BR112018007900B8 - Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço - Google Patents

Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço

Info

Publication number
BR112018007900B8
BR112018007900B8 BR112018007900A BR112018007900A BR112018007900B8 BR 112018007900 B8 BR112018007900 B8 BR 112018007900B8 BR 112018007900 A BR112018007900 A BR 112018007900A BR 112018007900 A BR112018007900 A BR 112018007900A BR 112018007900 B8 BR112018007900 B8 BR 112018007900B8
Authority
BR
Brazil
Prior art keywords
diluent
injection
optimizing
well
thinner
Prior art date
Application number
BR112018007900A
Other languages
English (en)
Other versions
BR112018007900A2 (pt
BR112018007900B1 (pt
Inventor
Pavlov Alexey
Fjalestad Kjetil
Original Assignee
Statoil Petroleum As
Equinor Energy As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoil Petroleum As, Equinor Energy As filed Critical Statoil Petroleum As
Publication of BR112018007900A2 publication Critical patent/BR112018007900A2/pt
Publication of BR112018007900B1 publication Critical patent/BR112018007900B1/pt
Publication of BR112018007900B8 publication Critical patent/BR112018007900B8/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F23/00Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
    • B01F23/40Mixing liquids with liquids; Emulsifying
    • B01F23/47Mixing liquids with liquids; Emulsifying involving high-viscosity liquids, e.g. asphalt
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/128Adaptation of pump systems with down-hole electric drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Geophysics (AREA)
  • Chemical & Material Sciences (AREA)
  • Automation & Control Theory (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Artificial Intelligence (AREA)
  • Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Evolutionary Computation (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Medical Informatics (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Control Of Positive-Displacement Pumps (AREA)
  • Investigating Or Analysing Materials By Optical Means (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)
  • Infusion, Injection, And Reservoir Apparatuses (AREA)

Abstract

MÉTODO E SISTEMA PARA A OTIMIZAÇÃO DA ADIÇÃO DE DILUENTE A UM POÇO DE PETRÓLEO COMPREENDENDO UMA BOMBA DE FUNDO DE POÇO” CAMPO DA INVENÇÃO. Um sistema para otimizar a injeção de um diluente para um, alguns ou todos de um ou mais poços compreendendo uma bomba de fundo de poço e meios de manutenção para o diluente, os ditos meios de manutenção sendo conectados à ou cada poço através de uma ou mais linhas de injeção através das quais o diluente pode ser bombeado pelo meio de injeção de diluente, caracterizado pelo fato de que o dito sistema compreende meios de medição para medição em tempo real de um ou mais parâmetros de desempenho de produção, e medição da taxa de injeção do diluente; e meios para otimizar a injeção do diluente para pelo menos um do dito um ou mais poços com base de: (i) meios para preparar as variações controladas da injeção de diluente no pelo menos ou cada poço; (ii) meios para o processamento das medições em tempo real dos parâmetros de desempenho de produção afetados por estas variações para determinar qualquer ajustamento necessário da injeção do diluente em direção a um valor ideal; e (iii) se necessário, preparar o ajustamento físico correspondente da injeção do diluente a fim de resultar no desempenho de produção mais próximo ao ponto ideal, assim como um método para a dita otimização.
BR112018007900A 2015-10-22 2015-10-22 Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço BR112018007900B8 (pt)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/NO2015/000027 WO2017069633A1 (en) 2015-10-22 2015-10-22 Method and system for the optimisation of the addition of diluent to an oil well comprising a downhole pump

Publications (3)

Publication Number Publication Date
BR112018007900A2 BR112018007900A2 (pt) 2018-10-30
BR112018007900B1 BR112018007900B1 (pt) 2023-01-31
BR112018007900B8 true BR112018007900B8 (pt) 2023-04-18

Family

ID=58557486

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112018007900A BR112018007900B8 (pt) 2015-10-22 2015-10-22 Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço

Country Status (9)

Country Link
US (1) US11085274B2 (pt)
AU (1) AU2015412337B2 (pt)
BR (1) BR112018007900B8 (pt)
CA (1) CA3002330C (pt)
GB (1) GB2559504B (pt)
MX (1) MX2018004941A (pt)
NO (1) NO20180704A1 (pt)
RU (1) RU2700358C1 (pt)
WO (1) WO2017069633A1 (pt)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CO2019004629A1 (es) * 2019-05-06 2020-11-10 Ecopetrol Sa Proceso de control de inyección de diluyente en fondo de pozo para dilucion de crudo extrapesado
CN112495241B (zh) * 2021-02-08 2021-06-08 王铁军 一种应用于稠油井的降粘剂加注装置
MX2024004811A (es) * 2021-10-20 2024-05-31 Schlumberger Technology Bv Sistema de dilucion de fluido de perforacion.
US11982284B2 (en) 2022-03-30 2024-05-14 Saudi Arabian Oil Company Optimizing the performance of electrical submersible pumps (ESP) in real time

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8682589B2 (en) * 1998-12-21 2014-03-25 Baker Hughes Incorporated Apparatus and method for managing supply of additive at wellsites
US7389787B2 (en) * 1998-12-21 2008-06-24 Baker Hughes Incorporated Closed loop additive injection and monitoring system for oilfield operations
US6535795B1 (en) 1999-08-09 2003-03-18 Baker Hughes Incorporated Method for chemical addition utilizing adaptive optimization
JP2005009097A (ja) * 2003-06-17 2005-01-13 Katsuaki Tomita ロール網戸における網端縁固定装置
US7114557B2 (en) * 2004-02-03 2006-10-03 Schlumberger Technology Corporation System and method for optimizing production in an artificially lifted well
CA2592880C (en) * 2007-06-01 2012-10-16 Noralta Controls Ltd. Automated well bore compensation control system
FR2920817B1 (fr) * 2007-09-11 2014-11-21 Total Sa Installation et procede de production d'hydrocarbures
CN101684727B (zh) * 2008-09-28 2013-06-26 中国石油化工股份有限公司 超深井稠油掺稀比例确定的优化方法及其掺稀混配器
CA2701422A1 (en) 2010-04-26 2011-10-26 Exxonmobil Upstream Research Company A method for the management of oilfields undergoing solvent injection
WO2012109514A1 (en) * 2011-02-11 2012-08-16 Bp Corporation North America Inc. Reservoir treatment
BR112014007854A2 (pt) * 2011-10-06 2017-04-18 Landmark Graphics Corp método para otimizar a recuperação de óleo em médio prazo e dispositivo portador de programa
NO2776665T3 (pt) * 2011-11-16 2018-07-28
US9714741B2 (en) * 2014-02-20 2017-07-25 Pcs Ferguson, Inc. Method and system to volumetrically control additive pump
US20170247986A1 (en) * 2014-10-28 2017-08-31 Bryan BUSSELL Additive management system

Also Published As

Publication number Publication date
GB2559504A (en) 2018-08-08
RU2700358C1 (ru) 2019-09-16
WO2017069633A1 (en) 2017-04-27
BR112018007900A2 (pt) 2018-10-30
AU2015412337A1 (en) 2018-06-07
BR112018007900B1 (pt) 2023-01-31
GB201806340D0 (en) 2018-05-30
AU2015412337B2 (en) 2021-08-19
MX2018004941A (es) 2018-11-09
GB2559504B (en) 2021-08-04
WO2017069633A8 (en) 2017-06-08
US20190063193A1 (en) 2019-02-28
US11085274B2 (en) 2021-08-10
CA3002330C (en) 2023-07-11
CA3002330A1 (en) 2017-04-27
NO20180704A1 (en) 2018-05-18

Similar Documents

Publication Publication Date Title
BR112016028422A2 (pt) método para a fratura hidráulica de uma formação subterrânea atravessada por um poço de exploração
WO2018035400A3 (en) Method for determining characteristics of a network of hydraulic fractures
BR112016002893A2 (pt) sistema para monitoramento de lama em tempo real, método para controle melhorado de um processo de perfuração, e, uso do sistema
BR112018007900B8 (pt) Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço
BR112017025555A2 (pt) sistema e método para monitoramento em tempo real e estimativa de desempenho de produção de sistema de poço inteligente
BR112016002616A2 (pt) método, sistema e mídia legível em computador não transitória
GB2545144A (en) Apparatus and method using measurements taken while drilling to map mechanical boundaries and mechanical rock properties along a borehole
BR112014027507A2 (pt) métodos e sistemas para monitoramento em tempo real e processamento de dados de furo de poço
BR112016021678A2 (pt) método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador.
BR112018003333A2 (pt) sistema de rcd inteligente
BR112015024544A2 (pt) sistema e método para fornecimento de medições geológicas compensadas
BR112017000076A2 (pt) método para detectar anomalias em uma rede de distribuição, em particular, de água potável
BR112017001353A2 (pt) sistema e método para monitorar escala orgânica de fundo de poço e intervir em um poço de produção
BR112018009804A8 (pt) método para modelar uma formação subterrânea e sistema de perfilagem
BR112017012735A2 (pt) aparelho, sistema e método para operações de petróleo e gás
BR112014017203A8 (pt) método, sistema de computador e meio não transitório de leitura por computador
BR112020000534A8 (pt) método e sistema de monitoramento de eventos de influxo e perda em um poço
BR112018017328A2 (pt) inversão bidimensional melhorada
BR112014029223A2 (pt) métodos e aparelhos para a modelagem de características de folhelho em lamas à base de água usando uma rede neural artificial
MX2014011016A (es) Metodo y dispositivo de agrupamiento.
BR112016025600A2 (pt) Método para a medição da viscosidade de fluido não newtoniano para medição em linha e controle do processo, sistema utilizado para preparar uma pasta fluida, e aparelho utilizado para preparar e caracterizar um fluido de furo de poço
BR112018007739A2 (pt) método e sitema
BR112017004758A2 (pt) método para determinar parâmetros em um poço, e, sistema de poço.
BR112018000356A2 (pt) bomba submarina e sistema e método para controle
AR100386A1 (es) Acidificación optimizada de pozos de inyección y producción

Legal Events

Date Code Title Description
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B06A Patent application procedure suspended [chapter 6.1 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 22/10/2015, OBSERVADAS AS CONDICOES LEGAIS

B25D Requested change of name of applicant approved

Owner name: EQUINOR ENERGY AS (NO)