Process for the foundation of structures by sealing them against groundwater.Info
- Publication number
- CH115493A CH115493A CH115493DA CH115493A CH 115493 A CH115493 A CH 115493A CH 115493D A CH115493D A CH 115493DA CH 115493 A CH115493 A CH 115493A
- Authority
- CH
- Switzerland
- Prior art keywords
- layer
- sealing
- foundation
- water
- concrete
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 8
- 239000003673 groundwater Substances 0.000 title claims description 7
- 238000007789 sealing Methods 0.000 title claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 238000004078 waterproofing Methods 0.000 description 3
- 239000010426 asphalt Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 239000011270 tar paper Substances 0.000 description 2
- 101150054854 POU1F1 gene Proteins 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Building Environments (AREA)
Description
Verfahren zur Gründung von Baukörpern unter Abdichtung derselben gegen Grundwasser. Die Erfindung betrifft ein Verfahren zur Gründung ' von Baukörpern unter Ab dichtung derselben gegen Grundwasser, wie solches beispielsweise bei Gebirgsstollen, Untergrundbahnen und dergleichen zur An wendung kommt.
Solche Gründungsverfahren werden im allgemeinen so ausgeführt, dass zunächst eine Baugrube durch Abpumpen des Grundwas sers nach Möglichkeit trocken gelegt wird. Sodann wird auf die rauhe Wand der Grube eine dünne Betonschicht aufgebracht und hierdurch für eine Abdichtungsschicht eine glatte Unterlage geschaffen. Die Dichtungs schicht besteht gewöhnlich aus mehreren La gen Pappe, die mit Bitumen getränkt ist. Auf diese kann dann das übrige Bauwerk material, beispielsweise eine Betonschicht, aufgebracht werden.
Es hat sich nun gezeigt, dass bei stark grundwasserhaltigem Boden, besonders dort, wo Wasseradern durchschnitten werden, die Betonschicht trotz Abpumpens des Grund- wassers, leicht porös bleibt und infolgedes sen für das Aufbringen der Teerpappe nicht genügend trocknet. Die Teerpappe wird in folgedessen durchnässt und klebt nicht zu sammen.
Die vorliegende Erfindung verfolgt den Zwech, in diesem Falle eine vollkommen trockene Unterlage für die genannte Abdich tungsschicht zu schaffen. Dies wird da durch erreicht, dass zwischen eine Beton schicht, welche die Abdichtungsschicht auf nimmt, und die Wand der Baugrube eine weitere, wasserabführende Schicht, am besten aus Falzbaupappe, gelegt wird, wel che Rillen bildet, in denen das Sickerwasser, zum Beispiel nach unten, in Kanäle rinnt, aus denen es abgeführt wird.
In der Zeichnung zeigen: Fig. 1 einen Schnitt durch einen gemäss einem Verfahrensbeispiel gegründeten und abgedichteten Stollen, Fig. 2 einen Schnitt durch dabei verwen dete Falzbaupappe. Die muhe Wand der Baugrube 1 wird durch eine dünne Betonschicht 2 geebnet. Auf diese werden ein oder mehrere Lagen 3 aus Falzbaupappe aufgebracht (Fig. 2). Die Falzbaupappe besitzt viele Längsfalze oder -Rillen, in denen das durch die Schicht hindurchsickernde Wasser nach unten ab laufen kann.
Dort wird es in Kanälen 4 besammelt, um dann den Sammelgruben oder dergleichen zuzufliessen. Auf diese Falzbaupappenschicht 3 wird eine weitere Betonschicht 5 aufgebracht. Diese bindet dicht und ohne Poren ab, da alles etwaige Druckwasser durch die Falzbaupäppe abge leitet wird. Sie bildet also eine geeignete Unterlage für die eigentliche Abdichtungs schicht 6; diese besteht aus Pappschichten, welche mit Bitumen getränkt sind. Auf die ser Abdichtungsschicht wird die Betonwand 7 aufgeführt.
Process for the foundation of structures by sealing them against groundwater. The invention relates to a method of founding 'building structures under seal from the same against groundwater, such as such for example in mountain tunnels, subways and the like comes to use.
Such foundation processes are generally carried out in such a way that first a construction pit is drained if possible by pumping out the groundwater. A thin layer of concrete is then applied to the rough wall of the pit, creating a smooth base for a waterproofing layer. The sealing layer usually consists of several layers of cardboard that is impregnated with bitumen. The rest of the building material, for example a concrete layer, can then be applied to this.
It has now been shown that in the case of soil with a lot of groundwater, especially where water veins are cut, the concrete layer remains slightly porous despite the pumping out of the groundwater and consequently does not dry sufficiently for the tar paper to be applied. As a result, the tar paper gets soaked and does not stick together.
The present invention pursues the purpose of creating a completely dry base for said waterproofing layer in this case. This is achieved by the fact that between a concrete layer, which takes the sealing layer, and the wall of the construction pit another, water-draining layer, preferably made of folded cardboard, is placed, which forms grooves in which the seepage water, for example after downstairs, flowing into channels from which it is discharged.
In the drawing: FIG. 1 shows a section through a tunnel established and sealed according to a method example, FIG. 2 shows a section through folded cardboard used in this process. The hard wall of the excavation pit 1 is leveled by a thin layer of concrete 2. One or more layers 3 of folded cardboard are applied to this (FIG. 2). The folded cardboard has many longitudinal folds or grooves in which the water seeping through the layer can run downwards.
There it is collected in channels 4 in order to then flow into the collecting pits or the like. A further concrete layer 5 is applied to this folded cardboard layer 3. This binds tightly and without pores, since any pressurized water is diverted through the folded cardboard. So it forms a suitable base for the actual sealing layer 6; this consists of cardboard layers which are soaked with bitumen. The concrete wall 7 is listed on this waterproofing layer.
Claims (1)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE115493X | 1924-05-23 |
Publications (1)
Publication Number | Publication Date |
---|---|
CH115493A true CH115493A (en) | 1926-07-01 |
Family
ID=5654269
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CH115493D CH115493A (en) | 1924-05-23 | 1925-05-04 | Process for the foundation of structures by sealing them against groundwater. |
Country Status (1)
Country | Link |
---|---|
CH (1) | CH115493A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3111811A (en) * | 1956-12-15 | 1963-11-26 | Nederlanden Staat | Method for the construction of a tunnel or tunnel-part and a tunnel or tunnel-part obtained by pursuing said method |
US4439066A (en) * | 1982-03-19 | 1984-03-27 | Mcnally Michael P | Pervious tunnel liner member |
-
1925
- 1925-05-04 CH CH115493D patent/CH115493A/en unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3111811A (en) * | 1956-12-15 | 1963-11-26 | Nederlanden Staat | Method for the construction of a tunnel or tunnel-part and a tunnel or tunnel-part obtained by pursuing said method |
US4439066A (en) * | 1982-03-19 | 1984-03-27 | Mcnally Michael P | Pervious tunnel liner member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2434200B2 (en) | METHOD OF CREATING UNDERGROUND CAVITIES | |
CH115493A (en) | Process for the foundation of structures by sealing them against groundwater. | |
DE2330718C3 (en) | Process for producing a resilient sealing layer of a building and a plate or film for carrying out the process | |
DE526167C (en) | Method for sealing mountain tunnels against groundwater | |
DE2101092C3 (en) | Arched extension of the route with the help of segments made of concrete | |
DE825676C (en) | Water-side sealing body for dam clamp | |
DE2618364C2 (en) | Multi-layer chimney and mantle brick for one chimney | |
DE2519542A1 (en) | DEVICE FOR THE TREATMENT OF ONE OR MORE ACCESSORIES IN A CLOSED ROOM, AS WELL AS A METHOD OF USING THE DEVICE TO TEMPORARILY OR PERMANENTLY FILL CAUSES IN A POROUS MATERIAL | |
DE2829712C2 (en) | Process for the production of underground structures | |
DE1584757A1 (en) | Process for the production of a cast precast concrete part | |
DE19604525A1 (en) | High-pressure injection sealing bed for excavation | |
DE2834496A1 (en) | FOLDABLE COMPONENT | |
DE2051607C3 (en) | Multi-layer covering for sealing raw ceilings in building construction, civil engineering and civil engineering as well as processes for its production | |
DE697464C (en) | Process for the construction of tunnels located underwater or in the groundwater | |
DE3234719A1 (en) | METHOD AND DEVICE FOR PRODUCING A ROOF CONSTRUCTION | |
DE101958C (en) | ||
DE489350C (en) | Procedure for testing concrete within a structure | |
DE1944686A1 (en) | Method for sinking earth bores and device for carrying out the same | |
DE4015474A1 (en) | Concrete floor for building - is supported by parallel tubular structural elements | |
AT377811B (en) | METHOD FOR DRYING UNDERGROUND PARTS OF CONSTRUCTIONS, ESPECIALLY BASEMENT WALLS | |
DE179650C (en) | ||
AT141351B (en) | From round wood existing ring or arched expansion body for pit expansion u. like | |
DE535686C (en) | Ceiling made of reinforced concrete beams and hollow stones made of baked clay suspended between them | |
DE2834875A1 (en) | PROCEDURE FOR CONSTRUCTION OF AN UNDERGROUND TILT | |
CH97820A (en) | Process for the construction of dams. |