BR112018007900B8 - Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço - Google Patents
Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poçoInfo
- Publication number
- BR112018007900B8 BR112018007900B8 BR112018007900A BR112018007900A BR112018007900B8 BR 112018007900 B8 BR112018007900 B8 BR 112018007900B8 BR 112018007900 A BR112018007900 A BR 112018007900A BR 112018007900 A BR112018007900 A BR 112018007900A BR 112018007900 B8 BR112018007900 B8 BR 112018007900B8
- Authority
- BR
- Brazil
- Prior art keywords
- diluent
- injection
- optimizing
- well
- thinner
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000003129 oil well Substances 0.000 title abstract 2
- 239000003085 diluting agent Substances 0.000 abstract 9
- 238000002347 injection Methods 0.000 abstract 8
- 239000007924 injection Substances 0.000 abstract 8
- 238000004519 manufacturing process Methods 0.000 abstract 3
- 238000005259 measurement Methods 0.000 abstract 3
- 238000012423 maintenance Methods 0.000 abstract 2
- 238000005457 optimization Methods 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F23/00—Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
- B01F23/40—Mixing liquids with liquids; Emulsifying
- B01F23/47—Mixing liquids with liquids; Emulsifying involving high-viscosity liquids, e.g. asphalt
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/128—Adaptation of pump systems with down-hole electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Geophysics (AREA)
- Chemical & Material Sciences (AREA)
- Automation & Control Theory (AREA)
- General Physics & Mathematics (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Software Systems (AREA)
- Evolutionary Computation (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Medical Informatics (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Control Of Positive-Displacement Pumps (AREA)
- Investigating Or Analysing Materials By Optical Means (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Injection Moulding Of Plastics Or The Like (AREA)
- Infusion, Injection, And Reservoir Apparatuses (AREA)
Abstract
MÉTODO E SISTEMA PARA A OTIMIZAÇÃO DA ADIÇÃO DE DILUENTE A UM POÇO DE PETRÓLEO COMPREENDENDO UMA BOMBA DE FUNDO DE POÇO CAMPO DA INVENÇÃO. Um sistema para otimizar a injeção de um diluente para um, alguns ou todos de um ou mais poços compreendendo uma bomba de fundo de poço e meios de manutenção para o diluente, os ditos meios de manutenção sendo conectados à ou cada poço através de uma ou mais linhas de injeção através das quais o diluente pode ser bombeado pelo meio de injeção de diluente, caracterizado pelo fato de que o dito sistema compreende meios de medição para medição em tempo real de um ou mais parâmetros de desempenho de produção, e medição da taxa de injeção do diluente; e meios para otimizar a injeção do diluente para pelo menos um do dito um ou mais poços com base de: (i) meios para preparar as variações controladas da injeção de diluente no pelo menos ou cada poço; (ii) meios para o processamento das medições em tempo real dos parâmetros de desempenho de produção afetados por estas variações para determinar qualquer ajustamento necessário da injeção do diluente em direção a um valor ideal; e (iii) se necessário, preparar o ajustamento físico correspondente da injeção do diluente a fim de resultar no desempenho de produção mais próximo ao ponto ideal, assim como um método para a dita otimização.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/NO2015/000027 WO2017069633A1 (en) | 2015-10-22 | 2015-10-22 | Method and system for the optimisation of the addition of diluent to an oil well comprising a downhole pump |
Publications (3)
Publication Number | Publication Date |
---|---|
BR112018007900A2 BR112018007900A2 (pt) | 2018-10-30 |
BR112018007900B1 BR112018007900B1 (pt) | 2023-01-31 |
BR112018007900B8 true BR112018007900B8 (pt) | 2023-04-18 |
Family
ID=58557486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112018007900A BR112018007900B8 (pt) | 2015-10-22 | 2015-10-22 | Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço |
Country Status (9)
Country | Link |
---|---|
US (1) | US11085274B2 (pt) |
AU (1) | AU2015412337B2 (pt) |
BR (1) | BR112018007900B8 (pt) |
CA (1) | CA3002330C (pt) |
GB (1) | GB2559504B (pt) |
MX (1) | MX2018004941A (pt) |
NO (1) | NO20180704A1 (pt) |
RU (1) | RU2700358C1 (pt) |
WO (1) | WO2017069633A1 (pt) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CO2019004629A1 (es) * | 2019-05-06 | 2020-11-10 | Ecopetrol Sa | Proceso de control de inyección de diluyente en fondo de pozo para dilucion de crudo extrapesado |
CN112495241B (zh) * | 2021-02-08 | 2021-06-08 | 王铁军 | 一种应用于稠油井的降粘剂加注装置 |
MX2024004811A (es) * | 2021-10-20 | 2024-05-31 | Schlumberger Technology Bv | Sistema de dilucion de fluido de perforacion. |
US11982284B2 (en) | 2022-03-30 | 2024-05-14 | Saudi Arabian Oil Company | Optimizing the performance of electrical submersible pumps (ESP) in real time |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8682589B2 (en) * | 1998-12-21 | 2014-03-25 | Baker Hughes Incorporated | Apparatus and method for managing supply of additive at wellsites |
US7389787B2 (en) * | 1998-12-21 | 2008-06-24 | Baker Hughes Incorporated | Closed loop additive injection and monitoring system for oilfield operations |
US6535795B1 (en) | 1999-08-09 | 2003-03-18 | Baker Hughes Incorporated | Method for chemical addition utilizing adaptive optimization |
JP2005009097A (ja) * | 2003-06-17 | 2005-01-13 | Katsuaki Tomita | ロール網戸における網端縁固定装置 |
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
CA2592880C (en) * | 2007-06-01 | 2012-10-16 | Noralta Controls Ltd. | Automated well bore compensation control system |
FR2920817B1 (fr) * | 2007-09-11 | 2014-11-21 | Total Sa | Installation et procede de production d'hydrocarbures |
CN101684727B (zh) * | 2008-09-28 | 2013-06-26 | 中国石油化工股份有限公司 | 超深井稠油掺稀比例确定的优化方法及其掺稀混配器 |
CA2701422A1 (en) | 2010-04-26 | 2011-10-26 | Exxonmobil Upstream Research Company | A method for the management of oilfields undergoing solvent injection |
WO2012109514A1 (en) * | 2011-02-11 | 2012-08-16 | Bp Corporation North America Inc. | Reservoir treatment |
BR112014007854A2 (pt) * | 2011-10-06 | 2017-04-18 | Landmark Graphics Corp | método para otimizar a recuperação de óleo em médio prazo e dispositivo portador de programa |
NO2776665T3 (pt) * | 2011-11-16 | 2018-07-28 | ||
US9714741B2 (en) * | 2014-02-20 | 2017-07-25 | Pcs Ferguson, Inc. | Method and system to volumetrically control additive pump |
US20170247986A1 (en) * | 2014-10-28 | 2017-08-31 | Bryan BUSSELL | Additive management system |
-
2015
- 2015-10-22 BR BR112018007900A patent/BR112018007900B8/pt active IP Right Grant
- 2015-10-22 US US15/769,997 patent/US11085274B2/en active Active
- 2015-10-22 MX MX2018004941A patent/MX2018004941A/es unknown
- 2015-10-22 GB GB1806340.4A patent/GB2559504B/en active Active
- 2015-10-22 RU RU2018117819A patent/RU2700358C1/ru active
- 2015-10-22 CA CA3002330A patent/CA3002330C/en active Active
- 2015-10-22 WO PCT/NO2015/000027 patent/WO2017069633A1/en active Application Filing
- 2015-10-22 AU AU2015412337A patent/AU2015412337B2/en active Active
-
2018
- 2018-05-18 NO NO20180704A patent/NO20180704A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
GB2559504A (en) | 2018-08-08 |
RU2700358C1 (ru) | 2019-09-16 |
WO2017069633A1 (en) | 2017-04-27 |
BR112018007900A2 (pt) | 2018-10-30 |
AU2015412337A1 (en) | 2018-06-07 |
BR112018007900B1 (pt) | 2023-01-31 |
GB201806340D0 (en) | 2018-05-30 |
AU2015412337B2 (en) | 2021-08-19 |
MX2018004941A (es) | 2018-11-09 |
GB2559504B (en) | 2021-08-04 |
WO2017069633A8 (en) | 2017-06-08 |
US20190063193A1 (en) | 2019-02-28 |
US11085274B2 (en) | 2021-08-10 |
CA3002330C (en) | 2023-07-11 |
CA3002330A1 (en) | 2017-04-27 |
NO20180704A1 (en) | 2018-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112016028422A2 (pt) | método para a fratura hidráulica de uma formação subterrânea atravessada por um poço de exploração | |
WO2018035400A3 (en) | Method for determining characteristics of a network of hydraulic fractures | |
BR112016002893A2 (pt) | sistema para monitoramento de lama em tempo real, método para controle melhorado de um processo de perfuração, e, uso do sistema | |
BR112018007900B8 (pt) | Método e sistema para a otimização da adição de diluente a um poço de petróleo compreendendo uma bomba de fundo de poço | |
BR112017025555A2 (pt) | sistema e método para monitoramento em tempo real e estimativa de desempenho de produção de sistema de poço inteligente | |
BR112016002616A2 (pt) | método, sistema e mídia legível em computador não transitória | |
GB2545144A (en) | Apparatus and method using measurements taken while drilling to map mechanical boundaries and mechanical rock properties along a borehole | |
BR112014027507A2 (pt) | métodos e sistemas para monitoramento em tempo real e processamento de dados de furo de poço | |
BR112016021678A2 (pt) | método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador. | |
BR112018003333A2 (pt) | sistema de rcd inteligente | |
BR112015024544A2 (pt) | sistema e método para fornecimento de medições geológicas compensadas | |
BR112017000076A2 (pt) | método para detectar anomalias em uma rede de distribuição, em particular, de água potável | |
BR112017001353A2 (pt) | sistema e método para monitorar escala orgânica de fundo de poço e intervir em um poço de produção | |
BR112018009804A8 (pt) | método para modelar uma formação subterrânea e sistema de perfilagem | |
BR112017012735A2 (pt) | aparelho, sistema e método para operações de petróleo e gás | |
BR112014017203A8 (pt) | método, sistema de computador e meio não transitório de leitura por computador | |
BR112020000534A8 (pt) | método e sistema de monitoramento de eventos de influxo e perda em um poço | |
BR112018017328A2 (pt) | inversão bidimensional melhorada | |
BR112014029223A2 (pt) | métodos e aparelhos para a modelagem de características de folhelho em lamas à base de água usando uma rede neural artificial | |
MX2014011016A (es) | Metodo y dispositivo de agrupamiento. | |
BR112016025600A2 (pt) | Método para a medição da viscosidade de fluido não newtoniano para medição em linha e controle do processo, sistema utilizado para preparar uma pasta fluida, e aparelho utilizado para preparar e caracterizar um fluido de furo de poço | |
BR112018007739A2 (pt) | método e sitema | |
BR112017004758A2 (pt) | método para determinar parâmetros em um poço, e, sistema de poço. | |
BR112018000356A2 (pt) | bomba submarina e sistema e método para controle | |
AR100386A1 (es) | Acidificación optimizada de pozos de inyección y producción |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 22/10/2015, OBSERVADAS AS CONDICOES LEGAIS |
|
B25D | Requested change of name of applicant approved |
Owner name: EQUINOR ENERGY AS (NO) |