BR112014018277B1 - Aparelho de previsão do tempo e método de previsão do tempo - Google Patents

Aparelho de previsão do tempo e método de previsão do tempo Download PDF

Info

Publication number
BR112014018277B1
BR112014018277B1 BR112014018277-9A BR112014018277A BR112014018277B1 BR 112014018277 B1 BR112014018277 B1 BR 112014018277B1 BR 112014018277 A BR112014018277 A BR 112014018277A BR 112014018277 B1 BR112014018277 B1 BR 112014018277B1
Authority
BR
Brazil
Prior art keywords
weather
observation
value
grid
time interval
Prior art date
Application number
BR112014018277-9A
Other languages
English (en)
Portuguese (pt)
Other versions
BR112014018277A2 (pt
Inventor
Fumihiko MIZUTANI
Ryuichi Muto
Atsushi Sakakibara
Daisuke Monoe
Aimi Kobayashi
Original Assignee
Chuden Cti Co., Ltd
Toshiba Infrastructure Systems & Solutions Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuden Cti Co., Ltd, Toshiba Infrastructure Systems & Solutions Corporation filed Critical Chuden Cti Co., Ltd
Publication of BR112014018277A2 publication Critical patent/BR112014018277A2/pt
Publication of BR112014018277B1 publication Critical patent/BR112014018277B1/pt

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01WMETEOROLOGY
    • G01W1/00Meteorology
    • G01W1/10Devices for predicting weather conditions
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Environmental Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Ecology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Operations Research (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Radar Systems Or Details Thereof (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Other Investigation Or Analysis Of Materials By Electrical Means (AREA)
BR112014018277-9A 2012-02-20 2013-02-19 Aparelho de previsão do tempo e método de previsão do tempo BR112014018277B1 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012-034367 2012-02-20
JP2012034367 2012-02-20
PCT/JP2013/054012 WO2013125527A1 (ja) 2012-02-20 2013-02-19 気象予測装置及び気象予測方法

Publications (2)

Publication Number Publication Date
BR112014018277A2 BR112014018277A2 (pt) 2018-05-22
BR112014018277B1 true BR112014018277B1 (pt) 2021-11-16

Family

ID=49005712

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112014018277-9A BR112014018277B1 (pt) 2012-02-20 2013-02-19 Aparelho de previsão do tempo e método de previsão do tempo

Country Status (7)

Country Link
US (1) US9645283B2 (enExample)
EP (1) EP2818899B1 (enExample)
JP (1) JP6034361B2 (enExample)
CN (1) CN104040378B (enExample)
BR (1) BR112014018277B1 (enExample)
IN (1) IN2014DN05828A (enExample)
WO (1) WO2013125527A1 (enExample)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106526710A (zh) * 2016-10-19 2017-03-22 陈文飞 一种雾霾预测方法及装置
JP6941484B2 (ja) * 2017-06-07 2021-09-29 大成建設株式会社 雨量予測装置
US11268973B2 (en) * 2018-03-16 2022-03-08 Texas Tech University System Space-to-time conversion technique using remotely sensed velocity fields
CN108256696B (zh) * 2018-03-16 2021-10-26 电子科技大学 一种结合状态预测和粒子群优化的组网雷达天线配置方法
US11009625B2 (en) 2019-03-27 2021-05-18 The Climate Corporation Generating and conveying comprehensive weather insights at fields for optimal agricultural decision making
CN110196215A (zh) * 2019-06-24 2019-09-03 四川长虹电器股份有限公司 花粉粉层浓度和种类实时监测系统及方法
CN111458769B (zh) * 2020-05-26 2021-05-28 南京大学 用于输电线路环境气象数据预测的方法及系统
WO2025243418A1 (ja) * 2024-05-22 2025-11-27 Ntt株式会社 制御装置、及び、制御方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3727762B2 (ja) 1997-09-30 2005-12-14 富士電機ホールディングス株式会社 コンピュータによる降雨予測方法及び降雨予測プログラムを記録したコンピュータ読み取り可能な記録媒体
JP3764287B2 (ja) * 1998-12-21 2006-04-05 富士電機ホールディングス株式会社 降雨予測補正方法、その装置、及び記録媒体
US6801856B2 (en) * 2001-10-19 2004-10-05 Mitsubishi Heavy Industries, Ltd. Atmosphere condition prediction method
US6850184B1 (en) * 2003-05-05 2005-02-01 Wsi Corporation Forecasted radar mosaics
CN100541169C (zh) * 2003-06-13 2009-09-16 三菱重工业株式会社 扩散物质的扩散状况预测方法及扩散状况预测系统
JP3851641B2 (ja) * 2004-06-14 2006-11-29 関西電力株式会社 降雨量予測方法及び降雨量予測プログラム
JP2007187478A (ja) * 2006-01-11 2007-07-26 Toshiba Corp 気象予測システム
JP4882469B2 (ja) * 2006-04-13 2012-02-22 富士通株式会社 気象予測プログラム、気象予測装置および気象予測方法
US20080097701A1 (en) * 2006-09-07 2008-04-24 Mcgill University Short term and long term forecasting systems with enhanced prediction accuracy

Also Published As

Publication number Publication date
US9645283B2 (en) 2017-05-09
JPWO2013125527A1 (ja) 2015-07-30
HK1201587A1 (en) 2015-09-04
EP2818899A4 (en) 2015-10-07
EP2818899A1 (en) 2014-12-31
EP2818899B1 (en) 2017-09-20
CN104040378A (zh) 2014-09-10
IN2014DN05828A (enExample) 2015-05-15
BR112014018277A2 (pt) 2018-05-22
US20140316704A1 (en) 2014-10-23
CN104040378B (zh) 2018-01-16
JP6034361B2 (ja) 2016-11-30
WO2013125527A1 (ja) 2013-08-29

Similar Documents

Publication Publication Date Title
BR112014018277B1 (pt) Aparelho de previsão do tempo e método de previsão do tempo
Sorg et al. The days of plenty might soon be over in glacierized Central Asian catchments
Feldmann et al. Spatial postprocessing of ensemble forecasts for temperature using nonhomogeneous Gaussian regression
Peña et al. Atmospheric stability and turbulence fluxes at Horns Rev—An intercomparison of sonic, bulk and WRF model data
Zhang et al. A modified monthly degree‐day model for evaluating glacier runoff changes in China. Part I: model development
US20130066569A1 (en) Power generation predicting apparatus and method thereof
Dorrestijn et al. Stochastic parameterization of convective area fractions with a multicloud model inferred from observational data
CN115795399A (zh) 一种多源遥感降水数据自适应融合方法和系统
Lee et al. 4DVAR Data Assimilation with the Regional Ocean Modeling System (ROMS): Impact on the water mass distributions in the Yellow Sea
Matthews et al. Conditioning temperature‐index model parameters on synoptic weather types for glacier melt simulations
Ducrocq et al. The water cycle in the Mediterranean
Kang et al. Use of GNSS-derived PWV for predicting the path of typhoon: case studies of Soulik and Kongrey in 2018
Givati et al. The advantage of using international multimodel ensemble for seasonal precipitation forecast over Israel
Lengfeld et al. Observing local-scale variability of near-surface temperature and humidity using a wireless sensor network
Contini et al. Accuracy of measurements of turbulent phenomena in the surface layer with an ultrasonic anemometer
Hamzehpour et al. Investigation of soil salinity to distinguish boundary line between saline and agricultural lands in Bonab Plain, southeast Urmia Lake, Iran
Zafor et al. Analysis of rainfall trends and variability at Sylhet region in Bangladesh
Raj Adhikari et al. Climate change scenarios and its impact on water resources of Langtang Khola Basin, Nepal
Zhang et al. Predicting Extreme Climate In The Yellow River Delta Region Based On Statistical Downscaling And Decision Tree Model
DE SILVA et al. The impact of data assimilation and atmospheric forcing data on predicting short-term sea ice distribution along the Northern sea route
Solberg et al. A multi-sensor multitemporal algorithm for snow cover extent retrieval from optical and passive microwave data
Zeri et al. Contribution of coherent structures to the buoyancy heat flux under different conditions of stationarity over Amazonian forest sites
HK1201587B (en) Meteorological forecasting device and meteorological forecasting method
Kim et al. Characteristics of the Derived Energy Dissipation Rate using the 1-Hz Aircraft Quick Access Recorder (QAR) Data
Filipiak-Kowszyk et al. Accuracy analysis of determination the vertical displacements in unstable reference system

Legal Events

Date Code Title Description
B25A Requested transfer of rights approved

Owner name: CHUDEN CTI CO., LTD (JP) ; TOSHIBA INFRASTRUCTURE

B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 19/02/2013, OBSERVADAS AS CONDICOES LEGAIS.

B25A Requested transfer of rights approved

Owner name: CHUDEN CTI CO., LTD (JP) ; KABUSHIKI KAISHA TOSHIBA (JP)