CA2531547A1 - Reinforcement for arch type structure with beveled/skewed ends - Google Patents

Reinforcement for arch type structure with beveled/skewed ends Download PDF

Info

Publication number
CA2531547A1
CA2531547A1 CA 2531547 CA2531547A CA2531547A1 CA 2531547 A1 CA2531547 A1 CA 2531547A1 CA 2531547 CA2531547 CA 2531547 CA 2531547 A CA2531547 A CA 2531547A CA 2531547 A1 CA2531547 A1 CA 2531547A1
Authority
CA
Canada
Prior art keywords
reinforcement
layer
arch
leg portion
type structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CA 2531547
Other languages
French (fr)
Other versions
CA2531547C (en
Inventor
Michael W. Wilson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AIL International Inc
Original Assignee
AIL International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AIL International Inc filed Critical AIL International Inc
Priority to CA2531547A priority Critical patent/CA2531547C/en
Priority to KR1020087017848A priority patent/KR101529319B1/en
Priority to EP06840549.7A priority patent/EP1963582B1/en
Priority to AU2006329214A priority patent/AU2006329214A1/en
Priority to PCT/CA2006/002123 priority patent/WO2007071067A1/en
Publication of CA2531547A1 publication Critical patent/CA2531547A1/en
Application granted granted Critical
Publication of CA2531547C publication Critical patent/CA2531547C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A method for controlling deformation of a cut end region of an erected arch-type structure for use in underpass construction and the like where the cut end region has at least one extended leg portion. The method comprises building progressively at least one layer of mechanically-stabilized earth adjacent the extended leg portion by alternately layering a plurality of compacted layers of fill with interposed layers of reinforcement. Each layer of reinforcement is secured to the extended leg portion during the progressive building. The securement of the layers of reinforcement to the extended leg portions provide support in controlling deformation of the cut end region during backfilling and regular service.

Description

REINFORCEMENT OF ARCH TYPE STRUCTURE WITH
BEVELED/SKEWED ENDS

FIELD OF THE INVENTION

[0001] This invention generally relates to structural metal plate arch-type structures. In particular, this invention relates to a method for controlling deformation of a cut end region of an erected arch-type structure for use in underpass construction and the like, where the cut end region has at least one extended leg portion.

BACKGROUND OF THE INVENTION
[0002] As rural and urban infrastructure continues to age and develop, there is a continual demand for cost-effective technologies relating to the construction and maintenance of highways, railways and the like. Often unappreciated but vitally important to the construction of such infrastructure is the underpass system. Underpass systems are typically designed to carry not only dead loads, but also live loads. While some of the most impressive underpass systems are used in mining or forestry applications where spans can exceed 20m, they are also very common in regular highway construction to allow passage of railway, watercourses or other vehicular/pedestrian traffic.
While concrete structures have been regularly employed for these purposes, they are very expensive to install, are cost prohibitive in remote areas and are subject to strength weakening due to corrosion of the reinforcing metal and hence, repair.
[0003] In the field of arch-type structures, there have been significant advances in respect of the use of corrugated metal culverts, arch culverts and box culverts. For example, U.S. Pat. No. 5,118,218 discloses the use of sheets of metal having exceptionally deep corrugations where by, using significant material on the crown portions of the culvert and perhaps as well in the haunch portions of the culvert, significant loads can be carried by the culvert design. Ovoid and circular structures are described in U.K. Patent Application No. 2,140,848 where wing members are used to increase the load carrying capabilities, and in particular avoid bending of the crown or roof structure as live loads pass thereover.
[0004] U.S. Pat. No. 5,326,191 discloses a reinforced metal box culvert which is provided with a special form of continuous reinforcement along at least the crown or top portion of the culvert. Significant advantages are provided in load carrying characteristics, reduced overburden requirements and the ability to provide large span structures that reduce the cost. These systems greatly facilitate the installation of large span structures with the ability to carry live loads under a variety of conditions. Improvements to the box culvert and arch culvert designs are also described in U.S. Pat. No.
5,375,943 and International PCT Application No. PCT/CA97/00407.
[0005] The use of mechanically-stabilized earth in archway construction is described in U.S. Pat. No. 4,618,283. This construction technique avoids arching of the structure because the sidewalls of the archway are built as successive layers of mechanically-stabilized earth which are deposited along side and over top of the structure. The technique involves building on each side of the archway mechanically-stabilized earth which constitutes vertical support sections, and then building across the top of the arch again using mechanically-stabilized earth to define the roof of the archway. As the archway is built step-by-step, facings are applied to contain the mechanically-stabilized earth and prevent such compacted unbound fill of the mechanically-stabilized earth structure from coming loose and falling into the archway.
Such facing may be simply attached to the vertical portions of the wire mesh which terminate at the edge of the archway envelope. Alternatives to the facing material include spraying of concrete to provide a liner within the archway or the use of a corrugated metal liner. Optionally, the facing of the mechanically-stabilized earth vertical structures may be attached to the corrugated metal liner. The liner is not designed to carry any structural load either live or dead, instead the live and dead loads are carried by the mechanically-stabilized earth vertical support sections as well as the mechanically-stabilized earth roof section.
[0006] A further method for controlling deformation of an erected structure, principally during the backfilling process is described in U.S. Pat. No.
6,050,746.

SUMMARY OF THE INVENTION
[0007] Accordingly, in one aspect, there is provided a method for controlling deformation of a cut end region of an erected arch-type structure for use in underpass construction and the like, where the cut end region has at least one extended leg portion, said method comprising:
i) building progressively at least one layer of mechanically-stabilized earth adjacent said extended leg portion by alternately layering a plurality of compacted layers of fill with interposed layers of reinforcement; and ii) securing to said extended leg portion each layer of reinforcement during said progressive building, whereby securement of said layers of reinforcement to said extended leg portions provide support in controlling deformation of the cut end region during backfilling and regular service.
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Preferred embodiments are described with respect to the drawings wherein:
Figure 1 is a perspective view of a representative type of beveled/skewed arch-type structure;
Figure 2 is a partial perspective view of the cut end region of the arch-type structure of Figure 1;
Figure 3 is a partial top view of the cut end region of the arch-type structure of Figure 1;

Figure 4a is a partial perspective view of the cut end region of the arch-type structure of Figure 1 showing a single layer of the wire grid mat reinforcement;
Figure 4b is a partial front view of the arch-type structure of Figure 1, showing the consecutive layers of backfill and reinforcement on each side of the arch-type structure;
Figure 5a is a side sectional view through a portion of the arch-type structure of Figure 1, showing greater detail of the connection of the reinforcement to the sidewall;
Figure 5b is a top sectional view through a portion of the arch-type structure of Figure 1, showing the placement of a plurality of reinforcements on the sidewall;
Figures 6a, 6b, 6c and 6d are sequential elevational views showing placement of the reinforcements at the cut end region of the arch-type structure of Figure 1;
Figure 7 is a top sectional view through a portion of the arch-type structure showing an alternate embodiment for connecting the reinforcement to the sidewall;
Figures 8a, 8b, 8c and 8d are sections through alternate embodiments for connecting the reinforcement to the sidewall;
Figures 9a, 9b, 9c, 9d and 9e are sections through alternate embodiments for the reinforcement connection;
Figures 10a to 101 are top plan views of various types of reinforcement;
Figures 11 a and 11 b show an alternate embodiment for connecting the reinforcement to the sidewall;
Figure 12a and 12b show a further alternate embodiment for connecting the reinforcement to the sidewall; and Figures 13a and 13b show yet a further alternate embodiment for connecting the reinforcement to the sidewall.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The construction of underpass systems or similar thoroughfare infrastructure using large and/or long span metal arch-type structures presents certain challenges. As one can appreciate, these structures are subject to extreme stresses, not only during the intended use (i.e.
anticipated live/dead loads), but also during the initial construction process. Technology has enabled the construction of larger and longer structures, as evidenced by U.S. Pat. Nos. 5,326,191 and 5,375,943 and International PCT Applications No. PCT/CA97/00407, assigned to the assignee of the subject application.
With larger structures, the susceptibility of deformation and/or failure due to extreme forces imparted during the backfill process has required further technological development, as evidenced by U.S. Pat. No. 6,050,746, assigned to the assignee of the subject application. With the core technology now available to provide a wide-ranging number of applications, new challenges have presented themselves.
[0010] With arch-type structures not comprising beveled or skewed ends, the structural metal plates at each end region are configured to form a complete span defining the effective topside circumference of the structure.
It will be appreciated that these complete spans provide a degree of stability to the structure. In many applications, however, there is a requirement for such structures to have beveled/skewed ends, whether it is simply a matter of aesthetics, or for specific properties such as hydraulics relating to a watercourse passing therethrough. In such structures comprising a bevel/skew, the structural metal plates are truncated at the end region, resulting in a lack of stability. As such, these arch-type structures are at increased risk of deformation due to pressures exerted by backfill and standard loads experienced during regular use. While beveled/skewed structures are known, their installations have traditionally required reinforcement using steel, concrete or tie-back arrangements (i.e. steel rods tied to an anchoring device) to provide the necessary support. It has been found that these various ways to provide reinforcement are labor intensive and can substantially increase the overall cost of installing such a structure.
[0011] A representative underpass or similar thoroughfare infrastructure comprising a metal arch-type structure 10 constructed of structural metal plate is shown in Figure 1. Above the metal arch-type structure 10 is a prescribed depth of overburden 12, on top of which is a roadway 14 constructed in a usual manner. As better shown in Figure 2, the structure 10 is generally comprised of a pair of footings 16 and a plurality of structural metal plates 18.
In the preferred embodiment, the structural metal plates 18 are corrugated.
The structural metal plates 18 are fastened together so as to achieve the desired erected structure. While the preferred method of fastening is to bolt the various plates together, it will be appreciated that other alternate suitable fasteners that meet the specific structural and load requirements (welds, rivets, etc...) can be used.
[0012] In Figure 3, shown is a top view of the arch-type structure 10 comprising a cut end region 22 having both a beveled and skewed configuration. The arch-type structure 10 is comprised of a plurality of interconnected structural metal plates 18 fastened together in staggered stepwise arrangement to achieve the desired erected structure. Note the truncated structural metal plates 20 at the cut end region 22. With the arch-type structure 10 being both beveled and skewed, there is defined at the cut end region 22 both a long leg portion 24, and a short leg portion 26. To ensure structural integrity during the construction process, it is advisable to first assemble at least two complete spans 28 of metal plates comprising the sidewalls 30, haunch 32 and crown 34 (see Figure 2) and have these affixed to the respective footings 16 before proceeding with the assembly of the cut end region 22. Once fastened in place, the cut end region 22 comprising the truncated structural metal plates 20 are erected using plate-by-plate assembly. If necessary, in certain applications, extra temporary support may be used.
[0013] During the backfilling process, as mentioned above, the cut end region 22 is susceptible to deformation and/or failure before installation is complete. This is particularly true for structures in which the sidewalls 30 are vertically extended. To enable backfilling in the cut end region 22, the truncated structural metal plates 20 are reinforced in accordance with the method shown in Figures 4a and 4b.
[0014] As shown in Figures 4a and 4b, mechanically-stabilized earth is installed on each side of the cut end region 22 of the arch-type structure 10 in a manner which minimizes deformation of this region during backfilling.
Mechanically-stabilized earth has been used extensively in providing retaining walls, headwalls and the like such as described in the aforementioned U.S.
Pat. No. 4,618,283.
[0015] In the cut end region 22, the mechanically-stabilized earth is developed by alternately layering a plurality of compacted layers of fill 36 with interposed layers of reinforcement 38 to form the mechanically-stabilized earth as shown in Figure 4b. In the preferred embodiment, the reinforcement layers each comprise a wire grid mat (see Figure 4a), formed of a plurality of interconnected intersecting rods 40 and 42. Fill is provided on top of the excavation bed 44 and along the slopes 46 to form a first layer 36a of compacted fill. The fill may be any type of granular material such as various types of sand, gravel, broken rock and the like. The unbound fill even when compacted remains granular and has a relatively low resistance to sheer forces. After the first layer of compacted fill is installed a layer of reinforcement 38a is laid down where that layer of reinforcement 38a is connected to the sidewalls 48 of the extended short and long leg portions of the cut end region 22, so as to secure the layer of reinforcement 38a to the sidewalls 48. Such manner of connection to the truncated structural metal plates will be described further below. The next layer of fill 36b is then applied over top of the reinforcement layer 38a. After the layer of fill 36b is completed the next layer of reinforcement 38b is laid down over top this layer of compacted fill 36b. Reinforcement layer 38b is also connected to the sidewalls as described above. This procedure is repeated several times as required to backfill the excavated space between the slopes 46 and the sidewalls 48 of the arch-type structure 10. In the structure shown in Figure 4b, the long leg portion 28 has eight (8) reinforcement layers 38a, 38b, 38c, 38d, 38e, 38f, 38g and 38h attached to it, and the short leg portion 26 has one reinforcement layer 38a attached to it. The backfilling is then completed to the level of the crown and the usual overburden 50 is then applied.
[0016] Overburden 50 is developed in the usual manner such that when the overburden is in place, both the live and dead loads applied to the structure are accommodated by the capacity of the structural metal plate. For example, with the design criteria set out in assignee's above noted U.S. patents and International application, the live and dead loads are accommodated by the backfilled structure in the usual manner where the loads are resisted by the structural strength of the metal plate, as well as the backfill resisting outward movement of the sidewalls which is commonly referred to as "Positive Arching."
[0017] As shown in Figures 4a and 4b, for an arch-type structure having both a beveled and skewed profile, the use of reinforcement layers on each leg extension may not be symmetrical. As can be appreciated, the short leg portion 26 will require less reinforcement as there are fewer truncated structural metal plates 20 to support. As shown, for the arch-type structure represented, the short leg portion 26 receives one reinforcement layer 38a, whereas the long leg portion 24 receives eight (8) reinforcement layers 38a through 38h.
[0018] By following the procedure of this method the reinforced soil system controls deformation and/or failure of the cut end region 22 of the arch-type structure 10. It will be appreciated, however, that while reinforcement has only been provided in the region of the bevel/skew, it may also be advantageous to provide reinforcement at other regions of the structure as well. As described in assignee's U.S. Pat. No. 6,050,746, which is herein incorporated by reference, reinforcement of the structure may also be configured to provide only an interim function which becomes obsolete at the end of the backfilling operation.
[0019] While a variety of methods can be used for connecting the reinforcement to the sidewall, in the preferred embodiment represented in Figures 5a and 5b, an end section 52 of the reinforcement 38 is fixedly retained between a length of angle iron 54 and a length of flat bar 56. As better shown in Figure 5b, a first set of fasteners 58 are used to capture the reinforcement 38 between the angle iron 54 and flat bar 56, while a second set of fasteners 60 are used to impart further clamping pressure, while also attaching the angle iron 54 and flat bar 56 to the sidewall 48 of the structural metal plate 18. Use of the angle iron 54 and length of flat bar 56 ensures distribution of load across the corrugations of the sidewall of the extended leg portions, reducing the likelihood of deformation and localized failure due to point loads associated with prior art tie-back systems. The reinforcement 38 is configured at point 62 with a bend such that the extending portion of the reinforcement 38 lays in a generally horizontal position. While the reinforcement 38 generally extends laterally away from the structure in a generally horizontal position, other non-horizontal configurations may be possible, if for example certain obstructions are present in the backfill zone.
[0020] Figures 6a to 6d show a series of successive elevational views illustrating placement of the reinforcement 38 relative to the cut end region 22.
As will be noted, the reinforcement 38 is generally present as a plurality of reinforcements (i.e. a plurality of wire grid mats), but it will be appreciated that any number from a single unit through to a large number can be used, depending on the particular support requirements. Referring specifically to Figure 6a, shown on the short leg portion 26 is a reinforcement layer 38a comprising three adjacently positioned wire grid mats. On the long leg portion 24, the reinforcement layer 38a comprises four adjacently positioned wire grid mats. Further, the length of each of the reinforcements can be tailored to the particular application, depending on the support requirements and the available space between the structure and any adjacent structure, or the slopes of the excavated area. Reference is made to Figure 6d which shows a reinforcement 38d that not only comprises six (6) wire grid mats, but mats that are approximately three (3) times longer than those in Figure 6a. Figures 6b and 6c show intermediate reinforcement layers 38b and 38c, respectively.
The length and quantity of reinforcements will be a factor of the particular situation in which they are being installed. As a general rule, reinforcements may be configured with a length that is approximately 70% of the height of the wall. In situations where there is low cover (i.e. close to the top of the structure), the mats may be lengthened to increase the frictional capacity of the mat itself. Approaching the base of the structure, the mats may be shortened as they are subject to higher frictional forces. Also, in certain situations it may be necessary to increase the diameter of the rods used to construct the wire grid mat so as to handle higher forces and resist tearing under extreme load. As mentioned, the above are general guidelines and in no way are meant to be interpreted as limitations to the configuration of the reinforcement mats. In actual practice, the specifics of the installation, the expected loads and the engineered capacity of the structure will dictate the final configuration of these reinforcements.
[0021] While the above discussed method for connecting the reinforcement to the sidewall is preferred, one skilled in the art may choose to implement a suitable alternative. The following presents a number of alternates for achieving this connection. Referring to the structure shown in Figure 7, the reinforcement 38 once again takes the form of the preferred wire grid mat.
The longitudinal rods are connected in accordance with the embodiments of Figures 8a to 8d or 9a to 9e to a length of structural material (i.e. angle iron) which distributes the loads along the sidewall of the extended leg portions.
This reduces the likelihood of deformation due to point loads associated with prior art tie-back systems. As shown, the angle iron 62 is bolted at 64 to the interconnected structural metal plates 48. Bolts are normally used to connect the plates 48; hence, a second nut 68 may be used to connect the angle iron to the bolt 64 in assembling the structure.
[0022] The alternate embodiments of Figures 8a to 8d and 9a to 9e show various types of connection of the reinforcement to the angle iron 62. As shown in Figure 8a, the longitudinally extending rods 70 have their end portions 72 extend through an opening 74 in the upright portion 76 of the angle iron. The distal end 78, of each longitudinally extending rod 70 is then deformed to provide a button 80, which is greater than the opening 74 in the upright portion, so as to retain the reinforcement in the angle iron. The deformation of the distal end and forming the button 80, is such to accommodate both the tensile stress applied to the reinforcement during the backfilling operation, as well as the expected stresses due to normal usage of the structure. As shown in Figure 8b the distal end 82 of the longitudinally extending rod 70 is flattened to define a butterfly button 84 which holds the rod in place. As shown in Figure 8c the distal end 86 is bent upon itself to define an enlarged end 88 which retains the reinforcement 38. As shown in Figure 8d, the distal end 90 is bent upwardly to form leg 92 which retains the reinforcement in place in the angle iron 62.
[0023] As shown in Figure 9a to 9e, alternative arrangements may be used where the reinforcement 38 has the longitudinally extending rods 70 secured to the lower leg 94 of the angle iron 62. The lower leg 94 has an opening 96 formed therein to accommodate the rod 70 and has at its distal end 98 a deformed button 100 to secure the rod in place. Similarly with embodiments of Figures 9b, 9c and 9d, the respective distal end is deformed to secure the rod 70 in the lower leg portion 94. In Figure 9b, the distal end is flattened to define a butterfly button 102 which holds the rod 70 in place. In Figure 9c, the distal end is bent upon itself to define and enlarged end 104 which retains the rod 70 in place. In Figure 9d, the distal end is bent downwardly to form leg 106 which retains the rod 70 in place. In the embodiment in Figure 9e the rod 70 is bent upon itself at 108 and secured in place by rod wire 110.
[0024] It should be appreciated that the reinforcement layer interposed at each compacted layer of fill for the reinforced soil may take on a variety of structures and shapes. In addition to the preferred wire grid structure set out above, it will be understood that other types of reinforcement may be used such as, individual strips 112 (see Figures 10 a to 101). As shown in Figure 10a, each end 114 of the strip is connected to the sidewall either directly or via a load distributing device such as the angle iron 62 of Figure 7. This type of strip is very common to the system originally developed by "VIDAL" which is described for example in French Pat. No. 75/07114 published Oct. 1, 1976.
As shown in Figure 10b the strip 116 may be corrugated to enhance its load carrying capacity. An alternate corrugated strip 118 is shown in Figure 10c; a spiral strip 120 is shown in Figure 1 0d. In Figure 1 0e the reinforcement may be rods 122 with enlargements 124. Alternatively, ladder-like strips 126 and 128 may be used such as in Figures 10f and 10g.
[0025] The strips may also have enlarged portions such as shown in Figure 10h for strip 130 with enlarged sections 132. Alternatively, the strip 134 Figure 10i may have auger or propeller shaped units 136, as shown in Figure 10i. The outwardly extending rods 138 of Figures 10j, 10k and 101 may have enlarged disks 140, enlarged concrete masses 142 or flat plate 144 connected thereto to anchor the strips in the compacted fill. Alternatively, the strips, as well as the aforementioned wire grid mat may be configured to anchor into surrounding rock using suitable rock anchors.
[0026] With respect to the use of strips as reinforcement, the load distributing member 62, which is in the form of an angle iron is connected to the sidewall 74 of the plate 48 by bolts 64 as shown in Figure 11 a. The strip for example 112 is then bolted to the angle iron 62 by bolt 146 to complete the connection. Alternatively, in Figure 11 b the angle iron 62 may have the strip 118 connected thereto by the use of a pin 148, which extends through aperture 150 in the strip and aperture 152 in the leg 94 of the angle iron 62.
[0027] A further alternative configuration for the connection of the reinforcement to the arch-type structure is to use hook bolts 154 that capture the reinforcement. The application of backfill upon this connection maintains the reinforcement in place relative to the hook 154, eliminating the need for the reinforcement to be locked in position. Shown in Figures 12a and 12b is the use of hook bolts for connecting wire grid mat to the arch-type structure by way of an angle iron 62 to distribute the load. Figures 13a and 13b show the use of hook bolts 154 for connecting wire grid mat wherein the bolts are connected directly to the sidewall 48 of the arch-type structure.
[0028] It will be appreciated that for the various types of reinforcement the strips and/or grid may be made of any type of material (i.e. steel, aluminum, composites, plastics, etc) which has sufficient structural strength to resist movement in the sidewall of the erected structure during backfilling and subsequent usage. It will be further appreciated that a combination of reinforcements (i.e. a combination of wire grid mats and corrugated strips) could be used in a single installation. This provides maximum flexibility when engineering into the design the required load bearing characteristics.
[0029] In applications where there are two or more adjacent structures, each having similar beveled/skewed ends, the reinforcements discussed above could be configured to attach to one another between the adjacent structures, thereby providing a level of enhanced support. Alternatively, the reinforcements could be arranged to lie atop one another, without connection, or still further in a staggered, alternating configuration in the region between the structures, thereby strengthening the backfill contained therebetween.
[0030] While the above discussion has centered on an arch-type structure comprised of a plurality of interconnected structural metal plates to obtain the desired shape, the aforementioned reinforcement could be used with other corrugated metal plate technologies. It will be appreciated that the reinforcement described above could be used on similar structures wherein each span of structural metal plate defining the structures effective topside circumference is comprised of anywhere from a single length, to a plurality of lengths. Further, it will be appreciated that the geometry of the arch-type structure is not limited to those shown in the Figures, but may include any arch type structure including, but not limited to an ovoids, a re-entrant arch, a box culvert, round culvert or elliptical culvert.
[0031] It will be appreciated that while the above discussion refers to an arch-type structure having both a bevel and skew on a cut end, the aforementioned reinforcement may find application in structures that are solely beveled, or solely skewed. Further, it will be appreciated that while straight bevels and skews have been represented, inwardly or outwardly curved bevels and skews are also possible. It will also be appreciated that in providing a beveled/skewed cut end region, the cut section may be configured with either a smooth or stepped profile, as deemed appropriate for the particular application.
[0032] It will be noted that the completed arch-type structure shown in Figure 1 has at each end a concrete collar. This collar not only provides a finished appearance to the structure, but also provides an additional amount of support to the beveled/skewed ends. It is important to note, however, that a significant advantage of this technology is that this collar is no longer the primary support for the beveled/skewed end. As such, this concrete collar is not required to be as robust as in prior art structures, thereby simplifying construction and reducing cost.
[0033] A further advantage of this technology is that the structural metal plates used can be of lighter gauge as the ability to withstand the pressures exerted by the backfill in the beveled/skewed region is assisted by the aforementioned reinforcements.
[0034] In applications where round pipes or culverts are used to direct a watercourse, there is a tendency at the ends of a beveled/skewed pipe for the extended portions of the pipe to rise upwards due to pressures exerted by the water flow. The ability to reinforce the cut end region of these pipes would assist in preventing this deformation which generally has the end result of completely and/or partially blocking the opening.
[0035] In accordance with the above discussed embodiments, arch-type structures comprising at least one beveled/skewed end may be erected and backfilled in an efficient controlled cost-effective manner. The backfilling procedure does not require special fill or special techniques other than those already commonly used in developing reinforced soils. The procedure for securing the reinforcement to the sidewalls is achieved in a variety of ways where localized stress on the structure is minimized. Such a structure greatly reduces costs because it is no longer required to 'over-engineer' the structure to withstand the stresses in the beveled/skewed region, nor are costly reinforcements such as concrete end caps and tie-backs with anchors required.
[0036] Although preferred embodiments of the invention have been described herein in detail, it will be understood by those skilled in the art that variations may be made thereto without departing from the spirit of the invention or the scope of the appended claims.

Claims (10)

1. A method for controlling deformation of a cut end region of an erected arch-type structure for use in underpass construction and the like, where the cut end region has at least one extended leg portion, said method comprising:
i) building progressively at least one layer of mechanically-stabilized earth adjacent said extended leg portion by alternately layering a plurality of compacted layers of fill with interposed layers of reinforcement; and ii) securing to said extended leg portion each layer of reinforcement during said progressive building, whereby securement of said layers of reinforcement to said extended leg portions provide support in controlling deformation of the cut end region during backfilling and regular service.
2. The method of claim 1, further comprising positioning a load distributing device between said reinforcement and said extended leg portion to distribute load across the extended leg portion, thereby reducing point loads.
3. The method of claim 2, wherein said load distributing device is a segment of angle iron.
4. The method of claim 1, wherein each layer of reinforcement comprises at least one wire grid mat comprising interconnected rods.
5. The method of claim 1, wherein each layer of reinforcement extends laterally away from said arch-type structure in a generally horizontal configuration.
6. The method of claim 4, wherein at least one layer of reinforcement comprises a plurality of wire grid mats.
7. The method of claim 1, wherein each layer of reinforcement is maintained in position by frictional forces within said mechanically stabilized earth.
8. The method of claim 1, wherein each layer of reinforcement is comprised of a plurality of strips
9. The method of claim 1, wherein said end cut region of said arch-type structure defines a bevel/skew configuration.
10. The method of claim 1, wherein the layers of reinforcement are comprised of a combination of grid wire mat and plurality of strips where the layer of reinforcement is maintained in position by frictional forces within said mechanically stabilized earth.
CA2531547A 2005-12-23 2005-12-23 Reinforcement for arch type structure with beveled/skewed ends Active CA2531547C (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CA2531547A CA2531547C (en) 2005-12-23 2005-12-23 Reinforcement for arch type structure with beveled/skewed ends
KR1020087017848A KR101529319B1 (en) 2005-12-23 2006-12-22 Reinforcement of arch type structure with beveled/skewed ends
EP06840549.7A EP1963582B1 (en) 2005-12-23 2006-12-22 Method of controlling deformation of a cut end region of an arch type structure
AU2006329214A AU2006329214A1 (en) 2005-12-23 2006-12-22 Reinforcement of arch type structure with beveled/skewed ends
PCT/CA2006/002123 WO2007071067A1 (en) 2005-12-23 2006-12-22 Reinforcement of arch type structure with beveled/skewed ends

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA2531547A CA2531547C (en) 2005-12-23 2005-12-23 Reinforcement for arch type structure with beveled/skewed ends

Publications (2)

Publication Number Publication Date
CA2531547A1 true CA2531547A1 (en) 2007-06-23
CA2531547C CA2531547C (en) 2014-02-18

Family

ID=38175431

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2531547A Active CA2531547C (en) 2005-12-23 2005-12-23 Reinforcement for arch type structure with beveled/skewed ends

Country Status (5)

Country Link
EP (1) EP1963582B1 (en)
KR (1) KR101529319B1 (en)
AU (1) AU2006329214A1 (en)
CA (1) CA2531547C (en)
WO (1) WO2007071067A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101440028B1 (en) * 2013-07-08 2014-09-17 한국철도기술연구원 Underground tunnel structure crossing rail way, and Constructing Method thereof
CN105625202B (en) * 2016-03-18 2017-09-08 杭州江润科技有限公司 The construction method of the cast-in-place box culvert of the porous overlength of big cross section
CN106801384A (en) * 2017-02-06 2017-06-06 中交第二公路勘察设计研究院有限公司 Assembled steel reinforced concrete aliform type culvert opening and construction method
CN110924322B (en) * 2019-12-11 2021-06-29 史晓东 Installation structure and construction method of water passing pipe culvert

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4618283A (en) * 1984-09-06 1986-10-21 Hilfiker Pipe Co. Archway construction utilizing alternating reinforcing mats and fill layers
US4610572A (en) * 1985-08-29 1986-09-09 Tekken Construction Co., Ltd. Method of building strengthened embankment body
JP3099040B2 (en) * 1996-12-20 2000-10-16 鹿島建設株式会社 Embankment culvert
US6050746A (en) * 1997-12-03 2000-04-18 Michael W. Wilson Underground reinforced soil/metal structures
KR20030025369A (en) * 2001-09-20 2003-03-29 재단법인 포항산업과학연구원 Retaining wall reinforcement
US6640505B1 (en) * 2001-10-25 2003-11-04 Bebotech Corporation Hybrid arched overfilled structure
US6874974B2 (en) * 2003-03-10 2005-04-05 Terratech Consulting Ltd. Reinforced soil arch

Also Published As

Publication number Publication date
WO2007071067A1 (en) 2007-06-28
KR101529319B1 (en) 2015-06-16
EP1963582A1 (en) 2008-09-03
EP1963582B1 (en) 2014-02-12
KR20080114682A (en) 2008-12-31
AU2006329214A1 (en) 2007-06-28
EP1963582A4 (en) 2012-10-17
CA2531547C (en) 2014-02-18

Similar Documents

Publication Publication Date Title
US7217064B1 (en) Reinforcement of arch type structure with beveled/skewed ends
JP4031811B2 (en) Composite concrete metal encapsulated stiffener for metal plate arched structures
CA2654993C (en) Reinforcement rib and overhead structure incorporating the same
US6050746A (en) Underground reinforced soil/metal structures
JP7061002B2 (en) How to repair a bridge
CA2531547C (en) Reinforcement for arch type structure with beveled/skewed ends
KR101816767B1 (en) Reinforced concrete reinforced concrete structure
AU2012268823B2 (en) Reinforcement of Arch Type Structure with Beveled/Skewed Ends
JP5659188B2 (en) Reinforcement structure of reinforced soil support layer and back ground of structure
KR20030011206A (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
KR100392849B1 (en) Coupling Structure of Vertical Steel Bar for Reinforced Earth Retaining-Wall Frame
JP3665896B2 (en) Reinforced embankment body and its construction method
KR102608598B1 (en) Waveform steel sheet structure equipped with the reinforcing mold
KR200245925Y1 (en) An assembly structure falling rock preventing for tunnel
KR101942413B1 (en) Install structure of retaining stone wall using grid-type steel frame
KR200253330Y1 (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
KR200232628Y1 (en) Coupling Structure of Vertical Steel Bar for Reinforced Earth Retaining-Wall Frame
KR200232630Y1 (en) Structure for Sinking Frame in Reinforced Earth Retaining-Wall
KR200429311Y1 (en) Coupling Structure of front wire net for Reinforced Earth Retaining-Wall
MXPA98010225A (en) Reinforced subterranean structures of tierra / me

Legal Events

Date Code Title Description
EEER Examination request