BR112019001650A2 - sistemas e método de produção e controle ciber-físico - Google Patents
sistemas e método de produção e controle ciber-físicoInfo
- Publication number
- BR112019001650A2 BR112019001650A2 BR112019001650-3A BR112019001650A BR112019001650A2 BR 112019001650 A2 BR112019001650 A2 BR 112019001650A2 BR 112019001650 A BR112019001650 A BR 112019001650A BR 112019001650 A2 BR112019001650 A2 BR 112019001650A2
- Authority
- BR
- Brazil
- Prior art keywords
- cyber
- automation system
- control systems
- system devices
- physical production
- Prior art date
Links
- 230000006399 behavior Effects 0.000 abstract 1
- 230000009466 transformation Effects 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41885—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
- G05B19/4187—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow by tool management
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41815—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the cooperation between machine tools, manipulators and conveyor or other workpiece supply system, workcell
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41835—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by programme execution
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4185—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
- G05B19/41855—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication by local area network [LAN], network structure
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4188—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by CIM planning or realisation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/25—Pc structure of the system
- G05B2219/25417—Identify capabilities necessary to produce article
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/25—Pc structure of the system
- G05B2219/25418—Enter description of capabilities of each module
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31052—Find feasable assembly sequences
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31053—Planning, generate assembly plans
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
a presente invenção refere-se a um sistema de produção ciber-físico (100) que inclui várias unidades ciber-físicas configuradas para coletivamente produzirem um produto compreendendo uma ou mais peças de trabalho. cada uma das unidades ciber-físicas compre-ende um ou mais dispositivos do sistema de automação, uma interface de rede e um processador. a interface de rede (300) está configurada para receber uma ou mais instâncias de perfil (305, 310). cada instância de perfil proporciona uma solicitação independente da máquina para transformação de uma peça de trabalho pelo um ou mais dispositivos do sistema de automação. o processador é configurado para executar cada uma da uma ou mais instâncias de perfil pela aplicação de comportamentos que controlam os dispositivos do sistema de automação.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2016/046226 WO2018031005A1 (en) | 2016-08-10 | 2016-08-10 | Skill interface for industrial applications |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112019001650A2 true BR112019001650A2 (pt) | 2019-05-07 |
BR112019001650B1 BR112019001650B1 (pt) | 2023-07-18 |
Family
ID=
Also Published As
Publication number | Publication date |
---|---|
KR20190040236A (ko) | 2019-04-17 |
EP3482265B1 (en) | 2023-02-22 |
KR102257938B1 (ko) | 2021-05-27 |
JP2019532383A (ja) | 2019-11-07 |
WO2018031005A1 (en) | 2018-02-15 |
US20190171190A1 (en) | 2019-06-06 |
CN109564419B (zh) | 2022-01-11 |
EP3482265A1 (en) | 2019-05-15 |
CN109564419A (zh) | 2019-04-02 |
US11054812B2 (en) | 2021-07-06 |
JP7351744B2 (ja) | 2023-09-27 |
RU2711874C1 (ru) | 2020-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112017001174A2 (pt) | método, equipamento, e meio não transitório legível por computador que contém um programa de computador | |
BR112021025468A2 (pt) | Sistemas e métodos para produzir um produto | |
BR102019008496A8 (pt) | Métodos para designar dinamicamente operadores para controlar remotamente e/ ou monitorar movimentos de um ou mais sistemas de veículos e sistema de designação de operador de veículo remoto | |
BR112018002040A2 (pt) | controle de uma nuvem de dispositivo | |
BR112018000241A2 (pt) | modelo de recursos de rede para suportar gerenciamento de ciclo de vida de virtualização de função de rede | |
BR112016025340A2 (pt) | configurar fluxos de trabalho em um dispositivo host que operam em um sistema de controle do processo | |
BR112015027847A2 (pt) | Método para acessar um serviço, um dispositivo compreendendo uma memória, dispositivo para acessar um serviço , e sistema para acessar um serviço | |
BR112017002283A2 (pt) | método e aparelho para gerar automaticamente um dicionário de eventos em uma rede de internet das coisas (iot) | |
BR112017005151A2 (pt) | sistema e método para a recuperação de hidrocarbonetos e meio não transitório para leitura por computador | |
BR112018007324A2 (pt) | sistemas e métodos para montagem de produto descartável | |
BR112017024164A2 (pt) | aparelho, sistema e método de determinação de um ou mais parâmetros óticos de uma lente | |
BR112019006270A2 (pt) | controle de conteúdo colaborativo de conteúdo de mídia | |
BR112017009953B8 (pt) | Sistema de produção de energia e método para controle automatizado de um sistema de produção de energia | |
BR112015022863A2 (pt) | método e sistema de controle de múltiplas entradas e dispositivo eletrônico que suporta os mesmos | |
BR112019008825A2 (pt) | estrutura de software de sistema determinístico certificável para aplicações críticas de segurança em tempo real crítico em sistemas de aviônica com processadores de múltiplos núcleos | |
BR112016029552A2 (pt) | sistema e produto de programa de computador para o planejamento inverso de tratamento com radiação | |
BR112017007122A2 (pt) | sistema para monitorar e controlar uma planta industrial | |
BR112016023999A2 (pt) | monitoramento da atividade de um robô | |
BR112015029783A2 (pt) | método e aparelho para controle condicional de um regulador de pressão eletrônico | |
BR112018007949A2 (pt) | ferramenta de campo petrolífero, método e sistema para operações de campo petrolífero. | |
BR102016015261A8 (pt) | ?controlador? | |
BR102017028271A2 (pt) | sistema e processo de monitoramento de desempenhos de aplicativos do sistema informático | |
BR112016018702A2 (pt) | Método para prever uma falha em um sistema de controle de temperatura de cabine | |
BR112016007137A8 (pt) | sistema, meio de armazenamento e método para otimizar transferência de dados em plataformas de computação em nuvem | |
BR112019009175A2 (pt) | dispositivo terminal, dispositivo de rede principal, sistema de comunicação e método de controle de comunicação |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B350 | Update of information on the portal [chapter 15.35 patent gazette] | ||
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 10/08/2016, OBSERVADAS AS CONDICOES LEGAIS |