BR112013033901A2 - método para obter parâmetros operacionais de uma central elétrica, e sistema para obter parâmetros operacionais de uma central elétrica - Google Patents
método para obter parâmetros operacionais de uma central elétrica, e sistema para obter parâmetros operacionais de uma central elétricaInfo
- Publication number
- BR112013033901A2 BR112013033901A2 BR112013033901A BR112013033901A BR112013033901A2 BR 112013033901 A2 BR112013033901 A2 BR 112013033901A2 BR 112013033901 A BR112013033901 A BR 112013033901A BR 112013033901 A BR112013033901 A BR 112013033901A BR 112013033901 A2 BR112013033901 A2 BR 112013033901A2
- Authority
- BR
- Brazil
- Prior art keywords
- operating parameters
- power station
- obtaining operating
- obtaining
- station
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02K—JET-PROPULSION PLANTS
- F02K1/00—Plants characterised by the form or arrangement of the jet pipe or nozzle; Jet pipes or nozzles peculiar thereto
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0286—Modifications to the monitored process, e.g. stopping operation or adapting control
- G05B23/0294—Optimizing process, e.g. process efficiency, product quality
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/23—Clustering techniques
- G06F18/232—Non-hierarchical techniques
- G06F18/2321—Non-hierarchical techniques using statistics or function optimisation, e.g. modelling of probability density functions
- G06F18/23213—Non-hierarchical techniques using statistics or function optimisation, e.g. modelling of probability density functions with fixed number of clusters, e.g. K-means clustering
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/041—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0267—Fault communication, e.g. human machine interface [HMI]
- G05B23/0272—Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Economics (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Automation & Control Theory (AREA)
- Game Theory and Decision Science (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Probability & Statistics with Applications (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Life Sciences & Earth Sciences (AREA)
- Bioinformatics & Computational Biology (AREA)
- Evolutionary Computation (AREA)
- Evolutionary Biology (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/177,324 US9200591B2 (en) | 2011-07-06 | 2011-07-06 | Automatic identification of operating parameters for power plants |
PCT/US2012/044115 WO2013006302A2 (en) | 2011-07-06 | 2012-06-26 | Automatic identification of operating parameters for power plants |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112013033901A2 true BR112013033901A2 (pt) | 2017-02-14 |
Family
ID=47437626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112013033901A BR112013033901A2 (pt) | 2011-07-06 | 2012-06-26 | método para obter parâmetros operacionais de uma central elétrica, e sistema para obter parâmetros operacionais de uma central elétrica |
Country Status (6)
Country | Link |
---|---|
US (1) | US9200591B2 (pt) |
EP (1) | EP2729891B1 (pt) |
CN (1) | CN103635910B (pt) |
AU (1) | AU2012279410B2 (pt) |
BR (1) | BR112013033901A2 (pt) |
WO (1) | WO2013006302A2 (pt) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI514167B (zh) * | 2013-08-13 | 2015-12-21 | Realtek Semiconductor Corp | 參數產生裝置與方法 |
US10296843B2 (en) * | 2014-09-24 | 2019-05-21 | C3 Iot, Inc. | Systems and methods for utilizing machine learning to identify non-technical loss |
US10831162B2 (en) * | 2016-06-28 | 2020-11-10 | General Electric Company | Systems and methods for providing an integrated power plant advisor |
US10953995B2 (en) | 2017-06-30 | 2021-03-23 | General Electric Company | Propulsion system for an aircraft |
US10696416B2 (en) | 2017-06-30 | 2020-06-30 | General Electric Company | Propulsion system for an aircraft |
US10738706B2 (en) | 2017-06-30 | 2020-08-11 | General Electric Company | Propulsion system for an aircraft |
US10569759B2 (en) | 2017-06-30 | 2020-02-25 | General Electric Company | Propulsion system for an aircraft |
CN109657891B (zh) * | 2018-09-18 | 2022-11-25 | 深圳供电局有限公司 | 一种基于自适应k-means++算法的负荷特性分析方法 |
US11435734B2 (en) * | 2019-03-19 | 2022-09-06 | King Fahd University Of Petroleum And Minerals | Apparatus and method for failure detection |
US11525375B2 (en) | 2020-04-09 | 2022-12-13 | General Electric Company | Modeling and control of gas cycle power plant operation with variant control profile |
CN113554247A (zh) * | 2020-04-23 | 2021-10-26 | 北京京东乾石科技有限公司 | 自动导引运输车运行状况评估方法、装置和系统 |
CN112257278A (zh) * | 2020-10-28 | 2021-01-22 | 华润电力技术研究院有限公司 | 机组耗差计算模型获取方法、耗差获取方法及系统 |
CN113027826B (zh) * | 2021-02-26 | 2023-11-10 | 北京京能高安屯燃气热电有限责任公司 | 燃气轮机压气机清洁方法及装置 |
CN113065766B (zh) * | 2021-04-01 | 2024-05-14 | 中核核电运行管理有限公司 | 一种基于历史数据挖掘分析的汽机运行工况寻优方法 |
CN113220753B (zh) * | 2021-05-10 | 2023-01-20 | 西安热工研究院有限公司 | 一种基于电厂历史数据自动生成运行参数目标曲线的方法 |
CN113219923B (zh) * | 2021-05-11 | 2022-05-13 | 山东鲁能控制工程有限公司 | 一种火电机组智能分散控制方法及系统 |
CN113359435B (zh) * | 2021-05-12 | 2022-08-12 | 东南大学 | 用于火电机组动态工况数据的修正方法 |
CN114004301B (zh) * | 2021-11-03 | 2022-07-19 | 江苏博泰环保工程有限公司 | 基于聚类分析的灰渣输送系统与控制方法 |
CN114764597A (zh) * | 2022-04-18 | 2022-07-19 | 临界面(上海)智能科技有限公司 | 一种基于分层聚类的电驱动系统可靠性工况提取方法 |
CN115455866B (zh) * | 2022-10-31 | 2023-02-24 | 北京寄云鼎城科技有限公司 | 稳定工况识别方法及系统、设备及介质 |
CN115828130A (zh) * | 2023-02-14 | 2023-03-21 | 中国石油天然气股份有限公司 | 基于聚类算法的多参数优势水流通道自动识别方法及系统 |
CN116402411B (zh) * | 2023-06-09 | 2024-05-14 | 济南作为科技有限公司 | 耗差分析方法、装置、设备及存储介质 |
CN116774749B (zh) * | 2023-08-25 | 2023-11-03 | 北京拓普尔通信技术有限公司 | 智能控温的电力柜 |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5311562A (en) | 1992-12-01 | 1994-05-10 | Westinghouse Electric Corp. | Plant maintenance with predictive diagnostics |
US6898540B2 (en) | 2002-11-12 | 2005-05-24 | General Electric Company | System and method for displaying real-time turbine corrected output and heat rate |
US7689323B2 (en) | 2003-05-13 | 2010-03-30 | Siemens Aktiengesellschaft | Automatic generation control of a power distribution system |
US7398652B1 (en) * | 2004-11-10 | 2008-07-15 | Pegasus Technologies, Inc. | System for optimizing a combustion heating process |
US7584024B2 (en) * | 2005-02-08 | 2009-09-01 | Pegasus Technologies, Inc. | Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques |
EP1818746A1 (en) * | 2006-02-10 | 2007-08-15 | ALSTOM Technology Ltd | Method of condition monitoring |
CA2679632C (en) * | 2007-03-12 | 2018-01-09 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
US20090125155A1 (en) * | 2007-11-08 | 2009-05-14 | Thomas Hill | Method and System for Optimizing Industrial Furnaces (Boilers) through the Application of Recursive Partitioning (Decision Tree) and Similar Algorithms Applied to Historical Operational and Performance Data |
CN101981522B (zh) | 2008-04-09 | 2013-02-13 | 三菱电机株式会社 | 图形用户界面装置 |
US8577822B2 (en) * | 2008-09-25 | 2013-11-05 | University Of Iowa Research Foundation | Data-driven approach to modeling sensors wherein optimal time delays are determined for a first set of predictors and stored as a second set of predictors |
US20120283885A1 (en) * | 2011-05-04 | 2012-11-08 | General Electric Company | Automated system and method for implementing statistical comparison of power plant operations |
-
2011
- 2011-07-06 US US13/177,324 patent/US9200591B2/en active Active
-
2012
- 2012-06-26 EP EP12807364.0A patent/EP2729891B1/en active Active
- 2012-06-26 AU AU2012279410A patent/AU2012279410B2/en active Active
- 2012-06-26 BR BR112013033901A patent/BR112013033901A2/pt not_active IP Right Cessation
- 2012-06-26 CN CN201280033190.6A patent/CN103635910B/zh active Active
- 2012-06-26 WO PCT/US2012/044115 patent/WO2013006302A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
AU2012279410A1 (en) | 2014-02-20 |
EP2729891B1 (en) | 2018-08-08 |
CN103635910B (zh) | 2017-06-13 |
AU2012279410B2 (en) | 2017-04-06 |
US20130013255A1 (en) | 2013-01-10 |
WO2013006302A3 (en) | 2013-04-25 |
WO2013006302A2 (en) | 2013-01-10 |
CN103635910A (zh) | 2014-03-12 |
EP2729891A4 (en) | 2016-06-29 |
US9200591B2 (en) | 2015-12-01 |
EP2729891A2 (en) | 2014-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112013033901A2 (pt) | método para obter parâmetros operacionais de uma central elétrica, e sistema para obter parâmetros operacionais de uma central elétrica | |
BR112014014583A2 (pt) | método para produção de uma ração animal, e, ração animal | |
BR112014004195A2 (pt) | sistema de conversão de energia, e, método de operação de um sistema de conversão de energia | |
BR112014015562A8 (pt) | aerofólio e método para fabricar um aerofólio | |
FR2981910B1 (fr) | Atterrisseur, aeronef et procede | |
BR112013021333A2 (pt) | sistema médico e método para um procedimento médico | |
BR112013030972A2 (pt) | sistema e método para mensagens instantâneas seguras | |
BR112013019637A2 (pt) | sistemas, aparelho e métodos para implantação de implantes | |
BR112014008975A2 (pt) | método e sistema para monitorar o estado de caixas de engrenagem | |
BR112014003218A2 (pt) | sistema de resfriamento de líquido para um aparelho de conversão de potência, aparelho de conversão de potência e método de resfriar um aparelho de conversão de potência | |
BR112013033167A2 (pt) | método, e, aparelho | |
EP2695448A4 (en) | METHOD FOR IMPROVING U-ASPD FOR LOW-POWER WIFI | |
BR112013011423A2 (pt) | sistema e método para transmissão de múltiplas entradas e múltiplas saídas de enlace ascendente | |
BR112014032109A2 (pt) | dispositivo e método para monitorar uma rede elétrica, e, sistema de rede elétrica | |
BR112012032023A2 (pt) | sistema de monitoramento, método para monitoramento e método para controlar o monitoramento | |
BR112013030423A2 (pt) | método para produção de biocoque | |
BR112014007864A2 (pt) | sistema, e método | |
BR112012029993A2 (pt) | correia e sistema de grelha, e método para formar correia de grelha | |
BR112013021775A2 (pt) | bactéria corineforme, e, método para produzir um l-aminoácido | |
BR112014015717A8 (pt) | sistema, e método | |
BR112013003535A2 (pt) | método para formar espuma | |
BR112014002754A2 (pt) | método, sistema e aparelho para gerenciar uma partida de futebol | |
BR112014012552A2 (pt) | aparelho, e método | |
BR112014011709A2 (pt) | método, e aparelho | |
BR112014005875A2 (pt) | método, sistema e cápsula para preparar uma bebida |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 9A ANUIDADE. |
|
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2625 DE 27-04-2021 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |