BR112015031904A2 - abordagem híbrida para casamento de histórico auxiliado em reservatórios grandes - Google Patents
abordagem híbrida para casamento de histórico auxiliado em reservatórios grandesInfo
- Publication number
- BR112015031904A2 BR112015031904A2 BR112015031904A BR112015031904A BR112015031904A2 BR 112015031904 A2 BR112015031904 A2 BR 112015031904A2 BR 112015031904 A BR112015031904 A BR 112015031904A BR 112015031904 A BR112015031904 A BR 112015031904A BR 112015031904 A2 BR112015031904 A2 BR 112015031904A2
- Authority
- BR
- Brazil
- Prior art keywords
- history matching
- aided
- realizations
- geomodel
- production well
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 abstract 6
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 230000000704 physical effect Effects 0.000 abstract 1
- 238000005070 sampling Methods 0.000 abstract 1
Classifications
-
- G01V20/00—
Abstract
resumo abordagem híbrida para casamento de histórico auxiliado em reservatórios grandes um método para casamento de histórico auxiliado híbrido, incluindo: a)executar casamento de histórico por calcular um descasamento para múltiplas realizações de um geomodelo representando um reservatório; b) selecionar um poço de produção a partir de um grupo de poços de produção no reservatório; c) gerar uma ou mais realizações de amostra para o geomodelo por amostrar uma ou mais propriedades físicas de célula de grade ao longo de uma ou mais trajetórias dinâmicas a partir de uma ou mais das múltiplas realizações do geomodelo que atendem um critério de classificação predeterminada, uma ou mais trajetórias dinâmicas conectando o poço de produção selecionado com pelo menos um de um poço de injeção, um aquífero e um tampão de gás; d) atualizar uma ou mais das múltiplas realizações para o poço de produção selecionado utilizando uma ou mais realizações de amostra e um sistema de computador; e e) repetir as etapas a) d) para cada poço de produção no grupo de poços de produção.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361843108P | 2013-07-05 | 2013-07-05 | |
PCT/US2013/055463 WO2015002660A1 (en) | 2013-07-05 | 2013-08-16 | Hybrid approach to assisted history matching in large reservoirs |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112015031904A2 true BR112015031904A2 (pt) | 2017-07-25 |
Family
ID=52144102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112015031904A BR112015031904A2 (pt) | 2013-07-05 | 2013-08-16 | abordagem híbrida para casamento de histórico auxiliado em reservatórios grandes |
Country Status (12)
Country | Link |
---|---|
US (1) | US10627542B2 (pt) |
CN (1) | CN105359003A (pt) |
AU (1) | AU2013393321B2 (pt) |
BR (1) | BR112015031904A2 (pt) |
CA (1) | CA2914272C (pt) |
DE (1) | DE112013007215T5 (pt) |
GB (1) | GB2530444B (pt) |
MX (1) | MX2015017429A (pt) |
RU (1) | RU2015152040A (pt) |
SA (1) | SA515370245B1 (pt) |
SG (1) | SG11201509731WA (pt) |
WO (1) | WO2015002660A1 (pt) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10627542B2 (en) * | 2013-07-05 | 2020-04-21 | Landmark Graphics Corporation | Hybrid approach to assisted history matching in large reservoirs |
EP3616102A4 (en) * | 2017-04-28 | 2021-01-13 | Services Pétroliers Schlumberger | METHOD AND SYSTEM FOR GENERATING A COMPLETE DESIGN USING A STREAM LINE MODEL |
US10983233B2 (en) | 2019-03-12 | 2021-04-20 | Saudi Arabian Oil Company | Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs |
US11499397B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using flux conditioning |
US11501038B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using pattern recognition |
US11846741B2 (en) | 2020-04-06 | 2023-12-19 | Saudi Arabian Oil Company | Systems and methods for evaluating a simulation model of a hydrocarbon field |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0416496D0 (en) * | 2004-07-23 | 2004-08-25 | Council Of The Central Lab Of | Imaging device |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
US8335677B2 (en) * | 2006-09-01 | 2012-12-18 | Chevron U.S.A. Inc. | Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies |
US8170801B2 (en) * | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
US20080319726A1 (en) * | 2007-06-19 | 2008-12-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US9026417B2 (en) * | 2007-12-13 | 2015-05-05 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
CA2783787A1 (en) * | 2010-02-12 | 2011-08-18 | Exxonmobil Upstream Research Company | Method and system for creating history-matched simulation models |
US20120179438A1 (en) * | 2011-01-11 | 2012-07-12 | Schlumberger Technology Corporation | Robust Solution of Difficult Sub-Problems Arising from Numerical Reservoir Simulation |
US9747393B2 (en) * | 2011-02-09 | 2017-08-29 | Exxonmobil Upstream Research Company | Methods and systems for upscaling mechanical properties of geomaterials |
US10133831B2 (en) * | 2012-05-14 | 2018-11-20 | Landmark Graphics Corporation | Method and system of predicting future hydrocarbon production |
EP2850468B1 (en) * | 2012-05-14 | 2020-02-12 | Landmark Graphics Corporation | Method and system of selecting hydrocarbon wells for well testing |
US9260948B2 (en) * | 2012-07-31 | 2016-02-16 | Landmark Graphics Corporation | Multi-level reservoir history matching |
US10138724B2 (en) * | 2012-07-31 | 2018-11-27 | Landmark Graphics Corporation | Monitoring, diagnosing and optimizing gas lift operations by presenting one or more actions recommended to achieve a GL system performance |
US9261097B2 (en) * | 2012-07-31 | 2016-02-16 | Landmark Graphics Corporation | Monitoring, diagnosing and optimizing electric submersible pump operations |
US10627542B2 (en) * | 2013-07-05 | 2020-04-21 | Landmark Graphics Corporation | Hybrid approach to assisted history matching in large reservoirs |
-
2013
- 2013-08-16 US US14/899,680 patent/US10627542B2/en active Active
- 2013-08-16 WO PCT/US2013/055463 patent/WO2015002660A1/en active Application Filing
- 2013-08-16 SG SG11201509731WA patent/SG11201509731WA/en unknown
- 2013-08-16 CA CA2914272A patent/CA2914272C/en active Active
- 2013-08-16 AU AU2013393321A patent/AU2013393321B2/en not_active Ceased
- 2013-08-16 MX MX2015017429A patent/MX2015017429A/es unknown
- 2013-08-16 DE DE112013007215.7T patent/DE112013007215T5/de not_active Withdrawn
- 2013-08-16 GB GB1521370.5A patent/GB2530444B/en active Active
- 2013-08-16 RU RU2015152040A patent/RU2015152040A/ru unknown
- 2013-08-16 BR BR112015031904A patent/BR112015031904A2/pt not_active IP Right Cessation
- 2013-08-16 CN CN201380077249.6A patent/CN105359003A/zh active Pending
-
2015
- 2015-12-06 SA SA515370245A patent/SA515370245B1/ar unknown
Also Published As
Publication number | Publication date |
---|---|
AU2013393321B2 (en) | 2016-08-25 |
US10627542B2 (en) | 2020-04-21 |
GB2530444B (en) | 2020-06-03 |
CA2914272A1 (en) | 2015-01-08 |
DE112013007215T5 (de) | 2016-04-28 |
WO2015002660A1 (en) | 2015-01-08 |
GB201521370D0 (en) | 2016-01-20 |
SG11201509731WA (en) | 2015-12-30 |
GB2530444A (en) | 2016-03-23 |
US20160131801A1 (en) | 2016-05-12 |
MX2015017429A (es) | 2016-07-26 |
AU2013393321A1 (en) | 2015-12-17 |
RU2015152040A (ru) | 2017-08-15 |
SA515370245B1 (ar) | 2017-09-10 |
CA2914272C (en) | 2018-06-12 |
CN105359003A (zh) | 2016-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112015031904A2 (pt) | abordagem híbrida para casamento de histórico auxiliado em reservatórios grandes | |
AU2022206780B2 (en) | Automated system and methodology for feature extraction | |
CL2020002805A1 (es) | Método para identificar un modulador de un sistema biológico; método para identificar un modulador de un proceso de enfermedad (divisional 201302526) | |
WO2013163644A3 (en) | Updating a search index used to facilitate application searches | |
BR112015012733A2 (pt) | método para determinar a porosidade de querogênio de uma formação para operações de fundo de poço e sistema para determinar porosidade de querogênio de uma formação para operações de fundo de poço | |
CL2015003469A1 (es) | Método y sistema de reconocimiento y clasificación de billetes de banco | |
NZ711033A (en) | Nanofluidic devices for the rapid mapping of whole genomes and related systems and methods of analysis | |
BR112014010082A2 (pt) | método, sistema de computador e meio não transitório lido por computador armazenando um programa | |
WO2014025811A3 (en) | Method and apparatus of implementing navigation of product properties | |
BR112016006470A2 (pt) | método para predizer um risco durante operações de perfuração de um poço, e, dispositivo portador de programa não transitório | |
BR112016001108A2 (pt) | Identificação e extração de blocos de falha em um ou mais corpos que representam uma estrutura geológica | |
SA516370635B1 (ar) | طريقة وجهاز لإجراء تتبع تلقائي آلي لطبقة ترابية على أحجام متعددة | |
BR112016006621A2 (pt) | método para gerenciar um risco predeterminado durante as operações de perfuração de um poço e dispositivo transportador de programa não transitório tangível | |
GB2538370A (en) | Designing wellbore completion intervals | |
GB201203233D0 (en) | Method and device for a meta data fragment from a metadata component associated with multimedia data | |
BR112015025384A2 (pt) | método | |
BR112013016699A2 (pt) | método, sistema de computador, e, meio legível por computador | |
MX341255B (es) | Sistema y metodo para simulacion de desorcion de gas en un deposito utilizando un enfoque de multi-porosidad. | |
MY190825A (en) | Nmr in kinetics of hydrocarbon generation | |
SA516370488B1 (ar) | نظام وطريقة لإجراء محاكاة تدفق وسيط أساسه cart لتصنيف الهيئات الإحصائية الجيولوجية لخواص الصخور | |
Azizi et al. | Risk assessment of open pit slope design at PT Adaro Indonesia | |
BR112016006473A2 (pt) | método e sistema para fazer medições relativas à exploração de petróleo e gás, e, dispositivo de armazenamento legível por máquina | |
WO2014145234A3 (en) | Systems and apparatus for integrated and comprehensive biomedical annotation of bioassay data | |
BR112016006194A2 (pt) | método implementado por computador, método implementado por computador para perfurar um furo de poço, sistema, e, meio legível por computador | |
IN2014CH00698A (pt) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] | ||
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2475 DE 12-06-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |
|
B350 | Update of information on the portal [chapter 15.35 patent gazette] |