Process for the production of road surfaces from concrete blocks.

Info

Publication number
CH133407A
CH133407A CH133407DA CH133407A CH 133407 A CH133407 A CH 133407A CH 133407D A CH133407D A CH 133407DA CH 133407 A CH133407 A CH 133407A
Authority
CH
Switzerland
Prior art keywords
concrete
cavities
concrete blocks
filled
teaching
Prior art date
Application number
Other languages
German (de)
Inventor
Pohlig Cuno
Original Assignee
Pohlig Cuno
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DEP55789D external-priority patent/DE467044C/en
Application filed by Pohlig Cuno filed Critical Pohlig Cuno
Publication of CH133407A publication Critical patent/CH133407A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/001Paving elements formed in situ; Permanent shutterings therefor ; Inlays or reinforcements which divide the cast material in a great number of individual units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/508Devices or arrangements for forming individual paving elements in situ, e.g. by sectioning a freshly-laid slab

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Description

  

  Verfahren zur Herstellung von Strassendecken aus Betonsteinen.    Die Erfindung betrifft ein Verfahren zur  Herstellung einer Strassendecke aus Betonstei  nen, welche an Ort und Stelle gestampft und  durch Zwischenlagen aus elastischem Stoff,  wie     Ü1-,    Teer- und Asphaltpappe oder -Papier  oder dergleichen voneinander getrennt wenden.

    Das Verfahren besteht darin,     @dass    durch Auf  stellen von der Grösse der herzustellenden Be  tonsteine entsprechenden Lehrkörpern auf der       Bettung    in .der Grösse ,der     herzustellenden    Be  tonsteine entsprechenden     Abständen    vonein  ander, eine Gruppe von Hohlräumen und  durch Ausfüllen dieser Hohlräume mit Be  ton und     danauffolgendem    Entfernen der Lehr  körper eine zweite Gruppe von Hohlräumen       gebildet    wird und die Hohlräume einer der  beiden Gruppen vor ihrem Ausfüllen mit Be  ton mit den Zwischenlagen ausgekleidet wer  den.

   Nach diesem Verfahren können auch  Strassendecken mit Betonsteinen von :schicht  weise verschiedener Zusammensetzung herge  stellt werden, indem die Lehrkörper bereits  entfernt werden, wenn die     zwischen    ihnen. be  findlichen Hohlräume erst     izu    einem Teil    ihrer Höhe mit Beton ausgefüllt sind, worauf  in den durch ihr Entfernen     entstandenen    und  durch die     Zwischenlagen    von .den ersteren ge  trennten Hohlräumen Beton bis zur gleichen  Höhe wie in ,

  der ersteren     Gruppe    nachgefüllt  und hierauf in beiden     Hohlraumgruppen    eine  oder mehrere Schichten von     Beton    anderer       Zusammensetzung    nachgefüllt werden.  



  Die Zeichnung veranschaulicht eine Aus  führungsform des Verfahrens, und zwar in       Fig.    1 in einer Draufsicht auf das teilweise  hergestellte Pflaster und in     Fig.    2 in einem  Querschnitt durch dasselbe.  



  Auf der     Strassenbettung    b werden Lehr  körper e, deren Grösse den herzustellenden  Betonsteinen entspricht, schachbrettartig in  solchen Abständen voneinander versetzt auf  gestellt,     rdass    zwischen ihnen Hohlräume e  von der Grösse der herzustellenden Beton  steine verbleiben. Die Lehrkörper c können  massive oder hohle Kästen (wie     @dargestellt)     oder auch offene Rahmen aus Holz oder  Leichtmetall oder sonstigem geeigneten Bau  stoff sein.

        Das Verfahren kann nun in der Weis;:  fortgeführt     werden"dass    die Hohlräume e an  ihrem Umfang ringsum mit     Zwischenlagen    d  aus elastischem, gegen die Witterung und  Fäulnis widerstandsfähigem     iStoff,    wie zum  Beispiel     01-,    Teer- und Asphaltpappe oder  dergleichen ;ausgekleidet werden und in die  derart ausgekleideten     Hohlräume    Zement  beton feingebracht wird. Hierauf     werden,die     Lehrkörper c entfernt und in die hierdurch  entstehende zweite Gruppe von Hohlräumen,  welche auf der nach aussen offenen -Seite  durch ein Brett oder dergleichen     abgedeckt     werden können, wird nunmehr Zementbeton f  eingebracht und gestampft.

   Hierauf werden  nächstfolgende Reihen von Lehrkörpern  wie zuvor aufgestellt     und,die    einzelnen Grup  pen von Hohlräumen., von denen     ,die    eine wie  zuvor mit Zwischenlagen d ausgekleidet wird,  wie zuvor mit Beton gefüllt, und sofort.  



  Das Verfahren kann .aber auch     -derart     durchgeführt werden, dass an Stelle der  ersten, von den Zwischenräumen zwischen  den Lehrkörpern c gebildeten Hohlräume die  durch Entfernen der Lehrkörper c entste  hende zweite Gruppe von Hohlräumen vor  deren Füllen mit     denn    Beton mit     rden        Zwi-          schenl.agen    d     ausgekleidet    wird. In diesem  Fall bilden die bereits hergestellten Beton  steine !die W     @i!derlagefläche        und,den    Halt für  die Zwischenlagen, während im ersteren  Fall .die Lehrkörper c die Stütze für     idie    Zwi  schenlagen bilden.

   In beiden Fällen brauchen  daher     die,den    einzelnen     Hohlraum    umkleiden  den Zwischenlagen keine in sich zusammen  hängende     Form    zu bilden.  



  Zur Herstellung     von    Betonsteinen von       schichtweise    verschiedener     Zusammensetzung     ist     das        Verfahren,d-erart        ,durchzuführen"d:

  ass     wie     Fig.    2 beispielsweise     veranschaulicht,    die  zwischen den Lehrkörpern c und Zwischen  lagen d belassenen Hohlräume nur bis zu  einem Teil ihrer Höhe mit Beton gefüllt und  hierauf die Lehrkörper c entfernt werden,  worauf     idie    hierdurch     entstehenden    Hohl  räume in gleicher Höhe wie die ersteren mit  Beton gefüllt und auf diese Lage eine oder    mehrere 'Schichten Beton anderer, also ge  gebenenfalls fetterer Zusammensetzung auf  gebracht werden, wobei wie zuvor durch -die  Zwischenlagen voneinander getrennte einzelne  Schichten innig miteinander     verbunden    sind,

    sofern jeweilig eine Schicht sofort auf eine  noch frische untere Schicht     aufgebracht        wird.     



  Das Verfahren ist nicht auf die Verwen  dung von im Grundriss rechteckigen     Lehrkör-          pern,beschränkt,    .diese können vielmehr auch  andere geeignete .eckige Gestalt besitzen, so  fern diese nur ein     schachbrettartigies        Aneinan-          derfügen    der Lehrkörper     gestattet.     



  Auf die beschriebene Weise können auch,  wie     Fig.    1 beispielsweise veranschaulicht,  zwischen aus einer einheitlichen Betonschicht  bestehenden Pflasterbahnen     a,        beispielsweise     als Dehnungsfuge oder zur     Zugänglichma-          chung    von unterirdischen Leitungen     rdienende          Betonsteinpfla,sterstreifen    eingefügt werden.



  Process for the production of road surfaces from concrete blocks. The invention relates to a method for producing a road surface made of concrete stones, which are tamped on the spot and separate from each other by intermediate layers made of elastic material, such as Ü1, tar and asphalt cardboard or paper or the like.

    The method consists in creating a group of cavities by placing the size of the concrete stones to be produced on the bedding in the size corresponding to the distances between the concrete stones to be produced, and by filling these cavities with concrete and the following Remove the teaching body a second group of cavities is formed and the cavities of one of the two groups are lined with the intermediate layers before they are filled with concrete.

   This method can also be used to produce road surfaces with concrete blocks of different composition in layers, by removing the teaching staff when they are between them. be-sensitive cavities are only filled with concrete to a part of their height, whereupon in the cavities created by their removal and separated by the intermediate layers of the former concrete up to the same height as in,

  the first group is refilled and then one or more layers of concrete of a different composition are refilled in both cavity groups.



  The drawing illustrates an embodiment of the method, namely in Fig. 1 in a plan view of the partially produced plaster and in Fig. 2 in a cross section through the same.



  On the road bed b, teaching bodies e, the size of which corresponds to the concrete blocks to be produced, are placed in a chessboard-like manner offset from one another at such intervals that cavities e of the size of the concrete blocks to be produced remain between them. The faculty c can be solid or hollow boxes (as shown @) or open frames made of wood or light metal or other suitable building material.

        The process can now be continued "that the cavities e are lined around their circumference with intermediate layers d made of elastic material that is resistant to weathering and decay, such as oil, tar and asphalt cardboard or the like, and Cement concrete is then finely poured into the cavities lined in this way, then the teaching body c is removed and cement concrete f is now introduced into the second group of cavities that are created and which can be covered on the outwardly open side by a board or the like stamped.

   Thereupon the next following rows of faculty are set up as before and, the individual groups of cavities., Of which one is lined as before with intermediate layers d, as before, filled with concrete, and immediately.



  The method can .aber also be carried out in such a way that, instead of the first cavities formed by the spaces between the teaching bodies c, the second group of cavities resulting from the removal of the teaching bodies c before they are filled with the concrete with the intermediate. agen d is lined. In this case, the concrete blocks that have already been produced form the rebound surface and the support for the intermediate layers, while in the former case the teaching staff c form the support for the intermediate layers.

   In both cases, therefore, the intermediate layers clad the individual cavity do not need to form a coherent shape.



  For the production of concrete blocks of different composition in layers, the procedure d-erart is to be carried out "d

  As shown in FIG. 2, for example, the cavities left between the teaching bodies c and intermediate layers d are filled with concrete only up to a part of their height and the teaching body c is then removed, whereupon the resulting cavities are at the same height as the former Concrete is filled and one or more 'layers of concrete of a different, possibly richer composition are applied to this layer, whereby, as before, individual layers separated from one another are intimately connected to one another by the intermediate layers

    provided that a layer is applied immediately to a fresh lower layer.



  The method is not limited to the use of teaching staff with a rectangular floor plan, but these can also have other suitable angular shapes, provided that this only allows the teaching staff to be joined together in a checkerboard manner.



  In the manner described, as FIG. 1 shows, for example, strips of concrete stone paving can be inserted between paving strips a consisting of a uniform concrete layer, for example as expansion joints or to make underground pipes accessible.

 

Claims (1)

PATENTANSPRUCH: Verfahren zur Herstellung einer 'Strassen decke aus auf der Betturig gestampften und durch elastische Zwischenlagen voneinander getrennten Betonsteinen, dadurch gekenn zeichnet, PATENT CLAIM: Process for the production of a road surface from concrete blocks tamped on the bed and separated from one another by elastic intermediate layers, characterized by dass durch Aufstellen von der Grösse der herzustellenden Betonsteine entspre @hen- den Lehrkörpern auf der Betturig in der Grösse der herzustellenden Betonsteine ent sprechenden Abständen voneinianidier eine Gruppe von Hohlräumen und durch Ausfül- len dieser Hohlräume mit Beton und Entfernen der Lehrkörper eine zweite Gruppe von Hohlräumen gebildet wird und die Hohlräume einer der beiden Gruppen vor ihrem Ausfüllen mit Beton mit den, that by setting up the size of the concrete blocks corresponding to the size of the concrete blocks, teachers on the Betturig in the size of the concrete blocks to be produced a group of cavities and by filling these cavities with concrete and removing the teaching staff a second group of cavities is formed and the cavities of one of the two groups before they are filled with concrete with the, die Betonsteine voneinander trennenden Zwischenlagen ausgekleidet werden. UNTERANSPRUCH: Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Lehrkörper bereits entfernt werden, wenn die zwischen ihnen be findlichen Hohlräume erst zu einem Teil ihrer Höhe mit Beton ausgefüllt sind, worauf die durch,das Entfernen der Lehrkörper ent standenen, durch die Zwischenlaben von den ersteren getrennten Hohlräume bis zur Blei. eher Höhe mit Beton gefüllt und hierauf die Hohlräume insgesamt mit einer oder meh rerer Betonschichten gefüllt werden. the concrete blocks separating intermediate layers are lined. SUBCLAIM: Method according to claim, characterized in that the teaching bodies are already removed when the cavities between them are filled with concrete only to a part of their height, whereupon the resulting by removing the teaching body through the intermediate lobes from the the former separate cavities down to the lead. rather height filled with concrete and then the cavities are filled with one or more concrete layers.
CH133407D 1927-07-30 1928-07-28 Process for the production of road surfaces from concrete blocks. CH133407A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP55789D DE467044C (en) 1926-06-14 1927-07-30 Process for the production of a concrete pavement

Publications (1)

Publication Number Publication Date
CH133407A true CH133407A (en) 1929-06-15

Family

ID=7388009

Family Applications (1)

Application Number Title Priority Date Filing Date
CH133407D CH133407A (en) 1927-07-30 1928-07-28 Process for the production of road surfaces from concrete blocks.

Country Status (1)

Country Link
CH (1) CH133407A (en)

Similar Documents

Publication Publication Date Title
CH133407A (en) Process for the production of road surfaces from concrete blocks.
DE655809C (en) Concrete road surface with dividing strips made of cardboard, jute, fiber or the like.
DE467044C (en) Process for the production of a concrete pavement
DE611210C (en) Paving slab consisting of several blocks
DE2043081A1 (en) Process for the production of preferably steam-hardening components, for example aerated concrete elements
DE638942C (en) Pavement made of stones or slabs
AT132505B (en) Concrete slab for the production of road surfaces.
DE102017114619A1 (en) Prefabricated wall element
EP0477176B1 (en) Process for making an elevated floor
DE804125C (en) Joint filling and smearing device for the production of limited mortar beds on walls
DE560333C (en) Ceiling beam hollow brick
DE812111C (en) Wall for structures and manufacturing processes
DE894158C (en) Composite stone and mold for its manufacture
DE461247C (en) Pavement made of shaped stones
AT154161B (en) Process for connecting two components that are to be attached next to one another and movable with respect to one another, as well as connections made using this process
DE461533C (en) Process for the production of reinforced, angular containers made of concrete
DE333223C (en) Cavity wall made of unequal-sided angle plates
DE613338C (en) Flat or circular masonry that tapers towards the top and consists of individual layers of stone made from normal and fitting stones
AT130446B (en) Process for the production of quarry stone paving.
DE663513C (en) Multi-layer covering plate
DE499662C (en) Concrete road surface with a fabric insert
DE7239285U (en) Paving element, in particular concrete paving element
DE924859C (en) Shaft wall for wells, seepage and manholes and device for their manufacture
DE328569C (en) Method for forming and drying clay panels
AT88145B (en) Cavity wall made of unequal-sided angle plates.