CA3058488C - A x80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof - Google Patents

A x80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof Download PDF

Info

Publication number
CA3058488C
CA3058488C CA3058488A CA3058488A CA3058488C CA 3058488 C CA3058488 C CA 3058488C CA 3058488 A CA3058488 A CA 3058488A CA 3058488 A CA3058488 A CA 3058488A CA 3058488 C CA3058488 C CA 3058488C
Authority
CA
Canada
Prior art keywords
cooling
steel plate
rolling
temperature
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA3058488A
Other languages
French (fr)
Other versions
CA3058488A1 (en
Inventor
Changlin JIANG
Xiaohong Xu
Jianyang CHU
Guoqing Xu
Tao Lin
Xiaolin Wu
Jianguo Hu
Yueming PAN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Xingcheng Special Steel Works Co Ltd
Original Assignee
Chu Jianyang
Jiang Changlin
Pan Yueming
Jiangyin Xingcheng Special Steel Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chu Jianyang, Jiang Changlin, Pan Yueming, Jiangyin Xingcheng Special Steel Works Co Ltd filed Critical Chu Jianyang
Publication of CA3058488A1 publication Critical patent/CA3058488A1/en
Application granted granted Critical
Publication of CA3058488C publication Critical patent/CA3058488C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0221Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
    • C21D8/0226Hot rolling
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0247Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the heat treatment
    • C21D8/0263Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the heat treatment following hot rolling
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/08Ferrous alloys, e.g. steel alloys containing nickel
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/14Ferrous alloys, e.g. steel alloys containing titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/16Ferrous alloys, e.g. steel alloys containing copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/42Ferrous alloys, e.g. steel alloys containing chromium with nickel with copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/44Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/46Ferrous alloys, e.g. steel alloys containing chromium with nickel with vanadium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/48Ferrous alloys, e.g. steel alloys containing chromium with nickel with niobium or tantalum
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/50Ferrous alloys, e.g. steel alloys containing chromium with nickel with titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/58Ferrous alloys, e.g. steel alloys containing chromium with nickel with more than 1.5% by weight of manganese

Abstract

A high carbon equivalent and high low-temperature toughness pipeline steel plate for an X80 elbow pipe and a manufacturing method therefor. The method has the characteristics of simple process and high yield. The thickness of the steel plate is 18.4-42 mm. The manufacturing process is as follows: preparing materials according to proportions; smelting same by a converter or an electric furnace; refining same outside the converter or furnace; performing continuous casting; reheating a plate blank; performing rolling, and ACC gradient cooling; and straightening. The steel plate has excellent low-temperature toughness; the manufacturing method therefor is simple and easy, and brings high yield.

Description

DESCRIPTION
A X80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof Technical Field The present application relates to a technical field of manufacturing X80 pipeline steel plate for bent pipes, especially relates to a X80 pipeline steel plate for bent pipes with high carbon equivalent and high toughness at low temperatures and a manufacturing method thereof.
Background Art With the dominance of petrochemical energy in the world's energy demand and the rapid growth of petrochemical energy demand under the roaring world economy nowadays, the long-distance pipelines are largely improved for higher transmission efficiency and less investment, and the development trend of long-distance oil and gas pipelines steel is to be in high strength or super high grade. At present, the highest grade of pipeline steel used in the world is X80. In addition to the straight pipe, a pipeline project also includes the bent pipes for the direction change of the pipeline, the bent pipes in stations, and so on. Bent pipes are usually produced by two kinds of processes, namely, cold bending and hot bending, and the cold bending process has been gradually replaced by hot bending process as cold bending process is under the influence of manufacturing process and service environment. The hot bending of bent pipes usually are to heat the main pipe to Ac3 or above by induction heating equipment, and then the heating zone rotates around the fixed center to bend the bent pipe with the required radius of curvature by a fixed turning panel and under the action of back thrust; after bending, the bent pipe outer ring is cooled by an annular cooling ring, and the heated part of the bent pipe undergoes an accelerated cooling similar to ACC because of the limited cooling capacity of the annular cooling ring.
The steel plate after cooling treatment is treated by tempering in a continuous furnace in consideration of the property uniformity. From the view of the whole process, the whole hot bending and cooling bending process are similar to the TMCP process, which is the combination of high-temperature deformation (bending) and ACC
cooling process. Because the Whole hot bending process is deformed to a small extent ¨ 1 ¨

at a high temperature and the subsequent cooling capacity is weak, the hot bending steel plate for bent pipes can only be designed with high carbon-equivalent composition. The high-carbon-equivalent design will bring two main problems to the whole production: 1) the impact toughness is reduced; 2) there would be a defective shape of the steel plate due to the large structural stress in the cooling process, which brings difficulties to the subsequent straightening and affects the production efficiency at the same time.
At home and abroad, there are patent reports on X80 steel grade bent pipes and the steel plate for bent pipes, such as the patent application of CN201410239039.9, which refers to a hot-rolling plate steel for X80 steel grade bent pipe wherein: 1) only the impact toughness of steel plate at -20 C is referred in the patent application, but in fact, more steel plates for bent pipes need the impact toughness at -30 C or even lower temperature at present; 2) slowly stack cooling is required after rolling of steel plate in the application patent, which is unfavorable to mass production efficiency of steel plate and the follow-up production process at the same time.
Another patent application of No. CN201110245761.X has the following characteristics: 1) the patent mainly emphasizes the hot bending process but does not mention what kind of steel plate production process is used for raw material steel plate; 2) the low-temperature toughness impact value at -45 C obtained by the patent is not higher than 200J, and the numerical fluctuation is large.
Considering the whole process of austenite deformation in the hot bending process and that subsequent cooling is relatively simple and insufficient, the design of steel plate for bent pipes usually always adopts a high carbon equivalent composition compared with that of steel plate for straight pipe. The design of high-carbon-equivalent components will lead to a lower impact toughness under low temperatures.
Disclosure of Invention According to the characteristics of the hot bending process for bent pipes, the chemical composition in the application is still designed with high carbon equivalent, but through the innovation of the cooling process in the production process, a pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes is obtained with a concise process and a high yield.
The technical scheme adopted by the invention to solve the above technical problems is to manufacture X80 pipeline steel plate for bent pipes with HIC
resistance,
- 2 -wherein the chemical constituents by mass percentage are as follows: C:
Mn: 1.55-1.90%, Si: <0.45%, S: <0.001%, P: <0.010%, Nb: 0.045-0.08%, Ti: <0.015%, V: <0.008%, Alt: <0.06%, N: <0.0040%, 0: <0.004%, Mo:
<0.40%, Cu: <0.30%, Ni: 0.20--1.5%, Cr: <0.35%, Mo+Cu+Ni+Cr <1.5%, Ceq: 0.35-0.53%, Pcm: 0.17-0.27%, , the balance is Fe and unavoidable impurity elements.
Furthermore, the thickness of the steel plate is 18.4-42mm, the yield strength>600Mpa, the tensile strength >710Mpa, the yield ratio <0.93, the elongation is >35%, the impact energy at -30 C >350J, the impact energy at -50 C>250J, and the impact energy at -60 C >230J.
The composition of the steel in the invention is based on the design principle of high carbon equivalence, and comprises appropriate amount of C, Mn, trace elements of Nb, V, Ti and other micro-alloying elements, as well as a small amount of Mo, Cu, Ni, and other elements, combined with a specific TMCP rolling process, thereby the ultimate mechanical properties are ensured, especially the low-temperature impact toughness under the condition of high carbon equivalence. The principle of adding the elements mentioned above is as follows:
C: C is the most economical and basic strengthening element in steel, and can obviously improve the strength of steel by solid solution strengthening and precipitation strengthening, but have adverse effects on the toughness, ductility, and weldability of steel. Therefore, the development trend of pipeline steel is to reduce C
content, but in order to match the hot bending process, strength and toughness, the C
content is controlled to be 0.05-0.10%.
Mn: Mn is the most important element to compensate for the loss of strength caused by the decrease of C content in pipeline steel, enhances the strength of steel by solid solution strengthening; Mn is an element to enlarge the y phase and reduce the y a transformation temperature of steel, which helps to obtain fine transformation products, improve the toughness of steel, reduce the ductile-brittle transition temperature; Mn is also an element to improve the hardenability of steel.
Considering the harm of Mn segregation to HIC resistance in the process of inspection and with due consideration for both the hot bending process and the strength requirement, the Mn content in the present invention is designed to be 1.55-1.9%, and soft reduction is adopted in continuous casting to alleviate the central segregation caused by high Mn content.
- 3 -Nb: Nb is one of the most important micro-alloying elements in modern microalloyed steels, especially pipeline steels, and has an obvious effect on grain refinement. The recovery and recrystallization of deformed austenite can be hindered by Nb solid solution dragging and Nb (C, N) strain-induced precipitation during hot rolling; the deformed austenite which is not rolled in the recrystallization zone can be transformed into fine phase transformation products during phase transformation by TMCP to give the steel high strength and toughness, and the range of Nb content is determined mainly based on the relationship between C and Nb content in the invention.
V: V has higher precipitation strengthening and weaker grain refinement, and plays a major role in precipitation strengthening when combined with the microalloying elements of Nb, V, and Ti.
Ti: Ti is a strong N-fixing element, and the stoichiometric ratio of Ti/N is 3.42, that is, N below 60 ppm in steel can be fixed by using about 0.02% Ti, and TiN

precipitates can be formed during slab continuous casting, and the fine precipitate is an indispensable element in pipeline steel, which can effectively prevent the growth of austenite grains in slab during heating, help to improve the solid solubility of Nb in austenite, and can improve the impact toughness of the welding heat affected zone, but too much Ti will form large TiN particles, which will affect the falling impact performance, so Ti content will be controlled to be <0.015% in this patent.
Mo: Mo can delay the formation of the preliminary ferrite phase in the y transformation, is the major element to promote the formation of acicular ferrite, and plays an important role in controlling phase transformation and improving the hardenability of steel. Obvious acicular ferrite or bainite can be obtained by adding a certain amount of Mo at a certain cooling rate and final cooling temperature and considering TMCP process and hot bending process, Mo content can be controlled at no less than 0.15%.
S, P: S and P are unavoidable impurity elements in pipeline steel, and the lower the content of S and P, the higher impact toughness pipeline steels have by changing the sulfide morphology through ultra-low sulfur and Ca treatment.
Cu, Ni: As the strength of steel can be improved by solution strengthening, the adding of Ni not only improve the toughness of steel but also prevent the hot brittleness easily caused by Cu in steel, and Ni content is controlled at no less than 0.2%.
- 4 -Cr: The addition of Cr can improve the hardenability of steel and is relatively economical.
The invention also aims to provide the preparation method of a high-carbon-equivalent, low-temperature, and high-toughness X80 pipeline steel plate for bent pipes, which is as follows in sequence: ratio preparation ¨>
converter or electric furnace smelting ¨> out-of-furnace refining ¨> continuous casting ¨>
slab reheating ¨> specific TMCP process + stack cooling after cooling¨*straightening.
The specific process steps are as follows:
The raw materials are processed in sequence by KR molten steel pretreatment, converter smelting, LF refining, RH vacuum refining, continuous casting, wherein Ca-treatment process is used for refining, with a Ca/S molar ratio of not less than 1, and the type B inclusions are controlled to be Grade 1.5 or less. When continuous casting, soft reduction is used to prevent core segregation caused by a high Mn content, to manufacture a continuous casting slab which satisfies composition requirement and has a thickness of not less than 350 mm and a compression ratio of not less than 10.
The continuous casting slab is reheated with multiple heating stages, and the temperature of the second heating stage is controlled at 1250-1300 C; after the furnace is discharged, a specific TMCP process including two-stage rolling and intermediate slab cooling is performed: the first stage is the rolling in the recrystallization zone, wherein the final rolling temperature is not higher than 1200 C, and when rolling in the recrystallization zone, the single-pass rolling reduction ratio of continuous two or three passes is controlled to be not less than 20%; the intermediate slab cooling is to moderately cool the intermediate slab to the temperature of a start rolling temperature in the non-recrystallization zone at the second stage, by a Mild cooling system, wherein the cooling method is to cool the tank body by swinging back and forth, and the cooling rate is 6-12 C/s, to ensure that the austenite grains no longer grow after rolling and shaping in the recrystallization zone, and the temperature difference between the surface of the intermediate slab and the core is small; the second stage is the rolling in the non-recrystallization zone, wherein the start rolling temperature is not higher than 880 C, and the final rolling temperature is controlled at 790-850 C until the reaching of the final thickness.
After rolling, the steel plate is cooled by water, wherein the start cooling temperature is controlled to be not higher than 810 C, the final cooling temperature is
- 5 ¨
Date Recue/Date Received 2021-05-31 controlled to be not higher than 500 C, and the cooling rate is 10 to 35 C/s; after cooling, the steel plate is straightened, and then the final product is obtained by directly cooling to room temperature. In this cooling process, considering that the finished steel sheet has a high carbon equivalent, a stepwise gradient cooling process is adopted, that is, the cooling water amount of each cooling unit of the ACC
is set to be different: the amount of cooling water in the first 1-6 segments is the largest with a corresponding cooling rate of 25-35 C/s and the amount of cooling water in the ACC
cooling unit in the last 7-12 segments decreases in sequence with a corresponding cooling rate change of 10-20 C/s.
After the final rolling temperature ends, the first 1-6 ACC cooling segments of the steel plate are cooled to the temperature close to Ac3 line in CCT curve by means of the stepwise gradient cooling process. On one hand, it can get a larger degree of supercooling through a fast cooling speed, and obtain more phase-transformation nuclei and finally obtain finer phase-transformation crystal grains. On the other side, the cooling method mention above can shorten the time needed to arrive at the same average cooling speed and the final cooling temperature. Once the temperature is near the Ar3 line, lower cooling speed is adopted to reduce the phase-transformation stress and to reduce the sensitivity of temperature stress in the phase transformation under the condition of a high carbon equivalence. Thereby, the structure in the steel plate is relatively small and the ultimate residual stress is relatively small, and ultimately the steel plate still has high toughness at low temperatures.
The Mild Cooling cooling system adopted in the invention is arranged between the roughing mill and the finishing mill of the rolling mill production line, and the system is a box structure with a total length of 18 m, and spray nozzles are densely distributed on the top of the box to moderately cool the roughed intermediate slab;
Corresponding to different thickness of the intermediate slab, the cooling speed of the intermediate slab is obtained to be 4-18 C/s; the thickness of intermediate slab is usually about 40-180 mm according to product and production requirements, and the intermediate slab whose thickness of is less than 40 mm is not opened for moderate cooling unless necessary, because it is thinner; for thick intermediate slabs, considering the design limit, the maximum cooling speed is 4 C/s, while for thin slabs, the maximum cooling speed can reach 18 C/s.
Furthermore, the operation process of the Mild cooling system is as follows:
the intermediate slab is obtained by the rolling in the recrystallization zone, and the
- 6 -intermediate slab swings back and forth after entering the Mild cooling system in which the corresponding roller path operates the swing mode, meanwhile the nozzle sprays the water to the intermediate slab, in order to cool the intermediate slab to the start rolling temperature of the second stage at a specific cooling rate, and when the intermediate slab has been cooled to the start rolling temperature of the second stage, the intermediate slab is delivered out of the Mild cooling system and is sent to the rolling process at the second stage.
The invention has the following characteristics:
1) The technical problems of defective or unstable low-temperature impact performance under high carbon equivalent are solved by adopting appropriate composition and specific production technology, which makes the steel plate for bent pipes have excellent low-temperature impact toughness.
2) In the invention, a stepwise gradient cooling process is adopted for steel plate cooling, which can be realized on the spot without additional equipment investment with characteristics of high production efficiency and simple process.
Brief Description of Figures in the Drawings Figure 1 is a comparison of ACC stepwise gradient cooling and a conventional cooling in an embodiment of the invention;
Figure 2 is a structural diagram of a steel plate according to an embodiment of the invention.
Mode(s) for Carrying Out the Invention The present invention is further described in detail with reference to embodiments.
The preparation process of a X80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures, which is used for bent pipes, is as follows in sequence: ratio preparation ¨> converter or electric furnace smelting ¨> out-of-furnace refining ¨> continuous casting ¨> slab reheating ¨) rolling ¨> ACC gradient cooling ¨> straightening.
The specific process steps are as follows: the raw materials are processed in sequence by KR molten steel pretreatment, converter smelting, LF refining, RH
vacuum refining, continuous casting, wherein in refining a Ca/S molar ratio is controlled to be not less than 1, and the type B inclusions are controlled to be Grade 1.5 or less. When continuous casting, soft reduction is used to prevent core ¨ 7 ¨

segregation caused by high Mn content. The continuous casting slab manufactured satisfies composition requirements, has a thickness of 350 mm; when the slab is heated, the temperature of the second-step heating section is controlled at not more than 1300 C, and the residence time in this heating section is not less than 4 hours;
then the process of rolling, ACC stepwise gradient cooling and straightening are sequentially conducted.
The specific TMCP process includes two-stage rolling and intermediate slab cooling: the first stage is the rolling in the recrystallization zone, wherein the final rolling temperature is not higher than 1200 C, and when rolling in the recrystallization zone, the single-pass rolling reduction ratio of continuous two or three passes is controlled to be not less than 20%;
The intermediate slab cooling is quickly cooling the intermediate slab to the temperature of a start rolling temperature in the non-recrystallization zone at the second stage, by a Mild cooling system, wherein the cooling method is to cool the tank body by swinging back and forth, and the cooling rate is 6-12 C/s, to ensure that the austenite grains no longer grow after rolling and shaping in the recrystallization zone, and the temperature difference between the surface of the intermediate slab and the core is small;
The second stage is the rolling in the non-recrystallization zone, wherein the start rolling temperature is not higher than 900 C, and the final rolling temperature is controlled to be no higher than 850 C; after rolling, the steel plate is cooled by water, wherein the start cooling temperature is controlled to be not higher than 800 C, the final cooling temperature is controlled to be not higher than 500 C, and the cooling rate is 10 to 35 C/s; considering that the finished steel sheet has a high carbon equivalent, a stepwise gradient cooling process is adopted in this cooling process, that is, the cooling water amount of each cooling unit of the ACC is set to be different: the amount of cooling water in the first 1-6 segments is the largest with a corresponding cooling rate of 25-35 C/s and the amount of cooling water in the ACC cooling unit in the last 7-12 segments decreases in sequence with a corresponding cooling rate change of 10-20 C/s; after cooling, the steel plate is straightened, and then the final product is obtained by directly cooling to room temperature.
The specific chemical composition of the steel plate involved in each embodiment is shown in Table 1, the specific TMCP process parameters are shown in Table 2, and the main mechanical properties are shown in Table 3.
- 8 ¨
Date Recue/Date Received 2021-05-31 Table 1 Embodiment C Mn Si S P Nb Ti V Alt Mo+Cu+Ni+Cr 1 <0.1 1.55-1.9 <0.35 0.0005 0.01 <0.08 <0.015 <0.007 <0.06 1.5 2 0.10 1.65 0.25 0.0005 0.008 0.070 0.018 0.008 0.028 <1.5 3 0.05 1.9 0.20 0.0005 0.009 0.065 0.018 0.007 0.030 <1.5 Table 2 Embodiment Temperature Rolling in the Cumulative Start Final Cooling Final of the recrystallizati deformation temperature temperatu speed of cooling second-step on zone, the rate of the of the re of the water temperature heating final rolling rolling in the rolling in rolling in cooling C temperature recrystallizat the the Cis C ion zone non-recrysta non-recrys % llization tallization zone zone C
1 <1300 <1100 <55 <900 <850 10-35 <500 2 <1300 <1100 <55 <900 <850 10-35 <500 3 <1300 <1100 <55 <900 <850 10-35 <500 Table 3 Energy absorption under transverse Embodi Yield Strength Tensile Strength Elongation after Yield ratio Re/Rm impact ( V ) J
ment Rt0.5 Rm fracture %
Temperature 1 2 3 1 623 720 41.5 0.87 -30 351 367 355 2 631 719 42.3 0.88 -30 357 350 360 3 598 733 39.2 0.82 -30 389 378 395 Energy absorption under transverse Embodi Yield Strength Tensile Strength Elongation after Yield ratio Re/Rm impact (V) J
ment Rt0.5 Rm fracture % Temperature 1 2 3 1 623 720 41.5 0.87 -45 267 272 251 2 631 719 42.3 0.88 -45 255 255 264 3 598 733 39.2 0.82 -45 361 375 379 Energy absorption under transverse Embodi Yield Strength Tensile Strength Elongation after Yield ratio Re/Rm impact ( V ) J
ment Rt0.5 Rm fracture %
Temperature 1 2 3 1 623 720 41.5 0.87 -50 253 257 251 2 631 719 42.3 0.88 -50 262 255 258 3 598 733 39.2 0.82 -50 353 349 357 Energy absorption under transverse Embodi Yield Strength Tensile Strength Elongation after Yield ratio Re/Rm impact ( V ) J
ment Rt0.5 Rm fracture %
Temperature 1 2 3 1 623 720 41.5 0.87 -60 233 246 239 2 631 719 42.3 0.88 -60 245 253 244 3 598 733 39.2 0.82 -60 339 327 331 ¨ 10 ¨

Claims (4)

1. A X80 pipeline steel plate, comprising chemical components by mass percentage as follows:
C: <0.10%, Mn: 1.55-1.90%, Si: <0.45%, S: <0.001%, P: <0.010%, Nb: 0.045-0.08%, Ti:
<0.015%, V: <0.008%, Alt: <0.06%, N:<0.0040%, 0: <0.004%, Mo: <0.40%, Cu:
<0.30%, Ni: 0.20-1.5%, Cr: <0.35%, Mo+Cu+Ni+Cr <1.5%, Ceq: 0.35-0.53%, Pcm: 0.17-0.27%, the balance being Fe and unavoidable impurity elements.
2. The X80 pipeline steel plate according to Claim 1, wherein a thickness of the steel plate is 18.4-42mm, a yield strength of the steel plate is >600Mpa, a tensile strength of the steel plate is >710Mpa, a yield ratio of the steel plate is <0.93, an elongation of the steel plate is >35%, an impact energy at -30 C of the steel plate is >350J, the impact energy at -50 C
of the steel plate is >250J, and the impact energy at-60 C of the steel plate is >230J.
3. A method of manufacturing a X80 pipeline steel plate , comprising following steps:
processing raw materials in sequence by KR molten steel pretreatment, converter smelting, LF refining, RH vacuum refining and continuous casting, wherein using Ca-treatment for the refining step with a Ca/S molar ratio of not less than 1 and a grade of type B
inclusions being controlled no higher than 1.5, and during the continuous casting step, adopting soft reduction to prevent core segregation caused by a high Mn content to manufacture a continuous casting slab, satisfying composition requirement and having a thickness of not less than 350 mm and a compression ratio of not less than 10;
reheating the continuous casting slab with multiple heating stages, temperature of a second heating stage being controlled at 1250-1300 C;
after a furnace is discharged, performing a specific TMCP process including two-stage rolling and intermediate slab cooling:
the first stage being the rolling in a recrystallization zone, wherein a final rolling temperature is not higher than 1200 C, and during the step of rolling in the recrystallization zone, a single-pass rolling reduction ratio of continuous two or three passes is controlled to be not less than 20%;
the step of intermediate slab cooling being to moderately cool an intermediate slab to the temperature of a start rolling temperature in a non-recrystallization zone at the second stage by a mild cooling system, wherein the cooling method is to cool a tank body by swinging back and forth with a cooling rate of 6-12 C/s to ensure that austenite grains no longer grow after being rolled and shaped in the recrystallization zone, and the temperature difference between the surface and the core of the intermediate slab is small;

Date Recue/Date Received 2021-05-31 the second stage being the rolling in the non-recrystallization zone until a final thickness is reached, wherein the start rolling temperature is not higher than 880 C, and a final rolling temperature is controlled at 790-850 C;
after rolling, cooling the steel plate by water, wherein a start cooling temperature is controlled to be not higher than 810 C, a final cooling temperature is controlled to be not higher than 500 C, and a cooling rate is 10 to 35 C/s; and after cooling, straightening the steel plate, and directly cooling to room temperature to obtain a final product, wherein during the cooling process, being considered that a finished steel sheet has a high carbon equivalent, a stepwise gradient cooling process is adopted, that is, cooling water amount of each ACC cooling unit is set to be different: the cooling water amount in first 1-6 segments is the largest with a corresponding cooling rate of 25-35 C/s and the cooling water amount in 7-12 segments decreases in sequence with a corresponding cooling rate change of 10-20 C/s.
4. The method of manufacturing X80 pipeline steel plate according to Claim 3,wherein the intermediate slab is obtained by the rolling in the recrystallization zone, and the intermediate slab swings back and forth after entering the mild cooling system in which the corresponding roller path operates the swing mode, meanwhile a nozzle sprays the water to the intermediate slab, in order to cool the intermediate slab to the start rolling temperature of the second stage at a specific cooling rate; and when the intermediate slab has been cooled to the start rolling temperature of the second stage, the intermediate slab is delivered out of the Mild cooling system and is sent to the rolling process at the second stage.

Date Recue/Date Received 2021-05-31
CA3058488A 2017-04-01 2017-10-10 A x80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof Active CA3058488C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201710213372.6A CN107099745B (en) 2017-04-01 2017-04-01 High-carbon-equivalent low-temperature high-toughness pipeline steel plate for X80 elbow and manufacturing method thereof
CN201710213372.6 2017-04-01
PCT/CN2017/105529 WO2018176790A1 (en) 2017-04-01 2017-10-10 High carbon equivalent and high low-temperature toughness pipeline steel plate for x80 elbow pipe and manufacturing method therefor

Publications (2)

Publication Number Publication Date
CA3058488A1 CA3058488A1 (en) 2018-10-04
CA3058488C true CA3058488C (en) 2022-04-26

Family

ID=59675132

Family Applications (1)

Application Number Title Priority Date Filing Date
CA3058488A Active CA3058488C (en) 2017-04-01 2017-10-10 A x80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof

Country Status (5)

Country Link
CN (1) CN107099745B (en)
CA (1) CA3058488C (en)
DE (1) DE112017007384T5 (en)
RU (1) RU2724257C1 (en)
WO (1) WO2018176790A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107099745B (en) * 2017-04-01 2019-12-27 江阴兴澄特种钢铁有限公司 High-carbon-equivalent low-temperature high-toughness pipeline steel plate for X80 elbow and manufacturing method thereof
CN109338213B (en) * 2018-09-29 2021-01-26 南京钢铁股份有限公司 X80M deep sea strain-resistant pipeline steel and rolling process
CN109234622B (en) * 2018-09-29 2020-08-18 南京钢铁股份有限公司 X80M deep-sea strain-resistant pipeline steel and smelting process
CN110760757B (en) * 2019-08-14 2021-12-03 钢铁研究总院 Low-cost strengthening process of hot-rolled steel bar
CN110527809B (en) * 2019-08-26 2020-12-22 武汉科技大学 Preparation method of hot-rolled high-strength strip steel capable of reducing residual stress
CN115261716B (en) * 2021-04-30 2023-06-16 宝山钢铁股份有限公司 High-strength heat-resistant sleeve for thickened oil development and manufacturing method thereof
CN113403459B (en) * 2021-05-25 2023-04-07 中国科学院金属研究所 Rolling method for improving low-temperature impact toughness of X80 pipeline steel through texture control
CN113652615A (en) * 2021-07-27 2021-11-16 包头钢铁(集团)有限责任公司 Efficient pipeline steel L245N production process
CN113832394A (en) * 2021-08-18 2021-12-24 日照钢铁控股集团有限公司 Low-yield-ratio and high-fracture-toughness pipeline steel and manufacturing method thereof
CN114381664B (en) * 2021-12-22 2022-11-22 南阳汉冶特钢有限公司 Production method of thick X80MS steel plate for corrosion-resistant pipeline
CN114480809B (en) * 2022-04-18 2022-08-19 江苏省沙钢钢铁研究院有限公司 500 MPa-grade crack arrest steel plate and production method thereof
CN115418459B (en) * 2022-08-26 2024-03-22 河钢股份有限公司 Production method of steel plate

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3579307B2 (en) * 1999-08-19 2004-10-20 Jfeスチール株式会社 60kg-class direct quenched and tempered steel with excellent weldability and toughness after strain aging
RU2404280C2 (en) * 2006-07-13 2010-11-20 Сумитомо Метал Индастриз, Лтд. Hot-bent pipe and its manufacturing method
US8039118B2 (en) * 2006-11-30 2011-10-18 Nippon Steel Corporation Welded steel pipe for high strength line pipe superior in low temperature toughness and method of production of the same
KR100868423B1 (en) * 2006-12-26 2008-11-11 주식회사 포스코 High strength api-x80 grade steels for spiral pipes with less strength changes and method for manufacturing the same
RU2518830C1 (en) * 2010-06-30 2014-06-10 Ниппон Стил Энд Сумитомо Метал Корпорейшн Hot-rolled steel sheet and method of its production
RU2465346C1 (en) * 2011-08-25 2012-10-27 Открытое акционерное общество "Магнитогорский металлургический комбинат" Manufacturing method of high-strength strip for pipes of main pipelines
CN103014553B (en) * 2011-09-26 2014-12-03 宝山钢铁股份有限公司 High-strength and high-toughness steel plate with 630 Mpa-level yield strength and preparation method of steel plate
CN103740925B (en) * 2013-12-26 2015-03-25 秦皇岛首秦金属材料有限公司 Method for linkage production of high-toughness pipeline steel by adopting jetting and laminar cooling
CN104250713B (en) * 2014-09-19 2017-01-11 江阴兴澄特种钢铁有限公司 X80-grade large-deformation-resistant pipeline steel plate and manufacturing method thereof
CN104404387B (en) * 2014-10-29 2017-04-26 江苏沙钢集团有限公司 Steel plate for ultralow-temperature and high-pressure service delivery tubes, and its making method
CN104404378A (en) * 2014-12-19 2015-03-11 山东钢铁股份有限公司 Wide and thick steel plate for hot-bent elbow pipes at X65-X80 levels and manufacturing method of wide and thick steel plate
CN105950973B (en) * 2016-05-13 2018-08-31 江阴兴澄特种钢铁有限公司 The excellent think gauge X80 pipeline steels of ultralow temperature block hammer performance and its manufacturing method
CN105950972A (en) * 2016-05-13 2016-09-21 江阴兴澄特种钢铁有限公司 Thick-specification X80 pipeline steel plate with process time being shortened and manufacturing method thereof
CN106367685B (en) * 2016-08-30 2018-08-07 江阴兴澄特种钢铁有限公司 The effective X80 of deep-sea drilling water proof and following Grade Pipeline Steel and preparation method thereof
CN107099745B (en) * 2017-04-01 2019-12-27 江阴兴澄特种钢铁有限公司 High-carbon-equivalent low-temperature high-toughness pipeline steel plate for X80 elbow and manufacturing method thereof

Also Published As

Publication number Publication date
WO2018176790A1 (en) 2018-10-04
CA3058488A1 (en) 2018-10-04
CN107099745A (en) 2017-08-29
CN107099745B (en) 2019-12-27
DE112017007384T5 (en) 2019-12-12
RU2724257C1 (en) 2020-06-22

Similar Documents

Publication Publication Date Title
CA3058488C (en) A x80 pipeline steel plate with high carbon equivalent and high toughness at low temperatures used for bent pipes as well as a manufacturing method thereof
CN104805375B (en) A kind of ultra thick gauge high tenacity X80 pipeline steel and its manufacture method
CN105950973B (en) The excellent think gauge X80 pipeline steels of ultralow temperature block hammer performance and its manufacturing method
CN101161847B (en) High-ductility steel for hot-bending bends and production method for hot rolled plates thereof
WO2020169075A1 (en) High-strength weather-proof thin steel strip and production method therefor
CN104805374B (en) A kind of thickness Q460E steel plate more than 120mm and manufacture method thereof
WO2017193537A1 (en) Economical hic-resistant x90 pipeline steel plate and manufacturing method therefor
WO2018176788A1 (en) Pipeline steel plate for hic-resistant x80 elbow pipe and manufacturing method therefor
JP2018505303A (en) Yield strength 900-1000MPa tempered high strength steel and method for producing the same
CN103866204B (en) The large sstrain X80 dual phase sheet steel that the large soft reduction process of a kind of low temperature is produced
CN104141099B (en) A kind of manufacture method of super thick specification X70 hot-rolled sheet coil
CN103510003B (en) A kind of large diameter pipeline Chinese People&#39;s Anti-Japanese Military and Political College is out of shape heterogeneous X100 High Strength Steel Plate and manufacture method thereof
WO2020259715A1 (en) X80-grade pipeline steel plate having low carbon equivalent, thickness of over 40 mm, and high toughness at low temperatures, and manufacturing method therefor
CN112575257A (en) Low-cost boron-containing non-quenched and tempered 700MPa high-strength steel and manufacturing method thereof
CN1318631C (en) Method for producing high strength high toughness X80 pipeline steel and its hot-rolled plate
CN104846293A (en) High-strength high-toughness steel plate and preparation method thereof
CN111996461A (en) X70 pipeline coiled plate for microalloyed resistance welded pipe and production method thereof
CN109957714A (en) The pipeline steel and its manufacturing method of intensity and excellent in low temperature toughness
CN104894492A (en) Ultralow-temperature, large-diameter and WPHY80-level steel plate special for three-way pipe fitting and production method of steel plate
CN104328357B (en) A kind of Ni-Mo low-temperature high-toughness X100 steel for pipe fittings plate and manufacture method thereof
CN103540850B (en) The super thick steel for engineering machinery of yield strength &gt;=550MPa and production method
CN110468332A (en) A kind of thin gauge vertical masonry joint low yield strength ratio high tenacity pipeline roll bending and its manufacturing method
CN104073744B (en) The high tenacity X80 pipe line steel coiled sheet of thickness &gt;=18.5mm and production method
CN110819890A (en) X100 ultrahigh-steel-grade pipeline steel plate with stable long-time high-temperature tempering performance and manufacturing method thereof
CN104357749A (en) High-strength/toughness X90 hot-rolled steel strip for spiral submerged arc welded pipes and production method thereof

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20190930