CH194388A - Process for the construction of an arch bridge with a roadway below, suspended by means of hanging rods, designed as a concrete slab and an arch bridge created according to the process. - Google Patents

Process for the construction of an arch bridge with a roadway below, suspended by means of hanging rods, designed as a concrete slab and an arch bridge created according to the process.

Info

Publication number
CH194388A
CH194388A CH194388DA CH194388A CH 194388 A CH194388 A CH 194388A CH 194388D A CH194388D A CH 194388DA CH 194388 A CH194388 A CH 194388A
Authority
CH
Switzerland
Prior art keywords
arch
roadway
arch bridge
hanging rods
designed
Prior art date
Application number
Other languages
German (de)
Inventor
Coray Richard
Stauffacher Josua
Original Assignee
Coray Richard
Stauffacher Josua
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Coray Richard, Stauffacher Josua filed Critical Coray Richard
Publication of CH194388A publication Critical patent/CH194388A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • E01D1/005Bowstring bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

  

  'erfahren zur Errichtung einer Bogenbrücke mit unten liegender; mittels Hängestangen  aufgehängter, als Betonplatte ausgebildeter Fahrbahn und nach dem Verfahren erstellte  Bogenbrücke.    Vorliegende Erfindung betrifft ein Ver  fahren zur     Errichtung    einer Bogenbrücke mit  unten liegender,     mittels    Hängestangen     auf-          gehängter,    als Betonplatte ausgebildeter  Fahrbahn und eine nach diesem Verfahren       erstellte    Bogenbrücke.  



       Durch    das erfindungsgemässe Verfahren  wird     bezweckt,    die Fahrbahnplatte bei sol  chen Brücken so     herzustellen,    dass die im  Innern der     Betonplatte    liegenden Zugbänder       bezw.    Längsanker     unter    einer Verspannung       stehen,    welche ohne Zuhilfenahme von Pres  sen und     dergl.    lediglich durch das Aufbrin  gen der Lasten, vor dem Abbinden des Be  tons, entsteht.

   Eine solche Verspannung ist  für die     Verhinderung    der     Rissbildung    in der       Betonplatte,    sowie für deren     Lebensdauer    von  sehr grosser     Bedeutung.     



  Das Verfahren gemäss :der     Erfindung    be  steht darin,     dass    nach Montage des Bogens  an dessen beiden     Auflagerenden    zur     Armie-          rung    der     Betonplatte    bestimmte durch-    gehende Längsanker     mit    den untern Enden  der     Hängestangen    verbunden und verspannt  werden, und     dass    auf ein an den     untern    En  den der     Hängestangen        befestigtes,

      schweben  des     Schalgerüst    die Fahrbahn betoniert und  nach deren     Abbinden    das Gerüst entfernt  wird.  



  Dank diesem Herstellungsverfahren, bei       welchem        ein    besonderes     Leergerüst    für die       Abstützung    der Verschalung nicht benötigt  wird, sind Bogen und     Hängestangen,    sowie  die den     Horizontalschub    des Bogens aufneh  menden.

   Längsanker     vollbelastet,    sobald der  Beton für die Fahrbahn aufgebracht ist,     und     das Abbinden des Betons erfolgt bei voller  Belastung der     Gesamtkonstruktion,    so dass  nicht später Deformationen und Risse im  Beton entstehen     können,    wie dies sonst un  vermeidlich     ist,    wenn unter einer abgebun  denen     Betonfahrbahn    das     Leergerüst    ent  fernt und deren     hast    auf die     Brückenkon-          struktion    übertragen wird.

        Die     Erfindung    bezweckt ferner, den bei  Eisenbrücken erforderlichen Unterbau wie       l:ntergurt,        Querträger,    Längsträger und den       untern        Windverband    durch den Brücken  boden zu ersetzen, um einerseits die grosse  Zerstörungsgefahr durch Rosten zu besei  tigen, unter welcher der erwähnte     Unterbau          eiserner        Brücken    .durch die Einwirkungen von  Schmutz und     Wasser    besonders zu leiden hat,  und anderseits die verfügbare lichte Durch  gangshöhe unter ,der Brücke nicht ,durch vor  stehende Konstruktionsteile des Unterbaues  zu beeinträchtigen.  



  Dies wird bei der Bogenbrücke gemäss der  Erfindung dadurch erreicht,     .dass    der Bogen  als     Eisenkonstruktion    ausgebildet ist und die  Längsanker der Bogengurten als     Armierung     innerhalb 'der die Fahrbahn bildenden Be  tonplatte liegen, und im übrigen sämtliche  Konstruktionsteile aus Eisen oder Stahl über  der Fahrbahnplatte oder innerhalb derselben  liegen.  



  Ausführungsbeispiele des Erfindungs  gegenstandes sind in der Zeichnung darge  stellt.  



       Fig.    1     zeigt    eine     Brücke    nach einer ersten  Ausführungsform in Längsansicht;       Fig.    2     zeigt    in grösserem Massstab einen  Querschnitt der     Brücke;          Fig.    3 und 4 zeigen die     Brückenfahrbahn     mit Schalung im     Querschnitt        bezw.    einem       Teillängsschnitt;

            Fig.    5 zeigt in noch grösserem Massstab  ein     Auflagerende    der Brücke in senkrechtem       Längsschnitt,          Fig.    6     einen    waagrechten Längsschnitt  desselben, und       F'ig.    7 eine Ansicht;

         Fig.    8     und    9 zeigen Einzelheiten der       Hängestangenbefestigung;          Fig.        14?    zeigt eine zweite Ausführungs  form der Brücke .im     Querschnitt;          Fig.    11 zeigt     in    grösserem Massstab ein       Auflagerende    der     Brücke    im Längsschnitt,  und .  



       Fig.    12 einen senkrechten Schnitt hierzu  nach     Linie        XH-XII        in        Fig.    11;         Fig.    1; zeigt in noch grösserem     Massstab          einen.        Längsschnitt    durch ein     Fahrbahnstüch     mit Schalung und       Fig.    14 einen     Querschnitt    hierzu.  



  Die in     Fig.    1 bis 9     dargestellte    Brücke       besitzt    einen auf zwei     Widerlagern        W    ab  gestützten     eisernen:    Bogen B, an welchem die  aus einer armierten Betonplatte bestehende  Fahrbahn F mittels Hängestangen H auf  gehängt ist. Die beiden Bogengurten 1 sind  als     :geschweisstes    Kastenprofil ausgebildet,  wie aus     Fig.    8 und 9 ersichtlich,     und    durch  Querriegel 2 miteinander verbunden, so dass  der Bogen ein geschlossenes     steifes    Rahmen  werk bildet.

   An     den.        Auflagerenden    beider  Gurten 1 sind     Abschlussplatten    3 vorgesehen,  an welchen     mittels        Muttern    5 Längsanker 4  verankert sind, die sowohl zur Verspannung  des Bogens, als auch als     Armierungsstäbe    der  Betonplatte 6 dienen.

   In den Gurten 1 sind       mittels    eingenieteter Quereisen 7 und Bol  zen $     edie    Hängestangen H eingehängt, deren  untere Enden mittels     angeschweisstar    Tra  versen und     Rundeisenbügeln    mit den Längs  ankern 4 der     Fahrhahuarmierung    verbunden  sind.

       Diese    Längsanker 4 sind in Rippen der       Betonplatte    6     einbetoniert,    und an der Au  ssenseite .dieser Rippen     ist    die Betonplatte zu  Gehstegen     @6a    mit     Geländer        ausgekragt.    Jede  Endplatte 3 hat     einen    waagrechten Ansatz  3a,     mit    welchem der Gurt am einen Ende auf  dem Rollenlager     9a    und am     andern    Ende auf  einem     festen        Lager    9b in bekannter Weise       aufruht.     



  Beim Errichten einer solchen Brücke       werden:    zuerst die in sich standfesten Bogen  gurten 1     aus        Eisen    oder Stahl nebst der       Querriegel        montiert,    dann die Längsanker 4  eingesetzt und     gespannt    und die Hängestan  gen H eingehängt. An diesen Hängestangen  H wird     eine    Schalung für die Fahrbahn auf  gehängt.

   Zu     diesem    Zweck werden au den       untern    Enden der     Hängestangen    H Eisen  anker 10 angebracht und auf     diese    Querbal  ken 11 zum     Auflegen    des     Schalungsbodens     12     abgestützt,    so dass also der Bogenträger  das Baugerüst für .die Betonplatte ersetzt.  Nun wird die Fahrbahn betoniert,     und    nach      deren Abbinden die gesamte Schalung ent  fernt. Die     vorstehenden    Enden der Hänge  stangen     Il    werden autogen abgeschnitten.

    Infolge dieser Herstellungsweise entsteht  ohne     weiteres    eine Verspannung in den  Längsankern nach Massgabe     das    Eigenge  wichtes der     Brücke.    Da, hierbei der Bogen  träger nebst Hängestangen vom Aufbringen  des Betons an mit dessen Gewicht belastet  war,     tritt    beim Entfernen des     Schalungs-          gerüstes    keine zusätzliche Beanspruchung  mehr ein, wenn man von der Verkehrslast       absieht,    so dass auch .in .der Betonplatte keine  Deformationen     und    Risse durch Zugkräfte  und     Durchbiegung    eintreten werden.

   Unter  der Fahrbahn     befinden    sich dann keinerlei       Metallkonstruktionsteile,    welche dem Rosten  ausgesetzt sein könnten, sondern alle Eisen  konstruktionsteile liegen über der Fahrbahn  platte oder innerhalb derselben. Auch die  Anschlüsse der Hängestangen     H    sind gut  gegen     Rosten.    geschützt im Innern der Gur  ten     untergebracht.     



  In ästhetischer Beziehung wirkt eine  solche Brücke ebenfalls sehr     vorteilhaft.     Das Ausführungsbeispiel nach     Fig.    10 bis  14     unterscheidet    sich von dem erstbeschrie  benen im     wesentlichen:    dadurch,     dass    es sich  um eine schwerere Konstruktion für grössere  Verkehrslast handelt.     Dementsprechend    ist  die mittels der Hängestangen H am Bogen  träger B     aufgehängte    Fahrbahn 6 nach     Art     einer     Kassettendecke    mit Längs- und Quer  rippen ausgebildet.

   Die in den Hauptrippen       61a    liegenden Längsanker 4 sind an beiden  Enden     in,den    über die     Bogengurtung    heraus  ragenden     Fahrbahnkörper    einbetoniert. Zur  Befestigung des     Schalgerüstes    für den Fahr  bahnkörper sind hier an .den untern Enden  der Hängestangen     H    paarweise je zwei mit  ihren Stegen     gegeneinander        gekehrte        U-Eisen     13     befestigt,

      welche in     Querrippen        6r        des     fertigen     Betonkörpers        (Fig.    13 und 14) zu  liegen kommen. An diesen     Doppel-U-Eisen     13 werden beim Bau der Brücke     mittels          Hängeeisen    14 Längsbalken 15 aufgehängt,  auf welchen die Schalung 12 aufgelegt wird.

    Nach Abbinden des Betonkörpers wird die    Schalung entfernt und die vorstehenden En  den -der Hängeeisen 14 werden autogen ab  geschnitten.     Die        Doppel-U-Eisen    13 bilden       dann    einen     Bestandteil    .der     Fahrbahnarmie-          rung,    liegen also innerhalb der Fahrbahn  platte, wie auch alle     übrigen        Eisen@konstruk-          tionsteile    über der Fahrbahnplatte und in  nerhalb derselben liegen.  



  Bei grossen     Fahrbahnplatten,    bei welchen  das Betonieren mehrere Tage in     Anspruch     nimmt, werden naturgemäss durch Anord  nung von     Aussparungen:    in der Längsrich  tung der Brücke die Längsanker zuletzt ein  betoniert, nachdem sie schon ihre volle Vor  spannung erreicht haben.



  'Learn about the construction of an arch bridge with an underlying; Roadway suspended by means of hanging rods, designed as a concrete slab and arched bridge created according to the method. The present invention relates to a method for erecting an arch bridge with a roadway formed as a concrete slab and an arch bridge constructed according to this method, which lies below and is suspended by means of hanging rods.



       The aim of the method according to the invention is to produce the carriageway slab in sol chen bridges in such a way that the tension straps located inside the concrete slab respectively. Longitudinal anchors are under tension, which, without the aid of presses and the like, is created simply by applying the loads before the concrete is set.

   Such tension is of great importance for preventing cracks from forming in the concrete slab and for its service life.



  The method according to: the invention consists in that after the assembly of the arch at its two support ends for reinforcing the concrete slab, certain continuous longitudinal anchors are connected and braced with the lower ends of the hanging rods, and that on one at the lower ends the hanging rod attached,

      float the formwork scaffolding the roadway is concreted and after it has set, the scaffolding is removed.



  Thanks to this manufacturing process, in which a special empty frame is not required to support the formwork, arches and hanging rods, as well as the horizontal thrust of the arch absorbing menden.

   The longitudinal anchor is fully loaded as soon as the concrete for the roadway has been applied, and the setting of the concrete takes place when the entire structure is fully loaded, so that deformations and cracks in the concrete cannot occur later, as is otherwise unavoidable when the concrete roadway is torn down Empty scaffolding is removed and its structure is transferred to the bridge construction.

        The invention also aims to replace the substructure required for iron bridges, such as the lter chord, cross member, longitudinal member and the lower wind bracing, by the bridge floor, on the one hand to eliminate the great risk of destruction by rusting, under which the mentioned substructure of iron bridges The effects of dirt and water have to suffer particularly, and on the other hand, the available clear passage height under the bridge not to be impaired by protruding structural parts of the substructure.



  This is achieved in the arch bridge according to the invention. That the arch is designed as an iron structure and the longitudinal anchors of the arch belts as reinforcement lie within the concrete slab forming the roadway, and all iron or steel construction parts above the roadway slab or inside same lie.



  Embodiments of the subject invention are in the drawing Darge provides.



       1 shows a bridge according to a first embodiment in a longitudinal view; Fig. 2 shows, on a larger scale, a cross-section of the bridge; Fig. 3 and 4 show the bridge deck with formwork in cross section BEZW. a partial longitudinal section;

            FIG. 5 shows, on an even larger scale, a support end of the bridge in a vertical longitudinal section, FIG. 6 shows a horizontal longitudinal section of the same, and FIG. 7 is a view;

         Figures 8 and 9 show details of the hanging rod attachment; Fig. 14? shows a second embodiment of the bridge .in cross section; 11 shows, on a larger scale, a support end of the bridge in longitudinal section, and.



       FIG. 12 shows a vertical section on this along line XH-XII in FIG. 11; Fig. 1; shows one on an even larger scale. Longitudinal section through a road surface with formwork and FIG. 14 a cross section for this.



  The bridge shown in Fig. 1 to 9 has an iron supported on two abutments W from: Arch B, on which the roadway F consisting of a reinforced concrete slab is suspended by means of hanging rods H on. The two arch chords 1 are designed as: welded box profile, as can be seen from FIGS. 8 and 9, and connected to one another by crossbars 2 so that the arch forms a closed, rigid framework.

   To the. End plates 3 are provided to support ends of both belts 1, to which longitudinal anchors 4 are anchored by means of nuts 5, which are used both for bracing the arch and as reinforcing bars for the concrete slab 6.

   The hanging rods H are suspended in the belts 1 by means of riveted cross bars 7 and bolts, the lower ends of which are connected to the longitudinal anchors 4 of the crawler armor by means of welded trusses and round iron brackets.

       These longitudinal anchors 4 are concreted in ribs of the concrete slab 6, and on the outside of these ribs, the concrete slab is cantilevered into walkways @ 6a with railings. Each end plate 3 has a horizontal extension 3a with which the belt rests in a known manner on the roller bearing 9a at one end and on a fixed bearing 9b at the other end.



  When erecting such a bridge: first the stable arch straps 1 made of iron or steel are mounted along with the crossbars, then the longitudinal anchors 4 are inserted and tensioned and the hanger bars are attached to H. A formwork for the roadway is hung on this hanging rod H.

   For this purpose, iron anchors 10 are attached to the lower ends of the hanging rods H and are supported on these crossbeams 11 for placing the shuttering base 12, so that the arch support replaces the scaffolding for .die concrete slab. Now the roadway is concreted, and after it has set, the entire formwork is removed. The protruding ends of the hanging rods II are cut autogenously.

    As a result of this manufacturing method, tension in the longitudinal anchors is easily created according to the Eigenge weight of the bridge. Since, in this case, the arch girder together with the hanging rods was loaded with its weight from the time the concrete was applied, no additional stress occurs when the formwork scaffolding is removed, if one disregards the traffic load, so that no deformations or Cracks will occur due to tensile forces and deflection.

   There are then no metal construction parts under the roadway that could be exposed to rusting, but all iron construction parts are above the roadway plate or within the same. The connections of the hanging rods H are also good against rusting. protected inside the belts.



  Such a bridge is also very beneficial from an aesthetic point of view. The embodiment according to FIGS. 10 to 14 differs from the first-described enclosed essentially: in that it is a heavier construction for larger traffic loads. Accordingly, the suspended by means of the hanging rods H on the arch carrier B roadway 6 is designed in the manner of a cassette ceiling with longitudinal and transverse ribs.

   The longitudinal anchors 4 located in the main ribs 61a are concreted in at both ends in the carriageway body protruding over the arched waling. To attach the scaffolding for the track body are here attached to .den lower ends of the hanging rods H in pairs with two U-irons facing each other with their webs facing each other,

      which come to rest in transverse ribs 6r of the finished concrete body (FIGS. 13 and 14). During the construction of the bridge, longitudinal beams 15, on which the formwork 12 is placed, are suspended from this double U-iron 13 by means of suspension irons.

    After the concrete body has set, the formwork is removed and the protruding ends of the hanging iron 14 are cut off autogenously. The double U-irons 13 then form part of the roadway reinforcement, that is to say they lie within the roadway plate, as are all the other iron construction parts above the roadway plate and within it.



  In the case of large carriageway slabs, where concreting takes several days, naturally by arranging recesses: in the longitudinal direction of the bridge, the longitudinal anchors are concreted last after they have already reached their full prestressing.

 

Claims (1)

PATENTANSPRMHE : I. Verfahren zur Errichtung einer Bogen brücke mit unten liegender, mittels Hängestangen aufgehängter, als Beton- platte ausgebildeter Fahrbahn, dadurch gekennzeichnet, PATENT CLAIM: I. A method for erecting an arch bridge with a roadway below, suspended by means of hanging rods and designed as a concrete slab, characterized in that .dass nach Montage des Bogens an dessen beiden Auflagerenden zur Armierung der Betonplatte be stimmte .durchgehende Längsanker mit den untern Enden der Hängestangen ver bunden und verspannt werden, und dass auf ein an den untern Enden der Hänge s.tangen befestigtes, schwebendes Schal gerüst die Fahrbahn betoniert und nach deren Abbinden das Gerüst entfernt wird. 1t. Bogenbrücke, hergestellt nach dem Ver fahren gemäss, Patentanspruch I, .that after assembly of the arch at its two support ends to reinforce the concrete slab certain .continuous longitudinal anchors are connected and braced with the lower ends of the hanging rods, and that on a floating scaffold attached to the lower ends of the hanging rods, the Concrete the roadway and after it has set, the scaffolding is removed. 1t. Arch bridge, manufactured according to the method according to claim I, da durch gekennzeichnet, dass,,der Bogen. als Eisenkonstruktion ausgebildet ist und die Längsanker der Bogengurten. als Armierung innerhalb der die Fahrbahn bildenden Betonplatte liegen, und im übrigen sämtliche Konstruktionsteile aus Eisen oder Stahl über der Fahrbahn platte oder innerhalb derselben liegen. UNTERANSPRüCHE 1. as characterized by that ,, the arch. is designed as an iron structure and the longitudinal anchors of the arch belts. lie as reinforcement within the concrete slab forming the roadway, and, moreover, all structural parts made of iron or steel above the roadway plate or lie within the same. SUBCLAIMS 1. Verfahren gemäss Patentanspruch I, da durch gekennzeichnet, dass Querbalken zur Aufnahme der Schalung auf am un- tern. Ende der Hängestangen befestigte Eisenanker aufgelegt werden, und nach Entfernung der Schalung und der Quer balken die untern Enden der Hängestan gen an der Unterfläche der Fahrbahn platte abgeschnitten werden. Method according to patent claim I, characterized in that crossbars for receiving the formwork on the lower. Iron anchors attached to the end of the hanging rods are placed, and after removing the formwork and the crossbars, the lower ends of the Hängestan conditions are cut off on the lower surface of the roadway plate. 2,. Verfahren gemäss Patentanspruch I, da ,durch gekennzeichnet, dass an aus Dop pel -<B>U</B> -Eisen ;gebildeten Querträgern, welche man nachher in Betonquerrippen einbettet, Hängeeisen angebracht werden, an welchen Längsbalken zur Aufnahme der Schalung befestigt werden und welche nach Entfernung der Schalung an der Unterfläche der Querrippen abge schnitten werden. 3. Bogenbrücke gemäss Patentanspruch II, dadurch gekennzeichnet, dass die Längs anker mit den untern Enden .der Hänge stangen verbunden sind. 4. 2 ,. Method according to patent claim I, characterized in that hanging irons are attached to cross beams formed from double-iron, which are subsequently embedded in concrete cross-ribs, to which longitudinal beams are attached to accommodate the formwork and which are cut abge after removal of the formwork on the lower surface of the transverse ribs. 3. Arch bridge according to claim II, characterized in that the longitudinal anchors are connected to the lower ends of the suspension rods. 4th Bogenbrücke gemäss. Patentanspruch II, dadurch gekennzeichnet, .dass jeder Gurt des Bogenträgers als geschweisstes Ka stenprofil ausgebildet ist, in welchem die Hängestangen mittels Bolzen und einge- nieteter Querstücke befestigt sind. 5. Arch bridge according to. Claim II, characterized in that each strap of the arch support is designed as a welded box profile in which the hanging rods are fastened by means of bolts and riveted cross pieces. 5. Bogenbrücke gemäss Patentanspruch II. .dadurch gekennzeichnet, dass die Gurten des Bogenträgers mittels steifer Quer riegel zu einem geschlossenen Rahmen werk ausgebildet sind. 6. Arch bridge according to patent claim II. Characterized in that the straps of the arch girder are designed to form a closed framework by means of rigid transverse bars. 6th Bogenbrücke gemäss Patentanspruch 1I, dadurch gekennzeichnet, dass jeder Bo gengurt an jedem Ende mit einer senk rechten Platte versehen ist, an welcher die Längsanker verspannt sind und welche mit ihrem Fuss auf einem Rollen lager bezw. einem festen Lager aufruht. 7. Arch bridge according to claim 1I, characterized in that each Bo gengurt is provided at each end with a perpendicular right plate on which the longitudinal anchors are braced and which with their foot on a roller bearing or. rests in a fixed camp. 7th Bogenbrücke gemäss Patentanspruch 1I und Unteranspruch 3, .dadurch gekenn zeichnet, dass die Fahrbahnplatte mit Längs- und Querrippen ausgebildet ist und die Querrippen mit Trägern aus paarweise zusammengefügten. U-Eisen armiert sind, welche an den untern Enden der Hängestangen befestigt sind. Arched bridge according to patent claim 1I and dependent claim 3, characterized in that the roadway slab is designed with longitudinal and transverse ribs and the transverse ribs with beams made of joined together in pairs. U-iron are reinforced, which are attached to the lower ends of the hanging rods.
CH194388D 1936-05-01 1936-05-01 Process for the construction of an arch bridge with a roadway below, suspended by means of hanging rods, designed as a concrete slab and an arch bridge created according to the process. CH194388A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH194388T 1936-05-01

Publications (1)

Publication Number Publication Date
CH194388A true CH194388A (en) 1937-12-15

Family

ID=4439394

Family Applications (1)

Application Number Title Priority Date Filing Date
CH194388D CH194388A (en) 1936-05-01 1936-05-01 Process for the construction of an arch bridge with a roadway below, suspended by means of hanging rods, designed as a concrete slab and an arch bridge created according to the process.

Country Status (1)

Country Link
CH (1) CH194388A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1006448B (en) * 1953-07-25 1957-04-18 Peter Bauwens Bauunternehmung Prestressed concrete beam bridge, prestressed concrete ceiling or the like and process for their production
WO2003025291A1 (en) * 2001-09-20 2003-03-27 R & C Research And Concrete, S.A. Light, prefabricated structures for constructing walkways
FR2941242A1 (en) * 2009-01-20 2010-07-23 Baudin Chateauneuf Bowstring bridge end supporting device for use during construction of Bowstring bridge, has anchoring blocks made of anti-corrosion material i.e. concrete, where each block has support face that supports end of arch of Bowstring bridge
CN108301308A (en) * 2018-03-29 2018-07-20 中铁上海设计院集团有限公司 A kind of connection structure and its construction method for arch bridge round steel pipe sunpender
CN113202033A (en) * 2021-04-29 2021-08-03 中交路桥建设有限公司 Arch beam cross installation construction method of half-through tied steel box arch bridge
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1006448B (en) * 1953-07-25 1957-04-18 Peter Bauwens Bauunternehmung Prestressed concrete beam bridge, prestressed concrete ceiling or the like and process for their production
WO2003025291A1 (en) * 2001-09-20 2003-03-27 R & C Research And Concrete, S.A. Light, prefabricated structures for constructing walkways
ES2184645A1 (en) * 2001-09-20 2003-04-01 R & C Res And Concrete S A Light, prefabricated structures for constructing walkways
FR2941242A1 (en) * 2009-01-20 2010-07-23 Baudin Chateauneuf Bowstring bridge end supporting device for use during construction of Bowstring bridge, has anchoring blocks made of anti-corrosion material i.e. concrete, where each block has support face that supports end of arch of Bowstring bridge
CN108301308A (en) * 2018-03-29 2018-07-20 中铁上海设计院集团有限公司 A kind of connection structure and its construction method for arch bridge round steel pipe sunpender
CN108301308B (en) * 2018-03-29 2023-12-19 中铁上海设计院集团有限公司 Connection structure for arch bridge round steel pipe hanging rod and construction method thereof
CN113202033A (en) * 2021-04-29 2021-08-03 中交路桥建设有限公司 Arch beam cross installation construction method of half-through tied steel box arch bridge
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender

Similar Documents

Publication Publication Date Title
EP3303707B1 (en) Method for producing a roadway plate for a bridge
DE69914621T2 (en) PRELOADED BINDER WITH ADJUSTABLE TENSION
DE102009008826B4 (en) Bridge for railways and side members and method for their production
DE10009506B4 (en) Concrete-free threshold
CH194388A (en) Process for the construction of an arch bridge with a roadway below, suspended by means of hanging rods, designed as a concrete slab and an arch bridge created according to the process.
DE102011102987A1 (en) Incremental launching method for mounting road- and railway bridges with beam cross section, involves providing two steel main girders and carriageway slab made from steel, reinforced concrete or prestressed concrete
DE3027661A1 (en) Mine gallery roof supports and edge securing beams - are anchored lattice girders functioning as initial supports and advance rails
DE102017114090A1 (en) Method of constructing a building
DE10140733A1 (en) Bridge, esp. arched bridge has arched top booms coupled via suspension trusses to bottom booms of pre-stressed or reinforced concrete
DE3733627A1 (en) Method and apparatus for the sectional construction of prestressed-concrete bridges independently of terrain
DE2022965A1 (en) Reinforced concrete structure
DE19903310A1 (en) Compound support as steel support for bridge structure
DE920013C (en) Process for the production of composite structures, in particular girder bridges and shell roofs
DE69413950T2 (en) BRIDGE CONSTRUCTION
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
AT306314B (en) Device for increasing the load-bearing capacity of a girder built into an existing structure
DE916533C (en) Process for the production of composite structures made of steel and reinforced concrete, especially for bridge construction
DE102008022180B3 (en) Frame corner forming arrangement for roller support in concrete construction, has reinforced concrete wall that is reinforced concrete support, and ends of roller support are provided as double-T-profile that is recessed over frame corner
DE1124075B (en) Method for prestressing statically indeterminate composite beams, in particular bridge beams
AT344780B (en) STRENGTH CONCRETE ROAD SLAB
DE975280C (en) Steel truss bridge with reinforced concrete deck
DE1046650B (en) Suspension bridge made of prestressed concrete
DE916891C (en) Prestressed reinforced concrete bridge with subsequent connection
DE346970C (en) Device for the production of reinforced concrete ceilings with the help of a hanging structure
CH201557A (en) Procedure for the creation of a reinforced concrete structure.