BR112012017278A2 - método e sistema para criar modelos de simulação de ajuste de histórico - Google Patents

método e sistema para criar modelos de simulação de ajuste de histórico

Info

Publication number
BR112012017278A2
BR112012017278A2 BR112012017278A BR112012017278A BR112012017278A2 BR 112012017278 A2 BR112012017278 A2 BR 112012017278A2 BR 112012017278 A BR112012017278 A BR 112012017278A BR 112012017278 A BR112012017278 A BR 112012017278A BR 112012017278 A2 BR112012017278 A2 BR 112012017278A2
Authority
BR
Brazil
Prior art keywords
objective function
simulation
production history
flow
static
Prior art date
Application number
BR112012017278A
Other languages
English (en)
Inventor
Adedayo S Oyerinde
David Stern
Ganesan Subramanian
Isha Sahni
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of BR112012017278A2 publication Critical patent/BR112012017278A2/pt

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V20/00Geomodelling in general
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/282Application of seismic models, synthetic seismograms
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • G01V2210/663Modeling production-induced effects
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/024Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a parameter or coefficient is automatically adjusted to optimise the performance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • General Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Theoretical Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)

Abstract

método e sistema para criar modelos de simulação de ajuste de histórico. trata-se de um método para ajustar o histórico de produção a simulações de fluxo de inclui identificar uma pluralidade de parâmetros que controlam uma função objetivo medindo a incompatibilidade entre uma resposta de simulação de fluxo em um subespaço de parâmetros e um histórico de produção. um valor é calculado para uma função objetivo e para uma medição estática em cada uma pluralidade de experimentos no subespaço de parâmetros. esses resultados são usados para desenvolver uma relação matemática entre uma ou mais medições estáticas e a função objetivo. durante o subsequente ajustamento do modelo de simulação, uma janela alvo na função objetivo é identificada, e simulações de fluxo são executadas para cada modelo modificado que é previsto a partir da medição geológica estática para produzir uma função objetivo dentro da janela. uma função objetivo de cada simulação de fluxo para o histórico de produção é calculada e o procedimento é iterado ate que a função objetivo esteja dentre de uma faixa alvo.
BR112012017278A 2010-02-12 2010-11-15 método e sistema para criar modelos de simulação de ajuste de histórico BR112012017278A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US30400110P 2010-02-12 2010-02-12
PCT/US2010/056725 WO2011100009A1 (en) 2010-02-12 2010-11-15 Method and system for creating history-matched simulation models

Publications (1)

Publication Number Publication Date
BR112012017278A2 true BR112012017278A2 (pt) 2016-04-26

Family

ID=44368040

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112012017278A BR112012017278A2 (pt) 2010-02-12 2010-11-15 método e sistema para criar modelos de simulação de ajuste de histórico

Country Status (6)

Country Link
US (1) US9703006B2 (pt)
EP (1) EP2534606B1 (pt)
CN (1) CN102754105B (pt)
BR (1) BR112012017278A2 (pt)
CA (1) CA2783787A1 (pt)
WO (1) WO2011100009A1 (pt)

Families Citing this family (114)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7110525B1 (en) 2001-06-25 2006-09-19 Toby Heller Agent training sensitive call routing system
US9372943B2 (en) * 2008-05-05 2016-06-21 Exxonmobil Upstream Research Company Modeling dynamic systems by visualizing and narrowing a parameter space
EP2678718A2 (en) * 2011-02-23 2014-01-01 Total SA Computerized method for the estimation of a value for at least a parameter of a hydrocarbon-producing region, for planning the operation and operating the region
EP2769243A4 (en) * 2011-10-18 2017-03-15 Saudi Arabian Oil Company 4d saturation modeling
CN103975341B (zh) * 2011-10-18 2017-03-15 沙特阿拉伯石油公司 基于4d饱和度模型和仿真模型的储层建模
BR112014009734A2 (pt) * 2011-10-20 2017-04-18 Prad Res & Dev Ltd método para controlar equipamentos de recuperação de hidrocarbonetos de um reservatório
US9244819B2 (en) 2011-10-31 2016-01-26 International Business Machines Corporation Attribute value properties for test selection with cartesian product models
US8452813B2 (en) * 2011-10-31 2013-05-28 International Business Machines Corporation Test planning using attribute value properties
CN107031037B (zh) * 2012-01-24 2020-12-01 史密夫和内修有限公司 多孔结构及其制造方法
US9618639B2 (en) 2012-03-01 2017-04-11 Drilling Info, Inc. Method and system for image-guided fault extraction from a fault-enhanced seismic image
WO2013148900A1 (en) * 2012-03-28 2013-10-03 Geco Technology B.V. Providing an objective function based on variation in predicted data
US9182511B2 (en) 2012-11-04 2015-11-10 Drilling Info, Inc. System and method for reproducibly extracting consistent horizons from seismic images
FR2998397B1 (fr) * 2012-11-20 2015-07-24 Total Sa Procede pour determiner une representation d'un reservoir d'hydrocarbures
US10577895B2 (en) * 2012-11-20 2020-03-03 Drilling Info, Inc. Energy deposit discovery system and method
US9322263B2 (en) 2013-01-29 2016-04-26 Landmark Graphics Corporation Systems and methods for dynamic visualization of fluid velocity in subsurface reservoirs
FR3002270B1 (fr) * 2013-02-21 2015-02-27 Ifp Energies Now Procede d'exploitation d'un reservoir geologique au moyen d'un modele de reservoir cale et coherent vis a vis des proprietes d'ecoulement
US9229127B2 (en) 2013-02-21 2016-01-05 Saudi Arabian Oil Company Methods program code, computer readable media, and apparatus for predicting matrix permeability by optimization and variance correction of K-nearest neighbors
US10853893B2 (en) 2013-04-17 2020-12-01 Drilling Info, Inc. System and method for automatically correlating geologic tops
US10459098B2 (en) 2013-04-17 2019-10-29 Drilling Info, Inc. System and method for automatically correlating geologic tops
AU2013389972A1 (en) * 2013-05-24 2015-10-29 Halliburton Energy Services, Inc. Methods and systems for reservoir history matching for improved estimation of reservoir performance
CA2914272C (en) * 2013-07-05 2018-06-12 Landmark Graphics Corporation Hybrid approach to assisted history matching in large reservoirs
CA2916364A1 (en) * 2013-07-29 2015-02-05 Landmark Graphics Corporation Reservoir history matching
RU2016105167A (ru) * 2013-09-16 2017-08-22 Лэндмарк Графикс Корпорейшн Псевдофазовое моделирование добычи: способ обработки сигнала для оценки квази-многофазового течения при добыче с помощью управляемых моделей последовательной аналоговой ступенчатой функции относительной проницаемости при моделировании течения в коллекторе для ранжирования множества петрофизических реализаций
DE112013007436T5 (de) * 2013-09-16 2016-06-09 Landmark Graphics Corporation Umkehrung der relativen Permeabilität aus historischen Förderdaten unter Verwendung vonstufenfunktionsförmigen, gegenüber Viskositätsverhältnissen invarianten Approximationen der relativenPermeabilität
CA2921494A1 (en) * 2013-09-16 2015-03-19 Landmark Graphics Corporation Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlledmodels in reservoir flow simulation
DE112013007481T5 (de) * 2013-10-03 2016-07-14 Landmark Graphics Corporation Sensitivitätsanlayse für die Modellierung von Kohlenwasserstofflagerstätten
WO2015072883A1 (en) * 2013-11-18 2015-05-21 Baker Hughes Incorporated Methods of transient em data compression
AU2014357650B2 (en) 2013-12-04 2018-08-02 Schlumberger Technology B.V. Tuning digital core analysis to laboratory results
CA2931805C (en) * 2013-12-05 2022-07-12 Cgg Services Sa Methods and systems of detecting a microseismic event using an iterative non-linear inversion algorithm
US9958571B2 (en) 2013-12-30 2018-05-01 Saudi Arabian Oil Company Machines for reservoir simulation with automated well completions and reservoir grid data quality assurance
US11028449B2 (en) 2013-12-31 2021-06-08 Biota Technology, Inc. Microbiome based systems, apparatus and methods for monitoring and controlling industrial processes and systems
US11047232B2 (en) * 2013-12-31 2021-06-29 Biota Technology, Inc Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons
US10233727B2 (en) * 2014-07-30 2019-03-19 International Business Machines Corporation Induced control excitation for enhanced reservoir flow characterization
US10995592B2 (en) * 2014-09-30 2021-05-04 Exxonmobil Upstream Research Company Method and system for analyzing the uncertainty of subsurface model
US10385686B2 (en) 2014-10-28 2019-08-20 Eog Resources, Inc. Completions index analysis
US10385670B2 (en) * 2014-10-28 2019-08-20 Eog Resources, Inc. Completions index analysis
US9732593B2 (en) * 2014-11-05 2017-08-15 Saudi Arabian Oil Company Systems, methods, and computer medium to optimize storage for hydrocarbon reservoir simulation
GB2533847B (en) * 2014-11-06 2017-04-05 Logined Bv Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory
US9911210B1 (en) 2014-12-03 2018-03-06 Drilling Info, Inc. Raster log digitization system and method
US10822922B2 (en) 2015-01-19 2020-11-03 International Business Machines Corporation Resource identification using historic well data
US10934813B2 (en) * 2015-03-05 2021-03-02 Halliburton Energy Services, Inc. Method to optimize oilfield operations based on large and complex data sets
CN106156389A (zh) * 2015-04-17 2016-11-23 普拉德研究及开发股份有限公司 用于自动执行的井规划
US11487915B2 (en) * 2015-06-29 2022-11-01 Onesubsea Ip Uk Limited Integrated modeling using multiple subsurface models
GB2556731B (en) * 2015-08-21 2021-02-03 Halliburton Energy Services Inc Method and apparatus for production logging tool (PLT) results interpretation
US10908316B2 (en) 2015-10-15 2021-02-02 Drilling Info, Inc. Raster log digitization system and method
US10082006B2 (en) 2015-10-26 2018-09-25 International Business Machines Corporation Reduced space clustering representatives and its application to long term prediction
US20180276779A1 (en) * 2015-12-18 2018-09-27 Hitachi, Ltd. Model Determination Devices and Model Determination Methods
US10359542B2 (en) * 2016-01-22 2019-07-23 Saudi Arabian Oil Company Generating dynamically calibrated geo-models in green fields
WO2017165949A1 (en) * 2016-03-30 2017-10-05 Nexen Energy Ulc Methods, systems and devices for modelling reservoir properties
US10713398B2 (en) * 2016-05-23 2020-07-14 Saudi Arabian Oil Company Iterative and repeatable workflow for comprehensive data and processes integration for petroleum exploration and production assessments
WO2017222540A1 (en) * 2016-06-24 2017-12-28 Schlumberger Technology Corporation Drilling measurement valuation
US10188291B2 (en) 2016-09-08 2019-01-29 Howard P. Apple Device for screening convergence insufficiency and related methods
GB2556621B (en) * 2016-09-30 2020-03-25 Equinor Energy As Improved structural modelling
CA3030180A1 (en) * 2016-10-14 2018-04-19 Conocophillips Company Connectivity based approach for field development optimization
US10698320B2 (en) * 2016-12-14 2020-06-30 Taiwan Semiconductor Manufacturing Co., Ltd. Method for optimized wafer process simulation
WO2018194598A1 (en) * 2017-04-19 2018-10-25 Halliburton Energy Services, Inc. Statistics and physics-based modeling of wellbore treatment operations
US10767471B2 (en) * 2017-05-18 2020-09-08 Conocophillips Company Resource density screening tool
US10802177B2 (en) 2017-10-16 2020-10-13 Baker Hughes, A Ge Company, Llc Evaluating hydrocarbon reserves using tool response models
US20210165938A1 (en) * 2017-12-14 2021-06-03 Schlumberger Technology Corporation System and Method for Simulating Reservoir Models
CN109973071A (zh) * 2017-12-22 2019-07-05 中国石油天然气股份有限公司 碳酸盐岩连通单元连通关系判定方法和装置
EP3729301A1 (en) * 2017-12-22 2020-10-28 Global Life Sciences Solutions USA LLC Method, apparatus, system and computer program product relating to filtration process
WO2019132987A1 (en) * 2017-12-29 2019-07-04 Landmark Graphics Corporation Modeling complex basin fill utilzing known shoreline data
CN109989744B (zh) * 2017-12-29 2022-05-10 中国石油天然气股份有限公司 碳酸盐岩多套储集体油井生产压差的计算方法和装置
US11126762B2 (en) * 2018-02-28 2021-09-21 Saudi Arabian Oil Company Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
US10878345B2 (en) * 2018-04-22 2020-12-29 Sas Institute Inc. Tool for hyperparameter tuning
US11561690B2 (en) 2018-04-22 2023-01-24 Jmp Statistical Discovery Llc Interactive graphical user interface for customizable combinatorial test construction
US11328106B2 (en) 2018-04-22 2022-05-10 Sas Institute Inc. Data set generation for performance evaluation
US11143879B2 (en) * 2018-05-25 2021-10-12 Samsung Electronics Co., Ltd. Semi-dense depth estimation from a dynamic vision sensor (DVS) stereo pair and a pulsed speckle pattern projector
US20200041692A1 (en) 2018-07-31 2020-02-06 Jan Schmedes Detecting Fluid Types Using Petrophysical Inversion
US12018554B2 (en) 2018-09-06 2024-06-25 American University Of Beirut Black hole particle swarm optimization for optimal well placement in field development planning and methods of use
CN111119835A (zh) * 2018-11-01 2020-05-08 中国石油化工股份有限公司 一种随钻工况识别方法及系统
CN109469465B (zh) * 2018-11-14 2021-06-04 中国石油天然气股份有限公司 注水井参数的处理方法、装置及存储介质
GB2594613B (en) * 2019-03-04 2022-10-26 Landmark Graphics Corp Multi-objective completion parameters optimization for a wellbore using Bayesian optimization
US11105944B2 (en) * 2019-04-30 2021-08-31 Chevron U.S.A. Inc. System and method for lateral statistical estimation of rock and fluid properties in a subsurface formation
CN110929437B (zh) * 2019-10-28 2024-01-05 温州大学 基于响应面的动铁式比例电磁铁恒力预测方法
US11501038B2 (en) * 2019-10-31 2022-11-15 Saudi Arabian Oil Company Dynamic calibration of reservoir simulation models using pattern recognition
US11499397B2 (en) * 2019-10-31 2022-11-15 Saudi Arabian Oil Company Dynamic calibration of reservoir simulation models using flux conditioning
CN112949888A (zh) * 2019-12-11 2021-06-11 顺丰科技有限公司 件量预测模型训练以及件量预测方法、装置和计算机设备
US11680465B2 (en) 2019-12-23 2023-06-20 Saudi Arabian Oil Company Systems and methods for multiscale sector hydrocarbon reservoir simulation
CN111274689B (zh) * 2020-01-16 2021-03-02 中国地质大学(北京) 在历史拟合中寻求储层物性组合的非唯一解的方法及设备
US11754746B2 (en) * 2020-02-21 2023-09-12 Saudi Arabian Oil Company Systems and methods for creating 4D guided history matched models
US11261707B2 (en) 2020-03-27 2022-03-01 Saudi Arabian Oil Company Method and system for well assignment in a reservoir simulation based on well activity
US11846741B2 (en) 2020-04-06 2023-12-19 Saudi Arabian Oil Company Systems and methods for evaluating a simulation model of a hydrocarbon field
CN111535787B (zh) * 2020-04-09 2022-02-22 中国石油化工股份有限公司 高含水油藏动态渗流界面的判识模型及判识界限构建方法
US11775705B2 (en) 2020-04-23 2023-10-03 Saudi Arabian Oil Company Reservoir simulation model history matching update using a one-step procedure
CN111539118B (zh) * 2020-04-29 2023-04-25 昆船智能技术股份有限公司 一种环行穿梭车系统的仿真计算方法及计算机程序产品
US11586790B2 (en) * 2020-05-06 2023-02-21 Saudi Arabian Oil Company Determining hydrocarbon production sweet spots
US11352873B2 (en) 2020-05-11 2022-06-07 Saudi Arabian Oil Company System and method to identify water management candidates at asset level
US11867054B2 (en) 2020-05-11 2024-01-09 Saudi Arabian Oil Company Systems and methods for estimating well parameters and drilling wells
US11713666B2 (en) 2020-05-11 2023-08-01 Saudi Arabian Oil Company Systems and methods for determining fluid saturation associated with reservoir depths
US11802989B2 (en) * 2020-05-11 2023-10-31 Saudi Arabian Oil Company Systems and methods for generating vertical and lateral heterogeneity indices of reservoirs
CN113700458B (zh) * 2020-05-22 2023-08-22 中国石油天然气股份有限公司 油田注水系统能耗优化方法及装置
US20220027616A1 (en) * 2020-07-21 2022-01-27 Saudi Arabian Oil Company Systems and methods for reservoir history matching quality assessment and visualization
CN111858815B (zh) * 2020-07-22 2024-01-26 江苏省基础地理信息中心 基于语义和连通性的面状水系分级、制图方法、系统
US11740386B2 (en) * 2020-07-30 2023-08-29 Chevron U.S.A. Inc. Determination of representative wells to characterize subsurface regions
US20220075915A1 (en) * 2020-09-09 2022-03-10 Landmark Graphics Corporation Automated reservoir model prediction using ml/ai intergrating seismic, well log and production data
GB2606343A (en) * 2020-09-09 2022-11-09 Landmark Graphics Corp Automated reservoir model prediction using ML/AI integrating seismic, well log, and production data
EP4217905A1 (en) * 2020-09-23 2023-08-02 Services Pétroliers Schlumberger Machine-learning calibration for petroleum system modeling
CN112329144B (zh) * 2020-11-04 2023-08-08 武汉第二船舶设计研究所(中国船舶重工集团公司第七一九研究所) 适用于船海装备的数值模型预测系统及预测方法
WO2022103801A1 (en) * 2020-11-13 2022-05-19 Chevron U.S.A. Inc. Well correlation through intermediary well
AU2021377807B2 (en) * 2020-11-13 2024-04-04 Chevron U.S.A., Inc. Subsurface characterization based on multiple correlation scenarios
AU2021380731B2 (en) * 2020-11-13 2024-02-01 Chevron U.S.A. Inc. Visualization of directional influence of wells on correlation
CN114687715A (zh) * 2020-12-25 2022-07-01 苏州国双软件有限公司 一种用于控制油田注水系统的方法及装置
US11668847B2 (en) 2021-01-04 2023-06-06 Saudi Arabian Oil Company Generating synthetic geological formation images based on rock fragment images
WO2022170359A1 (en) * 2021-02-05 2022-08-11 Schlumberger Technology Corporation Reservoir modeling and well placement using machine learning
RU2754741C1 (ru) * 2021-03-12 2021-09-07 Общество с ограниченной ответственностью «Газпромнефть Научно-Технический Центр» (ООО «Газпромнефть НТЦ») Способ адаптации геолого-гидродинамической модели пласта
CN113256051B (zh) * 2021-03-16 2023-01-20 贵州电网有限责任公司 一种启发式发电机组检修计划的编制处理方法
WO2022251875A1 (en) * 2021-05-27 2022-12-01 Schlumberger Technology Corporation Machine learning proxy model for parameter tuning in oilfield production operations
US11578596B2 (en) 2021-07-08 2023-02-14 Saudi Arabian Oil Company Constrained natural fracture parameter hydrocarbon reservoir development
CN114329905B (zh) * 2021-12-03 2022-12-23 国家电投集团科学技术研究院有限公司 全范围模拟机可信度评估方法、装置及计算机设备
US11613957B1 (en) 2022-01-28 2023-03-28 Saudi Arabian Oil Company Method and system for high shut-in pressure wells
US20230297742A1 (en) * 2022-03-21 2023-09-21 C3.Ai, Inc. Artificial intelligence-based system implementing proxy models for physics-based simulators
CN115048886B (zh) * 2022-08-12 2022-11-01 阿里巴巴(中国)有限公司 设计参数调整方法、装置、电子设备和存储介质
CN115114538B (zh) * 2022-08-29 2023-09-15 伊苏林迪(北京)文化科技有限公司 一种公共空间的动态引流方法、装置、设备及存储介质

Family Cites Families (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5871047A (en) 1996-08-14 1999-02-16 Schlumberger Technology Corporation Method for determining well productivity using automatic downtime data
FR2765708B1 (fr) 1997-07-04 1999-09-10 Inst Francais Du Petrole Methode pour determiner des parametres hydrauliques representatifs a grande echelle d'un milieu fissure
US6826483B1 (en) 1999-10-13 2004-11-30 The Trustees Of Columbia University In The City Of New York Petroleum reservoir simulation and characterization system and method
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US7369973B2 (en) 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
US7043413B2 (en) 2000-06-29 2006-05-09 Object Reservoir, Inc. Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing
DZ3287A1 (fr) 2000-10-04 2002-04-11 Sofitech Nv Methodologie d'optimisation de la production pour reservoirs de melange multicouches au moyen de donnees de performances pour reservoirs de melange et d'informations diagraphiques de production
FR2818742B1 (fr) 2000-12-22 2003-02-14 Inst Francais Du Petrole Methode pour former un module a reseaux neuronaux optimise, destine a simuler le mode d'ecoulement d'une veine de fluides polyphasiques
FR2823877B1 (fr) 2001-04-19 2004-12-24 Inst Francais Du Petrole Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
US20040230404A1 (en) * 2002-08-19 2004-11-18 Messmer Richard Paul System and method for optimizing simulation of a discrete event process using business system data
US7835893B2 (en) 2003-04-30 2010-11-16 Landmark Graphics Corporation Method and system for scenario and case decision management
US7539625B2 (en) 2004-03-17 2009-05-26 Schlumberger Technology Corporation Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
CA2538577C (en) * 2003-09-30 2010-08-03 Exxonmobil Upstream Research Company Characterizing connectivity in reservoir models using paths of least resistance
US7725302B2 (en) 2003-12-02 2010-05-25 Schlumberger Technology Corporation Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
CN1898675A (zh) * 2004-01-30 2007-01-17 埃克森美孚上游研究公司 储层模型建立方法
US7783462B2 (en) 2004-01-30 2010-08-24 Exxonmobil Upstream Research Co. Reservoir evaluation methods
US7114557B2 (en) 2004-02-03 2006-10-03 Schlumberger Technology Corporation System and method for optimizing production in an artificially lifted well
US7999695B2 (en) 2004-03-03 2011-08-16 Halliburton Energy Services, Inc. Surface real-time processing of downhole data
US7548873B2 (en) 2004-03-17 2009-06-16 Schlumberger Technology Corporation Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software
FR2874706B1 (fr) 2004-08-30 2006-12-01 Inst Francais Du Petrole Methode de modelisation de la production d'un gisement petrolier
US7225078B2 (en) 2004-11-03 2007-05-29 Halliburton Energy Services, Inc. Method and system for predicting production of a well
US7596480B2 (en) 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations
US7277796B2 (en) 2005-04-26 2007-10-02 Schlumberger Technology Corporation System and methods of characterizing a hydrocarbon reservoir
MX2007014799A (es) 2005-05-26 2008-02-19 Exxonmobil Upstream Res Co Un metodo rapido para analisis de conectividad de deposito utilizando un metodo de marcha rapida.
FR2886740B1 (fr) 2005-06-03 2007-09-28 Inst Francais Du Petrole Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
US20070016389A1 (en) * 2005-06-24 2007-01-18 Cetin Ozgen Method and system for accelerating and improving the history matching of a reservoir simulation model
FR2890453B1 (fr) 2005-09-05 2007-10-19 Inst Francais Du Petrole Methode pour mettre a jour un modele geologique de reservoir a l'aide de donnees dynamiques
US7369979B1 (en) 2005-09-12 2008-05-06 John Paul Spivey Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production
US7584081B2 (en) 2005-11-21 2009-09-01 Chevron U.S.A. Inc. Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter
US8504341B2 (en) * 2006-01-31 2013-08-06 Landmark Graphics Corporation Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
CA2640725C (en) 2006-01-31 2016-05-31 Landmark Graphics Corporation Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators
US7805283B2 (en) 2006-02-17 2010-09-28 Schlumberger Technology Corporation Method for history matching a simulation model using self organizing maps to generate regions in the simulation model
EP1994488B1 (en) 2006-03-02 2013-07-17 ExxonMobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
US20070274155A1 (en) 2006-05-25 2007-11-29 Ikelle Luc T Coding and Decoding: Seismic Data Modeling, Acquisition and Processing
WO2008028122A2 (en) * 2006-09-01 2008-03-06 Chevron U.S.A. Inc. History matching and forecasting in the production of hydrocarbons
US9043188B2 (en) 2006-09-01 2015-05-26 Chevron U.S.A. Inc. System and method for forecasting production from a hydrocarbon reservoir
US7657494B2 (en) 2006-09-20 2010-02-02 Chevron U.S.A. Inc. Method for forecasting the production of a petroleum reservoir utilizing genetic programming
AU2007339997A1 (en) 2006-12-28 2008-07-10 Chevron U.S.A. Inc. History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions
FR2914434B1 (fr) 2007-03-30 2009-05-22 Inst Francais Du Petrole Methode de calage d'historique d'un modele geologique par modification graduelle des proportions des facies lithologiques
US8244509B2 (en) 2007-08-01 2012-08-14 Schlumberger Technology Corporation Method for managing production from a hydrocarbon producing reservoir in real-time
US8285532B2 (en) 2008-03-14 2012-10-09 Schlumberger Technology Corporation Providing a simplified subterranean model
US8793111B2 (en) * 2009-01-20 2014-07-29 Schlumberger Technology Corporation Automated field development planning
US7966166B2 (en) 2008-04-18 2011-06-21 Schlumberger Technology Corp. Method for determining a set of net present values to influence the drilling of a wellbore and increase production
FR2935177B1 (fr) 2008-08-19 2010-10-29 Inst Francais Du Petrole Methode de calage d'historique de reservoir petrolier au moyen de parametrisations locales
US20100076740A1 (en) 2008-09-08 2010-03-25 Schlumberger Technology Corporation System and method for well test design and interpretation
FR2947345B1 (fr) 2009-06-26 2011-07-15 Inst Francais Du Petrole Methode pour modifier des proportions de facies lors du calage d'historique d'un modele geologique
FR2949586B1 (fr) 2009-08-26 2011-09-23 Inst Francais Du Petrole Methode pour exploiter un reservoir petrolier a partir d'un calage d'historique optimise
US9223042B2 (en) 2009-09-25 2015-12-29 Landmark Graphics Corporation Systems and methods for the quantitative estimate of production-forecast uncertainty
US8412501B2 (en) 2010-06-16 2013-04-02 Foroil Production simulator for simulating a mature hydrocarbon field
FR2966865B1 (fr) 2010-10-28 2015-05-15 IFP Energies Nouvelles Procede d'exploitation d'un gisement petrolier a partir d'un calage d'historique des donnees de production et de donnees sismiques.
US9747393B2 (en) * 2011-02-09 2017-08-29 Exxonmobil Upstream Research Company Methods and systems for upscaling mechanical properties of geomaterials
US10545260B2 (en) 2011-04-15 2020-01-28 Conocophillips Company Updating geological facies models using the Ensemble Kalman filter

Also Published As

Publication number Publication date
US20120253770A1 (en) 2012-10-04
EP2534606A1 (en) 2012-12-19
WO2011100009A1 (en) 2011-08-18
EP2534606B1 (en) 2019-02-27
US9703006B2 (en) 2017-07-11
CN102754105A (zh) 2012-10-24
EP2534606A4 (en) 2017-12-13
CN102754105B (zh) 2016-05-25
CA2783787A1 (en) 2011-08-18

Similar Documents

Publication Publication Date Title
BR112012017278A2 (pt) método e sistema para criar modelos de simulação de ajuste de histórico
BR102015009550A8 (pt) Método para otimizar a operação de um parque eólico
BR112017025555A2 (pt) sistema e método para monitoramento em tempo real e estimativa de desempenho de produção de sistema de poço inteligente
WO2018224948A3 (en) MEMORY PROTECTION FOR CONTROL DEVICE SECURITY
MX2017016783A (es) Método para la detección de anomalías en un sistema de distribución de agua.
BR112016002946A2 (pt) sistemas e métodos de calibragem de elementos computacionais integrados
BR112015026401A2 (pt) controle de redes de fluxo
BR112016025340A2 (pt) configurar fluxos de trabalho em um dispositivo host que operam em um sistema de controle do processo
PH12013000300B1 (en) Method for determining and tuning process characteristic parameters using a simulation system
BR112016011902A2 (pt) Método e sistema de controle de equipamento de perfuração de fundo de poço, e, meio de armazenamento legível por computador
BR112014030607A2 (pt) métodos e aparelhos para controlar e/ou monitorar um atuador pneumático
BR112017009953B8 (pt) Sistema de produção de energia e método para controle automatizado de um sistema de produção de energia
BR112017014039A2 (pt) ?método para monitorar a razão de fluido oleofílico para fluido aquoso de um fluido de perfuração, e, sistema de monitoramento e controle de fluidos de perfuração?.
BR112014032101A2 (pt) computador configurado para estimar um parâmetro de movimentos para o movimento de um objeto móvel, determinador paramétrico de movimento de um objeto, e método automatizado realizado por computador
BR102015013229B8 (pt) Sistema de controle para um veículo agrícola e método para calibrar o alinhamento de uma saída do transportador de um veículo agrícola com um compartimento de armazenamento
BR112015032888A2 (pt) sistemas e métodos para criar e implementar um agente ou sistema de inteligência artificial
GB2536560A (en) Creating virtual production logging tool profiles for improved history matching
MX2016006825A (es) Control de operaciones de pozos.
BR112017013140A2 (pt) método implementado por computador e sistema de modelagem em mesoescala
MX2015007066A (es) Control de perforacion con presion controlada.
BR112018012996A2 (pt) ?método para modelagem de uma formação subterrânea, e, sistema de perfilagem?
BR112015005462A2 (pt) aparelho e método para controlar a execução de uma tarefa de processo dentro de uma configuração de um sistema de controle de biorreator, e, meio de armazenamento acessível por máquina tangível
WO2015185696A3 (en) Method of estimating well productivity along a section of a wellbore
BR112015021666A2 (pt) Método implantado por computador para atualizar uma estimativa para uma propriedade de material de um volume e sistema de computador para atualizar uma estimativa para uma propriedade de material de um volume
BR112018067462A2 (pt) sistema de controle e método de controle para sistema de ddr

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B09B Patent application refused [chapter 9.2 patent gazette]
B09B Patent application refused [chapter 9.2 patent gazette]

Free format text: MANTIDO O INDEFERIMENTO UMA VEZ QUE NAO FOI APRESENTADO RECURSO DENTRO DO PRAZO LEGAL