CH133128A - Upgrading and shuttering device for ring structures. - Google Patents

Upgrading and shuttering device for ring structures.

Info

Publication number
CH133128A
CH133128A CH133128DA CH133128A CH 133128 A CH133128 A CH 133128A CH 133128D A CH133128D A CH 133128DA CH 133128 A CH133128 A CH 133128A
Authority
CH
Switzerland
Prior art keywords
support ring
cladding
construction
head frame
upgrade
Prior art date
Application number
Other languages
German (de)
Inventor
Lovisa Fr Ohle
Original Assignee
Fr Ohle & Lovisa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fr Ohle & Lovisa filed Critical Fr Ohle & Lovisa
Publication of CH133128A publication Critical patent/CH133128A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Description

  

      Aufrüstungs-    und Verschalungseinrichtung für     Ringbauwerke.       Die Errichtung von     Ringbauwerken,    zum  Beispiel Schornsteinen aus Eisenbeton, ge  schieht unter Zuhilfenahme von Gerüsten,  die innerhalb des Schornsteines Aufstellung  finden und von Baustufe zu     Baustufe    ver  längert werden müssen, was sehr zeitraubend  ist, da hierbei der Kopfteil des Gerüstes ab  montiert und wieder aufmontiert werden muss,  wobei auch noch darauf zu achten ist, dass  das Kopfgerüst wieder genau     winkel-    und  lotrecht zum Schornstein zu stehen kommt.  



  Gegenstand vorliegender Erfindung ist       eineAufrüstungs-andVerschalungseinrichtung,     die diesen     'Übelstand    dadurch zu vermeiden       sucht,    dass eine     Tragringkonstruktion    mit  einer Einrichtung zum schnellen Hochwinden  und :

  Befestigen des Kopfgerüstes verbunden  werden kann, das Ganze derart, dass nach  Füllung des Hohlraumes mit Beton die     Trag-          ringkonstruktion        zrzm    Hochziehen des Kopf  gerüstes und einer daran     angeordneten    Ar  beitsbühne benutzt, und das Kopfgerüst auf  dem inzwischen verlängerten Innengerüst  befestigt und     winkel-    und lotrecht ausgerichtet    werden kann, und dass dann mittelst des  Kopfgerüstes die     Tragringkonstruktion    mit  der Verschalung durch Flaschenzüge um eine  neue Baustufe gehoben werden kann.  



  Die Erfindung ist auf der Zeichnung in  einem     Ausführungsbeispiel    dargestellt, und  zwar zeigt       Fig.    1 einen senkrechten Schnitt durch  einen Schornstein mit aufgebrachter Ver  schalung und teilweisem Schnitt durch das  Kopfgerüst,       Fig.2    eine Ansicht von oben auf das  Kopfgerüst;       Fig.    3 und 4 zeigen ein     Innerrverschalungs-          segrnent    in Ansicht und Querschnitt.  



  In Verbindung mit der äussern Stahl  plattenverschalung in ist oben eine besondere       Tragringkonstruktion    f angeordnet, auf wel  cher an acht Stellen Verstärkungshölzer     lc          aufgelascht    sind. Die äussere Verschalung     m     hängt auf Rollen z', die in Hängeschiebern z  gelagert sind, welche durch die Spindeln i  in den Verbindungsbügeln y zwischen dem  äussern Tragring g und dem innern Trag-      ring     h    je nach dem Durchmesser des Schorn  steines eingestellt werden können und dadurch  fest mit der     Tragringkonstruktion    f ver  bunden sind.

   Durch die Flaschenzüge 1,  welche oben an den     Kopfgerüstbalken    d und  untenan den     aufgelaschten    Balken k befestigt  sind, wird die     Tragringkonstruktion    f mit  der Aussenverschalung     uz    hochgezogen und  in die Lage der nächsten Baustufe gebracht.  Am äussern Tragring g hängen Gerüsthalter       2o,    welche durch auf die Stege x gelegte  Bretter verbunden sind, von denen aus die  äussere Verschalung     an    fest ausgespannt wird.

    Von der am Kopfgerüst c angeordneten Ar  beitsbühne aus, die aus Gründen der Über  sichtlichkeit in der Zeichnung weggelassen  ist, bringt man dann zunächst die untere  Hälfte o der Innenverschalung an und ver  steift sie durch in die Hakenlaschen p einge  legten Rundeisen     r.    Nachdem man dann den  dadurch entstandenen Hohlraum zwischen  Aussen- und Innenverschalung mit Beton  ausgefüllt hat, setzt man die obere Hälfte     n     der Innenverschalung auf die untere Hälfte o,  befestigt sie mit dieser durch die Querlaschen q  und versteift sie im übrigen wie vorher die  untere Hälfte der Innenverschalung. Der neu  entstandene Hohlraum zwischen Aussen- und  Innenverschalung wird hierauf mit Beton  gefüllt.  



  Jetzt legt man die     Tragringkonstruktion    f  auf den fertiggestellten Teil des Schorn  steines<I>a,</I> stützt den innern Tragring     lt    durch  vier Streben s gegen die innere Verschalung  ab, hakt die Flaschenzüge 1 von der     Trag-          ringkonstruktion    f ab und die Flaschenzüge     t     oben am innern Tragring h unten an den  Eckpfosten des     Kopfgerüstes    c ein, löst die  Zwingen     z4    und zieht mit den Flaschenzügen t  das Kopfgerüst c so hoch, wie es einer Bau  stufe, das heisst der Höhe der Aussenverscha  lung entspricht.

   Da das Innengerüst b aus  hochkant gestellten Bohlen besteht, deren  innere Bohlen in der Höhe nach oben über  schneiden, so haben die     Kopfgerüstpfosten     beim Hochwinden Führung und können an  diesen Bohlen durch die Zwingen     1s    zunächst  festgeklemmt werden bis die äussern Bohlen    dazwischen gesetzt sind. Das Innengerüst b  wird hierbei durch in den Beton befestigte  Versteifungsdrähte e abgestützt, so dass ein  seitliches Ausweichen unmöglich ist.

   Nun  richtet man das Kopfgerüst genau aus,     _lüftet          bezw.        entfernt    die Flaschenzüge     t    und Stre  ben s und hakt die Flaschenzüge 1 in die       Tragringkonstruktion    fein, um die Tragring  konstruktion f mit der Aussenverschalung in,  nach Lösung derselben, um eine Baustufe     zrr     heben. Auf diese Weise wird abwechselnd  nach Fertigstellung einer Baustufe zuerst das  Kopfgerüst und nachher die     Tragringkonstruk-          tion    f mit der Aussenverschalung m auf die  Höhe der nächsten Baustufe gebracht.

   Das  erforderliche Baumaterial wird hierbei über  zwei Rollen des Kranbalkens v innen im  Schornstein auf die Arbeitsbühnen hochge  wunden und von diesem aus mittelst Schütten  oder Rinnen dem Ringhohlraum zugeführt.  



  Statt aus Holz kann das Innengerüst und  das Kopfgerüst auch in Eisenkonstruktion  hergestellt sein.



      Upgrading and shuttering device for ring structures. The construction of ring structures, for example chimneys made of reinforced concrete, is done with the help of scaffolding, which is set up inside the chimney and has to be extended from construction stage to construction stage, which is very time-consuming because the head section of the scaffolding is removed and reassembled must be, whereby it must also be ensured that the head frame is exactly at an angle and perpendicular to the chimney.



  The subject of the present invention is an upgrading and shuttering device which seeks to avoid this drawback by providing a support ring construction with a device for rapid wind up and:

  Attaching the head scaffold can be connected, the whole thing in such a way that after filling the cavity with concrete, the support ring construction zrzm pulling up the head scaffold and a working platform attached to it, and the head scaffold is attached to the meanwhile extended inner scaffolding and aligned at an angle and perpendicular can be, and that then by means of the head frame, the support ring construction with the cladding can be lifted to a new stage by pulleys.



  The invention is shown in the drawing in one embodiment, namely Fig. 1 shows a vertical section through a chimney with applied formwork and a partial section through the head structure, Figure 2 is a view from above of the head structure; 3 and 4 show an inner casing part in view and cross section.



  In connection with the outer steel panel cladding in, a special support ring construction f is arranged on top of which reinforcement timber lc is lashed in eight places. The outer casing m hangs on rollers z ', which are mounted in hanging slides z, which can be adjusted by the spindles i in the connecting brackets y between the outer support ring g and the inner support ring h depending on the diameter of the chimney and thereby are firmly connected to the support ring structure f.

   By means of the pulley blocks 1, which are attached to the top frame beam d and below to the lashed beam k, the support ring construction f with the outer casing uz is pulled up and brought into the position of the next construction stage. Scaffolding holders 2o hang on the outer support ring g and are connected by boards placed on the webs x, from which the outer casing is firmly stretched.

    From the working platform arranged on the head frame c, which has been omitted in the drawing for the sake of clarity, the lower half o of the inner cladding is first attached and it is stiffened by round iron r inserted into the hook straps p. After the resulting cavity between the outer and inner cladding has been filled with concrete, the upper half n of the inner cladding is placed on the lower half o, fastened to it with the cross straps q and otherwise stiffened as before the lower half of the Interior cladding. The newly created cavity between the outer and inner cladding is then filled with concrete.



  Now you put the support ring construction f on the finished part of the chimney <I> a, </I> supports the inner support ring lt by four struts s against the inner casing, hooks the pulley blocks 1 from the support ring construction f and the Pulley blocks t at the top of the inner support ring h at the bottom of the corner post of the head frame c, loosens the clamps z4 and with the pulley blocks t pulls the head frame c as high as it corresponds to a construction stage, i.e. the height of the outer cladding.

   Since the inner scaffolding b consists of planks placed on edge, the inner planks of which cut upwards in height, the head scaffold posts have a guide when winding up and can initially be clamped to these planks by the clamps 1s until the outer planks are placed in between. The inner framework b is supported by stiffening wires e fastened in the concrete, so that it is impossible to give way to the side.

   Now you align the head frame exactly, ventilate or removes the pulley blocks t and struts s and hooks the pulley blocks 1 in the support ring construction finely to lift the support ring construction f with the outer cladding in, after solving the same, by one construction stage zrr. In this way, after the completion of a construction stage, first the head frame and then the support ring construction f with the external cladding m are brought to the level of the next construction stage.

   The required building material is wound up on the working platforms via two rollers of the crane beam v inside the chimney and fed from there to the annular cavity by means of chutes or channels.



  Instead of wood, the inner frame and the head frame can also be made of iron.

 

Claims (1)

PATENTANSPRUCH: Aufrüstungs- und Verschalungseinrichtung für Ringbauwerke mit einer in Richtung der senkrechten Mittelachse des Bauwerkes verstellbaren Tragringkonstruktion für die äussere Verschalung, wobei die Tragring konstruktion eine Vorrichtung zum Verstellen der äussern Verschalung in radialer Richtung besitzt, welche: PATENT CLAIM: Upgrade and cladding device for ring structures with a support ring construction for the outer cladding that can be adjusted in the direction of the vertical central axis of the building, the supporting ring construction having a device for adjusting the outer cladding in the radial direction, which: Vorrichtung zwischen einem äussern und einem innern Tragring ange ordnete Bügel mit Spindeln aufweist, auf denen einstellbare, die äussere Verschalung tragende Hängeschieber angeordnet sind, da durch gekennzeichnet, dass die Tragringkon- struktion mit einer Einrichtung zum schnellen Hochwinden und Befestigen des Kopfgerüstes verbunden werden kann, das Ganze derart, dass nach Füllung des Hohlraumes mit Beton die Tragringkonstruktion zum Hochziehen des Kopfgerüstes und einer daran angeordneten Arbeitsbühne benutzt und das Kopfgerüst auf dein inzwischen verlängerten Innengerüst befestigt und winkel- und lotrecht ausgerich- tet werden kann, The device has brackets with spindles arranged between an outer and an inner support ring, on which adjustable suspension slides supporting the outer casing are arranged, as characterized in that the support ring construction can be connected to a device for quickly winding up and fastening the head frame, the whole thing in such a way that after the cavity has been filled with concrete, the support ring construction can be used to pull up the head frame and a working platform attached to it and the head frame can be attached to your meanwhile lengthened inner frame and aligned vertically and vertically, und dass dann mittelst des Kopfgerüstes die Tragringkonstruktion mit der Aussenverschalung durch Flaschenzüge um eine neue Baustufe gehoben werden kann. UNTERANSPRüCHE: 1. Aufrüstungs- und Verschalungseinrichtung für Ringbauwerke nach Patentanspruch, dadurch gekennzeichnet, dass das Innen gerüst (b) verstellbare Bohlen aufweist, deren innere Bohlen in der Höhe nach oben überschneiden, das Ganze derart, dass die Eckpfosten des Kopfgerüstes (e) beim Hochwinden derselben Führung haben und dass Zwingen (u) zum Festklemmen dieser Pfosten an den Bohlen vorgesehen sind. and that the support ring construction with the outer casing can then be lifted to a new construction stage by means of the head frame. SUBClaims: 1. Upgrade and shuttering device for ring structures according to claim, characterized in that the inner frame (b) has adjustable planks, the inner planks of which overlap in height upwards, the whole thing in such a way that the corner posts of the head frame (e) when Winch the same guide and that clamps (u) are provided to clamp these posts to the planks. 2. Aufrüstungs- und Verschalungseinrichtung für Ringbauwerke nach Patentanspruch und Unteranspruch 1, dadurch gekenn zeichnet, dass das Innengerüst (b) durch in den Beton befestigte Versteifungs drähte (e) abgestützt ist, zum Zweck ein seitliches Ausweichen zu verhindern. 3. Aufrüstungs- und Verschalungseinrichtung für Ringbauwerke nach Patentanspruch und Untersanprüchen 1-2, dadurch gekenn zeichnet, dass an dem äussern Tragring (g) der Tragringkonstruktion (f) Gerüsthalter (zv) angeordnet und untereinander durch auf die Stege (x) gelegte Bretter verbun den sind, von denen aus die Aussen verschalung (m) gespannt werden kann. 2. Upgrade and cladding device for ring structures according to claim and dependent claim 1, characterized in that the inner frame (b) is supported by reinforcing wires (e) fastened in the concrete, for the purpose of preventing lateral evasion. 3. Upgrade and cladding device for ring structures according to claim and sub-claims 1-2, characterized in that on the outer support ring (g) of the support ring structure (f) scaffold holder (zv) arranged and connected to each other by boards placed on the webs (x) the ones from which the outer cladding (m) can be stretched.
CH133128D 1928-10-20 1928-10-20 Upgrading and shuttering device for ring structures. CH133128A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH133128T 1928-10-20

Publications (1)

Publication Number Publication Date
CH133128A true CH133128A (en) 1929-05-31

Family

ID=4391321

Family Applications (1)

Application Number Title Priority Date Filing Date
CH133128D CH133128A (en) 1928-10-20 1928-10-20 Upgrading and shuttering device for ring structures.

Country Status (1)

Country Link
CH (1) CH133128A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5379860A (en) * 1993-08-02 1995-01-10 Tang; I-Shya Carrier for construction of buildings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5379860A (en) * 1993-08-02 1995-01-10 Tang; I-Shya Carrier for construction of buildings

Similar Documents

Publication Publication Date Title
DE1911352C3 (en) Inflatable formwork
DE1684283C3 (en) Climbing formwork for the production of concrete structures such as silos or the like
DE7301816U (en) DEVICE FOR ERECTING PREFERABLY ENCLOSED CONCRETE BUILDINGS
AT118011B (en) Formwork for ring structures.
CH133128A (en) Upgrading and shuttering device for ring structures.
DE19509078A1 (en) Shuttering for overhead concrete arches
DE2125422B2 (en) Climbing formwork for erecting tower-like reinforced concrete structures
DE3915090A1 (en) Portal-like erection crane for erecting and dismantling panel and large-area formwork for round reinforced-concrete tanks
WO1984000189A1 (en) Method for wall concreting and formwork to implement such method
DE2854888C2 (en) Internal formwork that can be dismantled for the production of large-scale concrete structures
DE1280534B (en) Protective hood for a work scaffold for industrial chimney construction
DE2460742B2 (en) Formwork for the production of conical structural parts
DE510831C (en) Pull-up formwork
DE1116378B (en) Console frame
AT235000B (en) Formwork arrangement
DE102014017701B4 (en) Method for erecting a container with a roof of a roof, device for erecting a container according to the method and container with a roof of the roof
CH125056A (en) Tower crane.
DE1292363B (en) Climbing formwork for concreting tower-like structures
DE3626183A1 (en) Exterior shuttering for concreting towers or the like in sections
DE2728529A1 (en) Circular tubular concrete walled cattle shed construction - involves mounting revolving crane on centre divisible steel tubular pillar
AT218229B (en) Scaffolding for supporting formwork
DE8504548U1 (en) Formwork for rotationally symmetrical, particularly cylindrical and conical, e.g. slightly tapering, structures
AT235551B (en) Procedure for erecting inclined reinforced concrete columns and equipment for carrying out this procedure
DE1266948B (en) Climbing formwork for concreting tower-like structures
AT302590B (en) Formwork for shell concrete