BR112012002167B8 - sistemas de monitoramento e de transmissão de energia elétrica, e, método para monitorar parâmetros de um sistema de cabo de um sistema de transmissão de energia elétrica - Google Patents
sistemas de monitoramento e de transmissão de energia elétrica, e, método para monitorar parâmetros de um sistema de cabo de um sistema de transmissão de energia elétrica Download PDFInfo
- Publication number
- BR112012002167B8 BR112012002167B8 BR112012002167A BR112012002167A BR112012002167B8 BR 112012002167 B8 BR112012002167 B8 BR 112012002167B8 BR 112012002167 A BR112012002167 A BR 112012002167A BR 112012002167 A BR112012002167 A BR 112012002167A BR 112012002167 B8 BR112012002167 B8 BR 112012002167B8
- Authority
- BR
- Brazil
- Prior art keywords
- electric power
- monitoring
- monitoring nodes
- output data
- power transmission
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
- H02H7/263—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of measured values
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q9/00—Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/083—Locating faults in cables, transmission lines, or networks according to type of conductors in cables, e.g. underground
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0061—Details of emergency protective circuit arrangements concerning transmission of signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/30—Arrangements in telecontrol or telemetry systems using a wired architecture
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/40—Arrangements in telecontrol or telemetry systems using a wireless architecture
- H04Q2209/43—Arrangements in telecontrol or telemetry systems using a wireless architecture using wireless personal area networks [WPAN], e.g. 802.15, 802.15.1, 802.15.4, Bluetooth or ZigBee
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/80—Arrangements in the sub-station, i.e. sensing device
- H04Q2209/82—Arrangements in the sub-station, i.e. sensing device where the sensing device takes the initiative of sending data
- H04Q2209/826—Arrangements in the sub-station, i.e. sensing device where the sensing device takes the initiative of sending data where the data is sent periodically
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/80—Arrangements in the sub-station, i.e. sensing device
- H04Q2209/84—Measuring functions
- H04Q2209/845—Measuring functions where the measuring is synchronized between sensing devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/80—Arrangements in the sub-station, i.e. sensing device
- H04Q2209/88—Providing power supply at the sub-station
- H04Q2209/883—Providing power supply at the sub-station where the sensing device enters an active or inactive mode
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Alarm Systems (AREA)
Abstract
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2009/005520 WO2011012146A1 (en) | 2009-07-30 | 2009-07-30 | Method and system for monitoring a cable system of an electric power transmission system |
Publications (3)
Publication Number | Publication Date |
---|---|
BR112012002167A2 BR112012002167A2 (pt) | 2016-05-31 |
BR112012002167B1 BR112012002167B1 (pt) | 2019-12-10 |
BR112012002167B8 true BR112012002167B8 (pt) | 2020-03-17 |
Family
ID=41262293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112012002167A BR112012002167B8 (pt) | 2009-07-30 | 2009-07-30 | sistemas de monitoramento e de transmissão de energia elétrica, e, método para monitorar parâmetros de um sistema de cabo de um sistema de transmissão de energia elétrica |
Country Status (9)
Country | Link |
---|---|
US (1) | US9276399B2 (pt) |
EP (1) | EP2460023B1 (pt) |
CN (1) | CN102498408B (pt) |
AR (1) | AR077779A1 (pt) |
AU (1) | AU2009350577B2 (pt) |
BR (1) | BR112012002167B8 (pt) |
CA (1) | CA2769237C (pt) |
ES (1) | ES2440699T3 (pt) |
WO (1) | WO2011012146A1 (pt) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2460263B1 (en) | 2009-07-30 | 2018-11-28 | Prysmian S.p.A. | Apparatus and method for generating electric energy in an electric power transmission system |
BR112013001882B8 (pt) | 2010-07-26 | 2021-11-23 | Prysmian Spa | Aparelho e método para monitorar um sistema de transmissão de energia elétrica através de análise de descargas parciais, e, sistema de transmissão de energia elétrica |
US20140361785A1 (en) * | 2012-01-31 | 2014-12-11 | Damir Radan | Fault Detection in Subsea Power Cables |
CN103777578B (zh) * | 2012-10-19 | 2016-08-31 | 李成 | 带自检与热插拔功能的电力隧道电缆监控方法 |
CN103336227B (zh) * | 2013-05-28 | 2016-01-20 | 国家电网公司 | 新型电力电缆局部放电在线监测系统 |
CN103308830B (zh) * | 2013-05-28 | 2016-08-17 | 国家电网公司 | 电力电缆局部放电在线监测系统 |
JP5871339B2 (ja) * | 2014-01-21 | 2016-03-01 | 株式会社ジェイ・パワーシステムズ | 電力ケーブル |
CN104267301B (zh) * | 2014-10-27 | 2015-12-30 | 江苏省电力公司常州供电公司 | 电力用户用电信息采集控制系统 |
US11060754B2 (en) | 2015-06-05 | 2021-07-13 | Novinium, Inc. | Ventilation system for manhole vault |
US10962253B2 (en) | 2015-06-05 | 2021-03-30 | Novinium, Inc. | Systems for circulating air inside a manhole vault |
CN104991149A (zh) * | 2015-08-06 | 2015-10-21 | 陕西古源电力科技有限公司 | 一种单芯电力电缆在线状态监测装置及方法 |
WO2017115163A1 (en) * | 2015-12-31 | 2017-07-06 | Abb Schweiz Ag | A method and an apparatus for communicating a condition of a power line |
CA3019528C (en) | 2016-03-31 | 2022-10-11 | Novinium, Inc. | Smart system for manhole event suppression system |
GB2552143B (en) * | 2016-07-06 | 2020-08-05 | Viper Innovations Ltd | Test Arrangement |
FR3070496B1 (fr) * | 2017-08-28 | 2019-09-13 | Enedis | Identification d'anomalie dans un reseau de distribution electrique |
EP3850382A1 (en) * | 2018-09-10 | 2021-07-21 | 3M Innovative Properties Company | Method and system for monitoring a health of a power cable accessory based on machine learning |
CN113167829B (zh) * | 2019-02-04 | 2024-05-17 | 住友电气工业株式会社 | 通信装置 |
JP7360646B2 (ja) * | 2019-04-26 | 2023-10-13 | インフォメティス株式会社 | 計測装置、計測装置制御方法および計測装置制御プログラム |
CN111983382A (zh) * | 2020-08-11 | 2020-11-24 | 广州番禺电缆集团有限公司 | 一种基于多节点的智能电缆监控平台及方法 |
CN114034968B (zh) * | 2021-10-20 | 2023-08-08 | 广州番禺电缆集团有限公司 | 基于分布式节点的电缆数据检测方法和装置 |
CN115421003B (zh) * | 2022-09-22 | 2023-09-22 | 国网山东省电力公司武城县供电公司 | 一种配电网故障监测系统与监测方法 |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3851302A (en) * | 1973-03-09 | 1974-11-26 | Seismograph Service Corp | Method and apparatus for seismic data acquisition by sequential sampling of data |
DE2533382C2 (de) | 1975-07-25 | 1980-07-03 | Siemens Ag, 1000 Berlin Und 8000 Muenchen | Verfahren und Einrichtung zur Übertragung von Meßwerten in einem Brandmeldesystem |
US4413259A (en) | 1981-09-18 | 1983-11-01 | Raychem Corporation | Cascade monitoring apparatus |
CH664637A5 (de) | 1982-04-28 | 1988-03-15 | Cerberus Ag | Verfahren zur uebertragung von messwerten in einem ueberwachungssystem. |
US5434811A (en) * | 1987-11-19 | 1995-07-18 | National Semiconductor Corporation | Non-destructive read ferroelectric based memory circuit |
US5039980A (en) * | 1990-01-26 | 1991-08-13 | Honeywell Inc. | Multi-nodal communication network with coordinated responsibility for global functions by the nodes |
JPH07169627A (ja) | 1993-12-15 | 1995-07-04 | Mitsubishi Electric Corp | 非接触型トランス |
WO1999058992A2 (en) * | 1998-05-07 | 1999-11-18 | Dsc Communications A/S | A power cable monitoring system |
DE19923983B4 (de) * | 1999-05-25 | 2005-03-17 | Siemens Ag | Verfahren und Anordnung zur Fern-Zugangssteuerung |
US7105952B2 (en) | 2003-10-03 | 2006-09-12 | Soft Switching Technologies Corporation | Distributed floating series active impendances for power transmission systems |
US7091854B1 (en) * | 2004-04-09 | 2006-08-15 | Miao George J | Multiple-input multiple-output wireless sensor networks communications |
US7633262B2 (en) | 2005-03-11 | 2009-12-15 | Lindsey Manufacturing Company | Power supply for underground and pad mounted power distribution systems |
US20080049700A1 (en) * | 2006-08-25 | 2008-02-28 | Shah Rahul C | Reduced power network association in a wireless sensor network |
KR100864512B1 (ko) * | 2007-02-08 | 2008-10-20 | 삼성전자주식회사 | 무선 센서 네트워크에서 존 스케쥴링을 이용하여 데이터를어그리게이션하기 위한 장치 및 그 방법 |
JP5038813B2 (ja) * | 2007-08-07 | 2012-10-03 | 株式会社東芝 | 無線センサ装置及び無線センサ装置の起動制御方法 |
CN101196550B (zh) | 2007-12-21 | 2012-01-11 | 赵瑞琳 | 电力电缆监测装置和应用其监测电力电缆状态的方法 |
CN201229389Y (zh) * | 2008-07-24 | 2009-04-29 | 福建省泉州电业局 | 电缆护层绝缘在线监测装置 |
US7902973B2 (en) * | 2008-11-17 | 2011-03-08 | Cisco Technology, Inc. | Alarm reordering to handle alarm storms in large networks |
EP2460263B1 (en) | 2009-07-30 | 2018-11-28 | Prysmian S.p.A. | Apparatus and method for generating electric energy in an electric power transmission system |
-
2009
- 2009-07-30 US US13/387,428 patent/US9276399B2/en active Active
- 2009-07-30 EP EP09777542.3A patent/EP2460023B1/en active Active
- 2009-07-30 BR BR112012002167A patent/BR112012002167B8/pt not_active IP Right Cessation
- 2009-07-30 AU AU2009350577A patent/AU2009350577B2/en active Active
- 2009-07-30 WO PCT/EP2009/005520 patent/WO2011012146A1/en active Application Filing
- 2009-07-30 ES ES09777542.3T patent/ES2440699T3/es active Active
- 2009-07-30 CN CN200980161458.2A patent/CN102498408B/zh not_active Expired - Fee Related
- 2009-07-30 CA CA2769237A patent/CA2769237C/en active Active
-
2010
- 2010-07-29 AR ARP100102746A patent/AR077779A1/es active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
ES2440699T3 (es) | 2014-01-30 |
CN102498408B (zh) | 2015-04-15 |
US9276399B2 (en) | 2016-03-01 |
BR112012002167B1 (pt) | 2019-12-10 |
CA2769237A1 (en) | 2011-02-03 |
AR077779A1 (es) | 2011-09-21 |
AU2009350577B2 (en) | 2015-06-18 |
BR112012002167A2 (pt) | 2016-05-31 |
EP2460023B1 (en) | 2013-11-06 |
AU2009350577A1 (en) | 2012-02-09 |
WO2011012146A1 (en) | 2011-02-03 |
CN102498408A (zh) | 2012-06-13 |
CA2769237C (en) | 2019-02-26 |
EP2460023A1 (en) | 2012-06-06 |
US20120188095A1 (en) | 2012-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112012002167B8 (pt) | sistemas de monitoramento e de transmissão de energia elétrica, e, método para monitorar parâmetros de um sistema de cabo de um sistema de transmissão de energia elétrica | |
WO2013189967A3 (de) | Netzplanerstellung und betriebsführung | |
GB201210677D0 (en) | Aircraft power systems and methods | |
WO2010135402A3 (en) | Systems and methods for dynamic power allocation | |
WO2013107782A3 (en) | Power converter circuit, power supply system and method | |
EP2315087A3 (en) | Method and apparatus for monitoring a power system | |
BR112013028102A2 (pt) | sistema e método para monitorar a hemodinâmica | |
BR112015025412A2 (pt) | sistema de geração de potência de múltiplos parques | |
WO2012076015A3 (en) | A method of operating a wind turbine as well as a system suitable therefore | |
CL2013000242A1 (es) | Maquina de explotacion minera, modulo de monitoreo y metodo para monitorizar la maquina de explotacion minera, donde la maquina comprende un monitor de potencia que detecta el consumo de potencia de la maquina durante un periodo de tiempo de seleccion, un sensor que mide la carga util de la maquina en dicho tiempo y un modulo de monitoreo para la comparacion de datos de consumo de potencia y de carga util para generar datos de eficiencia de la pala y la salida de los datos de eficiencia de la pala | |
GB201306075D0 (en) | Performance and power optimized computer system architectures and methods leveraging power optimized tree fabric interconnect | |
CL2012003147A1 (es) | Sistema para supervisar y visualizar parametros representativos en una zona geografica de supervision que comprende una pluralidad de conjunto de sensores desplegados en lugares de medicion, un ordenador que recibe la salida de dichos sensores, un modulo de calculo informatico, un software de integracion y de gestion de redes y una pluralidad de terminales de supervision; y metodo asociado | |
ATE547916T1 (de) | Abfolgesteuerungs-einrichtung | |
WO2012106515A3 (en) | Sponsored stories unit creation from organic activity stream | |
BR102012020586A8 (pt) | sistema de armazenamento e gerenciamento de energia (sage) | |
WO2012000514A3 (en) | System, method, and computer program product for utilizing a wind park as a variable power system stabilizer | |
WO2014003788A3 (en) | Prediction of available generator running time | |
GB201109897D0 (en) | A method for managing wind farms | |
BRPI1000028A2 (pt) | turbina de gerador eólico e método de inicialização do mesmo. | |
JP2014033604A5 (ja) | 電池システム及び電池システムの充放電状態変更方法 | |
WO2012163979A3 (en) | Assessment of power systems | |
EA201000684A1 (ru) | Система управления энергопотреблением многодвигательной уборочной машины | |
CL2015000788A1 (es) | Procedimiento para supervisar un ramal conductor que abarca varios conductores electricos, donde el ramal conductor esta preparado para producir energia electrica generada por un generador de una instalacion de energia eolica, dicho procedimiento comprende medir la temperatura de por lo menos dos de los conductores, comparar las temperaturas y determinar si dos temperaturas discrepan entre si; dispositivo; instalacion de energia eolica. | |
JP2012120165A5 (pt) | ||
EP2503735A4 (en) | SYSTEM, DEVICE AND METHOD FOR MANAGING MULTISERVICE NODES |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06I | Publication of requirement cancelled [chapter 6.9 patent gazette] |
Free format text: ANULADA A PUBLICACAO CODIGO 6.6.1 NA RPI NO 2507 DE 22/01/2019 POR TER SIDO INDEVIDA. |
|
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 10/12/2019, OBSERVADAS AS CONDICOES LEGAIS. (CO) 10 (DEZ) ANOS CONTADOS A PARTIR DE 10/12/2019, OBSERVADAS AS CONDICOES LEGAIS |
|
B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: REF. RPI 2553 DE 10/12/2019 QUANTO AO INVENTOR. |
|
B21F | Lapse acc. art. 78, item iv - on non-payment of the annual fees in time |
Free format text: REFERENTE A 13A ANUIDADE. |
|
B24J | Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12) |
Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2681 DE 24-05-2022 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |