CH297767A - Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method. - Google Patents

Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method.

Info

Publication number
CH297767A
CH297767A CH297767DA CH297767A CH 297767 A CH297767 A CH 297767A CH 297767D A CH297767D A CH 297767DA CH 297767 A CH297767 A CH 297767A
Authority
CH
Switzerland
Prior art keywords
girders
clamping
section
tensioning
new
Prior art date
Application number
Other languages
German (de)
Inventor
Besemer Richard
Heilig Karl Ing Dr
Original Assignee
Besemer Richard
Heilig Karl Ing Dr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Besemer Richard, Heilig Karl Ing Dr filed Critical Besemer Richard
Publication of CH297767A publication Critical patent/CH297767A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

  

  Verfahren zum freien Vorbau von Brücken oder ähnlichen     langgestreckten    Bauwerken  in Spannbeton und Vorrichtung     zur        Durchführung        dieses    Verfahrens.    Der freie Vorbau vor Brücken oder     ähn-          liühen        langgestreekt.en    Bauwerken ist be  kannt. Es ist auch bekannt,     Brücken    in       .Spannbeton    herzustellen, und schliesslich ist  es     aneh    bereits bekanntgeworden, die     Spann-          betonherstellung    im freien Vorbau vorzuneh  men.

   Bei dem bisher bekanntgewordenen Ver  fahren der zuletzt genannten Art wurden  die einzelnen Bauwerksabschnitte nur in       l.ängsriehtung    miteinander zusammenge  spannt. Mit dem Verfahren gemäss der Er  findung wird zugleich längs und quer ge  spannt.  



  Mit demselben Spannvorgang wird nach  dem neuen Verfahren also nicht nur in Rich  tung der Brückenlängsachse, sondern zugleich  und im selben Arbeitsgang quer dazu vorge  spannt.  



  Die Erfindung betrifft ein Verfahren zum  freien Vorbau von Brücken oder ähnlichen       langgestreckten    Bauwerken in Spannbeton.  Die Vorrichtung zur Durchführung des Ver  fahrens zeichnet sich dadurch aus; dass zum  Spannen jedes Spannorgans über ein Gelenk       abgestützte    Spannpressen vorgesehen sind.  Durch die Anordnung des Gelenkes wird er  reicht, dass auch bei sehr verschieden langen  Längs- und Querteilen eines Spannorgans die  auf jeden Bereich entfallenden Dehnungs  anteile genau eingehalten werden können,  ohne dass das Spannorgan, z. B. ein Seil,    am Angriffspunkt des Spannorgans gleiten  müsste. Die im üblichen Spannverfahren mit       längsverschiebliehen    Spannorganen in Hüllen  schwierig abzuschätzende Reibung wird damit  gänzlich ausgeschaltet.  



  Die Zeichnung bezieht. sich auf zwei Aus  führungsbeispiele des erfindungsgemässen       Verfahrens          Fig.    1 stellt den Längsschnitt einer Brücke  dar, links mit einseitigem, rechts mit beid  seitigem freiem Vorbau.  



       Fig.    2 stellt einen Längsschnitt der     Brileke     in grösserem Massstab dar, mit dem benütz  ten Gerüst als     Schalungsträger.     



       Fig.    3 stellt einen Querschnitt der Brücke  dar, an der in     Fig.    2 eingetragenen Stelle.       Fig.4    stellt den Grundriss der Fahrbahn  dar.  



       Fig.    5 stellt die Einzelheit einer fertig ver  setzten Spannpresse dar.  



       Fig.    6 stellt eine weitere Ausführungsart  des     Vorbausystems    dar, analog     Fig.    2, also im  Längsschnitt.  



       Fig.    7 stellt den     zuzr        Fig.    6     gehörigen    Quer  schnitt der Brücke dar, an der in     Fig.    6 ein  getragenen Stelle.  



  Bei der in     Fig.1    dargestellten Brücke wer  den zuerst in üblicher Weise die     Widerlager    2  und Pfeiler 1 erstellt. Dann werden von festen  Gerüsten 3 aus die     Fahrbahnteile    4 nächst      den     Pfeilern    1 ausgeführt, um damit eine feste  Arbeitsbühne zu erhalten, von der aus mit  dem freien Vorbau begonnen werden kann.  Diese Bühne bildet die Ausgangsbaustelle für  den Vorbau. Der Querschnitt der Brücke be  steht aus     zwei    Hauptträgern 5 und der diese  verbindenden Fahrbahnplatte 6     (Fig.    3 und 7).  



  Beim Bau des in     Fig.    1 rechten Brücken  teils wird in folgender Weise vorgegangen:  Zuerst wird im Bereich des Pfeilers 1 der  Teil     a    erzeugt, der die Ausgangsbaustelle für  den Vorbau     bildet.    Nachher werden die beiden  Teile b, b' erzeugt., die zusammen den ersten  Bauwerksabschnitt bilden. Dabei werden in  jedem Teil b, b' nach oben offene Kanäle K  vorgesehen.

   Dann wird nach Erhärten der  Teile b, b' im Teil     a    ein aus einem Seil S be  stehendes Spannorgan mit seinem einen Ende  50 verankert und in der angeführten Reihen  folge durch die Kanäle     KI,        K2,        K3,        K.l,        K1,          K5,        K3,        K6,        K1,        K7,   <I>K3,</I>     Ks,        K1    geführt, wor  auf sein anderes Ende 60 ebenfalls in Teil     a     verankert wird.

   An den 12     Umlenkstellen        a4,     wo das Seil von der Längsrichtung der Brücke  in die Querrichtung und umgekehrt     überge-          führt    wird, werden in Aussparungen     Umlenk-          und    Spannkörper 19 eingesetzt, so, dass sie  beweglich sind. Dann wird hinter jedem Kör  per 19 eine Spannpresse 20 eingesetzt.  



  Die das Seil aufnehmenden Kanäle in  Längs- und Querrichtung zur Brücke, mit. 17  und 18 bezeichnet, bleiben dabei offen, bis  die ganze Brücke betoniert ist, und können  damit ständig kontrolliert werden. Diese  Spannpressen 20 werden in unter 45  zur       Brüekenachse    ausgesparte Kanäle in der Fahr  bahnplatte eingelegt. Sie stützen sich mittels  Gelenk am linken Ende gegen den Fahr  bahnbeton. Dann werden diese     sechzehn     Spannpressen 20 miteinander in Betrieb ge  setzt, wobei sie die Spannköpfe 19 gegen das  Spannorgan 23 nach aussen drücken. Die Ruf  lagerflächen der Spannköpfe 19 werden zur  Aufnahme des Seildruckes mit Blech gepan  zert.

   Infolge der Verschiedenheit der     Spann-          organdelinungen    in Längs- und Querrichtung  müssen die Spannpressen     iun    einen zu errech  nenden Betrag aus der     45 -Linie    gedreht wer-    den, derart, dass die     Pressenachsen    nach dem  Spannen unter 45  zur     Längsaehse    des Bau  teils geneigt sind. Ein Gleiten des Spann  organs 23 auf den Spannköpfen 19 ist deshalb  nicht erforderlich. Nach Erreichen der     End-          lage    werden die     Spannköpfe    gegen den erhär  teten Beton abgestützt mittels Klötzen 24, 25,  und     unverschieblich    festgehalten.

   Damit ist  die Spannung aufgebracht, und die Spann  pressen. 20 können entlastet, ausgebaut und  für den nächsten Bauabschnitt erneut ver  wendet werden. Damit ist. nun der aus den  Teilen     b,    b' bestehende     Bauwerksabsehnitt    zu  gleich in Längs- und     Querriehtung    der Brücke  vorgespannt. Nun wird der aus den Teilen c,  c' bestehende zweite     Bauwerksabsehnitt    mit  den zur Aufnahme des Spannorgans     S1    die  nenden Kanälen erzeugt.

   Nach Erhärten die  ses Abschnittes wird das für diesen Abschnitt  vorgesehene zweite Spannorgan     S1,    das mit  seinem Ende 61 im Teil     a    verankert. wurde, in  der     vorgeführten    Reihenfolge in die Kanäle       K3,        Kg,        K1,        Klo,        Ifsq        Klh        K19        K12x        K39        K13y          K1,        K1    1,     K3    eingeführt,

   worauf sein Ende 62  in     a    verankert wird.     Nun    werden wieder an  den     Umlenkstellen    U     mlenk-    und Spannkör  per 19 eingesetzt, und dann werden wieder  die Pressen zur Anlage gebracht usw. Ebenso       wird    der aus den Teilen     d.    d' und der aus den  Teilen e,     e'    gebildete     Bauwerksabsehnitt    er  zeugt und gespannt. Es wird also für jeden  Abschnitt ein Seil mehrmals bei den Längs  seiten des bisher erzeugten Teils und mehr  mals quer über den neuen Abschnitt geführt.  



  Der     -übersieht    wegen sind die Spann  organe alle in einer Ebene gezeichnet, die       Umlenkachsen    stehen somit alle lotrecht. Es  kann sich aber als     zweckmässig    erweisen, ein  seitig waagrechte     L:mlenkachsen    anzuwenden.  Das Verfahren bleibt dasselbe, da die Span  nung jeweils an der besser zugänglichen  Stelle aufgebracht wird.  



  Bei der Herstellung des in     Fig.1    linken  Brückenteils, wo nur nach einer Seite frei  vorgebaut wird, wird folgendermassen vor  gegangen: Es wird dabei zur Erläuterung die       Fig.4    herangezogen. Es werden im Teil     d     zwei     Umlenkstellen    bildende, aus Beton be-      stehende Zapfen V,     V1,    die strichpunktiert       eingezeiehnet    sind, angebracht.  



  Dann wird an den Teil a der hier aus  einem einzigen Teil b' bestehende Bauwerks  abschnitt erzeugt. Nach Erhärten desselben  wird ein Seil, das mit einem Ende im Teil     a,     verankert ist, in der Reihenfolge in folgende  Kanäle gelegt:     K1,    K4,     K3,    dann wird das  Seil über das Organ V gelegt, wird in K3,     K6,          K1        gelegt,    über das Organ     V1    gelegt und wie  der über     K,    nach vorn geführt, dann in K6,       K3    gelegt, über V geführt, über K3,<I>Kg,</I>     K1     wieder nach hinten geführt, worauf sein an  deres Ende in a verankert wird.

   An den Um  lenkstellen     ZT    in     b1    werden wiederum Um  lenk- und Spannkörper vorgesehen und dann  Pressen eingebaut, die das Seil spannen. Bei  der Erzeugung der Abschnitte c', d', e' wird       sinnoremäss    vorgegangen.  



  L m den freien Vorbau zu ermöglichen,  werden in den von den an den     plattenförmi-          ren    Teil anschliessenden Stegen gebildeten  Hauptträgern 5 im Teil a Nischen 26 ausge  spart, in die ein Lagerträger 27 mit lösbar,  z. B. verschiebbar, an ihm befestigten     Auf-          larrerteilen    28 eingesetzt wird, wobei die Teile  28 am Teil 27 nach dem Einsetzen arretiert  werden.

   Auf diesem Teil 27 werden als Git  terlängsträger ausgebildete     Vorbauträger    29  in der aus     Fig.    2 und 3 ersichtlichen Weise  gelagert, so dass diese     Vorbauträ.ger    29 als  Konsole zur Aufnahme der neuen     Bau-          absehnittslasten    wirken.

   Die rückwärtigen  Enden der Träger werden bei der     Erzeugung          zum    Beispiel des Abschnittes a' mittels ein  stellbaren Spindeln 30 am fertigen Teil     a        ab-          restützt,    so     da.ss    die genaue Lage des     zu    beto  nierenden Abschnittes eingestellt werden  kann.     l''berjedem        Vorbauträger    29 wird ein  oberer     I-Längsträger    31 angebracht.

   Beide       1-Träger    sind mittels Querträgern 31' zu  einem liegenden Rahmen     verbunden.    Die     Vor-          bautr5ger    29 weisen Klanen 32 auf, die über  die     I        rrterflansche    der obern Träger 31 mit  Spiel hinaufreichen. Dieses Spiel wird durch  Keile vernichtet. Auf den Obergurten der  Träger 31 wird die Schalung für die Fahr  bahn aufgesetzt, während die Schalung für    die Hauptträger 5 auf dem     Untergurt    der       Vorbautr    älter 29 abgestützt wird. Derart ist  der Abschnitt b' zur Betonierung bereit.

    Nach der Herstellung von     b'    wird die Ein  richtung wie folgt vorgeschoben: Im bereits  betonierten Deckenteil 33, Teil a, sind Löcher  34 ausgespart, durch die man mit auf die  Fahrbahnplatte abgestützten Haken 35 die  obere Flansche der Träger 31 fasst, so dass  die Träger 31 festgehalten werden. Dann wer  den die Keile bei den Klauen 32 entfernt, und  damit werden die Träger 31 und damit die  Schalung für die Fahrbahn abgesenkt zwecks  Lösung der Schalung vom neuen Bauwerks  teil. Dann werden die Träger 31 mit den La  ger bildenden Haken 35, die durch die Löcher  des letzten Bauwerksabschnittes greifen, ge  halten.

   Die Verlängerungen 28 der Lager  träger 27 werden nun eingezogen, so     da.ss    die       Vorbauträger    nun an den Trägern 31 an der  Fahrbahnunterseite hängen. Dann werden die  Träger 29 an den Trägern 31 vorgeschoben,  bis die Einschaltung eines neuen Bauabschnit  tes     e'    möglich ist.     Nun    werden die Verlänge  rungen 28 des Lagerträgers 27 in neue, in b'  befindliche Nischen 26 eingesetzt, so dass die       Vorbauträger    29 wieder auf dem Lagerträger  27 abgestützt sind. Die Haken 35 werden nun  mehr gelöst und die Träger 31 auf die gleiche  Länge vorgeschoben wie die     Vorbauträger    29.

    Nach der Einstellung nach Höhe und Rich  tung werden die     Klauen    wieder verkeilt, so  dass nach Auflegen der Verschalung der  nächste Abschnitt zum Betonieren bereit ist.  Dieses Spiel wiederholt sich, bis die Brücke  geschlossen ist. Die Teile 27, 28, 29, 31, 31'  bilden den     Konstruktionsteil.    Dieser ist so mit  27 verbunden, dass er um eine Querachse ge  schwenkt werden kann. Der     Konstruktionsteil     ist unterhalb der Oberkante des Bauwerkes  angeordnet. Andere     Absenkmöglichkeiten    er  geben sieh in den Nischen 26 oder zwischen       Vorbauträger    29 und Träger 31. Die gün  stigste Anordnung wird je nach den vorlie  genden Verhältnissen gewählt.  



  Mit dem beschriebenen Verfahren lässt sich  schnell und mit verhältnismässig billigen Mit  teln vorbauen; bei Brücken bleibt die Brük-           kendeeke    frei. Dadurch,     da.ss    die fertigbeto  nierten Teile des Bauwerkes selbst zum Hal  ten der     Vorbauträger    benützt werden, werden       regengewiehte    entbehrlich, wie sie zum Bei  spiel bei auf der Brückendecke     verfahrbaren          Vorbauwagen    notwendig sind.  



  Die Nischen können wegfallen, wenn die  Trägergestaltung für die     Vorbauträger    29 an  dere Lagerungsmöglichkeiten bietet. Eine sol  che Möglichkeit ist in     Fig.    6 und 7 dargestellt  mit. denselben Bezeichnungen wie oben. Der  Vorschub der     Vorbauträger    29 erfolgt in die  sem Fall auf Rollen 36, die auf Konsolen der  Stege 5 laufen.  



  Es kann sich als zweckmässig erweisen, an  Stelle der nach oben offenen Querkanäle     K..,          K5    usw. runde, allseitig geschlossene, rohr  artige Kanäle anzuordnen, die nach erfolgter  Spannung der Spannorgane mit     geeignetem     Mörtel satt. ausgepresst werden. Nach Fertig  stellung des ganzen Rohbauwerkes werde alle  die Spannorgane aufnehmenden Kanäle aus  betoniert, wobei ein einwandfreier Verbund  erzielt wird.  



  Die Spannorgane könnten auch durch  Drahtbündel aus parallelen Drähten, also     un-          #:        erseilten    Bündeln, gebildet sein.



  Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method. The free porch in front of bridges or similar elongated structures is well known. It is also known to produce bridges in prestressed concrete, and finally it has already become known that prestressed concrete can be produced in free pre-construction.

   In the previously known method of the last-mentioned type, the individual building sections were only clamped together in the longitudinal direction. With the method according to the invention, it is stretched lengthways and crossways at the same time.



  With the same clamping process, the new process is used not only to prestress in the direction of the longitudinal axis of the bridge, but at the same time and in the same operation across it.



  The invention relates to a method for the free pre-construction of bridges or similar elongated structures in prestressed concrete. The device for performing the process is characterized by this; that for tensioning each tensioning element supported tensioning jacks are provided. Due to the arrangement of the joint, it is enough that even with very different lengths of longitudinal and transverse parts of a tensioning member, the expansion shares allotted to each area can be precisely adhered to without the tensioning member, eg. B. a rope would have to slide at the point of application of the tensioning element. The friction, which is difficult to estimate in the usual tensioning process with longitudinally displaceable tensioning elements in covers, is thus completely eliminated.



  The drawing relates. Referring to two exemplary embodiments of the method according to the invention, FIG. 1 shows the longitudinal section of a bridge, on the left with a one-sided, on the right with both-sided free porch.



       Fig. 2 shows a longitudinal section of the Brileke on a larger scale, with the framework used as a formwork support.



       FIG. 3 shows a cross section of the bridge at the point indicated in FIG. Fig. 4 shows the floor plan of the roadway.



       Fig. 5 shows the detail of a finished ver set clamping press.



       FIG. 6 shows a further embodiment of the front-end system, analogous to FIG. 2, that is in longitudinal section.



       FIG. 7 shows the cross section of the bridge belonging to FIG. 6, at the point shown in FIG. 6.



  In the bridge shown in Figure 1 who first created the abutment 2 and pillar 1 in the usual way. Then the roadway parts 4 are carried out next to the pillars 1 from fixed scaffolding 3 in order to obtain a fixed working platform from which the free porch can be started. This stage forms the starting construction site for the porch. The cross section of the bridge be consists of two main girders 5 and the carriageway plate 6 connecting them (FIGS. 3 and 7).



  When building the bridge on the right in FIG. 1, the procedure is as follows: First, part a is produced in the area of the pier 1, which forms the initial construction site for the porch. Afterwards the two parts b, b 'are produced, which together form the first building section. In this case, channels K that are open at the top are provided in each part b, b '.

   Then after hardening of parts b, b 'in part a, a tensioning element consisting of a rope S is anchored with its one end 50 and in the order listed through the channels KI, K2, K3, Kl, K1, K5, K3, K6, K1, K7, <I> K3, </I> Ks, K1, which on its other end 60 is also anchored in part a.

   At the 12 deflection points a4, where the rope is transferred from the longitudinal direction of the bridge to the transverse direction and vice versa, deflection and tensioning bodies 19 are inserted in recesses so that they are movable. Then a jack 20 is used behind each body 19.



  The channels receiving the rope in the longitudinal and transverse direction to the bridge, with. 17 and 18, remain open until the entire bridge has been concreted, and can therefore be constantly monitored. These clamping jacks 20 are inserted into channels recessed under 45 to the bridge axis in the track plate. They are supported against the concrete of the roadway by means of a joint at the left end. Then these sixteen clamping jacks 20 are put together in operation ge, where they press the clamping heads 19 against the clamping member 23 to the outside. The call bearing surfaces of the clamping heads 19 are gepan certified to absorb the rope pressure with sheet metal.

   As a result of the difference in the tensioning organ lines in the longitudinal and transverse directions, the tensioning jacks have to be turned from the 45 line by an amount to be calculated so that the press axes are partly inclined after tensioning at 45 to the longitudinal axis of the construction. A sliding of the clamping organ 23 on the clamping heads 19 is therefore not necessary. After the end position has been reached, the clamping heads are supported against the hardened concrete by means of blocks 24, 25 and are held immovably.

   So that the tension is applied, and press the tension. 20 can be relieved, expanded and reused for the next construction phase. So is. now the section of the structure consisting of parts b, b 'is prestressed in the longitudinal and transverse directions of the bridge. Now the second building section consisting of parts c, c 'is produced with the channels for receiving the tensioning member S1.

   After this section has hardened, the second tensioning element S1 provided for this section is anchored with its end 61 in part a. was introduced into channels K3, Kg, K1, Klo, Ifsq Klh K19 K12x K39 K13y K1, K1 1, K3 in the order shown,

   whereupon its end 62 is anchored in a. Now mlenk- and Spannkör by 19 are used again at the deflection points U, and then the presses are brought back to the plant, etc. Likewise, the parts d. d 'and the building section formed from parts e, e' he testifies and tensioned. So it is for each section a rope several times on the longitudinal sides of the previously created part and several times across the new section.



  Overlooked because of the clamping organs are all drawn in one plane, the deflection axes are thus all perpendicular. However, it can prove to be useful to use one-sided horizontal L: mlenkaxes. The process remains the same, as the voltage is applied to the more accessible point.



  In the manufacture of the bridge part on the left in FIG. 1, where only one side is freely built in front, the following procedure is followed: FIG. 4 is used for explanation. In part d, two cones V, V1, which form deflection points and are made of concrete, which are drawn in with dash-dotted lines, are attached.



  Then the part a of the building section consisting of a single part b 'is generated. After it has hardened, a rope, which is anchored with one end in part a, is laid in the following channels in the order: K1, K4, K3, then the rope is laid over organ V, is laid in K3, K6, K1 , placed over the organ V1 and like the one over K, led forward, then placed in K6, K3, led over V, led back over K3, <I> Kg, </I> K1 again, whereupon his at the other end is anchored in a.

   At the deflection points ZT in b1, in turn, deflection and tensioning bodies are provided and then presses are installed that tension the rope. When generating the sections c ', d', e 'the procedure is based on the senses.



  L m to enable the free front end, niches 26 are saved in the main girders 5 formed by the webs adjoining the plate-shaped part in part a, into which a bearing bracket 27 can be detached, e.g. B. slidably mounted on it is used larrertteile 28, the parts 28 being locked on the part 27 after the insertion.

   On this part 27, front-end girders 29 designed as lattice girders are mounted in the manner shown in FIGS. 2 and 3, so that these front-end girders 29 act as a console for receiving the new structural loads.

   The rear ends of the girders are supported on the finished part a by means of adjustable spindles 30 when the section a 'is produced, for example, so that the exact position of the section to be concreted can be set. An upper I-side member 31 is attached above each front end support 29.

   Both 1-beams are connected to a horizontal frame by means of cross beams 31 '. The front-end girders 29 have clans 32 which extend up over the flange flanges of the upper girders 31 with play. This game is destroyed by wedges. The formwork for the roadway is placed on the upper chords of the girders 31, while the formwork for the main girders 5 is supported on the lower chord of the front door older 29. In this way, section b 'is ready for concreting.

    After the production of b ', the device is advanced as follows: In the already concreted ceiling part 33, part a, holes 34 are cut out through which the upper flanges of the girders 31 are gripped with the hooks 35 supported on the roadway slab, so that the girders 31 are recorded. Then who the wedges removed from the claws 32, and thus the carrier 31 and thus the formwork for the roadway are lowered for the purpose of releasing the formwork from the new structure. Then the carrier 31 with the La ger forming hooks 35 that engage through the holes of the last section of the structure, keep ge.

   The extensions 28 of the bearing supports 27 are now drawn in, so that the front end supports are now hanging on the supports 31 on the underside of the roadway. Then the carriers 29 are advanced on the carriers 31 until the inclusion of a new Bauabschnit tes e 'is possible. Now the extensions 28 of the bearing bracket 27 are inserted into new niches 26 located in b ', so that the front support 29 are supported on the bearing bracket 27 again. The hooks 35 are now loosened more and the carriers 31 are pushed forward to the same length as the front-end carriers 29.

    After the height and direction have been adjusted, the claws are wedged again so that the next section is ready for concreting after the formwork has been placed. This game repeats itself until the bridge is closed. The parts 27, 28, 29, 31, 31 'form the structural part. This is connected to 27 so that it can be pivoted about a transverse axis. The structural part is arranged below the upper edge of the structure. Other lowering options he give see in the niches 26 or between the front support 29 and support 31. The most favorable arrangement is chosen depending on the existing conditions.



  With the method described can be used quickly and with relatively cheap means; in the case of bridges, the bridge deeke remains free. Because the pre-concreted parts of the structure are used to hold the front girders themselves, rain-blown girders can be dispensed with, as is necessary, for example, with front building wagons that can be moved on the bridge ceiling.



  The niches can be omitted if the support design for the front support 29 offers other storage options. Such a possibility is shown in FIGS. 6 and 7 with. same designations as above. In this case, the front support 29 is advanced on rollers 36 that run on brackets of the webs 5.



  It can prove to be useful to arrange round, closed, pipe-like channels in place of the transverse channels K .., K5, etc., which are open at the top and which, once the tensioning elements have been tensioned, are fed with suitable mortar. be squeezed out. After completion of the entire building shell, all the ducts accommodating the tensioning elements will be concreted, with a perfect bond being achieved.



  The tensioning organs could also be formed by wire bundles of parallel wires, that is, unraveled bundles.

 

Claims (1)

PATENTANSPRÜCHE: 1. Verfahren zum freien Vorbau von Brük- ken und ähnlichen langgestreekten Bauwer ken in Spannbeton, dadurch gekennzeichnet, dass von einer Ausgangsbaustelle aus ein Bau teil dadurch erstellt wird, dass aufeinander folgend aneinander anschliessende Bauwerks abschnitte gebildet werden, ferner, dass zu gleich eine Längs- und eine Quervorspannung erzeugt wird, und zwar dadurch, dass für jeden Bauwerksabschnitt ein aus einem bieg samen Zugorgan bestehendes Spannorgan ver wendet wird, PATENT CLAIMS: 1. A method for the free pre-construction of bridges and similar elongated structures in prestressed concrete, characterized in that a structural part is created from an initial building site in that successively adjoining building sections are formed, furthermore that at the same time a longitudinal and a transverse prestress is generated, namely that a tensioning element consisting of a flexible tension element is used for each structural section, das mit dem einen Ende im Bereiche der Ausgangsbaustelle verankert wird und nach Erzeugen und Erhärten des zugehörigen Bauwerksabschnittes mehrmals den beiden Längsseiten des bisher erzeugten Bauwerksteils entlang und mehrmals quer über den neuen Bauwerksabschnitt geführt wird und dann mit dem andern Ende wieder im Bereich der Ausgangsbaustelle verankert wird, wobei es an den Umlenkstelten im neuen Bauwerksabschnitt, an denen die Umlenkung des Spannorgans von der Längs- in die Quer richtung und von letzterer wieder in die Längsrichtung erfolgt, über U mlenk- und Spannkörper geführt wird, which is anchored at one end in the area of the initial construction site and, after the associated structural section has been created and hardened, is guided several times along the two long sides of the previously created structural part and several times across the new structural section and is then anchored again at the other end in the area of the initial construction site At the deflection points in the new section of the building, where the tensioning element is deflected from the longitudinal to the transverse direction and from the latter back to the longitudinal direction, it is guided via U-joint and tensioning bodies, und wobei das Spannorgan in zunl mindesten auf einen Teil nach oben offene Kanäle verlegt wird, ferner, dass dann durch Spannmittel die U mlenk- organe nach aussen gedriiekt werden, so dass die Längs- und die Querteile des Spannorgans gleichzeitig unter Spannung gesetzt werden, und dass nach Fertigstellung des ganzen Roh bauwerkes durch Ausbetonieren der genann ten Kanäle ein einwandfreier Verbund erzielt wird. and wherein the tensioning element is laid in at least one part of the upwardly open channels, further that the U mlenk- organs are then pushed outwards by tensioning means, so that the longitudinal and transverse parts of the tensioning element are simultaneously placed under tension, and that after completion of the entire shell structure, a perfect bond is achieved by concreting the named canals. II. Vorrichtung zur Durchführung des Verfahrens gemäss dem Patentanspruch I, da durch gekennzeichnet, dass zur Spannung je des Spannorgans über ein Gelenk abgestützte Spannpressen vorgesehen sind. <B>UNTERANSPRÜCHE:</B> 1. II. Device for carrying out the method according to patent claim I, characterized in that clamping jacks supported by a joint are provided for tensioning each of the clamping members. <B> SUBClaims: </B> 1. Verfahren gemäss Patentanspruch I, da durch gekennzeichnet, dass die aus Spann köpfen bestehenden U mlenk- und Spann organe je über eine zugeordnete, gelenkig ab gestützte Spannpresse betätigt werden, wobei jede Spannpresse vor dem Spannen des be treffenden Spalnorganteils so eingestellt wird, dass nach erfolgtem Spannen die Pres- senachse um 45 zur Längsachse des Bauteils geneigt ist. 2. Verfahren nach Unteranspruch 1, da durch gekennzeichnet, dass das Spannorgan aus einem Seil besteht. 3. Method according to claim I, characterized in that the clamping heads consisting of U-joint and clamping organs are each actuated via an associated, articulated clamping jack, each clamping jack being set before clamping the relevant Spalnorg component so that after Clamping the press axis is inclined by 45 to the longitudinal axis of the component. 2. The method according to dependent claim 1, characterized in that the tensioning element consists of a rope. 3. Verfahren nach Unteranspruch 1, da durch gekennzeichnet, dass der freie Vorbau der Bauwerksabschnitte mittels eines unter halb Oberkante-Bauwerk angeordneten Kon struktionsteils erfolgt, der jeweils am vor Be ginn der Herstellung eines neuen Abschnittes fertigen. Baukörper abgestützt wird. 4. Verfahren nach Ullteransprueh 3 zur Erzeugung eines Bauteils mit plattenförmi gem Teil, von dem sieh seitlich Stege nach unten erstrecken, dadurch gekennzeichnet, dass an den Stegen ein Lagerträger für aus Längsträgern bestehende Vorbauträger des Konstruktionsteils aufgehängt wird. 5. The method according to dependent claim 1, characterized in that the free pre-construction of the building sections is carried out by means of a construction part arranged below the upper edge of the building, which each produce a new section before the start of the production. Structure is supported. 4. The method according to Ullteransprueh 3 for producing a component with plattenförmi gem part, of which see laterally webs extend downward, characterized in that a bearing bracket for the structural part consisting of longitudinal members is suspended from the structural part. 5. Verfahren nach Unteranspruch 4, da durch gekennzeichnet, dass in den Stegen Ni sehen gebildet. werden, die zur. Lagerung eines den Lagerträger bildenden Querträgers des Konstruktionsteils während des Erzeugens eines neuen Bauwerksabschnittes dienen, wo bei der Querträger an beiden Enden lösbar mit ihm verbundene Verlängerungen besitzt. 6. Method according to dependent claim 4, characterized in that Ni is formed in the webs. be used for. Storage of a cross member forming the bearing support of the structural part during the creation of a new structural section are used where the cross member has extensions detachably connected to it at both ends. 6th Verfahren nach Unteranspruch 5, da durch gekennzeichnet, dass die Vorbauträger in ihrem Mittelteil auf den Querträger abge stützt erden -und dass sie während der Er- zeugun g- eines neuen Bauwerksabschnittes auf den an denselben anschliessenden, fertig gestellten Baukörper an ihren rückwärtigen Teilen abgestützt werden. 7. Verfahren nach Unteranspruch 6, da durch gekennzeichnet, da.ss der genannte Kon struktionsteil so gelagert wird, dass er um eine Querachse verschwenkt werden kann. Method according to dependent claim 5, characterized in that the front girders are grounded in their middle part on the cross girder - and that they are supported at their rear parts during the creation of a new building section on the finished structure adjoining the same . 7. The method according to dependent claim 6, characterized in that the said construction part is mounted so that it can be pivoted about a transverse axis. $. Verfahren nach Unteranspruch 7, da durch gekennzeichnet, dass die Schalung für den plattenförmigen Teil auf I-Längsträgern angeordnet wird und dass letztere mit der Schalung zwecks Lösung der Schalung vom neu erstellten Bauwerksabschnitt abgesenkt werden. 9. $. Method according to dependent claim 7, characterized in that the formwork for the plate-shaped part is arranged on I-side members and that the latter are lowered with the formwork for the purpose of releasing the formwork from the newly created structural section. 9. Verfahren nach Unteranspruch 8, da durch gekennzeichnet, dass die 1-Längsträger über den Vorbauträgern angeordnet werden, wobei beim Verschieben der Vorbauträger die letzteren von an den untern Flanschen der I-Längsträger angreifenden Klauen derart getragen werden, dass sich Spiel zwischen I-Längs- und Vorbauträgern ergibt, und wobei die I-Längsträger von Lagern, die durch Öff nungen des plattenartigen Teils hindurchge führt sind, gehalten werden, ferner, Method according to dependent claim 8, characterized in that the 1-side members are arranged over the front end girders, the latter being carried by claws engaging the lower flanges of the I-side girders in such a way that there is play between I-length girders when the front end girders are moved. and front-end girders, and wherein the I-side members are held by bearings that are guided through openings in the plate-like part, furthermore, dass nach dem Verschieben der Vorbauträger die letz teren mit dem Querträger in neue Nischen abgestützt werden und darauf Keile in das genannte Spiel eingetrieben werden, damit die I-Längsträger auf die Vorbauträger abge stützt werden können. 10. that after moving the front beam, the latter are supported directly with the cross member in new niches and then wedges are driven into the said game so that the I-side members can be supported abge on the front beam. 10. Verfahren nach Unteranspruch 9, da dureh gekennzeichnet, dass nach dem Erhär ten eines neuen Bauwerksabschnittes die Schalung für den plattenförmigen Teil mit den 1-Längsträgern durch Herausschlagen der Keile abgesenkt und die I-Längsträger an den genannten Lagern abgestützt werden, worauf die Vorbauträger mittels der Klauen an den 1-Längsträgern aufgehängt, um die Länge eines neuen Bauwerksabschnittes vorgescho ben werden und nachher mittels des Querträ gers in neuen Nischen des Baukörpers abge stützt werden, worauf die von den genannten Lagern gelösten Längsträger ebenfalls vorge schoben werden. 11. The method according to dependent claim 9, characterized in that after the hardening of a new structural section, the formwork for the plate-shaped part with the 1-side girders is lowered by knocking out the wedges and the I-side girders are supported on the bearings mentioned, whereupon the front girders by means of the Claws suspended from the 1-side members to be advanced by the length of a new building section and then supported by means of the cross member in new niches of the structure, whereupon the side members released from said bearings are also pushed forward. 11. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass als Spannorgane Drahtbündel aus parallelen Drähten, also un- v erseilte Organe, verwendet werden. 12. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass an den Stegen Konsolen vorgesehen werden, auf welchen die Längsträger als Wagen auf Rollen vorgescho ben werden können. A method according to patent claim I, characterized in that wire bundles made of parallel wires, that is to say un-stranded organs, are used as tensioning organs. 12. The method according to claim I, characterized in that consoles are provided on the webs on which the longitudinal beams can be vorbo ben as a carriage on rollers.
CH297767D 1952-12-18 1953-11-14 Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method. CH297767A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE297767X 1952-12-18

Publications (1)

Publication Number Publication Date
CH297767A true CH297767A (en) 1954-04-15

Family

ID=6090766

Family Applications (1)

Application Number Title Priority Date Filing Date
CH297767D CH297767A (en) 1952-12-18 1953-11-14 Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method.

Country Status (1)

Country Link
CH (1) CH297767A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1134407B (en) * 1956-03-02 1962-08-09 Polensky & Zoellner Method for the section-by-section free pre-construction of prestressed concrete structures, in particular bridges
DE1152124B (en) * 1957-12-06 1963-08-01 Holzmann Philipp Ag Process for the cantilevered cantilever construction of prestressed concrete bridges in sections
DE1214715B (en) * 1961-04-28 1966-04-21 Holzmann Philipp Ag Front structure for the cantilevered cantilever construction of reinforced concrete bridges or similar reinforced concrete structures

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1134407B (en) * 1956-03-02 1962-08-09 Polensky & Zoellner Method for the section-by-section free pre-construction of prestressed concrete structures, in particular bridges
DE1152124B (en) * 1957-12-06 1963-08-01 Holzmann Philipp Ag Process for the cantilevered cantilever construction of prestressed concrete bridges in sections
DE1214715B (en) * 1961-04-28 1966-04-21 Holzmann Philipp Ag Front structure for the cantilevered cantilever construction of reinforced concrete bridges or similar reinforced concrete structures

Similar Documents

Publication Publication Date Title
DE2413815C2 (en) Method for the production of a cable-stayed bridge in the section-wise free front structure
DE2743273B1 (en) Method for producing elongated supporting structures, in particular multi-span bridge superstructures made of reinforced or prestressed concrete
DE3620587C1 (en) Method and device for the construction of reinforced-concrete or prestressed-concrete bridge superstructures in sections
DE3931201C1 (en) Concrete railway sleepers mfr. - uses moving frame mechanism which releases each sleeper immediately
CH297767A (en) Method for the free pre-construction of bridges or similar elongated structures in prestressed concrete and device for carrying out this method.
DE2530639A1 (en) FORMWORK SCAFFOLDING FOR CEILINGS
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE1684430B2 (en) Method for building high-rise buildings or the like. and device for carrying out the method
DE3700159A1 (en) Method and apparatus for constructing a main drain
DE1220990B (en) Method for creating wall fractures
DE2445029C3 (en) Method for producing the superstructure of a bridge or the like structure from prestressed concrete as well as supporting scaffolding for carrying out the method
DE1684213A1 (en) Procedure for erecting a structure
DE3723629C2 (en)
DE10154236A1 (en) Method for building girder bridge comprises building base section and erecting pylon as temporary support for this, prefabricated sections being added which are supported by cables attached to pylon
DE290547C (en)
DE1925958C (en) Device for cutting down the superstructure of bridges and similar structures made of steel or prestressed concrete, which is supported by abutments and pillars
DE1295580C2 (en) SCAFFOLDING FOR THE SECTION OF THE SUPERSTRUCTURE OF BRIDGES, HOCHSTRASSEN O.DGL. MADE OF REINFORCED CONCRETE OR STRENGTHENED CONCRETE
DE939168C (en) Process for the production of reinforced concrete bodies of great length
AT80718B (en) Process for the production of reinforced concrete ceilings. Process for the production of reinforced concrete ceilings.
DE1559082C (en) Process for the production of single or multi-storey buildings
DE1658587C (en) Device for the production of multi-span structures, in particular bridge structures, made of steel or prestressed concrete
DE6445C (en) Falsework for fume hoods
DE83133C (en)
AT152705B (en) Process for the section-wise production of reinforced concrete bodies that are primarily subject to bending.
EP1307326A2 (en) Hollow pre-stressed concrete slab and method for production thereof