivre tel que  le bronze ou le laiton.  



  Par exemple, l'un de ces procédés consiste  à former le tube à partir d'une bande en acier  qu'on enroule et à introduire dans le tube un  fil de cuivre ou du cuivre en poudre sur un  support qui doit fondre et couler en formant un  joint rendant le tube étanche. Une     difficulté    à  laquelle donne lieu ce procédé consiste dans  l'obligation de maintenir le joint du tube en  bas, ce qu'il n'est pas possible de faire lorsqu'il  s'agit d'une fabrication en série. De plus,  l'excès de cuivre apparaît sur la surface inté  rieure du tube sous forme de nappes ou de  gouttelettes.

   De plus, dans     1e    cas du cuivre en  poudre, le     support,    lorsqu'on le chauffe, fond  et coule en laissant subsister des intervalles  entre les faces en contact, de sorte que la quan  tité de cuivre est insuffisante pour remplir ces  intervalles et qu'on n'obtient pas un joint uni  forme.  



  Un autre procédé préconisé consiste à fa  briquer des tubes à double paroi à partir de  deux bandes, dont l'une forme la couche exté  rieure. Au point de vue pratique, il n'est pas  possible de fabriquer ces tubes en série avec  la certitude que la paroi du tube est à double    épaisseur dans toute son étendue. Des varia  tions des tolérances de largeur et d'épaisseur  des bandes sont inévitables et il en résulte un  intervalle entre les bords de la couche inté  rieure ou de la couche extérieure. Même si la  quantité de cuivre est suffisante pour     remplir     cet intervalle, la résistance du tube, dans l'in  tervalle précité, ne dépasse pas     celle    d'une seule  bande d'acier, étant donné la faible résistance  du cuivre.

   En outre, si la bande intérieure est  trop étroite ou si la bande extérieure est trop  large, les deux bandes ne sont pas en contact  étroit entre elles.  



  La présente invention a pour objet un pro  cédé de fabrication d'un :tube à partir     d'une     bande d'acier, visant à remédier aux inconvé  nients signalés et caractérisé en ce qu'on fait  avancer la bande dans 1e sens longitudinal et,  au fur et à mesure de son     avancement,    on la  roule sur elle-même dans le sens de sa largeur  d'au moins     720     pour obtenir un tube à cou  ches superposées, on fait avancer sur la bande,  dans le même sens et avant     qu'elle    n'ait été  complètement enroulée sur elle-même, un ru  ban d'un métal de liaison de façon que celui-ci  soit pris, une fois la bande enroulée, entre les  couches de celle-ci en un endroit éloigné des  bords de la bande enroulée,

   on agit sur la  bande pour que le contact entre ses couches  soit tel que, en chauffant le tube pour fondre      le ruban, le métal de liaison fondu puisse cou  ler entre les couches en contact et     remplir    com  plètement l'intervalle très petit existant entre  ces couches, et l'on refroidit enfin le tube de  façon à solidifier le métal de liaison.  



  Le ruban de métal de     liaison,    par exemple  de cuivre, une fois fondu coule rapidement  hors de l'espace qu'il occupait à l'état solide et  remplit complètement par capillarité l'intervalle  entre les couches du tube. La dimension ra  diale de cet intervalle est plus petite que celle  dudit espace, ce qui     facilite    l'écoulement par  capillarité. Quel que soit le degré de serrage  appliquant les faces l'une contre l'autre, il sub  siste un certain intervalle entre     elles    et plus les  couches sont enroulées serrées l'une sur l'autre,  plus le cuivre fondu a tendance à couler facile  ment dans les intervalles étroits. On a constaté  que     1a    limite de l'action capillaire exercée par  le cuivre fondu est d'environ 0,1 mm.

   Lorsque  le cuivre coule entre les couches du tube, il ne  s'écoule pas en dehors du joint. L'écoulement  s'arrête à la surface périphérique du tube, en  réunissant ainsi complètement, avec certitude,  les faces intérieure et extérieure du tube.  



  L'invention a également pour objet le tube  obtenu par le procédé ci-dessus, caractérisé en  ce qu'il consiste en une bande en acier enroulée  dans le sens de sa largeur sur 7200 de manière  à constituer un tube à deux couches superpo  sées, la portion de bande séparant les deux cou  ches à l'endroit du joint s'étendant obliquement  et ses deux faces étant en contact avec les bords  de la bande, les faces en contact desdites cou  ches étant réunies entre elles au moyen d'un  métal de liaison.    Le dessin représente, à titre d'exemple, des  machines pour la mise en     oeuvre    du procédé  revendiqué et deux formes d'exécution du tube  revendiqué.    La     fig.    1 représente, sous forme schémati  que, une desdites machines.  



  La     fig.    2 est une coupe transversale d'un  tube à un stade de sa fabrication.    La     fig.    3 représente un four de traitement  thermique des tubes.    La     fig.    4 est une coupe     transversale          tielle    à plus grande échelle du     tube    fini.  



  La     fig.    5 représente une autre machine  pour la fabrication des tubes.  



  La     fig.    6 est une coupe suivant la     ligne     de la     fig.    5.  



  La     fig.    7 est une coupe à plus grande  échelle d'un tube fabriqué au moyen de la ma  chine des     fig.    5 et 6.  



  Dans la machine représentée à la     fig.    1,  une bande en acier 2 est déroulée d'une bobine  1 pour avancer dans le sens longitudinal, entre  plusieurs cylindres de façonnage, qui roulent  cette bande sur elle-même dans le sens de la  largeur d'environ     720,,    pour former un tube à  deux couches superposées. Un mandrin 4,  maintenu par un support 5 s'engage dans  l'ébauche de tube formée à partir de     1a    bande  à l'endroit où celle-ci est encore ouverte, et  comporte une portion de bout 6, disposée entre  les deux derniers cylindres     opposés    de façon  que ceux-ci compriment fortement l'une contre  l'autre les couches du tube.  



  Un ruban 21 de cuivre se déroule à partir  d'une bobine 20 pour être pris entre les cou  ches du tube, après être passé sur un tendeur  22. Le ruban de cuivre 21     (fig.    2) est disposé  entre la couche intérieure 10 et la couche exté  rieure 11 à un endroit éloigné des bords de la  bande enroulée, de préférence à     90o    de ces  bords.

   La pression exercée sur le tube par les  deux derniers cylindres et par     1e    mandrin est  telle que les couches du tube, à l'endroit où se  trouve le ruban de cuivre, et ce     ruban,    se dé  forment de manière qu'ils soient en contact  intime entre eux et que les couches soient, de       part    et d'autre du ruban, en contact intime  entre elles, si bien qu'aucun espace vide ne  subsiste, d'une part, entre ces couches et, d'au  tre part, entre le ruban et les     couches.    La     fig.     2 représente le tube tel qu'il se présente au  moment où il sort des cylindres de façonnage.

    La bande est enroulée sur 720e environ, de  façon à présenter une couche intérieure 10 et  une couche extérieure 11, dont les faces 12  sont en contact. La portion de bande séparant      les deux couches à l'endroit du joint s'étend       obliquement,    comme représenté en 13, et ses  deux faces 14 et 15 sont en contact avec les  bords de la bande. Les bords sont de préfé  rence biseautés de façon à pouvoir s'appliquer  étroitement contre la     portion    décalée 13. Le  ruban est en contact avec les couches qui le  serrent, de sorte que le tube, pendant son mou  vement longitudinal, entraîne le ruban à partir  de la bobine. Le tube ainsi formé et le ruban  disposé entre ses couches avancent dans le sens  longitudinal d'un mouvement continu.  



  Le tube ainsi formé peut être coupé en  tronçons relativement longs, pour pouvoir su  bir un traitement thermique. La     fig.    3 repré  sente un four 25 auquel fait suite un refroidis  seur 26 et qui comporte plusieurs tuyaux de  guidage 27 le traversant et par lesquels on peut  faire passer simultanément dans le four et dans  le refroidisseur plusieurs tronçons de tubes. De  préférence, on maintient une atmosphère non  oxydante ou réductrice dans le four, en y in  troduisant par un tuyau d'admission 28 un gaz  non oxydant ou réducteur ; on peut ensuite  faire brûler le gaz à l'extrémité d'entrée du  four.  



  On soumet le tube à une température suf  fisante pour faire fondre le ruban de cuivre sur  toute la longueur du tube;     le    cuivre fondu coule  ainsi par capillarité entre les couches du tube  en remplissant l'intervalle 30     (fig.    4) existant  entre ces couches et en laissant à peu près vide  l'espace 21a dans lequel il se trouvait à l'état  solide. Dans     certains    cas, un petit excès de  cuivre 31 reste dans ledit     espace.     



  La machine représentée aux     fig.    5 et 6 est  semblable à la machine décrite ci-dessus et ses  organes, qui sont les mêmes que ceux décrits  ci-dessus, sont désignés par les mêmes référen  ces. La machine des     fig.    5 et 6 comprend deux  cylindres 36 et 37 destinés à former une rai  nure 35     (fig.    7) dans la bande, le cylindre 36  comportant une nervure 38 provoquant le dé  placement du métal de la bande et formant  ladite rainure dont la section est pratiquement  la même que celle du ruban de cuivre.     Celui-          ci    arrive dans la rainure 35 au fur et à mesure  de la formation du tube, par exemple au    moyen d'un dispositif de guidage 39     (fig.    5).

    Cependant, le contact et le serrage par friction  entre le ruban et la bande à l'endroit de la rai  nure sont suffisants pour tirer le ruban hors  de la bobine et provoquer son mouvement con  tinu.  



  Dans la mise en     #uvre    du procédé, on peut  amener les faces de la bande en acier nu en  contact direct, en ne formant qu'un intervalle  de dimensions très faibles entre les couches  d'acier. Ce résultat est avantageux, car ainsi  qu'il a déjà     élé    dit, le cuivre fondu a tendance  à couler dans cet intervalle étroit, et le résultat  est d'autant meilleur que l'intervalle est plus  étroit. La quantité de cuivre nécessaire pour  remplir ledit intervalle n'a pas besoin d'être  réglée avec une grande précision, car si le cui  vre est en excès il reste dans la rainure 35. En  effet, le cuivre fondu coule entre les couches  par capillarité et ne peut donc pas couler hors  du joint ni à     l'intérieur,    ni à l'extérieur du  tube.  



  Les dimensions du ruban doivent être dé  terminées d'après les dimensions. du tube et  l'usage auquel il est destiné, pour que la paroi  présente, à l'endroit de l'espace qu'occupait le  cuivré à l'état -solide, approximativement la  même résistance à la traction et à la     flexion    que  le reste de la paroi. En pratique, on détermine  la largeur et l'épaisseur du ruban de façon que  la longueur périphérique dudit espace ne dé  passe pas le quart de la longueur périphérique  du tube et que la dimension radiale de cet  espace ne dépasse pas le cinquième de l'épais  seur de la paroi du tube.  



  Par les mises en     oeuvre    du procédé décri  tes, on évite de devoir appliquer sur une face  de la bande une couche de métal de liaison, ce  qui constitue une opération coûteuse. De plus,  pour ménager entre les couches du tube un       intervalle    permettant l'écoulement par capilla  rité du cuivre fondu, il n'est pas nécessaire de  serrer ces couches aussi fortement que     dans    le  cas d'une couche de métal de liaison. Par suite  de la capillarité, le cuivre remplit tout ledit  intervalle, assurant ainsi une liaison ininterrom  pue entre les couches du tube.

   On réalise en  outre une économie dans la quantité de cuivre      consommée ; .en effet,     il    suffit d'une quantité  de cuivre égale environ au tiers de celle qui est  nécessaire pour fabriquer un tube avec une  bande recouverte d'une couche de cuivre.  



  Le tube obtenu présente des surfaces inté  rieure et extérieure propres, sans bavure ni  saillie.  



  Bien entendu, on peut employer deux ou  plusieurs rubans de métal de liaison, bien qu'on  donne généralement la préférence à un seul  ruban. Cependant, si l'on désire fabriquer un  tube susceptible de résister à de grands efforts  de déformation, il peut être nécessaire de ré  duire la largeur du ruban, en particulier s'il  s'agit de tubes de grand diamètre ; dans ce cas,  on utilisera deux rubans décalés     angulairement     et ayant chacun une largeur à peu près égale  à la moitié de celle d'un ruban unique de même  épaisseur.  



  Le métal de liaison, au lieu d'être du cui  vre, pourrait être un alliage contenant du  cuivre.



  Method of manufacturing a tube Various processes are known for manufacturing a tube from a steel strip, sealed and welded using a bonding metal such as copper or a copper alloy. such as bronze or brass.



  For example, one of these methods consists of forming the tube from a steel strip which is wound up and introducing into the tube a copper wire or powdered copper on a support which must melt and flow into it. forming a seal making the tube waterproof. One difficulty to which this process gives rise consists in the obligation to keep the seal of the tube at the bottom, which is not possible in the case of mass production. In addition, excess copper appears on the inside surface of the tube in the form of sheets or droplets.

   In addition, in the case of powdered copper, the support, when heated, melts and flows leaving gaps between the contacting faces, so that the quantity of copper is insufficient to fill these gaps and that 'one does not obtain a uniform joint.



  Another recommended process consists in making double-walled tubes from two strips, one of which forms the outer layer. From a practical point of view, it is not possible to manufacture these tubes in series with the certainty that the wall of the tube is of double thickness throughout its extent. Variations in the width and thickness tolerances of the webs are inevitable and a gap results between the edges of the inner layer or the outer layer. Even if the quantity of copper is sufficient to fill this gap, the resistance of the tube, in the aforementioned interval, does not exceed that of a single steel strip, given the low resistance of copper.

   Also, if the inner band is too narrow or the outer band is too wide, the two bands are not in close contact with each other.



  The present invention relates to a process for manufacturing a: tube from a steel strip, aiming to remedy the drawbacks indicated and characterized in that the strip is advanced in the longitudinal direction and, as it advances, it is rolled on itself in the direction of its width of at least 720 to obtain a tube with superimposed layers, it is advanced on the strip, in the same direction and before qu 'it has not been completely wound up on itself, a ru ban of a bonding metal so that it is taken, once the strip has been wound up, between the layers of this one in a place far from the edges of the wound tape,

   the strip is acted upon so that the contact between its layers is such that, by heating the tube to melt the strip, the molten bond metal can flow between the layers in contact and completely fill the very small gap existing between these layers, and the tube is finally cooled so as to solidify the bond metal.



  The ribbon of bonding metal, for example copper, when molten quickly flows out of the space which it occupied in the solid state and completely fills the gap between the layers of the tube by capillary action. The radial dimension of this gap is smaller than that of said gap, which facilitates the flow by capillary action. Whatever the degree of tightening applying the faces against each other, there is a certain gap between them and the more the layers are wound tightly one on the other, the easier the molten copper tends to flow. ment in narrow intervals. It has been found that the limit of capillary action exerted by molten copper is about 0.1 mm.

   When copper flows between the layers of the tube, it does not flow outside the joint. The flow stops at the peripheral surface of the tube, thereby completely and securely joining the inner and outer faces of the tube.



  The subject of the invention is also the tube obtained by the above process, characterized in that it consists of a steel strip wound in the direction of its width over 7200 so as to constitute a tube with two superposed layers, the strip portion separating the two layers at the location of the joint extending obliquely and its two faces being in contact with the edges of the strip, the surfaces in contact of said layers being joined together by means of a metal link. The drawing shows, by way of example, machines for carrying out the claimed method and two embodiments of the claimed tube. Fig. 1 shows, in schematic form, one of said machines.



  Fig. 2 is a cross section of a tube at one stage in its manufacture. Fig. 3 shows a heat treatment furnace for tubes. Fig. 4 is an enlarged cross section of the finished tube.



  Fig. 5 shows another machine for the manufacture of tubes.



  Fig. 6 is a section taken along the line of FIG. 5.



  Fig. 7 is a section on a larger scale of a tube manufactured by means of the machine of FIGS. 5 and 6.



  In the machine shown in FIG. 1, a steel strip 2 is unwound from a reel 1 to advance in the longitudinal direction, between several shaping rolls, which roll this strip on itself in the width direction of about 720 ,, to form a tube with two superimposed layers. A mandrel 4, held by a support 5, engages in the tube blank formed from the strip where the latter is still open, and comprises an end portion 6, disposed between the last two rolls. opposites so that they strongly compress the layers of the tube against each other.



  A copper tape 21 unwinds from a coil 20 to be taken between the layers of the tube, after passing over a tensioner 22. The copper tape 21 (fig. 2) is placed between the inner layer 10 and the outer layer 11 at a location remote from the edges of the wound strip, preferably 90 ° from these edges.

   The pressure exerted on the tube by the last two cylinders and by the mandrel is such that the layers of the tube, where the copper tape is, and this tape, deform so that they are in contact. intimate between them and that the layers are, on either side of the tape, in intimate contact with each other, so that no empty space remains, on the one hand, between these layers and, on the other hand, between the tape and the layers. Fig. 2 shows the tube as it looks when it comes out of the shaping rolls.

    The strip is wound over approximately 720th, so as to present an inner layer 10 and an outer layer 11, the faces 12 of which are in contact. The strip portion separating the two layers at the location of the joint extends obliquely, as shown at 13, and its two faces 14 and 15 are in contact with the edges of the strip. The edges are preferably bevelled so that they can be pressed tightly against the offset portion 13. The tape is in contact with the layers which clamp it, so that the tube, during its longitudinal movement, drives the tape away. of the coil. The tube thus formed and the tape disposed between its layers advance in the longitudinal direction in a continuous movement.



  The tube thus formed can be cut into relatively long sections, in order to be able to undergo heat treatment. Fig. 3 shows an oven 25 which is followed by a cooler 26 and which comprises several guide pipes 27 passing therethrough and by which several sections of tubes can be passed simultaneously into the oven and into the cooler. Preferably, a non-oxidizing or reducing atmosphere is maintained in the furnace, by introducing therein through an inlet pipe 28 a non-oxidizing or reducing gas; the gas can then be burnt at the inlet end of the furnace.



  The tube is subjected to a temperature sufficient to melt the copper tape over the entire length of the tube; the molten copper thus flows by capillary action between the layers of the tube, filling the gap 30 (FIG. 4) existing between these layers and leaving the space 21a in which it was in the solid state almost empty. In some cases, a small excess of copper 31 remains in said space.



  The machine shown in fig. 5 and 6 is similar to the machine described above and its members, which are the same as those described above, are designated by the same references. The machine of fig. 5 and 6 comprises two cylinders 36 and 37 intended to form a groove 35 (fig. 7) in the strip, the cylinder 36 comprising a rib 38 causing the displacement of the metal of the strip and forming said groove, the section of which is practically the same as that of the copper tape. The latter arrives in the groove 35 as the tube is formed, for example by means of a guide device 39 (FIG. 5).

    However, the contact and friction grip between the tape and the tape at the groove is sufficient to pull the tape off the spool and cause its continuous movement.



  In carrying out the process, the faces of the bare steel strip can be brought into direct contact, forming only a very small gap between the steel layers. This result is advantageous, because as it has already been said, the molten copper tends to flow in this narrow gap, and the result is better the narrower the gap. The quantity of copper necessary to fill said gap does not need to be regulated with great precision, because if the copper is in excess it remains in the groove 35. Indeed, the molten copper flows between the layers by capillary action. and therefore cannot flow out of the seal, neither inside nor outside the tube.



  The dimensions of the tape should be determined from the dimensions. of the tube and the use for which it is intended, so that the wall presents, at the location of the space occupied by the copper in the solid state, approximately the same tensile and bending strength as the rest of the wall. In practice, the width and the thickness of the tape are determined so that the peripheral length of said space does not exceed a quarter of the peripheral length of the tube and that the radial dimension of this space does not exceed one fifth of the thickness. sor of the tube wall.



  By implementing the method described, the need to apply a bonding metal layer to one face of the strip is avoided, which constitutes an expensive operation. In addition, in order to leave an interval between the layers of the tube allowing the capillary flow of the molten copper to flow, it is not necessary to tighten these layers as strongly as in the case of a bonding metal layer. As a result of capillary action, the copper fills the entire said gap, thus ensuring an uninterrupted bond between the layers of the tube.

   There is also a saving in the quantity of copper consumed; . indeed, it suffices a quantity of copper equal to about a third of that which is necessary to manufacture a tube with a strip covered with a layer of copper.



  The tube obtained has clean interior and exterior surfaces, without burrs or protrusions.



  Of course, two or more tapes of bonding metal can be employed, although preference is generally given to a single tape. However, if it is desired to manufacture a tube capable of withstanding great deformation forces, it may be necessary to reduce the width of the strip, in particular if it is a question of tubes of large diameter; in this case, two ribbons angularly offset and each having a width approximately equal to half that of a single tape of the same thickness will be used.



  The bond metal, instead of copper, could be an alloy containing copper.

 

Claims (1)

REVENDICATIONS 1. Procédé de fabrication d'un tube à partir d'une bande d'acier, caractérisé en ce qu'on fait avancer la bande dans le sens longitudinal et, au fur et à mesure de son avancement, on la roule sur elle-même dans lie sens de sa lar geur d'au moins 720- pour obtenir un tube à couches superposées, on fait avancer sur la bande, dans le même sens et avant qu'elle n'ait été complètement enroulée sur elle-même, un ruban d'un métal de liaison de façon que celui- ci soit pris, une fois la bande enroulée, entre les couches de celle-ci en un endroit éloigné des bords de la bande enroulée, on agit sur la bande pour que le contact entre ses couches soit tel que, en chauffant le tube pour fondre le ruban, CLAIMS 1. A method of manufacturing a tube from a steel strip, characterized in that the strip is advanced in the longitudinal direction and, as it advances, it is rolled on it. - even in the direction of its width of at least 720 - to obtain a tube with superimposed layers, one advances on the strip, in the same direction and before it has been completely wound up on itself, a tape of a bonding metal so that the latter is taken, once the strip has been wound up, between the layers of the latter at a place far from the edges of the wound strip, the strip is acted on so that the contact between its layers is such that, by heating the tube to melt the tape, le métal de liaison fondu puisse cou ler entre les couches en contact et remplir com plètement l'intervalle très petit existant entre ces couches, et l'on refroidit enfin le tube de façon à solidifier le métal de liaison. II. Tube obtenu par le procédé selon la re vendication I, caractérisé en ce qu'il consiste en une bande en acier enroulée dans le sens de sa largeur sur 720 de manière à constituer un tube à deux couches superposées, la portion de bande séparant les deux couches à l'endroit du joint s'étendant obliquement et ses dieux faces étant en contact avec les bords de la bande, the molten bond metal can flow between the contacting layers and completely fill the very small gap existing between these layers, and the tube is finally cooled so as to solidify the bond metal. II. Tube obtained by the process according to claim I, characterized in that it consists of a steel strip wound in the direction of its width over 720 so as to constitute a tube with two superimposed layers, the portion of strip separating the two layers at the site of the joint extending obliquely and its gods faces being in contact with the edges of the strip, les faces en contact desdites couches étant réunies entre elles au moyen d'un métal de liaison. SOUS-REVENDICATIONS 1. Procédé selon la revendication I, carac térisé en ce qu'on utilise, comme métal de liai son, du cuivre, et en ce qu'on détermine la sec tion du ruban de cuivre et que 1.'on chauffe le tube de telle façon que le cuivre, en coulant entre lesdites couches, laisse à peu près entiè rement vide l'espace dans lequel il se trouvait à l'état solide, en ce qu'on détermine la lar geur et l'épaisseur du ruban de façon que la longueur périphérique dudit espace ne dépasse pas le quart de la longueur périphérique du tube et que la dimension radiale dudit espace ne dépasse pas le cinquième de l'épaisseur de la paroi du tube, the contacting faces of said layers being joined together by means of a bonding metal. SUB-CLAIMS 1. A method according to claim I, characterized in that copper is used as the bonding metal, and in that the section of the copper strip is determined and that is heated. the tube in such a way that the copper, by flowing between the said layers, leaves almost entirely empty the space in which it was in the solid state, in that the width and the thickness of the tape so that the peripheral length of said space does not exceed one quarter of the peripheral length of the tube and that the radial dimension of said space does not exceed one fifth of the thickness of the wall of the tube, de sorte que la paroi du tube à l'endroit dudit espace présente approximati vement la même résistance à la traction et à la flexion que le reste de la paroi. 2. Procédé selon la revendication I, carac térisé par le fait qu'on exerce sur le tube, par les deux derniers cylindres et par le mandrin, une pression telle que les couches du tube, à l'endroit où se trouve le ruban de cuivre, et ce ruban, se déforment de manière qu'ils soient en contact intime entre eux et que les couches soient, de part et d'autre du ruban, en contact intime entre elles, si bien qu'aucun espace vide ne subsiste, d'une part, entre ces couches et, d'autre part, entre le ruban et les couches. 3. so that the wall of the tube at the location of said space has approximately the same tensile and flexural strength as the rest of the wall. 2. Method according to claim I, charac terized by the fact that one exerts on the tube, by the last two cylinders and by the mandrel, a pressure such that the layers of the tube, at the location where the tape is located. copper, and this tape, are deformed so that they are in intimate contact with each other and that the layers are, on either side of the tape, in intimate contact with each other, so that no empty space remains, on the one hand, between these layers and, on the other hand, between the tape and the layers. 3. Tube selon la revendication 1I, caracté risé en ce que le métal de liaison est du cuivre. 4. Tube selon la revendication 11, caracté risé en ce que le métal de liaison est un alliage de cuivre. Tube according to claim 11, characterized in that the bond metal is copper. 4. Tube according to claim 11, character ized in that the bonding metal is a copper alloy.
CH316469D 1952-09-08 1952-09-08 Manufacturing process of a tube CH316469A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH316469T 1952-09-08

Publications (1)

Publication Number Publication Date
CH316469A true CH316469A (en) 1956-10-15

Family

ID=4496410

Family Applications (1)

Application Number Title Priority Date Filing Date
CH316469D CH316469A (en) 1952-09-08 1952-09-08 Manufacturing process of a tube

Country Status (1)

Country Link
CH (1) CH316469A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2435295A1 (en) * 1978-09-08 1980-04-04 Mecano Bundy Gmbh METHOD FOR MANUFACTURING A TUBE WITH MULTIPLE LAYERED COPPER LAYERS AND INSTALLATION FOR CARRYING OUT SAID METHOD

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2435295A1 (en) * 1978-09-08 1980-04-04 Mecano Bundy Gmbh METHOD FOR MANUFACTURING A TUBE WITH MULTIPLE LAYERED COPPER LAYERS AND INSTALLATION FOR CARRYING OUT SAID METHOD

Similar Documents

Publication Publication Date Title
FR2547766A1 (en) METHOD AND APPARATUS FOR MANUFACTURING ONDULATED TUBES
FR2512383A1 (en) MOLD PART FOR MOLDING AND PROTECTING AN ARTICLE, AND METHOD AND APPARATUS FOR MANUFACTURING THE MOLD PART
FR2588353A1 (en) CONNECTION IN PARTICULAR FOR TUBES AND PIPES
FR2542060A1 (en) ISOLATED HEAT CONDUCTIVE PIPE AND METHOD FOR MANUFACTURING THE SAME
CH316469A (en) Manufacturing process of a tube
FR2596144A1 (en) SPIRAL HEAT EXCHANGER AND METHOD FOR MANUFACTURING THE SAME
FR2502288A1 (en) PROCESS FOR REVEATING A TUBE AND TUBE OBTAINED
FR2779982A1 (en) Multi-wound stainless steel pipe
BE1004684A6 (en) Parallel speaker large diameter for bodies to receive be cool.
EP1097796B1 (en) Process for wrapping a sheath with a foam layer, and tubular complex with wrapped sheath
CH344392A (en) Process for the manufacture of a pipe
FR2787548A1 (en) COMPOSITE FLEXIBLE FOR TRANSPORTING FLUID AND MANUFACTURING METHOD THEREOF
BE513956A (en)
CH339895A (en) Method of manufacturing metal tubes
BE898176A (en) Method of manufacturing a thermally insulated conduit.
FR2629562A1 (en) METHOD AND DEVICE FOR COATING WELDED TUBES
BE560507A (en)
EP0556268B1 (en) Sheathing method and product thereby obtained
CH308329A (en) Process for manufacturing a tube and tube obtained by this process.
CH338299A (en) Method and apparatus for the continuous manufacture of a tubular part
CH363316A (en) Process for manufacturing a tubular body and tubular body obtained by this process
FR2583136A2 (en) Method of manufacture of a multilayer thermal insulation around and along a solid through part, in particular a filling neck of a tank intended to contain a cryogenic fluid, and corresponding cryogenic tank.
CH326243A (en) Process for the manufacture of tubes and apparatus for its implementation
FR2606320A1 (en) PROCESS FOR FORMING FILAMENT REINFORCED METAL PRODUCTS
BE544274A (en)