BR112016006194A2 - método implementado por computador, método implementado por computador para perfurar um furo de poço, sistema, e, meio legível por computador - Google Patents
método implementado por computador, método implementado por computador para perfurar um furo de poço, sistema, e, meio legível por computadorInfo
- Publication number
- BR112016006194A2 BR112016006194A2 BR112016006194A BR112016006194A BR112016006194A2 BR 112016006194 A2 BR112016006194 A2 BR 112016006194A2 BR 112016006194 A BR112016006194 A BR 112016006194A BR 112016006194 A BR112016006194 A BR 112016006194A BR 112016006194 A2 BR112016006194 A2 BR 112016006194A2
- Authority
- BR
- Brazil
- Prior art keywords
- implemented method
- computer implemented
- computer
- computational model
- wellbore
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000005553 drilling Methods 0.000 title 1
- 238000005094 computer simulation Methods 0.000 abstract 4
- 238000004364 calculation method Methods 0.000 abstract 2
- 239000004215 Carbon black (E152) Substances 0.000 abstract 1
- 238000004590 computer program Methods 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000010206 sensitivity analysis Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- User Interface Of Digital Computer (AREA)
- Combined Controls Of Internal Combustion Engines (AREA)
- Operations Research (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Earth Drilling (AREA)
- Operation Control Of Excavators (AREA)
Abstract
métodos, sistemas e produtos de programas de computador para análise de sensibilidade baseada em faixa em modelagem de reservatório de hidrocarboneto são divulgados. um método implementado por computador pode incluir receber uma primeira faixa numérica definida como um valor mínimo e um valor máximo para um primeiro parâmetro de entrada de um modelo computacional, computar um resultado de modelo computacional diferente para cada um de uma pluralidade de valores na primeira faixa numérica usando cada um dos valores como o primeiro parâmetro de entrada em diferentes cálculos de modelo computacional respectivos e exibir resultados dos cálculos de modelo computacional.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2013/063246 WO2015050548A1 (en) | 2013-10-03 | 2013-10-03 | Sensitivity analysis for hydrocarbon reservoir modeling |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112016006194A2 true BR112016006194A2 (pt) | 2017-08-01 |
Family
ID=52779002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112016006194A BR112016006194A2 (pt) | 2013-10-03 | 2013-10-03 | método implementado por computador, método implementado por computador para perfurar um furo de poço, sistema, e, meio legível por computador |
Country Status (11)
Country | Link |
---|---|
US (1) | US10570663B2 (pt) |
CN (1) | CN105637525A (pt) |
AU (1) | AU2013402219B2 (pt) |
BR (1) | BR112016006194A2 (pt) |
CA (1) | CA2923537A1 (pt) |
DE (1) | DE112013007481T5 (pt) |
GB (1) | GB2533877A (pt) |
MX (1) | MX2016003312A (pt) |
RU (1) | RU2016108967A (pt) |
SG (1) | SG11201601686UA (pt) |
WO (1) | WO2015050548A1 (pt) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10401808B2 (en) * | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
US20180314231A1 (en) * | 2017-05-01 | 2018-11-01 | Honeywell International Inc. | Method and system for predicting damage of potential input to industrial process |
CN117131708B (zh) * | 2023-10-26 | 2024-01-16 | 中核控制系统工程有限公司 | 核工业dcs设备数字孪生抗震机理模型建模方法及应用 |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US5918217A (en) | 1997-12-10 | 1999-06-29 | Financial Engines, Inc. | User interface for a financial advisory system |
US6393290B1 (en) * | 1999-06-30 | 2002-05-21 | Lucent Technologies Inc. | Cost based model for wireless architecture |
US6853921B2 (en) | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US7904317B1 (en) * | 1999-10-14 | 2011-03-08 | The TriZetto Group | Method and apparatus for repricing a reimbursement claim against a contract |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
AU2001297541A1 (en) | 2000-11-09 | 2002-10-08 | Eastman Chemical Company | Software enabled wizards |
US20030126555A1 (en) * | 2002-01-03 | 2003-07-03 | International Business Machines Corporation | Enhanced attribute prompting in browser clients |
US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US9863240B2 (en) * | 2004-03-11 | 2018-01-09 | M-I L.L.C. | Method and apparatus for drilling a probabilistic approach |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
JP4998214B2 (ja) | 2007-11-02 | 2012-08-15 | ソニー株式会社 | 情報提示システム、情報信号処理装置、情報信号処理方法及び記録媒体 |
GB0820089D0 (en) | 2008-11-01 | 2008-12-10 | Innovation Technology Ltd | note storage and/or dispensing apparatus |
US20120303342A1 (en) * | 2009-05-07 | 2012-11-29 | Randy Doyle Hazlett | Method and system for representing wells in modeling a physical fluid reservoir |
US8532967B2 (en) * | 2009-08-14 | 2013-09-10 | Schlumberger Technology Corporation | Executing a utility in a distributed computing system based on an integrated model |
US9703006B2 (en) | 2010-02-12 | 2017-07-11 | Exxonmobil Upstream Research Company | Method and system for creating history matched simulation models |
US8649980B2 (en) * | 2010-03-05 | 2014-02-11 | Vialogy Llc | Active noise injection computations for improved predictability in oil and gas reservoir characterization and microseismic event analysis |
US8688426B2 (en) * | 2011-08-02 | 2014-04-01 | Saudi Arabian Oil Company | Methods for performing a fully automated workflow for well performance model creation and calibration |
US20130231901A1 (en) * | 2011-09-15 | 2013-09-05 | Zhengang Lu | Well pad placement |
-
2013
- 2013-10-03 MX MX2016003312A patent/MX2016003312A/es unknown
- 2013-10-03 CN CN201380079513.XA patent/CN105637525A/zh active Pending
- 2013-10-03 BR BR112016006194A patent/BR112016006194A2/pt not_active IP Right Cessation
- 2013-10-03 CA CA2923537A patent/CA2923537A1/en not_active Abandoned
- 2013-10-03 WO PCT/US2013/063246 patent/WO2015050548A1/en active Application Filing
- 2013-10-03 SG SG11201601686UA patent/SG11201601686UA/en unknown
- 2013-10-03 GB GB1604178.2A patent/GB2533877A/en not_active Withdrawn
- 2013-10-03 AU AU2013402219A patent/AU2013402219B2/en not_active Ceased
- 2013-10-03 DE DE112013007481.8T patent/DE112013007481T5/de not_active Withdrawn
- 2013-10-03 US US14/909,959 patent/US10570663B2/en not_active Expired - Fee Related
- 2013-10-03 RU RU2016108967A patent/RU2016108967A/ru not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
CA2923537A1 (en) | 2015-04-09 |
US20160201395A1 (en) | 2016-07-14 |
GB201604178D0 (en) | 2016-04-27 |
AU2013402219B2 (en) | 2017-10-12 |
CN105637525A (zh) | 2016-06-01 |
US10570663B2 (en) | 2020-02-25 |
GB2533877A (en) | 2016-07-06 |
DE112013007481T5 (de) | 2016-07-14 |
AU2013402219A1 (en) | 2016-03-24 |
RU2016108967A (ru) | 2017-09-15 |
SG11201601686UA (en) | 2016-04-28 |
MX2016003312A (es) | 2016-09-16 |
WO2015050548A1 (en) | 2015-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112016016831A2 (pt) | método implementado por computador, sistema incluindo memória e um ou mais processadores, e meio legível por computador não transitório | |
NO20171659A1 (en) | Systems and methods for characterizing materials external of a casing | |
MX347822B (es) | Representación geométrica de planos de fractura. | |
BR112015018454A2 (pt) | métodos de condução de evolução direcionada, método de condução de evolução direcionada de moléculas biológicas e sistema de computador. | |
BR112017013667A2 (pt) | aparelho, sistema, e, método para determinação de afastamento. | |
BR112018003885A2 (pt) | método e sistema para estimar a porosidade associada à matéria orgânica, método para avaliar o potencial de produção de um poço ou formação, e, meio legível por computador não transitório | |
BR112016006470A2 (pt) | método para predizer um risco durante operações de perfuração de um poço, e, dispositivo portador de programa não transitório | |
BR112016025340A2 (pt) | configurar fluxos de trabalho em um dispositivo host que operam em um sistema de controle do processo | |
BR112016014598A2 (pt) | método, sistema, e produto de programa de computador | |
MX2015013987A (es) | Analisis discriminante usado con dispositivos informaticos opticos. | |
BR112016001108A2 (pt) | Identificação e extração de blocos de falha em um ou mais corpos que representam uma estrutura geológica | |
BR112016021678A2 (pt) | método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador. | |
GB2536560A (en) | Creating virtual production logging tool profiles for improved history matching | |
TWI561996B (en) | Computing system, computer-implemented method, and non-transitory computer readable media thereof | |
BR112016006621A2 (pt) | método para gerenciar um risco predeterminado durante as operações de perfuração de um poço e dispositivo transportador de programa não transitório tangível | |
BR112014017203A2 (pt) | método, sistema de computador e meio não transitório de leitura por computador | |
BR112015007522A2 (pt) | dispositivo de computação , método de análise , produto de programa de computador e sistema de computador | |
BR112014014677A2 (pt) | método para realizar simulação de um reservatório de xisto representado por um modelo, produto de programa de computador e método para a perfuração de um ou mais poços no reservatório de xisto | |
WO2014209879A3 (en) | Characterizing porosity distribution from a borehole image | |
MX2015014246A (es) | Modelado de cuencas para yacimientos. | |
BR112014026014A2 (pt) | sistema e método para calibrar permeabilidade para uso em modelagem de reservatório | |
GB2568405A (en) | Point-vector based modeling of petroleum reservoir properties for a gridless reservoir simulation model | |
AR089219A1 (es) | Sistema y metodo para la simulacion flexible y eficiente de densidad de fractura variable en un simulador de yacimiento | |
GB2569900B (en) | Geostatistical analysis of microseismic data in fracture modeling | |
WO2014018414A3 (en) | Stratigraphic modeling using production data density profiles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] | ||
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2482 DE 31-07-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |