BR112017011159A2 - geração de energia elétrica dentro de uma instalação de elevador - Google Patents

geração de energia elétrica dentro de uma instalação de elevador

Info

Publication number
BR112017011159A2
BR112017011159A2 BR112017011159A BR112017011159A BR112017011159A2 BR 112017011159 A2 BR112017011159 A2 BR 112017011159A2 BR 112017011159 A BR112017011159 A BR 112017011159A BR 112017011159 A BR112017011159 A BR 112017011159A BR 112017011159 A2 BR112017011159 A2 BR 112017011159A2
Authority
BR
Brazil
Prior art keywords
pulley
elevator
tensioning element
coupling
piezoelectric layer
Prior art date
Application number
BR112017011159A
Other languages
English (en)
Inventor
Ferreira Henrique
Original Assignee
Inventio Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventio Ag filed Critical Inventio Ag
Publication of BR112017011159A2 publication Critical patent/BR112017011159A2/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B15/00Main component parts of mining-hoist winding devices
    • B66B15/02Rope or cable carriers
    • B66B15/04Friction sheaves; "Koepe" pulleys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/062Belts
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B1/00Constructional features of ropes or cables
    • D07B1/14Ropes or cables with incorporated auxiliary elements, e.g. for marking, extending throughout the length of the rope or cable
    • D07B1/147Ropes or cables with incorporated auxiliary elements, e.g. for marking, extending throughout the length of the rope or cable comprising electric conductors or elements for information transfer
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2501/00Application field
    • D07B2501/20Application field related to ropes or cables
    • D07B2501/2007Elevators

Landscapes

  • Elevator Control (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • General Electrical Machinery Utilizing Piezoelectricity, Electrostriction Or Magnetostriction (AREA)

Abstract

a presente invenção refere-se a uma instalação de elevador (1) e a um processo para gerar passivelmente e com segurança energia elétrica, durante a operação de uma instalação de elevador (1). a instalação de elevador (1) compreende uma cabine de elevador (2), um elemento de tensão (6) para suportar e movimentar a cabine de elevador, e uma polia (14; 8) em acoplamento com o elemento de tensão, em que a polia compreende uma camada piezelétrica (30), posicionada de modo que qualquer força aplicada à polia, durante acoplamento com o elemento de tensão, comprima a camada piezelétrica. na medida em que o elemento de tensão (6) é acionado para movimentar a cabine de elevador (2) para cima e para baixo ao longo de um poço de elevador (12), ele também se acopla com a polia rotativa (14; 8). a força conferida à polia (14; 8), durante esse acoplamento com o elemento de tensão, comprime a camada piezelétrica, que, consequentemente, gera energia elétrica.
BR112017011159A 2014-12-18 2015-12-14 geração de energia elétrica dentro de uma instalação de elevador BR112017011159A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP14198949 2014-12-18
PCT/EP2015/079584 WO2016096718A1 (en) 2014-12-18 2015-12-14 Electrical energy generation within an elevator installation

Publications (1)

Publication Number Publication Date
BR112017011159A2 true BR112017011159A2 (pt) 2018-01-02

Family

ID=52231888

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112017011159A BR112017011159A2 (pt) 2014-12-18 2015-12-14 geração de energia elétrica dentro de uma instalação de elevador

Country Status (6)

Country Link
US (1) US20170355571A1 (pt)
EP (1) EP3233705A1 (pt)
CN (1) CN107108178A (pt)
AU (1) AU2015366414B2 (pt)
BR (1) BR112017011159A2 (pt)
WO (1) WO2016096718A1 (pt)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11261062B2 (en) * 2019-05-03 2022-03-01 Otis Elevator Company Modular sheave unit

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7023100B2 (en) * 2003-12-15 2006-04-04 Glycon Technologies, L.L.C. Method and apparatus for conversion of movement to electrical energy
WO2005095826A1 (en) * 2004-04-02 2005-10-13 Litens Automotive Partnership Vibration compensating pulley
DE102004037540B4 (de) * 2004-08-03 2008-05-29 Micromotion Gmbh Getriebering eines Spannungswellengetriebes
JP5346864B2 (ja) * 2010-04-02 2013-11-20 株式会社日立ビルシステム エレベータのシーブの磨耗診断装置
US8633634B2 (en) * 2011-11-18 2014-01-21 The Board Of Regents Of The University Of Texas System MEMs-based cantilever energy harvester
CN104163375A (zh) * 2014-07-29 2014-11-26 苏州汉森华纳节能科技有限公司 电梯节能设备

Also Published As

Publication number Publication date
WO2016096718A1 (en) 2016-06-23
CN107108178A (zh) 2017-08-29
AU2015366414A1 (en) 2017-07-13
AU2015366414B2 (en) 2018-12-13
US20170355571A1 (en) 2017-12-14
EP3233705A1 (en) 2017-10-25

Similar Documents

Publication Publication Date Title
MX2017014571A (es) Dispositivo de accionamiento.
MX2016000289A (es) Metodo para revestir materiales alargados tal como, en particular cables conductores o mazos de cables.
EA201600566A1 (ru) Устройство для диагностики воздушных линий электропередач и его компонент
BR112014016385A2 (pt) dispositivo de geração de aerossol poligonal e sistema
BR112019002010A2 (pt) segmento de torre, porção de torre, torre, instalação de energia eólica, e, métodos para produzir um segmento de torre e para conectar segmentos de torre
BR112017001997A2 (pt) aparelho de substituição de módulo
BR112016015165A2 (pt) Aparelho de impulsão e método de fabricação do aparelho
BR112017011016A2 (pt) sistema de elevador com casa de máquinas deslocável
BR112018000845A2 (pt) lâmina de turbina eólica com locais de ancoragem
BR112018012777A2 (pt) método para fabricação de um laminado com uma camada termoplástica estendida
MX2020004162A (es) Elemento termo-electrico accionado por pulsos electricos.
BR112017010643A2 (pt) aparelho de absorção de energia
NZ717837A (en) A maintenance tool for a planetary gear
BR112017011159A2 (pt) geração de energia elétrica dentro de uma instalação de elevador
CL2018003186A1 (es) Generador hidroeléctrico y método para su fabricación y operación.
BR112017007831A2 (pt) terminação de membros de força de cabos de água profunda
BR112016028928A2 (pt) transmissão para converter um movimento de rotação em um movimento linear
BR112018075709A2 (pt) dispositivo atuador, e método para acionar um atuador de polímero eletroativo
BR112012026512A2 (pt) processo de tratamento das ondas acústicas emitidas na saída de um turbomotor de uma aeronave com um dispositivo de descarga de barreira dielétrica e aeronave que compreende um tal dispositivo
BR112018067866A2 (pt) dispositivo de instalação
BR112012030317A2 (pt) aparelhagem voltada para a operação e programação de um tear de anéis
BR112018073500A2 (pt) aparelho com arruela indicadora de tensão direta
MX2018011287A (es) Dispositivo para aplicar una fuerza aplicada a un elemento de conexion.
BR112018003909A2 (pt) dispositivo para o acionamento de um corrimão
ES1249377Y (es) Un panel eólico de aprovechamiento de la fuerza del viento para la producción de energía eléctrica.

Legal Events

Date Code Title Description
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B11B Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements