BRPI0820555A2 - Método para controlar, uma produção comum de pelo menos duas turbinas eólicas, sistemas central de controle de turbina eólica, parque eólico e agrupamento de parques eólicos - Google Patents

Método para controlar, uma produção comum de pelo menos duas turbinas eólicas, sistemas central de controle de turbina eólica, parque eólico e agrupamento de parques eólicos

Info

Publication number
BRPI0820555A2
BRPI0820555A2 BRPI0820555-8A BRPI0820555A BRPI0820555A2 BR PI0820555 A2 BRPI0820555 A2 BR PI0820555A2 BR PI0820555 A BRPI0820555 A BR PI0820555A BR PI0820555 A2 BRPI0820555 A2 BR PI0820555A2
Authority
BR
Brazil
Prior art keywords
wind
wind farm
central
farm
common production
Prior art date
Application number
BRPI0820555-8A
Other languages
English (en)
Inventor
Philip Richard Jacobsen Carne Jjaer
Jorge Martinez Garcia
Original Assignee
Vestas Wind Sys As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=40600122&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=BRPI0820555(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Vestas Wind Sys As filed Critical Vestas Wind Sys As
Publication of BRPI0820555A2 publication Critical patent/BRPI0820555A2/pt

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/021Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a variable is automatically adjusted to optimise the performance
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/028Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
    • F03D7/0284Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power in relation to the state of the electric grid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/04Automatic control; Regulation
    • F03D7/042Automatic control; Regulation by means of an electrical or electronic controller
    • F03D7/048Automatic control; Regulation by means of an electrical or electronic controller controlling wind farms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/10Purpose of the control system
    • F05B2270/20Purpose of the control system to optimise the performance of a machine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)
BRPI0820555-8A 2007-12-20 2008-12-22 Método para controlar, uma produção comum de pelo menos duas turbinas eólicas, sistemas central de controle de turbina eólica, parque eólico e agrupamento de parques eólicos BRPI0820555A2 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US1545107P 2007-12-20 2007-12-20
DKPA200701871 2007-12-20
PCT/DK2008/000448 WO2009080036A1 (en) 2007-12-20 2008-12-22 A method for controlling a common output from at least two wind turbines, a central wind turbine control system, a wind park and a cluster of wind parks

Publications (1)

Publication Number Publication Date
BRPI0820555A2 true BRPI0820555A2 (pt) 2015-06-16

Family

ID=40600122

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0820555-8A BRPI0820555A2 (pt) 2007-12-20 2008-12-22 Método para controlar, uma produção comum de pelo menos duas turbinas eólicas, sistemas central de controle de turbina eólica, parque eólico e agrupamento de parques eólicos

Country Status (6)

Country Link
US (1) US20100274401A1 (pt)
EP (1) EP2232343B1 (pt)
CN (1) CN101896872B (pt)
BR (1) BRPI0820555A2 (pt)
MX (1) MX2010005674A (pt)
WO (1) WO2009080036A1 (pt)

Families Citing this family (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2009001796A (es) * 2006-09-01 2009-04-06 Vestas Wind Sys As Sistema y metodo para controlar una turbina eolica en una central de energia eólica.
MX2009001795A (es) * 2006-09-01 2009-04-06 Vestas Wind Sys As Un sistema de prioridad para la comunicacion en un sistema de al menos dos turbinas eolicas distribuidas.
US20090212563A1 (en) * 2008-02-21 2009-08-27 General Electric Company System and method for improving performance of power constrained wind power plant
JP4698718B2 (ja) * 2008-09-30 2011-06-08 株式会社日立製作所 風力発電装置群の制御装置及び制御方法
US8041465B2 (en) * 2008-10-09 2011-10-18 General Electric Company Voltage control at windfarms
FR2949005B1 (fr) * 2009-08-07 2012-02-24 Biotope Controle d'une installation en fonction de la dangerosite de son interaction avec une espece animale
JP5167365B2 (ja) * 2010-05-28 2013-03-21 三菱重工業株式会社 監視制御装置及び方法並びにそれを備えたウィンドファーム
US9366227B2 (en) 2010-08-31 2016-06-14 Vestas Wind Systems A/S Control of electric output of a wind park
US20110193344A1 (en) * 2010-12-29 2011-08-11 Vestas Wind Systems A/S Control Network for Wind Turbine Park
JP5627529B2 (ja) * 2011-04-01 2014-11-19 三菱重工業株式会社 風力発電装置の制御装置、風力発電装置、ウインドファーム、及び風力発電装置の制御方法
US10519931B2 (en) 2011-05-31 2019-12-31 Vestas Wind Systems A/S Systems and methods for generating an inertial response to a change in the voltage of an electrical grid
US9728969B2 (en) * 2011-05-31 2017-08-08 Vestas Wind Systems A/S Systems and methods for generating an inertial response to a change in the voltage of an electricial grid
ES2562655T3 (es) * 2011-09-30 2016-03-07 Vestas Wind Systems A/S Control de retroceso rápido que incluye pérdidas de planta
US20130204447A1 (en) * 2012-02-02 2013-08-08 Martin Huus Bjerge Wind turbine with price-optimised turbine load control
US20130274946A1 (en) * 2012-04-13 2013-10-17 Owen Jannis Schelenz Methods and systems for controlling a power plant
US9960602B2 (en) 2012-05-02 2018-05-01 The Aerospace Corporation Maximum power tracking among distributed power sources
US9325176B2 (en) 2012-05-02 2016-04-26 The Aerospace Corporation Optimum power tracking for distributed power sources
US20130300115A1 (en) * 2012-05-08 2013-11-14 Johnson Controls Technology Company Systems and methods for optimizing power generation in a wind farm turbine array
EP2847457B1 (en) * 2012-05-11 2021-10-27 Vestas Wind Systems A/S A power system and method for operating a wind power system with a dispatching algorithm
DK2981712T3 (da) 2013-04-04 2020-10-26 Gen Electric Multi-park vindenergigenereringssystem
DE102013215398A1 (de) * 2013-08-06 2015-02-12 Wobben Properties Gmbh Verfahren zum Steuern von Windenergieanlagen
DK2905864T3 (da) * 2014-02-06 2021-02-08 Ge Renewable Tech Wind Bv Fremgangsmåder til drift af et sæt af vindmøller og systemer
US20150227875A1 (en) * 2014-02-07 2015-08-13 General Electric Company Systems and Methods to Determine Competitiveness of a Long Term Service Agreement
US10041476B2 (en) * 2014-09-02 2018-08-07 Siemens Industry, Inc. Systems, methods and apparatus for improved energy management systems with security-oriented probabilistic wind power generation dispatch
US10253758B2 (en) 2014-09-23 2019-04-09 General Electric Company System and method for optimizing wind farm performance
CN107078511B (zh) * 2014-11-03 2019-11-08 维斯塔斯风力系统集团公司 控制风力发电厂的有功功率生成和风力发电厂的方法
US10100813B2 (en) 2014-11-24 2018-10-16 General Electric Company Systems and methods for optimizing operation of a wind farm
EP3037657A1 (en) * 2014-12-23 2016-06-29 ABB Technology AG Optimal wind farm operation
DK179022B1 (en) * 2015-12-22 2017-08-28 Envision Energy (Jiangsu) Co Ltd Method and system of controlling wind turbines in a wind turbine farm
DE102016106590A1 (de) * 2016-04-11 2017-10-12 Wobben Properties Gmbh Verfahren zum Betreiben einer Windenergieanlage
US10385829B2 (en) 2016-05-11 2019-08-20 General Electric Company System and method for validating optimization of a wind farm
US10371124B2 (en) 2016-05-17 2019-08-06 General Electric Company System and method for determining wind farm wake loss
GB2551701A (en) 2016-06-21 2018-01-03 Univ Court Univ Of Edinburgh Control or processing system and method
US10260481B2 (en) 2016-06-28 2019-04-16 General Electric Company System and method for assessing farm-level performance of a wind farm
DE102016116573A1 (de) * 2016-09-05 2018-03-08 Wobben Properties Gmbh Verfahren zum Übertragen von Regelstellgrößen von einem Regler, insbesondere einem Windparkregler eines Windparks, an Einheiten sowie eine zu regelnde Einheit und einen Regler
JP6869685B2 (ja) * 2016-10-06 2021-05-12 株式会社日立製作所 ウィンドファーム及び風力発電装置
US10697439B2 (en) 2017-06-14 2020-06-30 General Electric Company Offset toggle method for wind turbine operation
DE102017006452A1 (de) * 2017-07-07 2019-01-10 Senvion Gmbh Leistungsreduktion bei mehreren Windenergieanlagen in einem Windpark
US10539119B2 (en) 2017-07-10 2020-01-21 WindESCo, Inc. System and method for augmenting control of a wind turbine assembly
EP3505752A1 (en) * 2017-12-22 2019-07-03 Vestas Wind Systems A/S Method of controlling a wind turbine generator
EP4002632A1 (de) * 2020-11-13 2022-05-25 Wobben Properties GmbH Verfahren zur bereitstellung von blindleistung

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998042980A1 (en) * 1997-03-26 1998-10-01 Forskningscenter Risø A wind turbine with a wind velocity measurement system
DE10011393A1 (de) * 2000-03-09 2001-09-13 Tacke Windenergie Gmbh Regelungssystem für eine Windkraftanlage
US6975925B1 (en) * 2002-03-19 2005-12-13 Windlynx Systems, B.V. Forecasting an energy output of a wind farm
US7487133B2 (en) 2002-09-19 2009-02-03 Global Nuclear Fuel - Americas, Llc Method and apparatus for adaptively determining weight factors within the context of an objective function
FI113163B (fi) 2002-10-01 2004-03-15 Kone Corp Hissiryhmän ohjausmenetelmä
WO2004038566A2 (en) 2002-10-23 2004-05-06 Hynomics Corporation Demand-based resource scheduling method and system
DE10320087B4 (de) * 2003-05-05 2005-04-28 Aloys Wobben Verfahren zum Betreiben eines Windparks
DE10323722A1 (de) 2003-05-24 2004-12-09 Daimlerchrysler Ag Verfahren zur Bestimmung eines Leistungsaufteilfaktors in Hybridfahrzeugen
US6924565B2 (en) * 2003-08-18 2005-08-02 General Electric Company Continuous reactive power support for wind turbine generators
US7119452B2 (en) * 2003-09-03 2006-10-10 General Electric Company Voltage control for wind generators
SE526001C2 (sv) * 2003-09-26 2005-06-14 Abb Research Ltd System för överföring av elektrisk kraft
US7013203B2 (en) * 2003-10-22 2006-03-14 General Electric Company Wind turbine system control
EP1571746B1 (en) 2004-03-05 2018-09-12 Gamesa Innovation & Technology, S.L. Active power regulating system of a wind farm
DE102004060943A1 (de) 2004-12-17 2006-07-06 Repower Systems Ag Windparkleistungsregelung und -verfahren
DK1880459T3 (da) * 2005-05-13 2013-11-04 Siemens Ag Effektstyresystem til vindmøllepark
US20070124025A1 (en) * 2005-11-29 2007-05-31 General Electric Company Windpark turbine control system and method for wind condition estimation and performance optimization
EP1914872A1 (en) * 2006-10-17 2008-04-23 Siemens Aktiengesellschaft Wind farm
US7531911B2 (en) * 2006-12-22 2009-05-12 Ingeteam Energy, S.A. Reactive power control for operating a wind farm
US8041465B2 (en) * 2008-10-09 2011-10-18 General Electric Company Voltage control at windfarms

Also Published As

Publication number Publication date
CN101896872B (zh) 2012-11-28
MX2010005674A (es) 2010-10-05
EP2232343A1 (en) 2010-09-29
WO2009080036A1 (en) 2009-07-02
EP2232343B1 (en) 2017-10-11
CN101896872A (zh) 2010-11-24
US20100274401A1 (en) 2010-10-28

Similar Documents

Publication Publication Date Title
BRPI0820555A2 (pt) Método para controlar, uma produção comum de pelo menos duas turbinas eólicas, sistemas central de controle de turbina eólica, parque eólico e agrupamento de parques eólicos
BRPI1015099A2 (pt) controlador para uma turbina eólica flutuante, turbina eólica, estrutura de turbina eólica flutuante, método de controle de uma turbina eólica flutuante, produto de software, e, método de fabricação de um produto de software.
BR112012005450A2 (pt) fundação para uma torre de turbina eólica, e, método para montar e implementar uma fundação para uma torre de turbina eólica
BR112012009619A2 (pt) métodos de controle de turbina eólica para melhorar a produção de energia
BRPI1005166A2 (pt) pa de retor de turbina eólica a metodo de fabricação da mesma
DK2145103T3 (da) Fremgangsmåde til drift af en vindpark med en flerhed af vindkraftanlæg
BR112014009985A2 (pt) método para fabricar uma junta de extremidade de raiz de uma pá de turbina eólica, e, segmento de raiz para a junta de extremidade de raiz de uma pá de turbina eólica
BRPI0923827A2 (pt) Controlador de passo da pá para uma estrutura de turbina eólica flutuante, método para controlar o passo de pá de uma estrutura de turbina eólica flutuante, e, instalação de turbina eólica flutuante.
BR102013016115A8 (pt) método para reduzir as oscilações da torre, sistema de controle de passo e turbina eólica
BRPI0912696A2 (pt) método de fabricar uma metade de lâmina de turbina, uma metade de lâmina de turbina, método de fabricar uma lâmina de turbina , e lâmina de turbina
BRPI0909453A2 (pt) pá de hélice de turbina eólica, e, métodos para fabricar e para reparar uma pá de hélice de turbina eólica
BRPI0909020A2 (pt) gerador de turbina eólica, e, método para controlar o mesmo.
BR112014005400A2 (pt) método para aumentar o crescimento de uma planta, e, composição
BRPI0924251A8 (pt) método de manufatura de pás de aerogeradores
BRPI0918769A2 (pt) sistema para melhoria de performance de turbina a gás em uma usina a gás natural
CO6541619A2 (es) Fábrica para producción por moldeo de dovelas prefabricadas de hormigón para la construcción de torres de susntentación de aerogenerador
BRPI1100051A2 (pt) gerador de turbina eólica, e, método para controlar para controlar um gerador de turbina eólica.
BR112012011644A2 (pt) usina de energia eólica para a produção de energia elétrica, e método de construção relacionado
WO2010136976A3 (en) Manufacture of wind turbine enhancement systems
BRPI0916297A2 (pt) nacela de uma instalação de energia eólica, instalação de energia eólica, e, arranjo de iluminação de obstrução para avaliação.
DK2403707T4 (da) Fremgangsmåde til linieproduktion af vindmøllevinger med stationære støbeforme
EP2577051A4 (en) SEGMENTED WIND POWER SHAFT WITH GRID CONNECTION AREAS AND CORRESPONDING SYSTEMS AND METHOD
BRPI1013261A2 (pt) método para fabricar pás de turbina eólica
DK2431606T3 (da) Vindmølle med pitch bremse.
BRPI1100021A2 (pt) sistema de controle de passo de lamina de turbina eolica, e rotor de turbina eolica e gerador de turbina eolica fornecidos com o mesmo .

Legal Events

Date Code Title Description
B25G Requested change of headquarter approved

Owner name: VESTAS WIND SYSTEMS A/S (DK)

B08F Application fees: dismissal - article 86 of industrial property law

Free format text: REFERENTE AS 5A, 6A E 7A ANUIDADES.

B08K Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87)

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2343 DE 01-12-2015 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.