BR112018012611A2 - método e sistema para monitorar o desempenho de poço e fundo de poço - Google Patents

método e sistema para monitorar o desempenho de poço e fundo de poço

Info

Publication number
BR112018012611A2
BR112018012611A2 BR112018012611A BR112018012611A BR112018012611A2 BR 112018012611 A2 BR112018012611 A2 BR 112018012611A2 BR 112018012611 A BR112018012611 A BR 112018012611A BR 112018012611 A BR112018012611 A BR 112018012611A BR 112018012611 A2 BR112018012611 A2 BR 112018012611A2
Authority
BR
Brazil
Prior art keywords
downhole
water level
pump
level sensor
monitoring well
Prior art date
Application number
BR112018012611A
Other languages
English (en)
Other versions
BR112018012611B8 (pt
BR112018012611B1 (pt
Inventor
Duzan Alexandre
Original Assignee
Suez Groupe
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=55027215&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=BR112018012611(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Suez Groupe filed Critical Suez Groupe
Publication of BR112018012611A2 publication Critical patent/BR112018012611A2/pt
Publication of BR112018012611B1 publication Critical patent/BR112018012611B1/pt
Publication of BR112018012611B8 publication Critical patent/BR112018012611B8/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/008Monitoring of down-hole pump systems, e.g. for the detection of "pumped-off" conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/04Measuring depth or liquid level
    • E21B47/047Liquid level

Landscapes

  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geophysics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Earth Drilling (AREA)
  • Control Of Positive-Displacement Pumps (AREA)

Abstract

a invenção refere-se a um método para monitorar o desempenho de poço (34) ou fundo de poço, onde o método compreende: - receber dados compreendendo um fluxo bombeado q a partir de um medidor de vazão (39) no poço (34) ou fundo de poço, o poço (34) ou fundo de poço compreendendo pelo menos - receber um nível de água a partir de um sensor de nível de água (37) no poço (34) ou fundo de poço, - uma bomba (35) e um sensor de nível de água (37), - um medidor de vazão (39), - a referida bomba (35) e o sensor de nível da água (35) em conexão a meios de computação (36), - gerar um ou mais valores de capacidade específica q / s, em um evento de bomba, caracterizado por o método compreender - selecionar um ou mais valores de capacidade específica q / s que sejam comparáveis sob uma primeira regra, a primeira regra compreendendo valores de nível de água estático swl que permanecem substancialmente invariáveis.
BR112018012611A 2015-12-21 2016-12-16 Método e sistema para monitorar o desempenho de poço e fundo de poço BR112018012611B8 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP15020256.2 2015-12-21
EP15020256.2A EP3184731B8 (en) 2015-12-21 2015-12-21 Method for monitoring well or borehole performance and system
PCT/EP2016/081418 WO2017108609A1 (en) 2015-12-21 2016-12-16 Method for monitoring well or borehole performance and system

Publications (3)

Publication Number Publication Date
BR112018012611A2 true BR112018012611A2 (pt) 2018-12-04
BR112018012611B1 BR112018012611B1 (pt) 2022-10-18
BR112018012611B8 BR112018012611B8 (pt) 2023-03-07

Family

ID=55027215

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112018012611A BR112018012611B8 (pt) 2015-12-21 2016-12-16 Método e sistema para monitorar o desempenho de poço e fundo de poço

Country Status (10)

Country Link
US (1) US10914160B2 (pt)
EP (1) EP3184731B8 (pt)
CN (1) CN108431367A (pt)
AU (1) AU2016375312B9 (pt)
BR (1) BR112018012611B8 (pt)
CL (1) CL2018001606A1 (pt)
ES (1) ES2928158T3 (pt)
FR (1) FR3045737A1 (pt)
MX (1) MX2018007540A (pt)
WO (1) WO2017108609A1 (pt)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723424B (zh) * 2018-12-11 2022-04-15 中煤科工集团西安研究院有限公司 一种井下钻孔放水量预测方法
CN114837654A (zh) * 2022-05-30 2022-08-02 杭州瑞利超声科技有限公司 基于物联网及云平台的油井动液面多端监测系统

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3940971A (en) * 1973-11-01 1976-03-02 Badger Meter, Inc. System for testing flow meters
US4778006A (en) * 1987-05-04 1988-10-18 Derowitsch Richard W Process for removing carbonate from wells
US4830111A (en) * 1987-09-09 1989-05-16 Jenkins Jerold D Water well treating method
US5147559A (en) * 1989-09-26 1992-09-15 Brophey Robert W Controlling cone of depression in a well by microprocessor control of modulating valve
US5342144A (en) * 1992-11-02 1994-08-30 Mccarthy Edward J Stormwater control system
US5639380A (en) * 1994-05-31 1997-06-17 Misquitta; Neale J. System for automating groundwater recovery controlled by monitoring parameters in monitoring wells
US5751599A (en) * 1996-07-10 1998-05-12 Bortnik; Michael Probeless microprocessor based controller for open recirculating evaporative cooling systems
US6542827B1 (en) * 2000-08-31 2003-04-01 Wallace C. Koster Well tending method and apparatus
US7168924B2 (en) * 2002-09-27 2007-01-30 Unico, Inc. Rod pump control system including parameter estimator
CA2463077A1 (en) * 2004-04-07 2005-10-07 J. Kelly Doary Method and apparatus for determining water level in a drilled or dug well for monitoring and water flow control purposes
US7261762B2 (en) 2004-05-06 2007-08-28 Carrier Corporation Technique for detecting and predicting air filter condition
CN1676869A (zh) * 2005-04-16 2005-10-05 张京三 采油井注水方法
US8141646B2 (en) * 2007-06-26 2012-03-27 Baker Hughes Incorporated Device and method for gas lock detection in an electrical submersible pump assembly
CN101476486B (zh) * 2008-11-26 2010-12-08 枣庄矿业(集团)有限责任公司滨湖煤矿 井下中央泵房排水自动监控系统
US8244499B2 (en) 2009-01-30 2012-08-14 Aquifer Resource Management, Inc. Methods and systems for managing aquifer operation
GB0903130D0 (en) * 2009-02-24 2009-04-08 Equaflow Ltd Areas for equestrian activities using structural modules
CN102191933B (zh) * 2011-03-30 2013-06-19 北京万普隆能源技术有限公司 一种煤层气井产出气测量控制工艺
US20120285896A1 (en) * 2011-05-12 2012-11-15 Crossstream Energy, Llc System and method to measure hydrocarbons produced from a well
GB2510547B (en) * 2012-03-01 2016-04-27 Waste Heat Recovery Ltd Heat recovery
CN102865078A (zh) * 2012-04-28 2013-01-09 中国神华能源股份有限公司 一种松散含水层下保水开采地质条件确定方法
US9284722B2 (en) * 2012-06-14 2016-03-15 Besst, Inc. Selective extraction of fluids from subsurface wells
US20140009302A1 (en) * 2012-06-29 2014-01-09 Wellintel, Inc. Wellhead water level sensor
AU2013204013B2 (en) * 2013-03-15 2015-09-10 Franklin Electric Company, Inc. System and method for operating a pump
US10371860B2 (en) * 2013-05-22 2019-08-06 S.S. Papadopulos & Associates, Inc. Simultaneous multi-event universal kriging methods for spatio-temporal data analysis and mapping
US10030502B1 (en) * 2013-06-28 2018-07-24 Wellntel, Inc System for well monitoring
CN103352700B (zh) * 2013-08-07 2015-04-15 兖州煤业股份有限公司 冲积含水层自动补充失水法预防井筒破裂的方法
CN103809570A (zh) * 2013-12-25 2014-05-21 浙江图维电力科技有限公司 一种地下井道多数据采集和控制系统
US10677626B2 (en) * 2016-03-01 2020-06-09 Besst, Inc. Flowmeter profiling system for use in groundwater production wells and boreholes
EP3468700A4 (en) * 2016-06-10 2020-08-05 Opec Remediation Technologies Pty Limited METHOD AND DEVICE FOR SEPARATING A SUBSTANCE FROM GROUNDWATER

Also Published As

Publication number Publication date
BR112018012611B8 (pt) 2023-03-07
CN108431367A (zh) 2018-08-21
WO2017108609A1 (en) 2017-06-29
AU2016375312A2 (en) 2018-10-25
EP3184731B8 (en) 2022-08-24
ES2928158T3 (es) 2022-11-15
US20180371890A1 (en) 2018-12-27
EP3184731A1 (en) 2017-06-28
BR112018012611B1 (pt) 2022-10-18
CL2018001606A1 (es) 2018-11-16
EP3184731B1 (en) 2022-07-20
FR3045737A1 (fr) 2017-06-23
MX2018007540A (es) 2019-03-28
US10914160B2 (en) 2021-02-09
AU2016375312A1 (en) 2018-07-12
AU2016375312B9 (en) 2022-05-19
AU2016375312B2 (en) 2022-05-05

Similar Documents

Publication Publication Date Title
BR112016029214A2 (pt) sistema, método e mídia legível em computador
CA3080317A1 (en) Smart fracturing system and method
BR112015031567A2 (pt) método e sistema para predizer propriedades de fluido, e, método para manutenção de um furo de poço
BR112016006909A2 (pt) processos para produzir um relatório e para otimizar o desempenho de um sistema de bombeamento
BR112017002862A2 (pt) método, e, sistema
BR112014027507A2 (pt) métodos e sistemas para monitoramento em tempo real e processamento de dados de furo de poço
BR112016003170A2 (pt) aparelhos de bombeamento submarino e métodos relacionados
BR112016016831A2 (pt) método implementado por computador, sistema incluindo memória e um ou mais processadores, e meio legível por computador não transitório
BR112017013687A2 (pt) impressão digital geométrica para localização de um dispositivo
BR112016028422A2 (pt) método para a fratura hidráulica de uma formação subterrânea atravessada por um poço de exploração
GB2554332A (en) Systems and methods for real time measurement of gas content in drilling fluids
BR112016021678A2 (pt) método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador.
BR112018003885A2 (pt) método e sistema para estimar a porosidade associada à matéria orgânica, método para avaliar o potencial de produção de um poço ou formação, e, meio legível por computador não transitório
BR112014026014A2 (pt) sistema e método para calibrar permeabilidade para uso em modelagem de reservatório
BR112016006617A2 (pt) método, sistema e meio legível por computador não transitório
BR112016002893A2 (pt) sistema para monitoramento de lama em tempo real, método para controle melhorado de um processo de perfuração, e, uso do sistema
BR112015024352A2 (pt) método e dispositivo microfluídico para realizar uma análise de pressão, volume e temperatura de fluido de poço
FR3005765B1 (fr) Fractures a segments multiples
BR112016025017A2 (pt) método para monitorar um elemento de vedação e meio legível por computador
BR112016018454A2 (pt) método e sistema de simulação de produção de fluido, e, meio de armazenamento legível por computador.
BR112018012611A2 (pt) método e sistema para monitorar o desempenho de poço e fundo de poço
BR112014018947A8 (pt) Equipamento, sistema e método implementado por processador
BR112017001647A2 (pt) ?sistema baseado em computador para prever a aceleração para uma coluna de ferramenta no fundo do poço, método para prever aceleração, e, ferramenta para prever a aceleração para uma coluna de ferramenta no fundo do poço?
BR112018007900B8 (pt) Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço
MX2015010070A (es) Sistemas y metodos para optimizacion de analisis de pozos y fluidos subterraneos con gases nobles.

Legal Events

Date Code Title Description
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 16/12/2016, OBSERVADAS AS CONDICOES LEGAIS

B25A Requested transfer of rights approved

Owner name: SUEZ INTERNATIONAL (FR)