CA2832642C - Mobile oil platform and method of hose management therefor - Google Patents

Mobile oil platform and method of hose management therefor Download PDF

Info

Publication number
CA2832642C
CA2832642C CA2832642A CA2832642A CA2832642C CA 2832642 C CA2832642 C CA 2832642C CA 2832642 A CA2832642 A CA 2832642A CA 2832642 A CA2832642 A CA 2832642A CA 2832642 C CA2832642 C CA 2832642C
Authority
CA
Canada
Prior art keywords
platform
hose
oil
subsea
floats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA2832642A
Other languages
French (fr)
Other versions
CA2832642A1 (en
Inventor
Franck Derenoncourt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CA2832642A priority Critical patent/CA2832642C/en
Publication of CA2832642A1 publication Critical patent/CA2832642A1/en
Application granted granted Critical
Publication of CA2832642C publication Critical patent/CA2832642C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/0122Collecting oil or the like from a submerged leakage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/204Keeping clear the surface of open water from oil spills

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

A mobile oil platform has a vessel for holding oil, a subsea hose connected to a subsea well, a pump mounted on the vessel for detachably connecting to the subsea hose and one or more floats connected to the subsea hose by cables, wherein the hose is connected to the vessel, and when detached the floats hold the hose in the water. A method of hose management is described, having the steps of retrieving one or more floats connected to a hose by cables, pulling the cables from the sea to retrieve the hose, and connecting the hose to a platform. The hose may be disconnected and dropped in the water wherein a float marks a hose position. Further, probes may be deployed to suck the oil/water mixture into a separator.

Description

2013-11-20 --I 400:00 (cm-r) I 3333032520 From Nlya II Engfteld Mobile Oil Platform and Method of Hose Management Therefor FIELD
The invention is in the field of mobile platforms for oil spill cleanup.
BACKGROUND
Marine drilling for oil has expanded exponentially in recent decades, due to the technologically-facilitated accessibility to undersea reserves. However, with such drilling comes the risk of oil spills such as the Exxon Valdez incident that was a surface spill from a tanker, and the BP
Deepwater Horizon spill, which occurred both at the surface and deep under the sea.
Oil spills cause mass amounts of environmental damage and it is extremely time consuming, expensive and generally difficult to clean up the mess left in their wake.
Often oil spills occur in hostile environments such as the sea subject to storms or in the far north.
Prior art oil spill technologies include adding dispersants to disperse the spill, containing the spill and burning the oil. In these cases, the oil is lost or destroyed, which results in a significant loss in addition to the cleanup costs.
In the past, to address oil spills authorities have sucked the oil and water mixture directly into trucks or barges, wherein the mixture contained 95% water and 5% oil, and either destroyed the mixture reclaimed or separated the oil from the water offsite. This is very inefficient due to the high transportation costs. Further, barging and booming was commonly practiced by authorities; however the booms and the barges couldn't protect the coastline because oil spill constantly went overboard due to heavy blowing wind. As oil has monetary value, a recovery method is preferable to destruction of the oil that also leaves potentially toxic by-products in the environment.

PAGE 6140 RCVD AT 11120/2013 2:08:47 PM [Eastern Standard Time] SVR:F00003/6 *
DNIS:3905* CSID:18883832720 * DURATION (mm-ss):16-37 To:Page.Z f 40 201 0-11 -20 10 S2 09 <G(SAT-) 10900002,20 Frorn 19yal I Engfielci The cleanup procedure becomes even more challenging when a supervisor has to be present at the spill site for the duration of the process. Further, some of the most skilled cleanup specialists are only available remotely.
There is therefore a need for an oil cleanup system which vacuums up the mixture of spilled oil and water, and separates the oil from the water for processing and resale, before returning the clean water to the sea. Further there is a need for such a system that may be operated remotely.
More and more, fixed oil platforms are being replaced by mobile oil platforms, connected to a subsea well by a flexible hose, which enables the platform to move with the water without becoming disconnected to the well. There are risks that the hose break or become disconnected underwater and leak oil into the sea. Prior art means of finding the hose break are limited to checking along the high structure over the well. The hose flow could be stopped at various checkpoints along the hose length, as well, so that parts of the hose could be replaced without the requirement of replacing the whole hose, however finding the broken is hose end was still a problem.
Therefore, there is also a need for a means of retrieving a broken subsea hoses in order to minimize the spilling of oil into the sea.
SUMMARY
A mobile oil platform is disclosed, comprising a vessel in a body of water for holding oil, a subsea hose connected to a subsea well, a pump mounted on the vessel for detachably connecting to the subsea hose and for pumping oil into the vessel, one or more floats connected to the subsea hose by cables for holding the end of the subsea hose, wherein the subsea hose is detachably connected to the vessel and when full, the vessel detaches from the hose such that the floats hold the hose in the body of water, and the full vessel is replaced by an empty vessel.
2 PAGE 71403 RCVD AT 11/20/2013 2:08:47 PM [Eastern Standard Time] 3 SVR:F00003/53 DNIS:39053 CSID:18883832720' DURATION (mm-ss):16-37 -20 'I 5:05 :00 ( Mr) I 88.83532,".20 From NJyal I Engflelci A method of hose management for a mobile platform is also disclosed and comprises the steps of retrieving one or more floats connected to a subsea well hose by cables, pulling the cables from the sea to retrieve the connected hose; and connecting the hose to a platform. In a further embodiment, the method further comprises the steps of detaching the hose from the platform, attaching the cables connected to the one or more floats to the hose, and dropping the hose in the water wherein the floats mark a hose position.
in an embodiment the floats are gas bags. In a further embodiment the method further comprises the steps of deploying one or more probes into an oil spill for sucking an oil and water mixture, sucking the oil and water mixture into a separator, separating by gravity the oil and water mixture, and evacuating the separated water.
An embodiment has the additional step of deploying one or more submersibles into a subsea oil spill for sucking the oil and water mixture. Also present may be the step of controlling the one or more probes remotely using a camera, or controlling the one or more submersibles remotely using a camera.
DESCRIPTION OF FIGURES
Figure 1 shows the oil spill recovery system, according to one embodiment of the present invention;
Figure 2 shows a perspective view of the oil spill recovery system, according to one embodiment of the present invention;
Figure 3 shows the technician within a remote cleanup control centre, according to one embodiment of the present invention;
Figure 4 shows a plan view of a surface probe, according to one embodiment of the present invention;
3 PAGE 8/40* RCVD AT 11/20/2013 2:08:47 PM [Eastern Standard Time]*SVR:F00003/6*
DNIS:3905* CSID:18883832720* DURATION (mm-ss):16-37 201.-11 ---20 os (GM T-) I 6.68332,20 Fror-nSlyall Engfield Figure 5 shows an elevation view of a surface probe, according to one embodiment of the present invention;
Figure 6 shows a cut away view of the separator ship, according to one embodiment of the present invention;
Figure 7a shows a cut away view of the separator, according to one embodiment of the present invention;
Figure 7b shows a cut away view of the separator, according to another embodiment of the present invention;
Figure 8 shows the pump mounted on the separator, according to one embodiment of the present invention;
Figure 9a shows an elevation view of the separator, according to one embodiment of the present invention;
Figure 9b shows a plan view of the separator, according to one embodiment of the present invention;
Figure 10a shows a perspective view of the dual truck separator, according to one embodiment of the present invention;
Figure 10b shows a perspective view of a single truck separator, according to one embodiment of the present invention;
Figure 11 shows a plan view of a platform connected to a subsea well;
Figure 12 shows a plan view of floats attached to the subsea well hose;
Figure 13 shows a plan view of the platform and relief vessels above the subsea well;
Figure 14 shows plan view of the platform and relief vessels above the subsea well, cleaning up an oil spill;
4 PAGE 9140 * RCVD AT 1112012013 2:08:47 PM [Eastern Standard Time] SVR:F00003/6 DNIS:3905* CSID:18883832720* DURATION (mm-ss):16-37 Rage 10 of 40 2019.-11-20 10 52 09 (GNAT) 18883832720 Frort, 9tngflalc4 Figure 15 shows a plan view of the platform with probes stored thereon;
Figure 16 shows a plan view of the platform with probes deployed into the water;
Figure 17 shows the submersible under water;
Figure 18 shown the submersible approaching a subsea well;
Figure 19 shows the submersible capping a subsea well;
Figure 20 shows the platform held by cables above a leaking subsea well;
Figure 21 shows the cables being held at the surface by floats;
Figure 22 shows platforms being held by cables above a leaking well; and Figure 23 shows platforms being held by cables above a subsea well.
DETAILED DESCRIPTION
The word "vessel" includes in its meaning oil tanker ships and converted separator ships, oil carrier trucks, separator trucks or oil carrier trucks carried on a ship.
The words "sea" and "subsea" refer to any body of water, including oceans, seas, lakes and inland waterways.
The described oil spill cleanup system provides an efficient way to clean up an oil spill that can be operated remotely from within a control room on a ship or on a truck, for example.
Depending on the scale required, the ship may be as large as an oil tanker or much smaller, with lower operating costs and greater agility. With reference to Figures 1 and 2 the separator ship 10 is shown floating within an oil spill 8. The ship 10 has a submarine hose 12 having a coupler 14 for connection to a remote-controlled submersible 15. The coupler facilitates use of different length or thickness of hoses. The submersible 15 has no passengers, therefore need not be pressurized, and is thus capable of descending beyond 10000m, able to probe the
5 PAGE 10/40* RCVD AT 1112012013 2:08:47 PM [Eastern Standard Time]*
SVR:F0000316 DNIS:3905* CSID:18883832720* DURATION (mm-ss):16-37 2013-11-20 16 02:00 (GNAT) 1.863652720 From NS-all En gfiald deepest regions of the sea. Assuming an undersea spill, the submersible is directed to the source of the spill and vacuums the spill up through the hose 12. The hose 12 is a durable oil-resistant hose that may be reeled out to the depth desired, beyond 10000m in some cases. A
pump 20 on the ship 10 pulls the oily water from the hose 12 and into the ship 10. The submersible 15 directs the hose 12 to the spill, and pumping water from the spill into the ship is performed by the pump 20 on the ship. The submersible 15 may be robotic in that, once the location of the undersea spill is provided, it is able to direct itself to the spill without user intervention. As will be seen below, within the ship is a mechanism to separate the oil and water. The resulting oil-free water is returned to the sea by a nozzle 24.
Further, at least one surface probe 25 is deployed within the spill waters surrounding the ship 10. The probe 25 is remote controlled such that it may be steered to areas of greatest oil density. The control may be from any remote location, however preferably located in the ship bridge 27. As shown in Figure 3, the cleanup technician, in front of his deck, has live videos of the oil spill area from the probe and from the ship; therefore, the cleanup operating room may be anywhere in the world. The surface hose 30 is connected to the probe 25 by means of a hose connector, which facilitates changing the hose for longer or shorter, or different hose characteristics. The probe 25 is then connected to the pump 20 by the hose 30.
The probe directs the hose 30 to a desired location, and the pump 20 then sucks the oil/
water mixture into the ship 10 for separation.
The probe 25 may simply comprise a float that floats around the spill waters and sucks up the oil/water mixture on the surface. In an embodiment, the surface hose 30 may be directed by personnel in a small motorboat or other vehicle. There may be a plurality of surface hoses, fanning out around the ship 10 in order to cover a broader area.
With reference to Figures 4 and 5, an embodiment of the surface probe 25 is shown. The probe 25 is operable on either side, therefore is able to withstand rough seas which may flip it over.
The probe body 28 floats as it is filled with foam or gas, or having sealed floats therein. The float has a hose connector 26 for the hose 30. At the end opposite the hose connector 26, is a
6 PAGE 11/40 RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Timel *
SVR:F00003/6 * DNIS:3905* CSID:18883832720 " DURATION (mm-ss):16-37 l==,stgo, 12 of 40 2012-11-20 1 5 09 <GMT) 1000303.270 Fronn Engfielci sucking tube 40 for sucking the oil/water surface mixture. in one embodiment, the sucking tube 40 is movable and manoeuvrable into the oil nearby, as seen in Figure 4.
Further, the sucking tube 40 may have a camera 42 for identifying the locations of greater oil concentration for increased efficiency. For mobility, the probe has paddles or a rudder and propeller configuration, as is known in the art.
The probe 25 may be operated remotely, and the camera 42 sends real-time footage of the area and of oil concentrations to the operator who may operate the probe 25 as easily as if onsite. The probe may also be robotic in that it senses the location of the oil and directs itself there to suck up the oil/water mixture.
With reference to Figure 6 the vacuum pump 20 generates a vacuum and can suck up oil and deposit it directly into the ship's first and second tanks 32, 34. The tanks are open to one another at the top, and are separated by a high wall 31 between them, which wall 31 extends 80 ยจ 95% of the height of the tanks 32, 34. With reference to Figure 6, the tanks may be organized adjacent lengthwise of the ship, such that one tank is on the port side of the ship and one on the starboard side, or adjacent widthwise of the ship, such that the first tank is in the bow of the ship and the second tank in the stern. In order to prevent listing of the vessel the tanks 32, 34 may take concentric forms, for example, to prevent the oil/water mixture from weighing only one side of the vessel and risk capsizing. Multiple tanks may also be used within the ship in a separator, for further, better separation of oil and water, as discussed below.
The oil/water mixture is pumped from the submersible 15 or the probe 25, through the hoses 12, 30 and into the first tank deck 32. The oil and water can be separated by specific gravity ("gravity separation") as oil is less dense than water and hydrophobic, so the water is pushed to the bottom of the first tank deck and the separation between the oil 35 and water 37 is quite distinct. The first tank deck is filled with the oil/water mixture, which separates as it is filled.
With the oil on top, once the level of the first tank overflows into the second, it is only oil that is transferred since the water remains in the bottom of the first tank 32. Any excess volume in the first tank overflows into the second tank deck 34. The clean water at the bottom of the first
7 PAGE 12/40* RCVD AT 11120/2013 2:08:47 PM [Eastern Standard Time] SVR:F00003/6 DNIS:3905* CSID:18883832720 DURATION (mm-ss):16-37 8S2:00(r,n-r) I 888383270 From 1,4ystil Engfialci tank deck 32 will dispense back into the body of water through the nozzle 24, by means of a pump (not shown) or simply by water pressure.
A separator 50 is shown in Figures 7a - 7b, 8 and 9a - 9b, which may be present in the ship 10 (not shown) or a truck (not shown), having a pump 20 above the separator 50 to pull the oil/water mixture in. The separator 50 consists of a number of tanks, in one embodiment four tanks 32, 34, 52, 54. The first tank 32 receives the water/oil mixture from the pump 20, through an entry 55 located above the first tank 32. As the first tanks fills, the oil separates to the top of the tank, and the water separates to the bottom. When full, the tank will have gradients, with almost pure oil at the top, with a mixture of water and oil in the middle, and almost pure water at the bottom. As the mixture settles the gradients are more defined. A
typical breakdown in the first tank 32 is 15% pure oil, 35% water/oil mixture, and 50% water. Once full, the first tank 32 overflows, such that the almost pure oil at the top overflows into the second tank 34. The second tank is now 50% oil, and 50% water/oil mixture. As the second tank fills and the oil rises to the top, it overflows into the third tank 52, such that the third tank is 90% oil. The third tank overflows once full, and given that the components have had a chance to settle, the overflow is pure oil and therefore the fourth tank 54 contains 100% pure oil, which may be evacuated through the oil evacuation valve 57, which has a pump (not shown) to facilitate evacuation. The clean water that settles to the bottom of the first tank 32 is evacuated by the water evacuation valve 59 on a lower portion of the first tank 32. There is a mechanical filter 53 between the valve 59 and the tanks 32. In one embodiment the filter extends to the top of the separator 50, and creates an oil free zone 49.
Such a separator may be within the ship or within a truck, for mobile shoreline applications. It may also be operated and monitored remotely. In Figures 9a - b and 10a - b, a configuration preferable to a truck is shown, wherein the separator 50 is contained within a truck body 51 and may be entered by a door 60, and the various tanks accessed by steps 65.
The separator 50 operates as described above and the water is ejected from the truck once separated.
8 PAGE 13/40* RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Time]*SVR:F0000316* 13NI5:3905* CSID:18883832720* DURATION (mm-ss):16-37 3_, -20 18 52 09 (c.m-r) 18883832-720 From Nlya II Engrialci With reference to Figures 10a b, tanker trucks 66 can be used as vessels to remove oil from the shoreline. The trucks 66 are designed to contain a separator 50, which receives an oil/water mixture from a plurality of hoses 72 connected to a pump 71 mounted to the roof of the truck 66. The hoses 72 are inserted into the oil/water mixture, and the pump 71 sucks the mixture into the first tank of the separator (not shown).
Two trucks may implement the two-tank design described above, wherein a first tank 62 is within a first truck 66 and a second tank 64 is within a second truck 67. The oil/water mixture 70 is pumped into the first tank 62 within the first truck 66 by oil spill hoses 72, from a probe 25 or simply vacuuming the shore oil by hand or boat, and a transfer 68 hose at the top of the first truck 66 sucks the separated oil from the top of the first tank 62 and into the second tank 64 where it further separates. Separated water is ejected from the bottom 62a of each tank (not shown for second tank), and after a period of time the second tank 64 will be full of separated oil, at which point it may be hauled away in the second truck 67, and a further truck (not shown) with the same features replaces it The chain of trucks, with a further truck replacing a full second truck, will continue until the cleanup is complete.
With reference to Figure 11, a further oil spill safety system comprised of floats for facilitating the retrieval of an undersea hose from a subsea well 105. The subsea well 105 is typically connected to a mobile oil platform 100 with a hose 110 to pump the oil up and into the platform by means of a pump 102. The platform 100 may consist of an oil carrier vessel converted for the purpose of pumping up and storing the oil from the subsea well. The converted oil carrier vessel as platform 100 can drop the hose 110 and depart once full, taking the oil to port, while a replacement oil carrier arrives to serve as platform 100 for the hose 110.
The hose opening 112 closes while the hose 110 is not attached to the platform 100 so as to prevent the spilling of oil. Detachment of the hose 110 from the platform 100 is also beneficial in case of an emergency, when the crew and costly equipment can be relocated, rather than remain in place as a fixed oil platform must.
9 PAGE 14140' RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Time] *
SVR:F0000316 DNIS:3905* CSID:18883832720 * DURATION (mm-ss):16-37 2012,-11 -20 10:50:09 (GMT) 10080032,20 From Nyall Engfial.
The platform 100 is equipped with a winch. The hose attachment method is as follows: i) once the platform arrives at the well, and retrieve the floats 115 holding the hose 110, the technicians free the cable 113 from the floats 115, which are hooked to the exterior of the vessel for storage; ii) the cable 113 is hooked to the winch, and iii) the hose 110 emerges from the sea, and iv) the hose opening 112 is connected to the platform 100. For detachment, the hose opening 112 is detached from the platform 110; ii) the cable 113 is attached to the hose 110 and the hose 110 lowered into the water by the winch; iii) the floats 115 are reattached to the cable 113; and iv) the floats float in the water holding the hose 110 at a known position.
The benefits of eliminating fixed oil platforms in favour of the described converted oil carrier vessels is the safety benefit of having a platform that is movable from the danger zone; the mobile platform of the converted oil carrier is cheaper and easier to manufacture and deploy;
and the fixed structure that is susceptible to water movement and storms is replaced by a long hose that is flexible and allows the platform to move with the elements.
With reference to Figure 12, floats 115 hold the hose 100 in an accessible position for the arrival of the next platform 100, and prevent it from sinking. The hose may be connected to the one or more floats by cable 113 or other similar means. The floats 115 contain a substance having a lower density than water, and may consist of robust balloons or gas bags for holding a gas, for example, or foam. Balloons or gas bags have the advantage of portability when not in use, however foam floats do not require inflation or deflation. Multiple floats have the benefit of maintaining floatation despite the failure of one or more of the floats.
The floats may have surveillance cameras attached thereto to ensure the security of the subsea well, and to monitor shipping lanes as desired.
With reference to Figure 13, the system is shown, with the platform 100 pumping oil through the hose 110 from the subsea well 105, the hose 110 attached to the platform's pump 102, which pumps the oil. The floats 115 are attached to the hose 110 to facilitate disconnection and connection to another platform 100 in the form of a vessel. In this embodiment, platform 100 is an oil carrier vessel, which can detach the hose 110 and depart when full, to be replaced by PAGE 15/40 RCVD AT 11120/2013 2:08:47 PM [Eastern Standard Timel SVR:F00003/6 * DNIS:3905 CSID:18883832720 DURATION (mm-ss):16-37 0-1 a-11 -00 18 52 09 (GMT) 1 saaaasz 700 From Nya II Engfeela another empty oil carrier vessel (not shown). In an embodiment, two further relief vessels 120 are present for receiving oil from the platform 100 via oil transfer hoses 122, to prevent the platform 100 from becoming full and dropping the hose 110.
With reference to Figure 14, the floats 115 are shown on the hose 110 in case the hose 110 is dropped by the platform 100. Further, an oil spill surrounds the platform 100 and the probe 25 is deployed into the oily water as described above to vacuum the oily water into the platform 100 using the pump 121, to which both hoses 12, 30 are attached. In one embodiment, platform 100 is an oil carrier vessel also containing a separator 50 for the spilled oil, which evacuates clean water from the water evacuation valve 123. For example, 80% of the storage capacity may be used for oil storage while 20% of the storage capacity is used for the separator 50. Therefore, the vessel may serve three purposes, as an oil carrier for use as a platform, as a separator for oil spill cleanup, and as an oil carrier/separator for use as a platform with availability for cleanup should the need arise. Further, a submersible 15 is deployed to clean up an underwater spill 8. A helicopter 125 is available for support functions and evacuation.
With reference to Figure 15, the platform 100 is shown with a plurality of probes 25 thereon, in storage on the deck of the platform 100. Submersibles 15 may also be stored on the platform 100 deck in a similar fashion. In Figure 16, the probes are shown deployed in the water in the vicinity of the platform 100. In an embodiment, the platform 100 contains four water/oil separators 50 equipped with a vacuum for use with the probes 25 and submersibles 15. The system is designed to suck up more spilled oil than any wellhead can gush out to avoid environmental disaster. Therefore, the platform 10 shown is equipped with storage and/or one or more oil separators, the platform equipped with four or more probes each which can be deployed very quickly into the spill area to control the damage.
With reference to Figures 17 to 19, the submersible 15 is shown attached to its submarine hose 12 and carrying cap 107, moving to cap a subsea well 105. In Figure 17, the submersible 15 is moving through the water to the leaking subsea well location. In Figure 18, the submersible 15 has located the subsea well 105 and is moving over the well. In Figure 19 the submersible 15 PAGE 16140 RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Time] SVR:F0000316*
DNIS:3905* CSID:18883832720* DURATION (mm-ss):16-37 1=99 1, of -10 2012 11 20 19 52 09 (c,m-r) I 800000.-zz0 From f,Jya II Engfielci caps the subsea well 105 with a cap 107, which is affixes over the well 105 opening. The submersible 15 is designed to seat on the subsea well 105 and suck up the spilled oil in case of an accident. The temporary capping of the well 105 lasts at least as long as it takes until a permanent capping occurs.
With reference to Figure 20, the platform 100 is shown above a well 105. The platform 100 is held in place above the well 105 by cables 113 attached to weights 106 to anchor the platform in position. The cables 113 attached to weights 106 may be deployed simply by dropping weights 106 into the water and having the cable 113 follow. Cables 113 may also be fixed into the ground near the well by affixed anchor, and held available at the top by floats 115. Cables 113 that are not currently in use holding a platform 100, are maintained accessible from the surface due to floats 115 which are removably attached to the cable 113 ends when detached from a platform 100. The cables 113 allow the platform 100 to move up and down in response to waves at the surface, so they do not pull the platform 100 under. In Figure 21, the platform 100 has been removed and the cables 113 that were holding the platform in place are now held by floats 115, for the arrival of the next platform. The hose 110 is also held in place at the surface by floats 115. Cables 113 may be fixed to weights on the sea floor, or dropped arid stand alone from their own weight, hanging from the associated floats 115, for example balloons, barges, life boats, and inflatable bags, and awaiting the oil mobile platform 100 in order to start the oil production. They can be used to control movement of the mobile platform 100 above the subsea wellhead. Furthermore, the floats 15 can be used to gather data on weather, kind of vessels and wild life in the area, above and under the sea if equipped with cameras.
With reference to Figure 22, multiple platforms 100 are held over the well site by cables 113 attached to weights. The cables 113 that were previously held by floats 115 are disengaged from the floats 115 and attached to platforms 100 that arrive to collect oil and cleanup the surrounding waters. In one embodiment, for tethering in rough seas the platform 100 has a cable of its own (not shown) to connect with the cables 113 being held by the floats 115. In Figure 23 the platforms have been deployed above the well site and are in the process of PAGE 17140 RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Time] SVR:F00003/6*
DNIS:3905* CSID:18883832720 * DURATION (mm-ss):16-37 To: Rago 10 of 40 201 4-11 -20 14:52:05(c.nn-r) I 0084852,20 From 1,Iya I I a. IcA
lowering the cables 113 attached to weights 106 to hold the platform 100 in position. Where cables 113 with floats 115 are not available around the subsea well for oil production, manufactured cables on board of the barge or the oil mobile platform can be dropped in order to assure the stability of the platform during the operation.
With reference to Figure 24, a single platform 100 containing both the separator 50 and the second tank holding oil 34. It has a water evacuation valve 59 for evacuating the clean water resulting from the separation process. The platform 100 has available thereon one or more submersibles 15 connected by hose 30 to the platform 100, as well as one or more surface probes 25 connected by hose to the platform 100. Weights 106 may be used at the ends of cables 113, or the end of the cable may be fixed within the seafloor 108. The weights 106 may be raised or dropped as necessary to maintain the platform in position over the subsea well.
With reference to Figure 25, in a further embodiment a single platform 100 has two tanks 130, 132 on which it floats, the first tank 130 containing the separator 50 which separates the oil from the water. The separated oil is pumped into the second tank 132 which contains only oil, for collection. The water resulting from the separator is returned to the sea through the water evacuation valve 59. The tanks of the platform may be removable and replaceable. For example, second tank 132, when full, may be replaced with an empty tank for further oil collection. The full tank may be towed away for treatment. Along the two tanks are a number of sets of hooks (oriented from higher to lower) for attaching the cable 113 to, depending on the state of the sea. If seas are calm, then the cable 113 is attached to the higher hooks 128. If the seas are rough, then the cable 113 is attached to the lower hooks 128. The cables 113, as mentioned above, may be held to the sea floor by weights 106 or fixed there 108.

PAGE 18/40 * RCVD AT 11/2012013 2:08:47 PM [Eastern Standard Time]
SVR:F0000316 DNIS:3905 CSID:18883832720 DURATION (mm-ss):16-37

Claims (14)

I claim:
1 . A mobile oil platform, comprising:
a. a vessel for holding oil;
b a subsea hose having an open end configured to engage with the platform, and an opposite end connected to a subsea well;
c. a pump mounted on the vessel configured to detachably connect to the subsea hose to pump oil into the vessel;
d. one or more floats connected to the subsea hose by a cable configured to hold the end of the subsea hose, wherein the subsea hose is detachably connected to the vessel and when full, the vessel detaches the subsea hose such that the floats hold the subsea hose in the sea, and the full vessel is replaced by an empty vessel.
2. The mobile oil platform of Claim 1, further comprising.
a two relief vessels; and b. oil transfer hoses connecting the platform to each of the relief vessels, wherein the relief vessels are configured to receive oil from the platform through the oil transfer hoses.
3. The mobile oil platform of Claim 1, further comprising surveillance cameras mounted on the floats to ensure the security of the subsea well and to monitor shipping lanes.
4. The mobile oil platform of Claim 1, wherein the open end of the subsea hose closes when detached from the platform to prevent the spilling of oil.
5. The mobile oil platform of Claim 1, wherein the floats are gas bags.
6 The mobile oil platform of Claim 1, wherein the floats are constructed of foam.
7. The mobile oil platforrn of Claim 1, further comprising-a. a probe; and b. a hose connecting the probe to the pump, wherein the probe is contigured to vacuum an oil/water mixture into the platform using the pump.
8 The mobile oil platform of Claim 7, further comprising:
a. a separator; and b a water evacuation valve, wherein the separator is configured to separate the oil/water mixture, and evacuate the water through the water evacuation valve.
9. The mobile oil platform of Claim 7, further comprising a camera attached to the probe, wherein the camera is configured to allow the probe to be remotely controlled.
10. The mobile oil platform of claim 1 further comprising.
a. a submersible; and b. a hose connecting the submersible to the purnp, wherein the submersible is configured to vacuum oil/water mixture into the platform using the pump.
11 The mobile oil platform of claim 10, further comprising a camera attached to the submersible, wherein the camera is configured to allow the submersible to be remotely controlled.
12. The mobile oil platform of Claim 1, further comprising a winch configured to retrieve the subsea well hose for attachment to the platform and lower the hose after detachment from the platform.
13. A method of retrieving and attaching the subsea hose to the mobile platform of claim 12 comprising:
a. retrieving one or more floats connected to the subsea hose by a cable, b. detaching the cable from the floats, c. connecting the winch to the cable;
d pulling the cable from the sea to retrieve the subsea hose using the winch, and e. connecting the open end of the subsea hose to the platform.
14. A method of detaching the subsea hose from the mobile platform of claim comprising.
a. detaching the subsea hose from the platform;
b. attaching the cable to the subsea hose;
c lowering the subsea hose into the water with the winch; and d. reattaching the cable to the floats, wherein the floats mark the position of the subsea hose in the water
CA2832642A 2013-11-12 2013-11-12 Mobile oil platform and method of hose management therefor Active CA2832642C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA2832642A CA2832642C (en) 2013-11-12 2013-11-12 Mobile oil platform and method of hose management therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA2832642A CA2832642C (en) 2013-11-12 2013-11-12 Mobile oil platform and method of hose management therefor

Publications (2)

Publication Number Publication Date
CA2832642A1 CA2832642A1 (en) 2014-10-01
CA2832642C true CA2832642C (en) 2015-09-08

Family

ID=51787252

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2832642A Active CA2832642C (en) 2013-11-12 2013-11-12 Mobile oil platform and method of hose management therefor

Country Status (1)

Country Link
CA (1) CA2832642C (en)

Also Published As

Publication number Publication date
CA2832642A1 (en) 2014-10-01

Similar Documents

Publication Publication Date Title
US9103085B2 (en) Oil spill recovery system and method
CA2799947C (en) Oil spill recovery system and method
US3724662A (en) Control of oil pollution at sea, apparatus and method
EP2981485B1 (en) Large volume subsea chemical storage and metering system
US5071545A (en) Ship-mounted oil spill recovery apparatus
US8882388B2 (en) Underwater oil and gas collection system
US9567045B2 (en) Marine lifting vessel
EP2326552B1 (en) Method of locating a subsea structure for deployment
EP2981455B1 (en) Large subsea package deployment methods and devices
US4007700A (en) Multiple seafloor storage and supply system
US10753058B2 (en) Containment unit and method of using same
US9315963B2 (en) Offshore atoll system and related methods of use
US7225750B2 (en) Rescue ship for disabled vessels, vessels rescue method, and use of a rescue ship
US5795103A (en) Oil tanker and method for recovering oil from submerged oil tanker
US20150166150A1 (en) Mobile oil platform system and method
CA2832642C (en) Mobile oil platform and method of hose management therefor
US20160122964A1 (en) Mobile Oil Platform and Method of Hose Management Therefor
GB2466377A (en) Method of manipulating the buoyancy of a device
RU116562U1 (en) OIL-PRODUCING UNDERWATER PLATFORM
RU2360828C1 (en) Underwater salvage complex
US8658045B1 (en) Oil spill recovery vessel and method therefore
GB2396335A (en) Flexible shipwreck cover
RU151568U1 (en) DEVICE FOR DIVING THE CESSON ON THE SEA
ES2239494B1 (en) DOME SYSTEM TO RECOVER OR AVOID THE DISPERSION OF A CONTAMINATING LOAD OF A SUNK VESSEL.
Suchy One-Atmosphere Subsea Transfer Systems