BR112012017278A2 - método e sistema para criar modelos de simulação de ajuste de histórico - Google Patents
método e sistema para criar modelos de simulação de ajuste de históricoInfo
- Publication number
- BR112012017278A2 BR112012017278A2 BR112012017278A BR112012017278A BR112012017278A2 BR 112012017278 A2 BR112012017278 A2 BR 112012017278A2 BR 112012017278 A BR112012017278 A BR 112012017278A BR 112012017278 A BR112012017278 A BR 112012017278A BR 112012017278 A2 BR112012017278 A2 BR 112012017278A2
- Authority
- BR
- Brazil
- Prior art keywords
- objective function
- simulation
- production history
- flow
- static
- Prior art date
Links
- 238000004088 simulation Methods 0.000 title abstract 7
- 238000000034 method Methods 0.000 title abstract 4
- 238000005259 measurement Methods 0.000 abstract 3
- 230000003068 static effect Effects 0.000 abstract 3
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. for interpretation or for event detection
- G01V1/282—Application of seismic models, synthetic seismograms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
- G01V2210/663—Modeling production-induced effects
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/0205—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
- G05B13/024—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a parameter or coefficient is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- General Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Theoretical Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Abstract
método e sistema para criar modelos de simulação de ajuste de histórico. trata-se de um método para ajustar o histórico de produção a simulações de fluxo de inclui identificar uma pluralidade de parâmetros que controlam uma função objetivo medindo a incompatibilidade entre uma resposta de simulação de fluxo em um subespaço de parâmetros e um histórico de produção. um valor é calculado para uma função objetivo e para uma medição estática em cada uma pluralidade de experimentos no subespaço de parâmetros. esses resultados são usados para desenvolver uma relação matemática entre uma ou mais medições estáticas e a função objetivo. durante o subsequente ajustamento do modelo de simulação, uma janela alvo na função objetivo é identificada, e simulações de fluxo são executadas para cada modelo modificado que é previsto a partir da medição geológica estática para produzir uma função objetivo dentro da janela. uma função objetivo de cada simulação de fluxo para o histórico de produção é calculada e o procedimento é iterado ate que a função objetivo esteja dentre de uma faixa alvo.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US30400110P | 2010-02-12 | 2010-02-12 | |
PCT/US2010/056725 WO2011100009A1 (en) | 2010-02-12 | 2010-11-15 | Method and system for creating history-matched simulation models |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112012017278A2 true BR112012017278A2 (pt) | 2016-04-26 |
Family
ID=44368040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112012017278A BR112012017278A2 (pt) | 2010-02-12 | 2010-11-15 | método e sistema para criar modelos de simulação de ajuste de histórico |
Country Status (6)
Country | Link |
---|---|
US (1) | US9703006B2 (pt) |
EP (1) | EP2534606B1 (pt) |
CN (1) | CN102754105B (pt) |
BR (1) | BR112012017278A2 (pt) |
CA (1) | CA2783787A1 (pt) |
WO (1) | WO2011100009A1 (pt) |
Families Citing this family (114)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7110525B1 (en) | 2001-06-25 | 2006-09-19 | Toby Heller | Agent training sensitive call routing system |
US9372943B2 (en) * | 2008-05-05 | 2016-06-21 | Exxonmobil Upstream Research Company | Modeling dynamic systems by visualizing and narrowing a parameter space |
EP2678718A2 (en) * | 2011-02-23 | 2014-01-01 | Total SA | Computerized method for the estimation of a value for at least a parameter of a hydrocarbon-producing region, for planning the operation and operating the region |
EP2769243A4 (en) * | 2011-10-18 | 2017-03-15 | Saudi Arabian Oil Company | 4d saturation modeling |
CN103975341B (zh) * | 2011-10-18 | 2017-03-15 | 沙特阿拉伯石油公司 | 基于4d饱和度模型和仿真模型的储层建模 |
BR112014009734A2 (pt) * | 2011-10-20 | 2017-04-18 | Prad Res & Dev Ltd | método para controlar equipamentos de recuperação de hidrocarbonetos de um reservatório |
US9244819B2 (en) | 2011-10-31 | 2016-01-26 | International Business Machines Corporation | Attribute value properties for test selection with cartesian product models |
US8452813B2 (en) * | 2011-10-31 | 2013-05-28 | International Business Machines Corporation | Test planning using attribute value properties |
CN107031037B (zh) * | 2012-01-24 | 2020-12-01 | 史密夫和内修有限公司 | 多孔结构及其制造方法 |
US9618639B2 (en) | 2012-03-01 | 2017-04-11 | Drilling Info, Inc. | Method and system for image-guided fault extraction from a fault-enhanced seismic image |
WO2013148900A1 (en) * | 2012-03-28 | 2013-10-03 | Geco Technology B.V. | Providing an objective function based on variation in predicted data |
US9182511B2 (en) | 2012-11-04 | 2015-11-10 | Drilling Info, Inc. | System and method for reproducibly extracting consistent horizons from seismic images |
FR2998397B1 (fr) * | 2012-11-20 | 2015-07-24 | Total Sa | Procede pour determiner une representation d'un reservoir d'hydrocarbures |
US10577895B2 (en) * | 2012-11-20 | 2020-03-03 | Drilling Info, Inc. | Energy deposit discovery system and method |
US9322263B2 (en) | 2013-01-29 | 2016-04-26 | Landmark Graphics Corporation | Systems and methods for dynamic visualization of fluid velocity in subsurface reservoirs |
FR3002270B1 (fr) * | 2013-02-21 | 2015-02-27 | Ifp Energies Now | Procede d'exploitation d'un reservoir geologique au moyen d'un modele de reservoir cale et coherent vis a vis des proprietes d'ecoulement |
US9229127B2 (en) | 2013-02-21 | 2016-01-05 | Saudi Arabian Oil Company | Methods program code, computer readable media, and apparatus for predicting matrix permeability by optimization and variance correction of K-nearest neighbors |
US10853893B2 (en) | 2013-04-17 | 2020-12-01 | Drilling Info, Inc. | System and method for automatically correlating geologic tops |
US10459098B2 (en) | 2013-04-17 | 2019-10-29 | Drilling Info, Inc. | System and method for automatically correlating geologic tops |
AU2013389972A1 (en) * | 2013-05-24 | 2015-10-29 | Halliburton Energy Services, Inc. | Methods and systems for reservoir history matching for improved estimation of reservoir performance |
CA2914272C (en) * | 2013-07-05 | 2018-06-12 | Landmark Graphics Corporation | Hybrid approach to assisted history matching in large reservoirs |
CA2916364A1 (en) * | 2013-07-29 | 2015-02-05 | Landmark Graphics Corporation | Reservoir history matching |
RU2016105167A (ru) * | 2013-09-16 | 2017-08-22 | Лэндмарк Графикс Корпорейшн | Псевдофазовое моделирование добычи: способ обработки сигнала для оценки квази-многофазового течения при добыче с помощью управляемых моделей последовательной аналоговой ступенчатой функции относительной проницаемости при моделировании течения в коллекторе для ранжирования множества петрофизических реализаций |
DE112013007436T5 (de) * | 2013-09-16 | 2016-06-09 | Landmark Graphics Corporation | Umkehrung der relativen Permeabilität aus historischen Förderdaten unter Verwendung vonstufenfunktionsförmigen, gegenüber Viskositätsverhältnissen invarianten Approximationen der relativenPermeabilität |
CA2921494A1 (en) * | 2013-09-16 | 2015-03-19 | Landmark Graphics Corporation | Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlledmodels in reservoir flow simulation |
DE112013007481T5 (de) * | 2013-10-03 | 2016-07-14 | Landmark Graphics Corporation | Sensitivitätsanlayse für die Modellierung von Kohlenwasserstofflagerstätten |
WO2015072883A1 (en) * | 2013-11-18 | 2015-05-21 | Baker Hughes Incorporated | Methods of transient em data compression |
AU2014357650B2 (en) | 2013-12-04 | 2018-08-02 | Schlumberger Technology B.V. | Tuning digital core analysis to laboratory results |
CA2931805C (en) * | 2013-12-05 | 2022-07-12 | Cgg Services Sa | Methods and systems of detecting a microseismic event using an iterative non-linear inversion algorithm |
US9958571B2 (en) | 2013-12-30 | 2018-05-01 | Saudi Arabian Oil Company | Machines for reservoir simulation with automated well completions and reservoir grid data quality assurance |
US11028449B2 (en) | 2013-12-31 | 2021-06-08 | Biota Technology, Inc. | Microbiome based systems, apparatus and methods for monitoring and controlling industrial processes and systems |
US11047232B2 (en) * | 2013-12-31 | 2021-06-29 | Biota Technology, Inc | Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons |
US10233727B2 (en) * | 2014-07-30 | 2019-03-19 | International Business Machines Corporation | Induced control excitation for enhanced reservoir flow characterization |
US10995592B2 (en) * | 2014-09-30 | 2021-05-04 | Exxonmobil Upstream Research Company | Method and system for analyzing the uncertainty of subsurface model |
US10385686B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
US10385670B2 (en) * | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
US9732593B2 (en) * | 2014-11-05 | 2017-08-15 | Saudi Arabian Oil Company | Systems, methods, and computer medium to optimize storage for hydrocarbon reservoir simulation |
GB2533847B (en) * | 2014-11-06 | 2017-04-05 | Logined Bv | Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory |
US9911210B1 (en) | 2014-12-03 | 2018-03-06 | Drilling Info, Inc. | Raster log digitization system and method |
US10822922B2 (en) | 2015-01-19 | 2020-11-03 | International Business Machines Corporation | Resource identification using historic well data |
US10934813B2 (en) * | 2015-03-05 | 2021-03-02 | Halliburton Energy Services, Inc. | Method to optimize oilfield operations based on large and complex data sets |
CN106156389A (zh) * | 2015-04-17 | 2016-11-23 | 普拉德研究及开发股份有限公司 | 用于自动执行的井规划 |
US11487915B2 (en) * | 2015-06-29 | 2022-11-01 | Onesubsea Ip Uk Limited | Integrated modeling using multiple subsurface models |
GB2556731B (en) * | 2015-08-21 | 2021-02-03 | Halliburton Energy Services Inc | Method and apparatus for production logging tool (PLT) results interpretation |
US10908316B2 (en) | 2015-10-15 | 2021-02-02 | Drilling Info, Inc. | Raster log digitization system and method |
US10082006B2 (en) | 2015-10-26 | 2018-09-25 | International Business Machines Corporation | Reduced space clustering representatives and its application to long term prediction |
US20180276779A1 (en) * | 2015-12-18 | 2018-09-27 | Hitachi, Ltd. | Model Determination Devices and Model Determination Methods |
US10359542B2 (en) * | 2016-01-22 | 2019-07-23 | Saudi Arabian Oil Company | Generating dynamically calibrated geo-models in green fields |
WO2017165949A1 (en) * | 2016-03-30 | 2017-10-05 | Nexen Energy Ulc | Methods, systems and devices for modelling reservoir properties |
US10713398B2 (en) * | 2016-05-23 | 2020-07-14 | Saudi Arabian Oil Company | Iterative and repeatable workflow for comprehensive data and processes integration for petroleum exploration and production assessments |
WO2017222540A1 (en) * | 2016-06-24 | 2017-12-28 | Schlumberger Technology Corporation | Drilling measurement valuation |
US10188291B2 (en) | 2016-09-08 | 2019-01-29 | Howard P. Apple | Device for screening convergence insufficiency and related methods |
GB2556621B (en) * | 2016-09-30 | 2020-03-25 | Equinor Energy As | Improved structural modelling |
CA3030180A1 (en) * | 2016-10-14 | 2018-04-19 | Conocophillips Company | Connectivity based approach for field development optimization |
US10698320B2 (en) * | 2016-12-14 | 2020-06-30 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for optimized wafer process simulation |
WO2018194598A1 (en) * | 2017-04-19 | 2018-10-25 | Halliburton Energy Services, Inc. | Statistics and physics-based modeling of wellbore treatment operations |
US10767471B2 (en) * | 2017-05-18 | 2020-09-08 | Conocophillips Company | Resource density screening tool |
US10802177B2 (en) | 2017-10-16 | 2020-10-13 | Baker Hughes, A Ge Company, Llc | Evaluating hydrocarbon reserves using tool response models |
US20210165938A1 (en) * | 2017-12-14 | 2021-06-03 | Schlumberger Technology Corporation | System and Method for Simulating Reservoir Models |
CN109973071A (zh) * | 2017-12-22 | 2019-07-05 | 中国石油天然气股份有限公司 | 碳酸盐岩连通单元连通关系判定方法和装置 |
EP3729301A1 (en) * | 2017-12-22 | 2020-10-28 | Global Life Sciences Solutions USA LLC | Method, apparatus, system and computer program product relating to filtration process |
WO2019132987A1 (en) * | 2017-12-29 | 2019-07-04 | Landmark Graphics Corporation | Modeling complex basin fill utilzing known shoreline data |
CN109989744B (zh) * | 2017-12-29 | 2022-05-10 | 中国石油天然气股份有限公司 | 碳酸盐岩多套储集体油井生产压差的计算方法和装置 |
US11126762B2 (en) * | 2018-02-28 | 2021-09-21 | Saudi Arabian Oil Company | Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration |
US10878345B2 (en) * | 2018-04-22 | 2020-12-29 | Sas Institute Inc. | Tool for hyperparameter tuning |
US11561690B2 (en) | 2018-04-22 | 2023-01-24 | Jmp Statistical Discovery Llc | Interactive graphical user interface for customizable combinatorial test construction |
US11328106B2 (en) | 2018-04-22 | 2022-05-10 | Sas Institute Inc. | Data set generation for performance evaluation |
US11143879B2 (en) * | 2018-05-25 | 2021-10-12 | Samsung Electronics Co., Ltd. | Semi-dense depth estimation from a dynamic vision sensor (DVS) stereo pair and a pulsed speckle pattern projector |
US20200041692A1 (en) | 2018-07-31 | 2020-02-06 | Jan Schmedes | Detecting Fluid Types Using Petrophysical Inversion |
US12018554B2 (en) | 2018-09-06 | 2024-06-25 | American University Of Beirut | Black hole particle swarm optimization for optimal well placement in field development planning and methods of use |
CN111119835A (zh) * | 2018-11-01 | 2020-05-08 | 中国石油化工股份有限公司 | 一种随钻工况识别方法及系统 |
CN109469465B (zh) * | 2018-11-14 | 2021-06-04 | 中国石油天然气股份有限公司 | 注水井参数的处理方法、装置及存储介质 |
GB2594613B (en) * | 2019-03-04 | 2022-10-26 | Landmark Graphics Corp | Multi-objective completion parameters optimization for a wellbore using Bayesian optimization |
US11105944B2 (en) * | 2019-04-30 | 2021-08-31 | Chevron U.S.A. Inc. | System and method for lateral statistical estimation of rock and fluid properties in a subsurface formation |
CN110929437B (zh) * | 2019-10-28 | 2024-01-05 | 温州大学 | 基于响应面的动铁式比例电磁铁恒力预测方法 |
US11501038B2 (en) * | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using pattern recognition |
US11499397B2 (en) * | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using flux conditioning |
CN112949888A (zh) * | 2019-12-11 | 2021-06-11 | 顺丰科技有限公司 | 件量预测模型训练以及件量预测方法、装置和计算机设备 |
US11680465B2 (en) | 2019-12-23 | 2023-06-20 | Saudi Arabian Oil Company | Systems and methods for multiscale sector hydrocarbon reservoir simulation |
CN111274689B (zh) * | 2020-01-16 | 2021-03-02 | 中国地质大学(北京) | 在历史拟合中寻求储层物性组合的非唯一解的方法及设备 |
US11754746B2 (en) * | 2020-02-21 | 2023-09-12 | Saudi Arabian Oil Company | Systems and methods for creating 4D guided history matched models |
US11261707B2 (en) | 2020-03-27 | 2022-03-01 | Saudi Arabian Oil Company | Method and system for well assignment in a reservoir simulation based on well activity |
US11846741B2 (en) | 2020-04-06 | 2023-12-19 | Saudi Arabian Oil Company | Systems and methods for evaluating a simulation model of a hydrocarbon field |
CN111535787B (zh) * | 2020-04-09 | 2022-02-22 | 中国石油化工股份有限公司 | 高含水油藏动态渗流界面的判识模型及判识界限构建方法 |
US11775705B2 (en) | 2020-04-23 | 2023-10-03 | Saudi Arabian Oil Company | Reservoir simulation model history matching update using a one-step procedure |
CN111539118B (zh) * | 2020-04-29 | 2023-04-25 | 昆船智能技术股份有限公司 | 一种环行穿梭车系统的仿真计算方法及计算机程序产品 |
US11586790B2 (en) * | 2020-05-06 | 2023-02-21 | Saudi Arabian Oil Company | Determining hydrocarbon production sweet spots |
US11352873B2 (en) | 2020-05-11 | 2022-06-07 | Saudi Arabian Oil Company | System and method to identify water management candidates at asset level |
US11867054B2 (en) | 2020-05-11 | 2024-01-09 | Saudi Arabian Oil Company | Systems and methods for estimating well parameters and drilling wells |
US11713666B2 (en) | 2020-05-11 | 2023-08-01 | Saudi Arabian Oil Company | Systems and methods for determining fluid saturation associated with reservoir depths |
US11802989B2 (en) * | 2020-05-11 | 2023-10-31 | Saudi Arabian Oil Company | Systems and methods for generating vertical and lateral heterogeneity indices of reservoirs |
CN113700458B (zh) * | 2020-05-22 | 2023-08-22 | 中国石油天然气股份有限公司 | 油田注水系统能耗优化方法及装置 |
US20220027616A1 (en) * | 2020-07-21 | 2022-01-27 | Saudi Arabian Oil Company | Systems and methods for reservoir history matching quality assessment and visualization |
CN111858815B (zh) * | 2020-07-22 | 2024-01-26 | 江苏省基础地理信息中心 | 基于语义和连通性的面状水系分级、制图方法、系统 |
US11740386B2 (en) * | 2020-07-30 | 2023-08-29 | Chevron U.S.A. Inc. | Determination of representative wells to characterize subsurface regions |
US20220075915A1 (en) * | 2020-09-09 | 2022-03-10 | Landmark Graphics Corporation | Automated reservoir model prediction using ml/ai intergrating seismic, well log and production data |
GB2606343A (en) * | 2020-09-09 | 2022-11-09 | Landmark Graphics Corp | Automated reservoir model prediction using ML/AI integrating seismic, well log, and production data |
EP4217905A1 (en) * | 2020-09-23 | 2023-08-02 | Services Pétroliers Schlumberger | Machine-learning calibration for petroleum system modeling |
CN112329144B (zh) * | 2020-11-04 | 2023-08-08 | 武汉第二船舶设计研究所(中国船舶重工集团公司第七一九研究所) | 适用于船海装备的数值模型预测系统及预测方法 |
WO2022103801A1 (en) * | 2020-11-13 | 2022-05-19 | Chevron U.S.A. Inc. | Well correlation through intermediary well |
AU2021377807B2 (en) * | 2020-11-13 | 2024-04-04 | Chevron U.S.A., Inc. | Subsurface characterization based on multiple correlation scenarios |
AU2021380731B2 (en) * | 2020-11-13 | 2024-02-01 | Chevron U.S.A. Inc. | Visualization of directional influence of wells on correlation |
CN114687715A (zh) * | 2020-12-25 | 2022-07-01 | 苏州国双软件有限公司 | 一种用于控制油田注水系统的方法及装置 |
US11668847B2 (en) | 2021-01-04 | 2023-06-06 | Saudi Arabian Oil Company | Generating synthetic geological formation images based on rock fragment images |
WO2022170359A1 (en) * | 2021-02-05 | 2022-08-11 | Schlumberger Technology Corporation | Reservoir modeling and well placement using machine learning |
RU2754741C1 (ru) * | 2021-03-12 | 2021-09-07 | Общество с ограниченной ответственностью «Газпромнефть Научно-Технический Центр» (ООО «Газпромнефть НТЦ») | Способ адаптации геолого-гидродинамической модели пласта |
CN113256051B (zh) * | 2021-03-16 | 2023-01-20 | 贵州电网有限责任公司 | 一种启发式发电机组检修计划的编制处理方法 |
WO2022251875A1 (en) * | 2021-05-27 | 2022-12-01 | Schlumberger Technology Corporation | Machine learning proxy model for parameter tuning in oilfield production operations |
US11578596B2 (en) | 2021-07-08 | 2023-02-14 | Saudi Arabian Oil Company | Constrained natural fracture parameter hydrocarbon reservoir development |
CN114329905B (zh) * | 2021-12-03 | 2022-12-23 | 国家电投集团科学技术研究院有限公司 | 全范围模拟机可信度评估方法、装置及计算机设备 |
US11613957B1 (en) | 2022-01-28 | 2023-03-28 | Saudi Arabian Oil Company | Method and system for high shut-in pressure wells |
US20230297742A1 (en) * | 2022-03-21 | 2023-09-21 | C3.Ai, Inc. | Artificial intelligence-based system implementing proxy models for physics-based simulators |
CN115048886B (zh) * | 2022-08-12 | 2022-11-01 | 阿里巴巴(中国)有限公司 | 设计参数调整方法、装置、电子设备和存储介质 |
CN115114538B (zh) * | 2022-08-29 | 2023-09-15 | 伊苏林迪(北京)文化科技有限公司 | 一种公共空间的动态引流方法、装置、设备及存储介质 |
Family Cites Families (52)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5871047A (en) | 1996-08-14 | 1999-02-16 | Schlumberger Technology Corporation | Method for determining well productivity using automatic downtime data |
FR2765708B1 (fr) | 1997-07-04 | 1999-09-10 | Inst Francais Du Petrole | Methode pour determiner des parametres hydrauliques representatifs a grande echelle d'un milieu fissure |
US6826483B1 (en) | 1999-10-13 | 2004-11-30 | The Trustees Of Columbia University In The City Of New York | Petroleum reservoir simulation and characterization system and method |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US7369973B2 (en) | 2000-06-29 | 2008-05-06 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
US7043413B2 (en) | 2000-06-29 | 2006-05-09 | Object Reservoir, Inc. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
DZ3287A1 (fr) | 2000-10-04 | 2002-04-11 | Sofitech Nv | Methodologie d'optimisation de la production pour reservoirs de melange multicouches au moyen de donnees de performances pour reservoirs de melange et d'informations diagraphiques de production |
FR2818742B1 (fr) | 2000-12-22 | 2003-02-14 | Inst Francais Du Petrole | Methode pour former un module a reseaux neuronaux optimise, destine a simuler le mode d'ecoulement d'une veine de fluides polyphasiques |
FR2823877B1 (fr) | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol |
US20040230404A1 (en) * | 2002-08-19 | 2004-11-18 | Messmer Richard Paul | System and method for optimizing simulation of a discrete event process using business system data |
US7835893B2 (en) | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US7539625B2 (en) | 2004-03-17 | 2009-05-26 | Schlumberger Technology Corporation | Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies |
CA2538577C (en) * | 2003-09-30 | 2010-08-03 | Exxonmobil Upstream Research Company | Characterizing connectivity in reservoir models using paths of least resistance |
US7725302B2 (en) | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
CN1898675A (zh) * | 2004-01-30 | 2007-01-17 | 埃克森美孚上游研究公司 | 储层模型建立方法 |
US7783462B2 (en) | 2004-01-30 | 2010-08-24 | Exxonmobil Upstream Research Co. | Reservoir evaluation methods |
US7114557B2 (en) | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
US7999695B2 (en) | 2004-03-03 | 2011-08-16 | Halliburton Energy Services, Inc. | Surface real-time processing of downhole data |
US7548873B2 (en) | 2004-03-17 | 2009-06-16 | Schlumberger Technology Corporation | Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software |
FR2874706B1 (fr) | 2004-08-30 | 2006-12-01 | Inst Francais Du Petrole | Methode de modelisation de la production d'un gisement petrolier |
US7225078B2 (en) | 2004-11-03 | 2007-05-29 | Halliburton Energy Services, Inc. | Method and system for predicting production of a well |
US7596480B2 (en) | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
US7277796B2 (en) | 2005-04-26 | 2007-10-02 | Schlumberger Technology Corporation | System and methods of characterizing a hydrocarbon reservoir |
MX2007014799A (es) | 2005-05-26 | 2008-02-19 | Exxonmobil Upstream Res Co | Un metodo rapido para analisis de conectividad de deposito utilizando un metodo de marcha rapida. |
FR2886740B1 (fr) | 2005-06-03 | 2007-09-28 | Inst Francais Du Petrole | Methode pour mettre a jour un modele geologique par des donnees sismiques et de production |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
FR2890453B1 (fr) | 2005-09-05 | 2007-10-19 | Inst Francais Du Petrole | Methode pour mettre a jour un modele geologique de reservoir a l'aide de donnees dynamiques |
US7369979B1 (en) | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
US7584081B2 (en) | 2005-11-21 | 2009-09-01 | Chevron U.S.A. Inc. | Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
CA2640725C (en) | 2006-01-31 | 2016-05-31 | Landmark Graphics Corporation | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US7805283B2 (en) | 2006-02-17 | 2010-09-28 | Schlumberger Technology Corporation | Method for history matching a simulation model using self organizing maps to generate regions in the simulation model |
EP1994488B1 (en) | 2006-03-02 | 2013-07-17 | ExxonMobil Upstream Research Company | Method for quantifying reservoir connectivity using fluid travel times |
US20070274155A1 (en) | 2006-05-25 | 2007-11-29 | Ikelle Luc T | Coding and Decoding: Seismic Data Modeling, Acquisition and Processing |
WO2008028122A2 (en) * | 2006-09-01 | 2008-03-06 | Chevron U.S.A. Inc. | History matching and forecasting in the production of hydrocarbons |
US9043188B2 (en) | 2006-09-01 | 2015-05-26 | Chevron U.S.A. Inc. | System and method for forecasting production from a hydrocarbon reservoir |
US7657494B2 (en) | 2006-09-20 | 2010-02-02 | Chevron U.S.A. Inc. | Method for forecasting the production of a petroleum reservoir utilizing genetic programming |
AU2007339997A1 (en) | 2006-12-28 | 2008-07-10 | Chevron U.S.A. Inc. | History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions |
FR2914434B1 (fr) | 2007-03-30 | 2009-05-22 | Inst Francais Du Petrole | Methode de calage d'historique d'un modele geologique par modification graduelle des proportions des facies lithologiques |
US8244509B2 (en) | 2007-08-01 | 2012-08-14 | Schlumberger Technology Corporation | Method for managing production from a hydrocarbon producing reservoir in real-time |
US8285532B2 (en) | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
US8793111B2 (en) * | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
US7966166B2 (en) | 2008-04-18 | 2011-06-21 | Schlumberger Technology Corp. | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
FR2935177B1 (fr) | 2008-08-19 | 2010-10-29 | Inst Francais Du Petrole | Methode de calage d'historique de reservoir petrolier au moyen de parametrisations locales |
US20100076740A1 (en) | 2008-09-08 | 2010-03-25 | Schlumberger Technology Corporation | System and method for well test design and interpretation |
FR2947345B1 (fr) | 2009-06-26 | 2011-07-15 | Inst Francais Du Petrole | Methode pour modifier des proportions de facies lors du calage d'historique d'un modele geologique |
FR2949586B1 (fr) | 2009-08-26 | 2011-09-23 | Inst Francais Du Petrole | Methode pour exploiter un reservoir petrolier a partir d'un calage d'historique optimise |
US9223042B2 (en) | 2009-09-25 | 2015-12-29 | Landmark Graphics Corporation | Systems and methods for the quantitative estimate of production-forecast uncertainty |
US8412501B2 (en) | 2010-06-16 | 2013-04-02 | Foroil | Production simulator for simulating a mature hydrocarbon field |
FR2966865B1 (fr) | 2010-10-28 | 2015-05-15 | IFP Energies Nouvelles | Procede d'exploitation d'un gisement petrolier a partir d'un calage d'historique des donnees de production et de donnees sismiques. |
US9747393B2 (en) * | 2011-02-09 | 2017-08-29 | Exxonmobil Upstream Research Company | Methods and systems for upscaling mechanical properties of geomaterials |
US10545260B2 (en) | 2011-04-15 | 2020-01-28 | Conocophillips Company | Updating geological facies models using the Ensemble Kalman filter |
-
2010
- 2010-11-15 US US13/513,816 patent/US9703006B2/en active Active
- 2010-11-15 CN CN201080063711.3A patent/CN102754105B/zh not_active Expired - Fee Related
- 2010-11-15 CA CA2783787A patent/CA2783787A1/en not_active Abandoned
- 2010-11-15 WO PCT/US2010/056725 patent/WO2011100009A1/en active Application Filing
- 2010-11-15 BR BR112012017278A patent/BR112012017278A2/pt not_active Application Discontinuation
- 2010-11-15 EP EP10845943.9A patent/EP2534606B1/en not_active Not-in-force
Also Published As
Publication number | Publication date |
---|---|
US20120253770A1 (en) | 2012-10-04 |
EP2534606A1 (en) | 2012-12-19 |
WO2011100009A1 (en) | 2011-08-18 |
EP2534606B1 (en) | 2019-02-27 |
US9703006B2 (en) | 2017-07-11 |
CN102754105A (zh) | 2012-10-24 |
EP2534606A4 (en) | 2017-12-13 |
CN102754105B (zh) | 2016-05-25 |
CA2783787A1 (en) | 2011-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112012017278A2 (pt) | método e sistema para criar modelos de simulação de ajuste de histórico | |
BR102015009550A8 (pt) | Método para otimizar a operação de um parque eólico | |
BR112017025555A2 (pt) | sistema e método para monitoramento em tempo real e estimativa de desempenho de produção de sistema de poço inteligente | |
WO2018224948A3 (en) | MEMORY PROTECTION FOR CONTROL DEVICE SECURITY | |
MX2017016783A (es) | Método para la detección de anomalías en un sistema de distribución de agua. | |
BR112016002946A2 (pt) | sistemas e métodos de calibragem de elementos computacionais integrados | |
BR112015026401A2 (pt) | controle de redes de fluxo | |
BR112016025340A2 (pt) | configurar fluxos de trabalho em um dispositivo host que operam em um sistema de controle do processo | |
PH12013000300B1 (en) | Method for determining and tuning process characteristic parameters using a simulation system | |
BR112016011902A2 (pt) | Método e sistema de controle de equipamento de perfuração de fundo de poço, e, meio de armazenamento legível por computador | |
BR112014030607A2 (pt) | métodos e aparelhos para controlar e/ou monitorar um atuador pneumático | |
BR112017009953B8 (pt) | Sistema de produção de energia e método para controle automatizado de um sistema de produção de energia | |
BR112017014039A2 (pt) | ?método para monitorar a razão de fluido oleofílico para fluido aquoso de um fluido de perfuração, e, sistema de monitoramento e controle de fluidos de perfuração?. | |
BR112014032101A2 (pt) | computador configurado para estimar um parâmetro de movimentos para o movimento de um objeto móvel, determinador paramétrico de movimento de um objeto, e método automatizado realizado por computador | |
BR102015013229B8 (pt) | Sistema de controle para um veículo agrícola e método para calibrar o alinhamento de uma saída do transportador de um veículo agrícola com um compartimento de armazenamento | |
BR112015032888A2 (pt) | sistemas e métodos para criar e implementar um agente ou sistema de inteligência artificial | |
GB2536560A (en) | Creating virtual production logging tool profiles for improved history matching | |
MX2016006825A (es) | Control de operaciones de pozos. | |
BR112017013140A2 (pt) | método implementado por computador e sistema de modelagem em mesoescala | |
MX2015007066A (es) | Control de perforacion con presion controlada. | |
BR112018012996A2 (pt) | ?método para modelagem de uma formação subterrânea, e, sistema de perfilagem? | |
BR112015005462A2 (pt) | aparelho e método para controlar a execução de uma tarefa de processo dentro de uma configuração de um sistema de controle de biorreator, e, meio de armazenamento acessível por máquina tangível | |
WO2015185696A3 (en) | Method of estimating well productivity along a section of a wellbore | |
BR112015021666A2 (pt) | Método implantado por computador para atualizar uma estimativa para uma propriedade de material de um volume e sistema de computador para atualizar uma estimativa para uma propriedade de material de um volume | |
BR112018067462A2 (pt) | sistema de controle e método de controle para sistema de ddr |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B09B | Patent application refused [chapter 9.2 patent gazette] | ||
B09B | Patent application refused [chapter 9.2 patent gazette] |
Free format text: MANTIDO O INDEFERIMENTO UMA VEZ QUE NAO FOI APRESENTADO RECURSO DENTRO DO PRAZO LEGAL |