CA2881718A1 - Systeme et procede d'execution d'operations de stimulation - Google Patents

Systeme et procede d'execution d'operations de stimulation Download PDF

Info

Publication number
CA2881718A1
CA2881718A1 CA2881718A CA2881718A CA2881718A1 CA 2881718 A1 CA2881718 A1 CA 2881718A1 CA 2881718 A CA2881718 A CA 2881718A CA 2881718 A CA2881718 A CA 2881718A CA 2881718 A1 CA2881718 A1 CA 2881718A1
Authority
CA
Canada
Prior art keywords
fracture
natural
fluid
natural fracture
intersection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA2881718A
Other languages
English (en)
Inventor
Olga Kresse
Xiaowei Weng
Hongren Gu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Original Assignee
Schlumberger Canada Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Ltd filed Critical Schlumberger Canada Ltd
Publication of CA2881718A1 publication Critical patent/CA2881718A1/fr
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/26Storing data down-hole, e.g. in a memory or on a record carrier
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
CA2881718A 2012-08-24 2013-08-23 Systeme et procede d'execution d'operations de stimulation Abandoned CA2881718A1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201261692867P 2012-08-24 2012-08-24
US61/692,867 2012-08-24
PCT/US2013/056461 WO2014032003A1 (fr) 2012-08-24 2013-08-23 Système et procédé d'exécution d'opérations de stimulation

Publications (1)

Publication Number Publication Date
CA2881718A1 true CA2881718A1 (fr) 2014-02-27

Family

ID=50150415

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2881718A Abandoned CA2881718A1 (fr) 2012-08-24 2013-08-23 Systeme et procede d'execution d'operations de stimulation

Country Status (7)

Country Link
US (1) US20150204174A1 (fr)
EP (1) EP2888441A4 (fr)
CN (1) CN104685153A (fr)
CA (1) CA2881718A1 (fr)
MX (1) MX2015002141A (fr)
RU (1) RU2591857C1 (fr)
WO (1) WO2014032003A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113950565A (zh) * 2019-05-17 2022-01-18 Fmc技术公司 用于自动和智能压裂垫的系统和方法

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2915625C (fr) * 2011-03-11 2021-08-03 Schlumberger Canada Limited Procede d'etalonnage de geometrie de fracture a des evenements microsismiques
US9618652B2 (en) * 2011-11-04 2017-04-11 Schlumberger Technology Corporation Method of calibrating fracture geometry to microseismic events
US10422208B2 (en) 2011-11-04 2019-09-24 Schlumberger Technology Corporation Stacked height growth fracture modeling
CA2854371C (fr) 2011-11-04 2019-12-24 Schlumberger Canada Limited Modelisation de l'interaction de fractures hydrauliques dans des reseaux de fractures complexes
WO2015030837A1 (fr) 2013-08-27 2015-03-05 Halliburton Energy Services, Inc. Simulation de fuite de fluide et reflux dans une région souterraine fracturée
WO2015057242A1 (fr) * 2013-10-18 2015-04-23 Halliburton Energy Services, Inc. Gestion d'une opération d'emplacement de puits de forage à l'aide d'un modèle de substitution
CN103775077B (zh) * 2014-02-07 2016-03-30 河南理工大学 一种多功能随钻探测装置及预测方法
MX2016015837A (es) * 2014-06-05 2017-04-13 Geoquest Systems Bv Metodo para el diseño mejorado de la altura de fractura hidraulica en una formacion de roca laminada subterranea.
GB2528384A (en) * 2014-06-24 2016-01-20 Logined Bv Completion design based on logging while drilling (LWD) data
EP3175080B1 (fr) * 2014-08-01 2019-08-21 Landmark Graphics Corporation Estimation du rendement de production de puits dans des systèmes de réservoir fracturé
US10184320B2 (en) * 2014-09-02 2019-01-22 Saudi Arabian Oil Company Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation
WO2016108872A1 (fr) * 2014-12-31 2016-07-07 Halliburton Energy Services, Inc. Appareil, procédés et systèmes de fracturation hydraulique
WO2016126252A1 (fr) * 2015-02-05 2016-08-11 Halliburton Energy Services, Inc. Simulateur d'écoulement de fluides multi-phase, multi-fluide dans des systèmes de réservoir de puits de forage intégrés
US9933535B2 (en) 2015-03-11 2018-04-03 Schlumberger Technology Corporation Determining a fracture type using stress analysis
US10450825B2 (en) * 2015-04-30 2019-10-22 Schlumberger Technology Corporation Time of arrival-based well partitioning and flow control
WO2016198894A2 (fr) * 2015-06-10 2016-12-15 Ikon Science Innovation Limited Procédé et appareil pour l'analyse de réservoirs et conception de fracture dans une couche de roche
WO2017027433A1 (fr) * 2015-08-07 2017-02-16 Schlumberger Technology Corporation Procédé de réalisation d'opérations intégrées de fracture et de réservoir pour de multiples puits de forage au niveau d'un emplacement de forage
US10794154B2 (en) 2015-08-07 2020-10-06 Schlumberger Technology Corporation Method of performing complex fracture operations at a wellsite having ledged fractures
US10920538B2 (en) 2015-08-07 2021-02-16 Schlumberger Technology Corporation Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
WO2017027068A1 (fr) 2015-08-07 2017-02-16 Schlumberger Technology Corporation Gestion de puits sur système informatique en nuage
US10810331B2 (en) * 2015-08-20 2020-10-20 FracGeo, LLC System for predicting induced seismicity potential resulting from injection of fluids in naturally fractured reservoirs
US10302814B2 (en) * 2015-08-20 2019-05-28 Baker Hughes, A Ge Company, Llc Mechanisms-based fracture model for geomaterials
US10920552B2 (en) 2015-09-03 2021-02-16 Schlumberger Technology Corporation Method of integrating fracture, production, and reservoir operations into geomechanical operations of a wellsite
CA2995448A1 (fr) * 2015-09-25 2017-03-30 Halliburton Energy Services, Inc. Modeles et procedes de fracturation hydraulique a orientations multiples
US10935684B2 (en) * 2015-10-28 2021-03-02 Halliburton Energy Services, Inc. Near real-time return-on-fracturing-investment optimization for fracturing shale and tight reservoirs
US10883346B2 (en) 2015-12-18 2021-01-05 Schlumberger Technology Corporation Method of performing a perforation using selective stress logging
CN105672973B (zh) * 2016-01-26 2017-12-05 西南石油大学 一种煤层气藏整体体积压裂优化设计方法
US10546072B2 (en) 2016-03-28 2020-01-28 Baker Huges, A Ge Company, Llc Obtaining micro- and macro-rock properties with a calibrated rock deformation simulation
US11789170B2 (en) 2016-06-15 2023-10-17 Schlumberger Technology Corporation Induced seismicity
WO2018117890A1 (fr) * 2016-12-21 2018-06-28 Schlumberger Technology Corporation Procédé et système prédictif pour prédire une performance de fracture hydraulique
WO2018140908A1 (fr) * 2017-01-30 2018-08-02 Schlumberger Technology Corporation Évaluation du comportement transitoire de pression de puits
US10914139B2 (en) * 2017-02-22 2021-02-09 Weatherford Technology Holdings, Llc Systems and methods for optimization of the number of diverter injections and the timing of the diverter injections relative to stimulant injection
WO2018236238A1 (fr) * 2017-06-20 2018-12-27 Schlumberger Technology B.V. Prédiction de performances d'écoulement de puits de forage
US10947841B2 (en) * 2018-01-30 2021-03-16 Baker Hughes, A Ge Company, Llc Method to compute density of fractures from image logs
FR3077841B1 (fr) * 2018-02-12 2020-12-11 Brgm Procede de pompage d'un reservoir souterrain fracture
RU2714456C2 (ru) * 2018-04-26 2020-02-17 Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" Министерства обороны Российской Федерации Полевое хранилище
CN110872943B (zh) * 2018-08-30 2021-07-13 中国石油化工股份有限公司 一种确定地层射孔方向的方法
WO2020117248A1 (fr) * 2018-12-06 2020-06-11 Halliburton Energy Services, Inc. Interprétation de comportement de pression de pompage et diagnostic pour efficacité de perforation de puits pendant des opérations de pompage
US11306572B2 (en) * 2019-07-12 2022-04-19 Halliburton Energy Services, Inc. Hydraulic fracturing modelling and control
US11377942B2 (en) 2019-07-12 2022-07-05 Halliburton Energy Services, Inc. Wellbore hydraulic fracturing through a pump operating in a damage avoidance mode
RU2717019C1 (ru) * 2019-11-06 2020-03-17 Шлюмберже Текнолоджи Б.В. Способ вывода на режим скважины, пробуренной в естественно трещиноватом пласте
CN110929413B (zh) * 2019-12-04 2020-11-10 西南石油大学 一种模拟裂缝性储层中水力裂缝壁面不连续性行为的方法
US20210230992A1 (en) 2020-01-24 2021-07-29 Halliburton Energy Services, Inc. Fracturing control
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
CN113513297A (zh) * 2021-08-04 2021-10-19 广州海洋地质调查局 一种干热岩地热开采方法及开采装置
CN115370341B (zh) * 2022-04-15 2023-11-28 中国石油大学(北京) 微观可视化岩板水力压裂室内模拟方法及装置
CN114961685B (zh) * 2022-06-23 2023-02-21 同济大学 一种采用负触变性流体进行地下资源开采的方法

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2324813C2 (ru) * 2003-07-25 2008-05-20 Институт проблем механики Российской Академии наук Способ и устройство для определения формы трещин в горных породах
US8126689B2 (en) * 2003-12-04 2012-02-28 Halliburton Energy Services, Inc. Methods for geomechanical fracture modeling
EP1977079A1 (fr) * 2006-01-27 2008-10-08 Schlumberger Technology B.V. Procede de fracturation hydraulique de formation souterraine
US8812334B2 (en) * 2006-02-27 2014-08-19 Schlumberger Technology Corporation Well planning system and method
US20070272407A1 (en) 2006-05-25 2007-11-29 Halliburton Energy Services, Inc. Method and system for development of naturally fractured formations
US7953587B2 (en) * 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US8165816B2 (en) * 2006-09-20 2012-04-24 Exxonmobil Upstream Research Company Fluid injection management method for hydrocarbon recovery
US8412500B2 (en) * 2007-01-29 2013-04-02 Schlumberger Technology Corporation Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation
US8347959B2 (en) * 2007-09-04 2013-01-08 Terratek, Inc. Method and system for increasing production of a reservoir
WO2009042333A1 (fr) * 2007-09-28 2009-04-02 Exxonmobil Upstream Research Company Application de conditionnement de réservoir dans des réservoirs de pétrole
US20100256964A1 (en) * 2009-04-07 2010-10-07 Schlumberger Technology Corporation System and technique to quantify a fracture system
US8392165B2 (en) * 2009-11-25 2013-03-05 Halliburton Energy Services, Inc. Probabilistic earth model for subterranean fracture simulation
US8731889B2 (en) * 2010-03-05 2014-05-20 Schlumberger Technology Corporation Modeling hydraulic fracturing induced fracture networks as a dual porosity system
CA2821763C (fr) * 2010-12-16 2021-10-19 Chevron U.S.A. Inc. Systeme et procede de simulation d'ecoulement de fluide dans un reservoir fissure
CN102606126A (zh) * 2012-03-27 2012-07-25 东方宝麟科技发展(北京)有限公司 裂缝性储层非平面网络裂缝压裂控制方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113950565A (zh) * 2019-05-17 2022-01-18 Fmc技术公司 用于自动和智能压裂垫的系统和方法
CN113950565B (zh) * 2019-05-17 2023-10-13 Fmc技术公司 用于自动和智能压裂垫的系统和方法
US11976541B2 (en) 2019-05-17 2024-05-07 Fmc Technologies, Inc. System and method for an automated and intelligent frac pad

Also Published As

Publication number Publication date
EP2888441A1 (fr) 2015-07-01
CN104685153A (zh) 2015-06-03
WO2014032003A1 (fr) 2014-02-27
EP2888441A4 (fr) 2016-09-14
US20150204174A1 (en) 2015-07-23
RU2591857C1 (ru) 2016-07-20
MX2015002141A (es) 2015-05-11

Similar Documents

Publication Publication Date Title
US20150204174A1 (en) System and method for performing stimulation operations
US10605060B2 (en) System and method for performing stimulation operations
US10920538B2 (en) Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
US10920552B2 (en) Method of integrating fracture, production, and reservoir operations into geomechanical operations of a wellsite
US10087722B2 (en) System and method for performing downhole stimulation operations
US10760416B2 (en) Method of performing wellsite fracture operations with statistical uncertainties
US10787887B2 (en) Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
CA2915625C (fr) Procede d'etalonnage de geometrie de fracture a des evenements microsismiques
US8762118B2 (en) Modeling hydraulic fractures
US10794154B2 (en) Method of performing complex fracture operations at a wellsite having ledged fractures
US9482088B2 (en) Mean regression function for permeability

Legal Events

Date Code Title Description
FZDE Discontinued

Effective date: 20190823