BR112014032853B8 - método de controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço - Google Patents

método de controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço

Info

Publication number
BR112014032853B8
BR112014032853B8 BR112014032853A BR112014032853A BR112014032853B8 BR 112014032853 B8 BR112014032853 B8 BR 112014032853B8 BR 112014032853 A BR112014032853 A BR 112014032853A BR 112014032853 A BR112014032853 A BR 112014032853A BR 112014032853 B8 BR112014032853 B8 BR 112014032853B8
Authority
BR
Brazil
Prior art keywords
well
setpoint
pressure
drilling operation
actual
Prior art date
Application number
BR112014032853A
Other languages
English (en)
Other versions
BR112014032853A2 (pt
BR112014032853B1 (pt
Inventor
N Butler Cody
R Lovorn James
s davis Nancy
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Publication of BR112014032853A2 publication Critical patent/BR112014032853A2/pt
Publication of BR112014032853B1 publication Critical patent/BR112014032853B1/pt
Publication of BR112014032853B8 publication Critical patent/BR112014032853B8/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/10Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Drilling And Boring (AREA)
  • Flow Control (AREA)

Abstract

método para controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço. um método para controlar a pressão em um furo de poço, podendo incluir determinar um ponto de ajuste de pressão de poço desejado, adicionar um deslocamento ao ponto de ajuste em resposta a uma pressão de poço real desviando-se do ponto de ajuste por um predeterminado valor, e ajustar um dispositivo de controle de fluxo, desse modo influenciando a pressão de poço real para o ponto de ajuste mais o deslocamento. um sistema de poço podendo incluir um dispositivo de controle de fluxo que variavelmente restringe o fluxo de um furo de poço, e um sistema de controle que determina um desejado ponto de ajuste de pressão de poço, compara o ponto de ajuste com uma pressão de poço real, e adiciona um deslocamento ao ponto de ajuste em resposta a um predeterminado valor de deslocamento entre o ponto de ajuste e a pressão de poço real, por meio do que o sistema de controle ajusta o dispositivo de controle de fluxo e, desse modo, influencia a pressão de poço real para o ponto de ajuste mais o deslocamento.
BR112014032853A 2012-07-02 2012-07-02 método de controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço BR112014032853B8 (pt)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2012/045239 WO2014007798A1 (en) 2012-07-02 2012-07-02 Pressure control in drilling operations with offset applied in response to predetermined conditions

Publications (3)

Publication Number Publication Date
BR112014032853A2 BR112014032853A2 (pt) 2017-06-27
BR112014032853B1 BR112014032853B1 (pt) 2021-01-26
BR112014032853B8 true BR112014032853B8 (pt) 2021-03-30

Family

ID=49882376

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112014032853A BR112014032853B8 (pt) 2012-07-02 2012-07-02 método de controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço

Country Status (11)

Country Link
US (1) US20140290964A1 (pt)
EP (1) EP2867439B1 (pt)
AU (1) AU2012384530B2 (pt)
BR (1) BR112014032853B8 (pt)
CA (1) CA2877702A1 (pt)
DK (1) DK2867439T3 (pt)
MX (1) MX359485B (pt)
NO (1) NO2867439T3 (pt)
RU (1) RU2598661C2 (pt)
SA (1) SA113340678B1 (pt)
WO (1) WO2014007798A1 (pt)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10060208B2 (en) * 2015-02-23 2018-08-28 Weatherford Technology Holdings, Llc Automatic event detection and control while drilling in closed loop systems
CA3072992A1 (en) * 2017-11-29 2019-06-06 Halliburton Energy Services, Inc. Automated pressure control system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4253530A (en) * 1979-10-09 1981-03-03 Dresser Industries, Inc. Method and system for circulating a gas bubble from a well
US5273112A (en) * 1992-12-18 1993-12-28 Halliburton Company Surface control of well annulus pressure
US20020112888A1 (en) * 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
US6484816B1 (en) * 2001-01-26 2002-11-26 Martin-Decker Totco, Inc. Method and system for controlling well bore pressure
US6575244B2 (en) * 2001-07-31 2003-06-10 M-I L.L.C. System for controlling the operating pressures within a subterranean borehole
WO2003071091A1 (en) * 2002-02-20 2003-08-28 Shell Internationale Research Maatschappij B.V. Dynamic annular pressure control apparatus and method
MXPA06001754A (es) * 2003-08-19 2006-05-12 Shell Int Research Sistema y metodo de perforacion.
US20050092523A1 (en) * 2003-10-30 2005-05-05 Power Chokes, L.P. Well pressure control system
US7407019B2 (en) * 2005-03-16 2008-08-05 Weatherford Canada Partnership Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control
US7836973B2 (en) * 2005-10-20 2010-11-23 Weatherford/Lamb, Inc. Annulus pressure control drilling systems and methods
GB2477880B (en) * 2008-12-19 2012-12-19 Halliburton Energy Serv Inc Pressure and flow control in drilling operations
GB0905633D0 (en) * 2009-04-01 2009-05-13 Managed Pressure Operations Ll Apparatus for and method of drilling a subterranean borehole
NO346117B1 (no) * 2010-01-05 2022-02-28 Halliburton Energy Services Inc Brønnkontrollsystemer og fremgangsmåter
BR112013001174A2 (pt) * 2010-08-26 2016-05-31 Halliburton Energy Services Inc "sistema de perfuração para perfuração de pressão gerenciada, e, métodos para controlar uma pressão furo abaixo durante a perfuração, e para controlar uma densidade de circulação equivalente em um poço."

Also Published As

Publication number Publication date
BR112014032853A2 (pt) 2017-06-27
US20140290964A1 (en) 2014-10-02
AU2012384530A1 (en) 2015-02-26
DK2867439T3 (en) 2018-06-14
RU2598661C2 (ru) 2016-09-27
EP2867439A4 (en) 2016-04-27
MX2014015369A (es) 2015-07-06
MX359485B (es) 2018-09-07
CA2877702A1 (en) 2014-01-09
AU2012384530B2 (en) 2016-09-22
BR112014032853B1 (pt) 2021-01-26
NO2867439T3 (pt) 2018-08-11
EP2867439B1 (en) 2018-03-14
SA113340678B1 (ar) 2016-01-27
EP2867439A1 (en) 2015-05-06
RU2015102060A (ru) 2016-08-20
WO2014007798A1 (en) 2014-01-09

Similar Documents

Publication Publication Date Title
BR112014032979A2 (pt) controle de pressão em operações de perfuração com a posição de estrangulamento determinada por uma curva de cv
MX2018002937A (es) Barrenas autoajustables controladas de forma activa y sistemas y métodos relacionados.
EP4265881A3 (en) A method of controlling a downhole flow control device
BR112017008825A2 (pt) método e sistema de direção assistida para um veículo, métodos para controlar um sistema de direção assistida de um veículo e para controlar um veículo, método de substituição de borboleta para um veículo recreativo, e, veículo.
BR112015000705A2 (pt) sistemas e métodos de controle de perfuração
CO2019007086A2 (es) Perforación automatizada basada en modelos antecedentes de la invención
BR112014009094A2 (pt) cabeça de comando com controle de dinâmicas de perfuração integradas
EP2939857A3 (en) Method and apparatus for an adjustable damper
WO2014168674A3 (en) Stabilized directional control systems and methods
BR112012017278A2 (pt) método e sistema para criar modelos de simulação de ajuste de histórico
EP3529130A4 (en) ELECTROHYDRAULIC CONTROL SYSTEM WITH FAILURE PROOF VALVES
GB2532360A (en) Method to optimize drilling efficiency while reducing stick slip
BR112017014039A2 (pt) ?método para monitorar a razão de fluido oleofílico para fluido aquoso de um fluido de perfuração, e, sistema de monitoramento e controle de fluidos de perfuração?.
BR112017027287A2 (pt) sistema integrado de detecção e monitoramento de comunicação sem fio
BR112013012985A2 (pt) cilindro hidráulico de amortecimento, método de controle do mesmo, e máquina de engenharia
BR112015020499A2 (pt) método para controlar a velocidade real de um veículo
BR112018011075A2 (pt) sistema e método de controle para controlar pressão de um circuito hidráulico e meio legível por computador não transitório
BR112017002055A2 (pt) sistema de elevador, sistema de freio para um sistema de elevador e método para o controle de um sistema de freio de um sistema de elevador
MX367803B (es) Sistema de control de cable con flujo de fluido para aplicar fuerza locomotora.
WO2014147327A8 (fr) Procédé de perçage d'une lentille ophtalmique selon une trajectoire hélicoïdale et dispositif de perçage associe
BR112019005339A2 (pt) método para controlar o deslocamento e dispositivo para controlar o deslocamento do veículo
BR112019007738A2 (pt) sistema de resistência ao fluxo variável para uso com um poço subterrâneo e método de controlar variavelmente a resistência do fluxo em um poço
GB2556711A (en) Wellbore control device
MX2014012074A (es) Sistema administrador de operacion para conducir un dispositivo de control de navegacion de acuerdo con un modo de operacion degradado.
BR112014032853B8 (pt) método de controlar pressão em um furo de poço em uma operação de perfuração de poço, e, sistema de poço

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 02/07/2012, OBSERVADAS AS CONDICOES LEGAIS.

B16C Correction of notification of the grant [chapter 16.3 patent gazette]

Free format text: REF. RPI 2612 DE 26/01/2021 QUANTO AO TITULAR.

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 12A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2781 DE 24-04-2024 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.