BR112013022954A2 - método para a operação de uma instalação de automação de potência e instalação de automação de potência - Google Patents
método para a operação de uma instalação de automação de potência e instalação de automação de potênciaInfo
- Publication number
- BR112013022954A2 BR112013022954A2 BR112013022954A BR112013022954A BR112013022954A2 BR 112013022954 A2 BR112013022954 A2 BR 112013022954A2 BR 112013022954 A BR112013022954 A BR 112013022954A BR 112013022954 A BR112013022954 A BR 112013022954A BR 112013022954 A2 BR112013022954 A2 BR 112013022954A2
- Authority
- BR
- Brazil
- Prior art keywords
- power automation
- automation installation
- operating
- installation
- power
- Prior art date
Links
- 238000009434 installation Methods 0.000 title 2
- 238000000034 method Methods 0.000 title 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J4/00—Circuit arrangements for mains or distribution networks not specified as ac or dc
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L67/125—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41845—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by system universality, reconfigurability, modularity
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/18—Network protocols supporting networked applications, e.g. including control of end-device applications over a network
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Computing Systems (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Power Sources (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2011/053524 WO2012119648A1 (de) | 2011-03-09 | 2011-03-09 | Energieautomatisierungsanlage und verfahren zum betreiben einer energieautomatisierungsanlage |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112013022954A2 true BR112013022954A2 (pt) | 2016-12-06 |
BR112013022954B1 BR112013022954B1 (pt) | 2021-10-19 |
Family
ID=44625473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112013022954-3A BR112013022954B1 (pt) | 2011-03-09 | 2011-03-09 | Método para a operação de uma instalação de automação de energia e instalação de automação de energia |
Country Status (6)
Country | Link |
---|---|
US (1) | US20140142777A1 (pt) |
EP (1) | EP2684335B1 (pt) |
CN (1) | CN103477607B (pt) |
BR (1) | BR112013022954B1 (pt) |
RU (1) | RU2013145091A (pt) |
WO (1) | WO2012119648A1 (pt) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5985198B2 (ja) * | 2012-02-10 | 2016-09-06 | 株式会社東芝 | 変電所自動化システム及び端末の自動認識方法 |
DE102014206946A1 (de) * | 2014-04-10 | 2015-10-29 | Siemens Aktiengesellschaft | Verfahren zum Übertragen von Nachrichten in einem Energieautomatisierungs-Netzwerk, Energieautomatisierungskomponente und Umspannstation |
US9471137B2 (en) * | 2014-08-11 | 2016-10-18 | International Business Machines Corporation | Managing power savings in a high availability system at a redundant component level of granularity |
CN105281874B (zh) * | 2015-11-26 | 2018-05-29 | 国家电网公司 | 一种用于变电站二次在线监测的lz进化无损压缩方法 |
CN105462817A (zh) * | 2015-12-22 | 2016-04-06 | 安徽万恩沼气科技有限公司 | 一种规模化大型沼气工程分散与集中调控装置 |
EP3255511B1 (en) * | 2016-06-10 | 2021-03-31 | Sebastian Kummer | Method for planning or operating a facility |
CN107065813A (zh) * | 2017-06-13 | 2017-08-18 | 苏州弘铭检测科技有限公司 | 一种车间设备数据监控系统及方法 |
DE102017122283B3 (de) | 2017-09-26 | 2018-09-20 | EnBW Energie Baden-Württemberg AG | Überwachung eines Energieparameters in einer Verteilstation |
US11218360B2 (en) * | 2019-12-09 | 2022-01-04 | Quest Automated Services, LLC | Automation system with edge computing |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7039821B1 (en) * | 1998-12-31 | 2006-05-02 | Potega Patrick H | Hardware for configuring and delivering power |
US6901316B1 (en) * | 2000-09-28 | 2005-05-31 | Rockwell Automation Technologies, Inc. | Electrical control system configuration method and apparatus |
FR2815494B1 (fr) * | 2000-10-12 | 2003-01-10 | Schneider Automation S A | Methode de configuration d'un module d'automatisme sur un reseau tcp/ip |
DE102004020577A1 (de) * | 2004-04-27 | 2005-11-24 | Siemens Ag | Elektrisches Feldgerät für die Prozessautomatisierung |
US8621117B2 (en) * | 2004-11-30 | 2013-12-31 | Abb Research Ltd. | Intelligent configuration system for power distribution feeder reclosers and switches |
WO2008011618A2 (en) * | 2006-07-21 | 2008-01-24 | Schweitzer Engineering Laboratories, Inc. | A method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network |
US7693607B2 (en) * | 2006-09-07 | 2010-04-06 | General Electric Company | Protection and control system for electric power networks with signal and command interfaces at the primary equipment |
WO2008148418A1 (de) | 2007-06-07 | 2008-12-11 | Siemens Aktiengesellschaft | Verfahren zum betreiben einer anordnung mit zumindest einer energieverteileinrichtung |
ATE512393T1 (de) * | 2007-10-12 | 2011-06-15 | Siemens Ag | Verfahren zum konfigurieren einer anordnung zum schützen, steuern oder überwachen einer elektrischen schalt- oder energieversorgungsanlage |
US9917436B2 (en) * | 2007-10-30 | 2018-03-13 | General Electric Company | System and method for control of power distribution |
EP2359571B1 (de) | 2008-09-26 | 2016-11-02 | Siemens Aktiengesellschaft | Anordnung mit einem leitstellengerät und einer damit in verbindung stehenden anlagenstation sowie verfahren zu deren betrieb |
US20100138066A1 (en) * | 2008-11-14 | 2010-06-03 | Thinkeco Power Inc. | System and method of democratizing power to create a meta-exchange |
CN102460335B (zh) * | 2009-04-09 | 2015-07-01 | 智能能源解决方案有限责任公司 | 用于能源消耗管理的系统和方法 |
BR112013002068A2 (pt) * | 2010-07-27 | 2016-05-24 | Siemens Ag | configuração dos links de comunicação de dispositivos de campo na instalação de automação energética |
-
2011
- 2011-03-09 US US14/003,960 patent/US20140142777A1/en not_active Abandoned
- 2011-03-09 RU RU2013145091/08A patent/RU2013145091A/ru unknown
- 2011-03-09 WO PCT/EP2011/053524 patent/WO2012119648A1/de active Application Filing
- 2011-03-09 BR BR112013022954-3A patent/BR112013022954B1/pt active IP Right Grant
- 2011-03-09 EP EP11709365.8A patent/EP2684335B1/de active Active
- 2011-03-09 CN CN201180069831.9A patent/CN103477607B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
EP2684335A1 (de) | 2014-01-15 |
CN103477607A (zh) | 2013-12-25 |
BR112013022954B1 (pt) | 2021-10-19 |
US20140142777A1 (en) | 2014-05-22 |
WO2012119648A1 (de) | 2012-09-13 |
EP2684335B1 (de) | 2018-04-25 |
RU2013145091A (ru) | 2015-04-20 |
CN103477607B (zh) | 2017-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112014005261A2 (pt) | método para controlar uma instalação combinada | |
BR112013022954A2 (pt) | método para a operação de uma instalação de automação de potência e instalação de automação de potência | |
BR112014015243A2 (pt) | receptáculo de uma instalção de energia eólica, instalação de energia eólica, e, método de construção de uma instalação de energia eólica | |
CO6950446A2 (es) | Mecanismo y método de sellado para empalme de cable de bajada | |
BR112013033901A2 (pt) | método para obter parâmetros operacionais de uma central elétrica, e sistema para obter parâmetros operacionais de uma central elétrica | |
BR112013023811A2 (pt) | método e aparelho para gerenciar ativamente consumo de potência elétrica fornecida por uma ou mais concessionárias de energia elétrica | |
BR112013028971A2 (pt) | fundação offshoer para instalações de energia eólica | |
BR112014022660A2 (pt) | método para executar uma operação de abandono de um poço | |
BR112014001119A2 (pt) | método para monitorar a condição de um objeto | |
BR112013031918A2 (pt) | trem de força para um veículo e método para controlar um trem de força | |
ZA201402001B (en) | Pc power monitoring | |
BR112014004885A2 (pt) | método para operar uma instalação de energia eólica, instalação de energia eólica | |
BR112014022808A2 (pt) | Método para controlar uma turbina de vento, e, turbina de vento | |
BR112013011924A2 (pt) | método para diminuir a corrosão por fluência | |
DK2405134T3 (da) | Drejningsmomentstyringsfremgangsmåde for generator | |
BR112014002841A2 (pt) | uma disposição de acionamento para uma turbina de vento | |
BR112013030423A2 (pt) | método para produção de biocoque | |
BR112013031815A2 (pt) | trem de força para um veículo e método para controlar um trem de força | |
BR112012005607A2 (pt) | método para controle de uma caixa de marchas | |
BR112013008875A2 (pt) | método e instalação para produção de tiras de aço a quente com eficiência no rendimento e em energia | |
BR112013011941A2 (pt) | método e sistema para reduzir eletroliticamente uma matéria - prima sólida | |
BR112013012370A2 (pt) | método para operar uma instalação de energia eólica, e, instalação de energia eólica | |
BR112012021070A2 (pt) | método para produção de cadaverina | |
EP2763301A4 (en) | METHOD FOR CONTROLLING POWER CONVERTER | |
BR112014014285A2 (pt) | composição, e, método para fabricar uma composição |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B15K | Others concerning applications: alteration of classification |
Free format text: AS CLASSIFICACOES ANTERIORES ERAM: H04L 29/08 , G05B 19/418 Ipc: G05B 19/418 (2006.01), H02J 4/00 (2006.01), H04L 2 |
|
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 09/03/2011, OBSERVADAS AS CONDICOES LEGAIS. PATENTE CONCEDIDA CONFORME ADI 5.529/DF, QUE DETERMINA A ALTERACAO DO PRAZO DE CONCESSAO. |