CH103823A - Process for the production of a watertight and pressure-resistant tunnel in a mountain range. - Google Patents

Process for the production of a watertight and pressure-resistant tunnel in a mountain range.

Info

Publication number
CH103823A
CH103823A CH103823DA CH103823A CH 103823 A CH103823 A CH 103823A CH 103823D A CH103823D A CH 103823DA CH 103823 A CH103823 A CH 103823A
Authority
CH
Switzerland
Prior art keywords
concrete
tunnel
lining
pressure
watertight
Prior art date
Application number
Other languages
German (de)
Inventor
Siemens- Kommanditgesellschaft
Original Assignee
Siemens Bauunion G M B H Komma
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Bauunion G M B H Komma filed Critical Siemens Bauunion G M B H Komma
Publication of CH103823A publication Critical patent/CH103823A/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

  

  Verfahren zur Herstellung eines     wasserdichten    und druckfesten Stollens  in einem Gebirge.    Bei     WasserkraAanlagen    im Gebirge kommt  es häufig vor, dass das gestaute Wasser     mit-          telst        Druckstollens    durch Gebirge hindurch  zuleiten ist. Die Herstellung derartiger Stol  len bereitet dadurch Schwierigkeiten,     @dass    sie  im Betriebe unter einem teilweisen grossen  Innendruck stehen und vor     Inbetriebnahme     und bei vorübergehender     Ausserbetriebsetzung     keinen     Innendi2iclL    aufweisen und dann von  aussen beansprucht werden können.

   Man ist  bisher in der Weise vorgegangen, dass man  solche Stollen mit steinartigen Baustoffen  (Beton oder Mauerwerk) ausgekleidet und  eine wasserdichte Zementschicht aufgebracht  hat. Es sind jedoch     erfahrungsgemäss    infolge  von     Temperaturänderungen    Spannungen,     Än-          derungen    des     Gebirgsdrucl-,es,    Schwinden des  Zementes oder dergleichen bisher in der Regel  Risse entstanden, durch die erhebliche Men  gen von Druckwasser verloren gegangen  sind,     womit    erhebliche wirtschaftliche     I\?ach-          tei'le    verknüpft waren.  



       Erfindungsgemäss    werden derartige Stol  len in der     Z9reise        ausgeführt,        .dass    nach Aus-         bruch    des     Stollens    zunächst durch eine Aus  kleidung aus steinartigen Baustoffen eine  glatte Röhre geschaffen wird. Die Baustoffe  füllen sämtliche Unebenheiten aus, und auf  der glatten Innenfläche wird dann eine  elastische Dichtungsschicht aufgetragen. Sie  besteht     zweckmässigerweise    aus mehreren  Lagen von Pappe, die mit einem Dichtungs  stoff imprägniert ist.

   Das Aufbringen der  Pappe geschieht ,durch     Kleben,    wobei als       Klebemittel    derselbe Stoff oder ein ähnlicher  Stoff dienen kann, der zum Imprägnieren der  Pappe verwendet wurde.     DieDichtungsschicht     wird dann von innen wiederum mit einer  Betonschicht ausgekleidet.  



  In der Zeichnung ist in     Fig.    1 ein Aus  führungsbeispiel eines nach dem Verfahren  gemäss der Erfindung hergestellten     Stollens     für eine Auskleidung mit Eisenbeton und in       Fig.    2 ein solches mit einer andern Ausklei  dung dargestellt.  



       Gemäss        Fig.    1 ist in dem Gebirge     a    zuerst  ein Stollen von dem erforderlichen Durchmes  ser     vorgetrieben.    Alsdann ist durch ein Be-           tons.pritzverfahren    eine Auskleidung b ein  gebracht. Die Verwendung     des.    Spritzbetons  bietet hierbei .den Vorteil, dass der Beton  sämtliche Ecken und Winkel ausfüllt und in  folgedessen sich allseitig ohne Hohlraum an  den bewachsenen Felsen anlegt. Das Licht  raumprofil ist hier     kreisförmig    gewählt.

   Auf  der     Betonschicht    b ist dann in     mehreren    La  gen eine Schicht imprägnierter Pappe c     auf-          geklebt.        Alsdaun    ist die Eisenbewehrung     cl          eingebracht,    und wiederum durch ein Sprit z  verfahren wird die Betonschicht e     li,:rgestellt,     die die Eiseneinlage     d    allseitig umschliesst.  



  Die     Dielitungsschicht    c stützt sich gegen  die     Betonauskleidung    b, wenn innerhalb des  Rohres Überdruck vorhanden ist, andernfalls  dient das Rohr d, e aus Eisenbeton als Wider  laber     gegenüber    einem etwaigen     äussern    Was  serdruck.  



  An Stelle von     imprägnierter    Pappe kann       -li    eine elastische Dichtungsschicht aus     an-          #        -tuo     derem Stoff verwendet werden. .  



  Wenn ein grösserer Innendruck im Rohr  herrscht, ist allerdings damit zu     rechnen,    dass  die innere     Betonauskleidung    Risse bekommt.  Dasselbe ist -der Fall bei     etwaigen        Ge-          birgsbewegungen.    In die entstehenden Risse  wird dann Wasser eintreten, an die Eisenein  lagen     gelangen    und deren Rosten bewirken.  Durch die dabei eintretende     R.a.uinvergrösse-          rung    .des Eisens kann .dann unter Umstünden  ein Absprengen von Teilen der Schutzaus  kleidung eintreten.

   Lässt man anderseits die  Eiseneinlagen fort, so darf bei der Herstel  lung der Betonauskleidung mit Hilfe des  Spritzverfahrens die obere Röhrenhälfte der       Auskleidung,    von den Seiten anfangend, nur  allmählich fortschreitend ausgeführt werden,  und es sind auch längere Arbeitspausen vor  zusehen, damit der bereits fertig bestellte Teil  der     Auskleidung    abbindet.

   Es besteht an  dernfalls die Gefahr, dass der     geben    die     Stol-          lendecke        bespritzte    Beton durch eine     Ge-          tviehtsbelastung    ein Ablösen und Durch  sacken der Dichtungsschicht     bewirkt.        Man     könnte auch die Betonauskleidung aus       Stampfbeton    herstellen. Es ist aber dann eine       kostspielige    Schalung erforderlich.

      Alle diese Übelstände werden vermieden,  wenn zur innern     Ausk        leidung    des     Stollens          Letonformsteine    verwendet werden. Diese  Verfahren ist in     Fib.    ?     -dargestellt.    Dort     iwt     zur     Verringerung    der Kosten nur der obere  Teil des Stollens mit     Fonmsteinen    ausgelegt       und    für den untern Teil     Stampfbeton    ver  wendet.  



  a ist das     Gebirge,    b die     Auskleidung        lind     c die Dichtungsschicht. Im untern Teil des       Stollens    ist eine     Sta.mpfbetonschiclit        j        ein;ga-          bracht,    die     seitlicb    so weit reicht, als der Be  ton ohne     besondere    Schalung hergestellt wer  den kann.

   Der     übri,-    'feil des     Rin-raurnes     ist mit den     Betonformsteinen        g    ausgekleidet,  die ausserhalb des     Stollens    an beliebiger Stelle  auf Vorrat herbestellt werden. Die Steine       haben    einen     U-förmigen        Querschnitt    und wer  den so     verlegt,        dass    der Hohlraum, der sich  durch die Form der Steine     ergibt,    der Dich  tung     zugekehrt    ist.

   Sie können unmittelbar  nach der Herstellung der Dichtung verlegt  werden und bilden dann eine     Unterstützung     für die Dichtung, deren Abblättern auf     dir-e     Weise     verhindert        wird.    Der Hohlraum zwi  schen den Steinen und der     Dichtung.ssdicht     wird' nachträglich durch das Einführen von  Zement- oder Betonbrei unter Druck ausge  füllt.

   Der sich einerseits     gegen    das     @tein-          1;ewölbe    und anderseits     geben    die     Dichtungs-          schicht        legende        Pressbeton    drückt dann die       Dichtung        geben    ihre Unterlage und verhin  dert ein nachträgliches     Abblättern        od3r          Durchhängen        derselben.    Die Steine können in  einfachen Ringen nebeneinander verlegt wer  den.

   Ein Verband der Steine untereinander  ist     nicht        erforderlich.    Tür     das        Betoneinpre.s-          sen    sind stellenweise Steine mit     offnungeii     einzubauen, die nachträglich     geschlossen     werden.



  Process for the production of a watertight and pressure-resistant tunnel in a mountain range. In the case of hydropower plants in the mountains, it often happens that the dammed water is fed through the mountains by means of a pressure tunnel. The production of such studs is difficult because they are under sometimes high internal pressure in the company and do not have an internal diameter before commissioning and when they are temporarily shut down and can then be stressed from the outside.

   So far, the approach has been to line such tunnels with stone-like building materials (concrete or masonry) and to apply a waterproof layer of cement. However, experience has shown that tensions, changes in rock pressure, shrinkage of cement or the like have so far usually developed through which considerable amounts of pressurized water have been lost, which is a considerable economic disadvantage 'le were linked.



       According to the invention, such studs are constructed in the zone so that after the stud has broken out, a smooth tube is first created by a lining made of stone-like building materials. The building materials fill in any unevenness and an elastic sealing layer is then applied to the smooth inner surface. It expediently consists of several layers of cardboard that is impregnated with a sealant.

   The cardboard is applied by gluing, whereby the same material or a similar material that was used to impregnate the cardboard can serve as the adhesive. The sealing layer is then again lined with a layer of concrete from the inside.



  In the drawing, in Fig. 1, an exemplary embodiment of a tunnel produced by the method according to the invention for a lining with reinforced concrete and in Fig. 2 such with another lining is shown.



       According to Fig. 1, a tunnel of the required diameter is first driven in the mountains a. A lining b is then brought in by a concrete injection molding process. The use of shotcrete offers the advantage that the concrete fills all nooks and crannies and consequently rests on the overgrown rock on all sides without a cavity. The light space profile is chosen here to be circular.

   A layer of impregnated cardboard c is then glued onto the concrete layer b in several layers. Then the iron reinforcement cl is introduced, and the concrete layer el is created, which surrounds the iron insert d on all sides.



  The dielectric layer c is supported against the concrete lining b when there is overpressure inside the pipe, otherwise the pipe d, e made of reinforced concrete serves as a counterweight to any external water pressure.



  Instead of impregnated cardboard, an elastic sealing layer made of other material can be used. .



  If there is greater internal pressure in the pipe, however, it is to be expected that the inner concrete lining will crack. The same is the case with any mountain movements. Water will then enter the resulting cracks, reach the iron deposits and cause them to rust. Due to the resulting increase in size of the iron, parts of the protective lining may then under certain circumstances burst off.

   If, on the other hand, the iron inlays are omitted, the upper tube half of the lining, starting from the sides, may only be made gradually progressing when producing the concrete lining with the aid of the spraying process, and longer work breaks must also be allowed for so that the already completed order Part of the lining sets.

   Otherwise, there is a risk that the concrete that has been sprayed onto the stool ceiling will cause the sealing layer to peel off and sag through an excessive load. The concrete lining could also be made from stamped concrete. However, expensive formwork is then required.

      All these inconveniences are avoided if Letonform blocks are used for the inner lining of the tunnel. This procedure is in Fib. ? - shown. There iwt to reduce costs only the upper part of the tunnel is laid out with concrete stones and used for the lower part of stamped concrete ver.



  a is the rock, b the lining and c the sealing layer. In the lower part of the tunnel there is a reinforced concrete slice that extends laterally as far as the concrete can be made without special formwork.

   The rest of the ring-room is lined with molded concrete blocks, which can be ordered for stock anywhere outside the tunnel. The stones have a U-shaped cross-section and are laid in such a way that the cavity that results from the shape of the stones faces you.

   They can be laid immediately after the seal has been made and then form a support for the seal, which is prevented from peeling in a dire way. The cavity between the stones and the Dicht.ssdicht is' subsequently filled by the introduction of cement or concrete paste under pressure.

   The pressed concrete, on the one hand against the stone vault and on the other hand, gives the sealing layer, then presses the seal, providing its base and prevents it from peeling off or sagging. The stones can be laid next to each other in simple rings.

   A bond between the stones is not necessary. In the door of the concrete grouting, stones with opening elements must be built in in places, which are subsequently closed.

 

Claims (1)

PATENTANSPRUCH Verfahren zur Herstellung eines wasser dichten und druckfesten Stollens in einem Gebirge, dadurch gekennzeichnet; dass nach Ausbruch des Stollens mit Hilfe steinartiger Baustoffe eine glatte RÖhTe geschaffen, auf die Innenwand eine elastische Dichtunjs- schicht aufgeklebt und dann eine Betonaus- kleidung eingefügt wird. <B>UNTERANSPRÜCHE:</B> 1. PATENT CLAIM A method for producing a watertight and pressure-resistant tunnel in a mountain range, characterized in that; that after the tunnel was excavated, a smooth RÖhTe was created with the help of stone-like building materials, an elastic sealing layer was glued to the inner wall and then a concrete lining was inserted. <B> SUBClaims: </B> 1. Verfahren nach Patentanspruch, dadurch g e 'kennzeichnet, dass die Auskleidung, t' des Stollens aus Beton besteht und . mittelst eines Spritzverfahrens erfolgt. 3.. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Innenauskleidung ,des Stollens aus Eisenbeton besteht, wobei der Beton auch mit Hilfe eines Spritzver- fahrens eingebracht wird. 3. Method according to patent claim, characterized in that the lining "t" of the tunnel consists of concrete and. takes place by means of a spraying process. 3. The method according to claim, characterized in that the inner lining of the tunnel consists of reinforced concrete, the concrete also being introduced with the aid of a spraying process. 3. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass zum mindesten der obere Teil des Stollens mit Betonform steinen ausgekleidet wird. 4. Verfahren nach Patentanspruch und Un teranspruch 3, dadurch gekennzeichnet, dass Formsteine mit U-förmigem Quer schnitt verwendet werden, so, dass zwi schen der Dichtungsschicht. und den Formsteinen Hohlräume entstehen und dass in die Hohlräume Zement- oder Beton brei unter Druck eingebracht wird. Method according to claim, characterized in that at least the upper part of the tunnel is lined with concrete blocks. 4. The method according to patent claim and un teran claim 3, characterized in that shaped blocks with a U-shaped cross-section are used, so that between tween the sealing layer. and the shaped stones create cavities and that cement or concrete slurry is introduced under pressure into the cavities.
CH103823D 1922-08-26 1923-03-21 Process for the production of a watertight and pressure-resistant tunnel in a mountain range. CH103823A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE103823X 1922-08-26
DE200223X 1923-02-20

Publications (1)

Publication Number Publication Date
CH103823A true CH103823A (en) 1924-05-01

Family

ID=25750433

Family Applications (1)

Application Number Title Priority Date Filing Date
CH103823D CH103823A (en) 1922-08-26 1923-03-21 Process for the production of a watertight and pressure-resistant tunnel in a mountain range.

Country Status (1)

Country Link
CH (1) CH103823A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989000633A1 (en) * 1987-07-21 1989-01-26 Alagi Állami Tangazdaság Process for repairing structures, objects, in particular sewers and pipes of defective stability and watertightness, without dismantling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989000633A1 (en) * 1987-07-21 1989-01-26 Alagi Állami Tangazdaság Process for repairing structures, objects, in particular sewers and pipes of defective stability and watertightness, without dismantling

Similar Documents

Publication Publication Date Title
CN104594387B (en) Improved post-cast strip advance water stop construction method
CN204343312U (en) Plugging device of precipitation well in foundation pit
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CH103823A (en) Process for the production of a watertight and pressure-resistant tunnel in a mountain range.
CN206174293U (en) Prefabricated constructional column
CN109763573B (en) Water stop ridge and construction method thereof
CN110258675B (en) Reinforcing and correcting method for strip foundation box type composite foundation of building
DE19939799A1 (en) Procedure to refurbish or reinforce supports in brickwork entails enclosing support in textile casing which is closed to form a sealed sleeve which is then filled via connection with suitable filler
CN106013143A (en) Anchor rod for underground engineering anti-floating system construction and construction method
DE19728519B4 (en) Method and arrangement for preparing and renovating an ancient wall
DE557509C (en) Process for the production of wells and shafts within sheet piling
GB506917A (en) Improvements in the formation of linings for tunnels and the like
RU2655712C1 (en) Method of the mine shaft with a tubing support reconstruction
DE19643175A1 (en) Reconstruction method for stacks of e.g. water pipes
DE19604525A1 (en) High-pressure injection sealing bed for excavation
Gerstner et al. Long‐term behaviour of pressure tunnels/Langzeitverhalten von Druckstollen
CN217480096U (en) Structure for rapidly reconstructing upstream dam surface seepage-proofing body of stone-laying dam
DE663820C (en) Lining for tunnels, galleries and similar structures
ES2009339A6 (en) Process for repairing structures, objects, in particular sewers and pipes of defective stability and watertightness, without dismantling.
DE2413613C2 (en) Process for the production of watertight sealing stops for miter gates and device for carrying out the process
DE102015006470B4 (en) System for the subsequent sealing of buildings (especially building cellars) against pressurized water with textile-reinforced concrete inner tubs based on microcrystalline mortar
GB119045A (en) Improvements in and relating to Reinforced Blockwork Floors, Roofs and the like.
DE3733537A1 (en) Process for repairing concrete foundations on masts and the like
DE805553C (en) Process for the production of reinforced concrete rib ceilings
AT255101B (en) Roof drain for flat roofs