CA2783977C - Method and system for partitioning parallel simulation models - Google Patents

Method and system for partitioning parallel simulation models Download PDF

Info

Publication number
CA2783977C
CA2783977C CA2783977A CA2783977A CA2783977C CA 2783977 C CA2783977 C CA 2783977C CA 2783977 A CA2783977 A CA 2783977A CA 2783977 A CA2783977 A CA 2783977A CA 2783977 C CA2783977 C CA 2783977C
Authority
CA
Canada
Prior art keywords
weights
connections
topology graph
reservoir
subdomains
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2783977A
Other languages
English (en)
French (fr)
Other versions
CA2783977A1 (en
Inventor
Serguei Maliassov
Robert R. Shuttleworth
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
ExxonMobil Upstream Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ExxonMobil Upstream Research Co filed Critical ExxonMobil Upstream Research Co
Publication of CA2783977A1 publication Critical patent/CA2783977A1/en
Application granted granted Critical
Publication of CA2783977C publication Critical patent/CA2783977C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V99/00—Subject matter not provided for in other groups of this subclass
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00—Details of seismic processing or analysis
    • G01V2210/60—Analysis
    • G01V2210/66—Subsurface modeling
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00—Details relating to CAD techniques
    • G06F2111/10—Numerical modelling
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00—Computer-aided design [CAD]

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geophysics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Complex Calculations (AREA)
  • Multi Processors (AREA)
CA2783977A 2010-02-12 2010-10-19 Method and system for partitioning parallel simulation models Expired - Fee Related CA2783977C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US30405610P 2010-02-12 2010-02-12
US61/304,056 2010-02-12
PCT/US2010/053141 WO2011100002A1 (en) 2010-02-12 2010-10-19 Method and system for partitioning parallel simulation models

Publications (2)

Publication Number Publication Date
CA2783977A1 CA2783977A1 (en) 2011-08-18
CA2783977C true CA2783977C (en) 2018-11-20

Family

ID=44368035

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2783977A Expired - Fee Related CA2783977C (en) 2010-02-12 2010-10-19 Method and system for partitioning parallel simulation models

Country Status (7)

Country Link
US (1) US9594186B2 (enExample)
EP (1) EP2534605B1 (enExample)
CN (1) CN102741855B (enExample)
BR (1) BR112012017275A2 (enExample)
CA (1) CA2783977C (enExample)
IN (1) IN2012DN05167A (enExample)
WO (1) WO2011100002A1 (enExample)

Families Citing this family (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222126B2 (en) * 2002-07-30 2007-05-22 Abel Wolman Geometrization for pattern recognition, data analysis, data merging, and multiple criteria decision making
US10061060B2 (en) 2009-11-12 2018-08-28 Exxonmobil Upstream Research Company Method and apparatus for generating a three-dimensional simulation grid for a reservoir model
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
US8433551B2 (en) 2010-11-29 2013-04-30 Saudi Arabian Oil Company Machine, computer program product and method to carry out parallel reservoir simulation
EP2811112B1 (en) * 2010-09-07 2019-07-24 Saudi Arabian Oil Company Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
US8386227B2 (en) 2010-09-07 2013-02-26 Saudi Arabian Oil Company Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
US9229129B2 (en) * 2010-12-10 2016-01-05 Conocophillips Company Reservoir geobody calculation
CN103370719B (zh) * 2010-12-16 2016-05-11 兰德马克绘图国际公司 用于在并行油藏模拟期间进行二维区域分解的系统及方法
GB201200498D0 (en) * 2012-01-13 2012-02-22 Optimized Systems And Solutions Ltd Simulation modelling
AU2012382415B2 (en) * 2012-06-15 2015-08-20 Landmark Graphics Corporation Parallel network simulation apparatus, methods, and systems
US8994739B2 (en) * 2012-07-10 2015-03-31 Landmark Graphics Corporation Systems and methods for reservoir simulation
EP2784704A1 (en) * 2013-03-26 2014-10-01 Fujitsu Limited Multi-component computational fluid dynamics simulations
US9576089B2 (en) * 2013-08-30 2017-02-21 Chevron U.S.A. Inc. Unified application framework for finite-difference modeling
WO2015103494A1 (en) * 2014-01-03 2015-07-09 Schlumberger Technology Corporation Graph partitioning to distribute wells in parallel reservoir simulation
US10184320B2 (en) * 2014-09-02 2019-01-22 Saudi Arabian Oil Company Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation
US20160090822A1 (en) * 2014-09-25 2016-03-31 Schlumberger Technology Corporation Collision detection method
WO2016130185A1 (en) * 2015-02-13 2016-08-18 Exxonmobil Upstream Research Company Method and system to enhance computations for a physical system
US10450825B2 (en) * 2015-04-30 2019-10-22 Schlumberger Technology Corporation Time of arrival-based well partitioning and flow control
CA2993293A1 (en) 2015-09-08 2017-03-16 Halliburton Energy Services, Inc. Simulators and simulation methods using adaptive domains
US10657440B2 (en) 2015-10-26 2020-05-19 International Business Machines Corporation Optical synapse for neuromorphic networks
US10395168B2 (en) 2015-10-26 2019-08-27 International Business Machines Corporation Tunable optical neuromorphic network
EP3386718B1 (en) 2015-12-11 2022-10-05 Hewlett-Packard Development Company, L.P. Density classifiers based on plane regions
US10019342B2 (en) * 2015-12-24 2018-07-10 Intel Corporation Data flow programming of computing apparatus with vector estimation-based graph partitioning
CN105649610B (zh) * 2015-12-31 2019-01-18 中国石油天然气股份有限公司 一种获取油藏压力的方法及装置
CN105701299A (zh) * 2016-01-15 2016-06-22 西南石油大学 一种动态摩阻扭矩计算方法
EP3423676A1 (en) * 2016-03-04 2019-01-09 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
US10318668B2 (en) * 2016-06-15 2019-06-11 International Business Machine Corporation Automatic decomposition of simulation model
US10215014B2 (en) 2016-07-03 2019-02-26 Reveal Energy Services, Inc. Mapping of fracture geometries in a multi-well stimulation process
WO2018026261A1 (en) * 2016-08-03 2018-02-08 Hitachi, Ltd. Simulation methods, computing nodes and simulation systems for parallel execution
US10452794B2 (en) * 2016-08-25 2019-10-22 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
US10296684B2 (en) * 2016-11-16 2019-05-21 Saudi Arabian Oil Company Parallel reservoir simulation with accelerated aquifer calculation
US10557344B2 (en) 2017-03-08 2020-02-11 Reveal Energy Services, Inc. Determining geometries of hydraulic fractures
US11040329B2 (en) 2017-03-17 2021-06-22 Hewlett-Packard Development Company, L.P. Density classifiers based on plane regions
US10513923B2 (en) 2017-07-24 2019-12-24 Reveal Energy Services, Inc. Dynamically modeling a hydraulic fracture
US10851643B2 (en) * 2017-11-02 2020-12-01 Reveal Energy Services, Inc. Determining geometries of hydraulic fractures
CN107798125B (zh) * 2017-11-10 2021-03-16 携程旅游网络技术(上海)有限公司 基于亲密度模型的准入判定方法、系统、设备及存储介质
EP3671494A1 (en) * 2018-12-21 2020-06-24 Dassault Systèmes Multi-instanced simulations for large environments
US11681838B2 (en) * 2020-05-26 2023-06-20 Landmark Graphics Corporation Distributed Sequential Gaussian Simulation
CA3155410C (en) 2020-07-20 2025-12-23 Reveal Energy Services, Inc. Determining fracture driven interactions between wellbores
CN112580774B (zh) * 2020-09-01 2022-10-21 浙江大学 一种面向可重构神经网络处理器的神经网络布局方法
ES2996861T3 (en) * 2020-11-11 2025-02-13 Repsol Sa Computer implemented method for manipulating a mesh for the discretization of a reservoir domain
US12497887B2 (en) * 2021-10-20 2025-12-16 Chevron U.S.A. Inc. Acceleration of subsurface simulation using filtered grid connectivity graph
CN113987840B (zh) * 2021-12-24 2022-03-15 中国汽车技术研究中心有限公司 基于Modelica的模型拆分方法、设备和存储介质

Family Cites Families (95)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794534A (en) 1985-08-08 1988-12-27 Amoco Corporation Method of drilling a well utilizing predictive simulation with real time data
US6612382B2 (en) 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
EP0937267A4 (en) 1996-09-13 2001-09-05 Pgs Tensor Inc PROCEDURE FOR RESERVOIR TIME OUT MONITORING
US5905657A (en) 1996-12-19 1999-05-18 Schlumberger Technology Corporation Performing geoscience interpretation with simulated data
US6018497A (en) * 1997-02-27 2000-01-25 Geoquest Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore
US6002985A (en) 1997-05-06 1999-12-14 Halliburton Energy Services, Inc. Method of controlling development of an oil or gas reservoir
US6049758A (en) 1997-06-16 2000-04-11 Bbn Corporation Reservoir monitoring
EP1036341B1 (en) 1997-12-01 2005-02-16 Schlumberger Limited Method and apparatus for creating, testing, and modifying geological subsurface models
US6101447A (en) 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
GB2352036B (en) * 1998-05-04 2002-11-27 Schlumberger Evaluation & Prod Near wellbore modelling method and apparatus
US6236942B1 (en) 1998-09-15 2001-05-22 Scientific Prediction Incorporated System and method for delineating spatially dependent objects, such as hydrocarbon accumulations from seismic data
US6529833B2 (en) 1998-12-30 2003-03-04 Baker Hughes Incorporated Reservoir monitoring in a laminated reservoir using 4-D time lapse data and multicomponent induction data
EP1151326B1 (en) 1999-02-12 2005-11-02 Schlumberger Limited Uncertainty constrained subsurface modeling
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US7006959B1 (en) * 1999-10-12 2006-02-28 Exxonmobil Upstream Research Company Method and system for simulating a hydrocarbon-bearing formation
US6826483B1 (en) 1999-10-13 2004-11-30 The Trustees Of Columbia University In The City Of New York Petroleum reservoir simulation and characterization system and method
US6295504B1 (en) * 1999-10-25 2001-09-25 Halliburton Energy Services, Inc. Multi-resolution graph-based clustering
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
WO2001073476A1 (en) * 2000-03-27 2001-10-04 Ortoleva Peter J Method for simulation of enhanced fracture detection in sedimentary basins
CA2408900C (en) 2000-04-14 2006-08-15 Lockheed Martin Corporation Method of determining boundary interface changes in a natural resource deposit
GB2382408B (en) 2000-06-19 2004-06-02 Halliburton Energy Systems Inc Apparatus and methods for applying time lapse VSP to monitor a reservoir
US7006951B2 (en) 2000-06-29 2006-02-28 Object Reservoir, Inc. Method for solving finite element models using time slabbing
US7369973B2 (en) * 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
US6801197B2 (en) 2000-09-08 2004-10-05 Landmark Graphics Corporation System and method for attaching drilling information to three-dimensional visualizations of earth models
CA2421863C (en) 2000-09-12 2009-05-12 Schlumberger Canada Limited Evaluation of multilayer reservoirs
US20020049575A1 (en) 2000-09-28 2002-04-25 Younes Jalali Well planning and design
US6978210B1 (en) 2000-10-26 2005-12-20 Conocophillips Company Method for automated management of hydrocarbon gathering systems
US20020112888A1 (en) 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
WO2002099464A1 (en) 2001-06-06 2002-12-12 Schlumberger Canada Limited Automated system for modeling faulted multi-valued horizons
US6772066B2 (en) 2002-06-17 2004-08-03 Schlumberger Technology Corporation Interactive rock stability display
RU2335788C2 (ru) 2002-12-10 2008-10-10 Дзе Риджентс Оф Дзе Юниверсити Оф Калифорния Система и способ контроля месторождения углеводородов с использованием электромагнитных полей регулируемого источника
US7899657B2 (en) 2003-01-24 2011-03-01 Rockwell Automoation Technologies, Inc. Modeling in-situ reservoirs with derivative constraints
FR2855631A1 (fr) 2003-06-02 2004-12-03 Inst Francais Du Petrole Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes
US7876705B2 (en) 2003-06-25 2011-01-25 Schlumberger Technology Corporation Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product
CN100590637C (zh) * 2003-09-30 2010-02-17 埃克森美孚上游研究公司 使用最小阻力路径来特征化储层模型中的连通性
US7725302B2 (en) 2003-12-02 2010-05-25 Schlumberger Technology Corporation Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
US20050199391A1 (en) 2004-02-03 2005-09-15 Cudmore Julian R. System and method for optimizing production in an artificially lifted well
US7672825B2 (en) 2004-06-25 2010-03-02 Shell Oil Company Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
US7809537B2 (en) 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation
US7225078B2 (en) 2004-11-03 2007-05-29 Halliburton Energy Services, Inc. Method and system for predicting production of a well
EA200701169A2 (ru) * 2004-11-29 2008-08-29 Шеврон Ю.Эс.Эй. Инк. Способ, система и запоминающее устройство для хранения программ для моделирования потока жидкости в физической системе с использованием расширяемой объектно-ориентированной архитектуры, основанной на динамической композиции
US7596480B2 (en) * 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations
US7277796B2 (en) 2005-04-26 2007-10-02 Schlumberger Technology Corporation System and methods of characterizing a hydrocarbon reservoir
FR2886740B1 (fr) 2005-06-03 2007-09-28 Inst Francais Du Petrole Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
US7913190B2 (en) 2005-07-18 2011-03-22 Dassault Systèmes Method, system and software for visualizing 3D models
EA013672B1 (ru) 2005-08-15 2010-06-30 Юниверсити Оф Саутерн Калифорния Система для разработки структуры интегрированного управления активами для месторождения нефти
GB2444874A (en) 2005-08-15 2008-06-18 Univ Southern California Modelling application development in the petroleum industry
US8145463B2 (en) 2005-09-15 2012-03-27 Schlumberger Technology Corporation Gas reservoir evaluation and assessment tool method and apparatus and program storage device
US7340347B2 (en) 2005-12-29 2008-03-04 Schlumberger Technology Corporation Method to visualize three dimensional log data on two dimensional media
US20070213935A1 (en) 2005-12-29 2007-09-13 Schlumberger Technology Corporation Method and System to Display Well Properties Information
WO2007084611A2 (en) 2006-01-20 2007-07-26 Landmark Graphics Corporation Dynamic production system management
US8812334B2 (en) 2006-02-27 2014-08-19 Schlumberger Technology Corporation Well planning system and method
US7328107B2 (en) 2006-04-28 2008-02-05 Kjt Enterprises, Inc. Integrated earth formation evaluation method using controlled source electromagnetic survey data and seismic data
US7716029B2 (en) 2006-05-15 2010-05-11 Schlumberger Technology Corporation Method for optimal gridding in reservoir simulation
US20070277115A1 (en) 2006-05-23 2007-11-29 Bhp Billiton Innovation Pty Ltd. Method and system for providing a graphical workbench environment with intelligent plug-ins for processing and/or analyzing sub-surface data
US20070279429A1 (en) 2006-06-02 2007-12-06 Leonhard Ganzer System and method for rendering graphics
US7953587B2 (en) 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
WO2007149766A2 (en) 2006-06-18 2007-12-27 Chevron U.S.A. Inc. Reservoir simulation using a multi-scale finite volume including black oil modeling
US9043188B2 (en) 2006-09-01 2015-05-26 Chevron U.S.A. Inc. System and method for forecasting production from a hydrocarbon reservoir
US7657494B2 (en) 2006-09-20 2010-02-02 Chevron U.S.A. Inc. Method for forecasting the production of a petroleum reservoir utilizing genetic programming
US8145464B2 (en) 2006-11-02 2012-03-27 Schlumberger Technology Corporation Oilfield operational system and method
US7467044B2 (en) 2007-01-15 2008-12-16 Chevron U.S.A. Inc Method and system for assessing exploration prospect risk and uncertainty
US8411952B2 (en) * 2007-04-04 2013-04-02 Siemens Aktiengesellschaft Method for segmenting an image using constrained graph partitioning of watershed adjacency graphs
US9175547B2 (en) 2007-06-05 2015-11-03 Schlumberger Technology Corporation System and method for performing oilfield production operations
FR2920816B1 (fr) 2007-09-06 2010-02-26 Inst Francais Du Petrole Methode pour mettre a jour un modele geologique a l'aide de donnees dynamiques et d'essais de puits
US20100132450A1 (en) 2007-09-13 2010-06-03 Pomerantz Andrew E Methods for optimizing petroleum reservoir analysis
US20110161133A1 (en) 2007-09-29 2011-06-30 Schlumberger Technology Corporation Planning and Performing Drilling Operations
MX2010005116A (es) 2007-11-10 2010-09-09 Landmark Graphics Corp Sistemas y metodos para automatizacion, adaptacion e integracion del flujo de trabajo.
CA2702965C (en) * 2007-12-13 2014-04-01 Exxonmobil Upstream Research Company Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
US8396699B2 (en) 2007-12-14 2013-03-12 Exxonmobil Upstream Research Company Modeling subsurface processes on unstructured grid
US9638830B2 (en) 2007-12-14 2017-05-02 Westerngeco L.L.C. Optimizing drilling operations using petrotechnical data
US7878268B2 (en) 2007-12-17 2011-02-01 Schlumberger Technology Corporation Oilfield well planning and operation
US8396826B2 (en) 2007-12-17 2013-03-12 Landmark Graphics Corporation Systems and methods for optimization of real time production operations
CN101903805B (zh) 2007-12-21 2013-09-25 埃克森美孚上游研究公司 沉积盆地中的建模
US9074454B2 (en) 2008-01-15 2015-07-07 Schlumberger Technology Corporation Dynamic reservoir engineering
US7963327B1 (en) 2008-02-25 2011-06-21 QRI Group, LLC Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics
US8190414B2 (en) * 2008-03-26 2012-05-29 Exxonmobil Upstream Research Company Modeling of hydrocarbon reservoirs containing subsurface features
US8200465B2 (en) 2008-06-18 2012-06-12 Terratek Inc. Heterogeneous earth models for a reservoir field
US8577613B2 (en) 2008-07-01 2013-11-05 Schlumberger Technology Corporation Effective hydrocarbon reservoir exploration decision making
US20100013831A1 (en) 2008-07-17 2010-01-21 Oseberg,L.L.C. Method for geographically displaying oil and gas related information
WO2010039325A1 (en) 2008-09-30 2010-04-08 Exxonmobil Upstream Reseach Company Method for solving reservoir simulation matrix equation using parallel multi-level incomplete factorizations
US8301429B2 (en) * 2008-10-09 2012-10-30 Chevron U.S.A. Inc. Iterative multi-scale method for flow in porous media
US8428924B2 (en) 2008-12-15 2013-04-23 Chevron U.S.A. Inc. System and method for evaluating dynamic heterogeneity in earth models
JP2012517435A (ja) 2009-02-06 2012-08-02 グリフオルス・セラピユーテイクス・インコーポレーテツド プラスミン活性を決定するための組成物、キットおよび方法
EP2253971A1 (en) 2009-05-19 2010-11-24 Nederlandse Organisatie voor toegepast -natuurwetenschappelijk onderzoek TNO Method of monitoring a hydrocarbon reservoir
FR2945879B1 (fr) 2009-05-20 2011-06-24 Inst Francais Du Petrole Methode d'exploitation de milieu poreux au moyen d'une modelisation d'ecoulements de fluide
US8532967B2 (en) 2009-08-14 2013-09-10 Schlumberger Technology Corporation Executing a utility in a distributed computing system based on an integrated model
DK2464824T3 (en) * 2009-08-14 2019-01-28 Bp Corp North America Inc RESERVOIR ARCHITECTURE AND CONNECTION ANALYSIS
US8429671B2 (en) 2009-10-21 2013-04-23 Exxonmobil Upstream Research Company Integrated workflow builder for disparate computer programs
BR112012011970A2 (pt) 2009-11-23 2016-05-10 Exxonmobil Upstream Res Co método e sistema para modelagem de propriedades geológicas utilizando elementos finitos mistos e homogeneizados
CA2785569A1 (en) * 2010-02-02 2011-08-11 Hector Klie Multilevel percolation aggregation solver for petroleum reservoir simulations
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
US9418180B2 (en) 2010-07-26 2016-08-16 Exxonmobil Upstream Research Company Method and system for parallel multilevel simulation
US20120271609A1 (en) 2011-04-20 2012-10-25 Westerngeco L.L.C. Methods and computing systems for hydrocarbon exploration
BR112013026391A2 (pt) 2011-05-17 2016-12-27 Exxonmobil Upstream Res Co método para particionar simulações de reservatório paralelas na presença de poços

Also Published As

Publication number Publication date
WO2011100002A1 (en) 2011-08-18
CN102741855B (zh) 2016-10-26
EP2534605B1 (en) 2020-06-17
US20120296619A1 (en) 2012-11-22
EP2534605A1 (en) 2012-12-19
US9594186B2 (en) 2017-03-14
EP2534605A4 (en) 2017-07-05
IN2012DN05167A (enExample) 2015-10-23
BR112012017275A2 (pt) 2016-04-19
CN102741855A (zh) 2012-10-17
CA2783977A1 (en) 2011-08-18

Similar Documents

Publication Publication Date Title
US9594186B2 (en) Method and system for partitioning parallel simulation models
US9418180B2 (en) Method and system for parallel multilevel simulation
US9134454B2 (en) Method and system for finite volume simulation of flow
US9754056B2 (en) Method and system for parallel simulation models
CA2803068C (en) Method and system for reservoir modeling
EP2599023B1 (en) Methods and systems for machine-learning based simulation of flow
AU2011283192B2 (en) Methods and systems for machine-learning based simulation of flow
EP2599030A1 (en) Methods and systems for machine-learning based simulation of flow
NO343811B1 (no) Fremgangsmåte og system for stabilisering av formuleringsmetoder
WO2012015515A1 (en) Methods and systems for machine-learning based simulation of flow

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20150417

MKLA Lapsed

Effective date: 20201019